Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M0721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Pass Dates ML20217D8361999-10-11011 October 1999 Provides NRC with Summary of Activities at TMI-2 During 3rd Quarter of 1999 ML20217F8271999-10-0707 October 1999 Forwards Pmpr 99-13, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990828- 0924.Diskette Containing Pmpr in Wordperfect 8 Is Encl. All Variances Are Expressed with Regard to Current Plans ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L0061999-10-0101 October 1999 Discusses GL 97-06 Issued by NRC on 971231 & Gpu Response for Three Mile Island .Staff Reviewed Response & Found No New Concerns with Condition of SG Internals or with Insp Practices Used to Detect Degradation of SG Internals ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212K8771999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Three Mile Island on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Provides Historical Listing of Plant Issues & Insp Schedule ML20212K8551999-09-30030 September 1999 Informs That During 990921 Telcon Between P Bissett & F Kacinko,Arrangements Were Made for Administration of Licensing Exams at Facility During Wk of 000214.Outlines Should Be Provided to NRC by 991122 ML20216J6581999-09-28028 September 1999 Provides Info as Requested of Licensees by NRC in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20212J0011999-09-27027 September 1999 Forwards Insp Rept 50-289/99-07 on 990828.No Violations Noted ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A2101999-09-13013 September 1999 Forwards Rev 3 of Gpu Nuclear Post-Defueling Monitored Storage QAP for Three Mile Island Unit 2, Including Changes Made During 1998.Description of Changes Provided on Page 2 ML20216G4151999-09-0909 September 1999 Forwards Pmpr 99-12, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990731- 0827.All Variances Expressed with Regard to Current Operations Plans ML20211M5861999-09-0202 September 1999 Forwards non-proprietary & Proprietary Response to NRC 990708 RAI Re TS Change Request 272,reactor Coolant Sys Coolant Activity.Proprietary Encl Withheld ML20211M6591999-09-0101 September 1999 Forwards Errata Page to 990729 Suppl to TS Change Request 274,to Reflect Proposed Changes Requested by . Page Transmitted by Submitted in Error ML20211L2401999-09-0101 September 1999 Submits Response to NRC AL 99-02, Operator Reactor Licensing Action Estimates ML20211H3731999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI LAR 285 & TMI-2 LAR 77 Re Changes Reflecting Storage of TMI-1 Radioactive Matls in TMI-2 Facility.Revised License Page mark-up,incorporating Response,Encl ML20211H4001999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI-1 LAR 285 & TMI-2 LAR 77 Re Changes to Clarify Authority to Possess Radioactive Matls Without Unit Distinction.Revised License Page mark-up, Incorporating Response Encl ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211H5041999-08-20020 August 1999 Forwards Proprietary & non-proprietary Rept MPR-1820,rev 1, TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis. Affidavit Encl.Proprietary Rept Wihheld 05000289/LER-1999-007, Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface1999-08-20020 August 1999 Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface ML20211A4261999-08-19019 August 1999 Forwards Insp Rept 50-289/99-04 on 990606-0717.Two Severity Level 4 Violations Occurred & Being Treated as Noncited Violations ML20211H3571999-08-19019 August 1999 Forwards Itemized Response to NRC 990712 RAI Re TS Change Request 248 Re Remote Shutdown Sys,Submitted on 981019 ML20211A3931999-08-12012 August 1999 Requests NRC Concurrence with Ongoing Analytical Approach as Described in Attachment,Which Is Being Utilized by Gpu Nuclear to Support Detailed License Amend Request to Revise Design Basis for TMI-1 Pressurizer Supports ML20210R4691999-08-11011 