ML102990150

From kanterella
Jump to navigation Jump to search
Cancelled - Notice of Meeting with (Tva), to Discuss Responses to the NRC Requests for Additional Information (Rals) for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis.
ML102990150
Person / Time
Site: Watts Bar, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/26/2010
From: Siva Lingam
Plant Licensing Branch II
To: Doug Broaddus
Plant Licensing Branch II
Lingam, S NRR/DORL 415-1564
References
Download: ML102990150 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 CANCELLED October 26, 2010 MEMORANDUM TO: Douglas A. Broaddus, Acting Chief Plant Licensing Branch 2-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation FROM: Siva P. Lingam, Project Manager Plant Licensing Branch 2-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

NOTICE OF FORTHCOMING MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA), SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2; WATTS BAR NUCLEAR PLANT, UNIT 1.

DATES & TIMES: Thursday, October 28, 2010 8:00 a.m. - 4:00 p.m. (Eastern Daylight Time)

LOCATION: U.S. Nuclear Regulatory Commission (NRC)

One White Flint North, Room 0-8B2 11555 Rockville Pike Rockville, Maryland 20852 PURPOSE: The purpose of this meeting is to discuss responses to the NRC requests for additional information (RAls) for Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors," dated November 19, 2008 (Agencywide Documents Access and Management System Accession No. ML083230054), and review the TVA analyses.

CATEGORY 1:* This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Members of the public who wish to attend this meeting are encouraged to telephone or e-mail the contact listed below.

CONTACT: Siva P. Lingam, DORUNRR 301-415-1564 Siva. Lingam@nrc.gov

  • Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002

CANCELLED D. Broaddus -2 TELECONFERENCE: Interested members of the public can participate in this call via a toll-free audio teleconference. Please call the meeting contact above by October 27, 2010, 4:00 p.m. Eastern Daylight Time, to get the telephone number and the pass code.

PARTICIPANTS: Participants from the NRC include members from the Office of Nuclear Reactor Regulation (NRR).

NRC TVA M. Scott, NRR R. Krich S. Bailey, NRR R.Cook J. Lehning, NRR K. Casey, et al.

S. Smith, I\JRR J. Lamb, NRR S. Lingam, NRR, et al.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting, or need a meeting notice, a transcript, or other information from a meeting in another format (e.g., Braille, large print),

please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this conference call and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket Nos. 50-327, 50-328, and 50-390

Enclosure:

Agenda cc w/encl: Distribution via Listserv

CANCELLED AGENDA FORTHCOMING NUCLEAR REGULATORY COMMISSION (NRC) MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA)

REGARDING GENERIC LETTER (Gl) 2004-02 RESPONSES FOR SEOUOYAH NUCLEAR PLANT, UNITS 1 AND 2 (SON), AND WATTS BAR NUCLEAR PLANT, UNIT 1 (WBN)

THURSDAY, OCTOBER 28,2010 8:00 A.M. - 4:00 P.M. (EASTERN DAYLIGHT TIME)

TOPIC 8:00 a.m. Introduction 8:15 a.m. Overview of GL 2004-02 Program NRC 8:30 a.m. Overview of Items Remaining to be Accomplished NRC 8:45 a.m. Review of TVA Water Level Calculations (SBLOCA Water Levels for WBN and SON Sump Strainers) NRCfTVA 10:00 a.m. Break/Opportunity for Public Comment 10:15a.m. Review of TVA Water Level Calculations (SBLOCA Water Levels for WBN and SON Sump Strainers) NRCfTVA 12:00 p.m. Lunch/Opportunity for Public Comment 1:00 p.m. Review of TVA Calculation (WBN Strainer Structural Integrity) NRCfTVA 2:30 p.m. Applicability of the Structural Integrity Calculation to SON/Plans for Insulation Remediation TVA/NRC 3:00 p.m. Break/Opportunity for Public Comment 3:15 p.m. Schedule for Final RAI Response Submittal/

Opportunity for Public Comment TVA/NRC 4:00 p.m. Adjourn Note: Time and order of topics are approximate and may change.

Enclosure

CANCELLED D. Broaddus -2 TELECONFERENCE: Interested members of the public can participate in this call via a toll-free audio teleconference. Please call the meeting contact above by October 27,2010,4:00 p.m. Eastern Daylight Time, to get the telephone number and the pass code.

PARTICIPANTS: Participants from the NRC include members from the Office of Nuclear Reactor Regulation (NRR).

NRC TVA M. Scott, NRR R. Krich S. Bailey, NRR R. Cook J. Lehning, NRR K. Casey, et al.

S. Smith, NRR J. Lamb, NRR S. Lingam, NRR, et al.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting, or need a meeting notice, a transcript, or other information from a meeting in another format (e.g., Braille, large print),

please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this conference call and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket Nos. 50-327, 50-328, and 50-390

Enclosure:

Agenda cc w/encl: Distribution via Listserv Distribution:

PUBLIC LPL2-2 R/F PMNS RidsNrrPMSequoyah Resource RidsNrrPMWattsBar1 Resource RidsNrrLACSola Resource RidaNrrLABClayton Resource Rids NrrDorlLpl2-2 WOrders, OEDO RidsRgn2MailCenter Resource RidsOgcMailCenter Resource Receptionist, OWFN (hard copy)

RidsAcrsAcnw_MailCTR resource RidsNrrDssSsib Resource Receptionist, TWFN (hard copy)

RidsNrrAdro Resource RidsNrrDorl Resource RidsOpaMail Resource CSteger, NRR DDiaz-Toro, EDO R-II SBailey, NRR ADAMS ACCESSION NO ML102990150 OFFICE LPL2-2/PM LP-WB/PM LPL2-2/LA SSIB/BC LPL2-2/BC NAME SLingam .ILamb CSoia SBailey DBroaddus(RPascarelli)

DATE 101 26 110 101 26 110 101 26/10 10/26 110 10/26 110 OFFICIAL RECORD COPY