August 1999 Forwards Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2.Update 3 Revises SAR to Reflect Current Plant Configuration & Includes Minor Editorial Changes & Corrections.Revised Pages on List of Effective Pages ML20210N7601999-08-10010 August 1999 Informs That NRC Staff Reviewed Applications Dtd 990629, Which Requested Review & Approval to Allow Authority to Possess Radioactive Matl Without Unit Distinction Between Units 1 & 2.Forwards RAI Re License Amend Request 285 ML20210N7191999-08-0606 August 1999 Forwards Notice of Partial Denial of Amend to FOL & Opportunity for Hearing Re Proposed Change to TS 3.1.12.3 to Add LCO That Would Allow Continued HPI Operation ML20210L3831999-07-30030 July 1999 Responds to NRC 990617 RAI Re OTSG Kinetic Expansion Region Insp Acceptance Criteria That Was Used for Dispositioning Indications During Cycle 12 Refueling (12R) Outage ML20210K7371999-07-30030 July 1999 Forwards Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp LOCA, Which Corrects Evaluation Model for Mk-B9 non- Mixing Vane Grid Previously Reported in Util to Nrc,Per 10CFR50.46 ML20210L1151999-07-28028 July 1999 Confirms Two Senior Management Changes Made within Amergen Energy Co,Per Proposed License Transfer & Conforming Administrative License Amends for TMI-1 05000289/LER-1999-009, Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section1999-07-22022 July 1999 Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section ML20216D4001999-07-22022 July 1999 Provides Summary of Activities at TMI-2 During 2nd Quarter of 1999 ML20210B8231999-07-21021 July 1999 Forwards Exemption from Certain Requirements of 10CFR50.54(w) for Three Mile Island Nuclear Station,Unit 2 in Response to Licensee Application Dtd 990309,requesting Reduction in Amount of Insurance for Unit to Amount Listed ML20210G9471999-07-15015 July 1999 Forwards Pmpr 99-10, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990605- 0702.Diskette Containing Pmpr in Wordperfect 8 Format Is Also Encl ML20209H9401999-07-15015 July 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Application for Exemption Dtd 990309. Proposed Exemption Would Reduce Amount of Insurance for Onsite Property Damage Coverage as Listed ML20209G2451999-07-15015 July 1999 Advises That Suppl Info in Support of Proposed License Transfer & Conforming Adminstrative License Amends,Submitted in & Affidavit,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20212K1701999-07-13013 July 1999 Submits Concerns Re Millstone & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Should Provide Adequate Emergency Planning in Case of Radiological Accident ML20216D9861999-07-12012 July 1999 Forwards RAI Re 981019 Application Request for Review & Approval of Operability & SRs for Remote Shutdown Sys. Response Requested within 30 Days of Receipt of Ltr ML20209G5861999-07-0909 July 1999 Forwards Insp Rept 50-289/99-05 on 990510-28.No Violations Noted ML20209F2571999-07-0909 July 1999 Forwards Staff Evaluation Rept of Individual Plant Exam of External Events Submittal on Three Mile Nuclear Station, Unit 1 ML20209D8451999-07-0808 July 1999 Forwards Insp Rept 50-289/99-06 on 990608-11.No Violations Noted.Overall Performance of ERO Very Good & Demonstrated, with Reasonable Assurance,That Onsite Emergency Plans Adequate & That Util Capable of Implementing Plan ML20209D6291999-07-0808 July 1999 Forwards Notice of Withdrawal & Corrected TS Pages 3-21 & 4-9 for Amend 211 & 4-5a,4-38 & 6-3 for Amend 212,which Was Issued in Error.Amends Failed to Reflect Previously Changes Granted by Amends 203 & 204 ML20209D5141999-07-0808 July 1999 Forwards RAI Re 981019 Application & Suppl ,which Requested Review & Approval of Revised Rc Allowable Dose Equivalent I-131 Activity Limit with Max Dose Equivalent Limit of 1.0 Uci/Gram.Response Requested within 30 Days 05000289/LER-1999-008, Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public1999-07-0202 July 1999 Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public ML20196J3981999-07-0101 July 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for TMI-1 Encl ML20209C1131999-07-0101 July 1999 Forwards Signed Agreement as Proposed in NRC Requesting Gpu Nuclear Consent in Incorporate TMI-1 Thermo Lag Fire Barrier Final Corrective Action Completion Schedule Commitment of 000630 Into Co Modifying License 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217D8361999-10-11011 October 1999 Provides NRC with Summary of Activities at TMI-2 During 3rd Quarter of 1999 ML20217F8271999-10-0707 October 1999 Forwards Pmpr 99-13, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990828- 0924.Diskette Containing Pmpr in Wordperfect 8 Is Encl. All Variances Are Expressed with Regard to Current Plans ML20216J6581999-09-28028 September 1999 Provides Info as Requested of Licensees by NRC in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A2101999-09-13013 September 1999 Forwards Rev 3 of Gpu Nuclear Post-Defueling Monitored Storage QAP for Three Mile Island Unit 2, Including Changes Made During 1998.Description of Changes Provided on Page 2 ML20216G4151999-09-0909 September 1999 Forwards Pmpr 99-12, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990731- 0827.All Variances Expressed with Regard to Current Operations Plans ML20211M5861999-09-0202 September 1999 Forwards non-proprietary & Proprietary Response to NRC 990708 RAI Re TS Change Request 272,reactor Coolant Sys Coolant Activity.Proprietary Encl Withheld ML20211M6591999-09-0101 September 1999 Forwards Errata Page to 990729 Suppl to TS Change Request 274,to Reflect Proposed Changes Requested by . Page Transmitted by Submitted in Error ML20211L2401999-09-0101 September 1999 Submits Response to NRC AL 99-02, Operator Reactor Licensing Action Estimates ML20211H3731999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI LAR 285 & TMI-2 LAR 77 Re Changes Reflecting Storage of TMI-1 Radioactive Matls in TMI-2 Facility.Revised License Page mark-up,incorporating Response,Encl ML20211H4001999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI-1 LAR 285 & TMI-2 LAR 77 Re Changes to Clarify Authority to Possess Radioactive Matls Without Unit Distinction.Revised License Page mark-up, Incorporating Response Encl ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj 05000289/LER-1999-007, Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface1999-08-20020 August 1999 Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface ML20211H5041999-08-20020 August 1999 Forwards Proprietary & non-proprietary Rept MPR-1820,rev 1, TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis. Affidavit Encl.Proprietary Rept Wihheld ML20211H3571999-08-19019 August 1999 Forwards Itemized Response to NRC 990712 RAI Re TS Change Request 248 Re Remote Shutdown Sys,Submitted on 981019 ML20211A3931999-08-12012 August 1999 Requests NRC Concurrence with Ongoing Analytical Approach as Described in Attachment,Which Is Being Utilized by Gpu Nuclear to Support Detailed License Amend Request to Revise Design Basis for TMI-1 Pressurizer Supports ML20210R4691999-08-11011 August 1999 Forwards Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2.Update 3 Revises SAR to Reflect Current Plant Configuration & Includes Minor Editorial Changes & Corrections.Revised Pages on List of Effective Pages ML20210L3831999-07-30030 July 1999 Responds to NRC 990617 RAI Re OTSG Kinetic Expansion Region Insp Acceptance Criteria That Was Used for Dispositioning Indications During Cycle 12 Refueling (12R) Outage ML20210K7371999-07-30030 July 1999 Forwards Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp LOCA, Which Corrects Evaluation Model for Mk-B9 non- Mixing Vane Grid Previously Reported in Util to Nrc,Per 10CFR50.46 ML20210L1151999-07-28028 July 1999 Confirms Two Senior Management Changes Made within Amergen Energy Co,Per Proposed License Transfer & Conforming Administrative License Amends for TMI-1 05000289/LER-1999-009, Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section1999-07-22022 July 1999 Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section ML20216D4001999-07-22022 July 1999 Provides Summary of Activities at TMI-2 During 2nd Quarter of 1999 ML20210G9471999-07-15015 July 1999 Forwards Pmpr 99-10, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990605- 0702.Diskette Containing Pmpr in Wordperfect 8 Format Is Also Encl ML20212K1701999-07-13013 July 1999 Submits Concerns Re Millstone & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Should Provide Adequate Emergency Planning in Case of Radiological Accident 05000289/LER-1999-008, Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public1999-07-0202 July 1999 Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public ML20196J3981999-07-0101 July 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for TMI-1 Encl ML20209C1131999-07-0101 July 1999 Forwards Signed Agreement as Proposed in NRC Requesting Gpu Nuclear Consent in Incorporate TMI-1 Thermo Lag Fire Barrier Final Corrective Action Completion Schedule Commitment of 000630 Into Co Modifying License ML20196J7651999-06-29029 June 1999 Provides Updated Info Re Loss of Feedwater & Loss of Electric Power Accident Analyses to Support TS Change Request 279 Re Core Protection Safety Limit,As Discussed at 990616 Meeting ML20196J7701999-06-29029 June 1999 Forwards LAR 285 for License DPR-50,clarifying Authority to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matls May Continue to Be Moved Between TMI-1 & TMI-2 Units ML20209C0391999-06-29029 June 1999 Forwards LAR 77 to License DPR-73,clarifying Authority to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-2 License to Amergen,Radioactive Matl May Continue to Be Moved Between TMI-1 & TMI-2 Units ML20196G2061999-06-23023 June 1999 Requests That NRC Update Current Service Lists to Reflect Listed Personnel Changes That Occurred at TMI 05000289/LER-1999-006, Forwards LER 99-006-00,providing Complete Description,Extent of Condition & Actions Taken in Association with Determination of Inability of Pressurizer Support Bolts to Meet FSAR Requirements1999-06-23023 June 1999 Forwards LER 99-006-00,providing Complete Description,Extent of Condition & Actions Taken in Association with Determination of Inability of Pressurizer Support Bolts to Meet FSAR Requirements ML20196D2171999-06-17017 June 1999 Forwards Pmpr 99-9, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990508- 0604.New Summary Personnel Table Was Added to Rept Period.Matl Scientist Joined Staff Period ML20196A0431999-06-15015 June 1999 Providess Notification That Design Verification Activities Related to Calculations Supporting Analytical Values Identified in Gpu Nuclear Ltr to NRC Has Been Completed 05000289/LER-1999-004, Forwards LER 99-004-00,re Discovery of Emergency FW Pump Bearing Failure During Performance of Oil Change on 990510. Event Was Determined Reportable IAW 10CFR50.73,since Pump Was Determined to Be Inoperable Longer than TS AOT1999-06-0909 June 1999 Forwards LER 99-004-00,re Discovery of Emergency FW Pump Bearing Failure During Performance of Oil Change on 990510. Event Was Determined Reportable IAW 10CFR50.73,since Pump Was Determined to Be Inoperable Longer than TS AOT ML20212K2541999-06-0808 June 1999 Submits Concerns Re Millstone NPP & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Requests That NRC Provide Adequate Emergency Planning in Case of Radiological Accident ML20212K2671999-06-0808 June 1999 Submits Concerns Re Millstone NPP & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Requests That NRC Provide Adequate Emergency Planning in Case of Radiological Accident ML20195E2751999-06-0404 June 1999 Informs That PCTs & LOCA Lhr Limits Submitted in Util Ltr for LOCA Reanalysis Performed in Support of TMI-1 20% Tube Plugging Amend Request Have Been Revised.Revised PCT & LOCA Lhr Limit Values Are Provided on Encl Table 1 ML20195E3281999-06-0404 June 1999 Forwards Application for Amend to License DPR-50,modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20195C5721999-06-0202 June 1999 Forwards Description of Gpu Nuclear Plans for Corrective Actions for 1 H Fire Barriers in Fire Zones AB-FZ-3,AB-FZ-5, AB-FZ-7,FH-FZ-2 & Previous Commitments for Fire Zones CB-FA-1 & FH-FZ-6 ML20207E2561999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Change in ECCS Analyses at TMI-1 ML20195B2461999-05-21021 May 1999 Forwards Itemized Response to NRC 990506 RAI for TS Change Request 279 Re Core Protection Safety Limit ML20206R6461999-05-13013 May 1999 Forwards Rev 39 of Modified Amended Physical Security Plan for TMI 05000289/LER-1999-003, Forwards LER 99-003-00, Discovery of Condition Outside UFSAR Design Basis for CR Habitability, Which Was Determined Reportable on 990310.Rept Is Being Submitted Four Weeks Later than Required,Per Discussion with NRC1999-05-0707 May 1999 Forwards LER 99-003-00, Discovery of Condition Outside UFSAR Design Basis for CR Habitability, Which Was Determined Reportable on 990310.Rept Is Being Submitted Four Weeks Later than Required,Per Discussion with NRC ML20206K6301999-05-0707 May 1999 Provides Addl Info Re TMI-1 LOFW Accident re-analysis Assumptions for 20% Average SG Tube Plugging as Discussed on 990421 ML20206H0781999-04-30030 April 1999 Forwards Rev 0 to 1092, TMI Emergency Plan. Summary of Changes Encl ML20206J4811999-04-30030 April 1999 Provides Summary of Activities at TMI-2 During First Quarter of 1999.TMI-2 RB Was Not Inspected During Quarter.Routine Radiological Surveys of Auxiliary & Fuel Handling Bldgs Did Not Identify Any Significant Adverse Trends ML20206E4121999-04-27027 April 1999 Requests That TS Change Request 257 Be Withdrawn ML20206C5211999-04-23023 April 1999 Requests Mod to Encl Indemnity Agreement Number B-64,on Behalf of Gpu & Affiliates,Meed,Jcpl,Penelec & Amergen Energy Co,Llc.Ltr Supersedes & Withdraws 990405 Request Submitted to NRC ML20206C8261999-04-22022 April 1999 Submits Financial Info IAW Requirements of 10CFR50.71(b) & 10CFR140.21 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059H5351990-09-10010 September 1990 Forwards Encls 1-3 of Generic Ltr 90-07 Re Operator Licensing Exam Schedule ML20059G0641990-08-31031 August 1990 Advises That Util Agreed to Revised Frequency of Once Every 12 Months for Corrective Actions Audits Per Tech Spec Change Request 65 Based on 900718 & 19 Discussions ML20059F1691990-08-30030 August 1990 Requests Exemption from Requirements of 10CFR50,App J, Section III.D.1(a) for Facility Re Schedule Requirements for Connecting Type a Testing w/10-yr Inservice Insp Interval, Per 10CFR50.12(a)(2) ML20064A4661990-08-30030 August 1990 Responds to 900803 SALP Rept 50-289/89-99.TMI Does Not Expect to Be Lead Plant for Installation of Advanced Control Sys.Maint Backlog Goals Established.Info on Emergency Preparedness & Engineering/Technical Support Encl ML20059C8791990-08-29029 August 1990 Forwards TMI-1 Semiannual Effluent & Release Rept for Jan - June 1990, Including Executive Summary of Effluent Release Rept,Disposal & Effluent Release Data & Assessment of Radiation Doses.No Changes to ODCM for Reporting Period ML20059D5491990-08-29029 August 1990 Responds to NRC Re Notice of Violation & Proposed Imposition of Civil Penalty Re Personnel Inattentiveness & Failure of Site Managers to Correct Condition.Shift & Immediate Supervisor Discharged ML20059C7851990-08-27027 August 1990 Forwards Rev 5 to Sys Description 3184-007, Solid Waste Staging Facility, Updating Minor Changes to Pages 6,8,9 & 13 ML20059C1091990-08-24024 August 1990 Forwards Rev 6 to Physical Security Contingency Plan.Rev Withheld ML20059B8251990-08-24024 August 1990 Forwards Payment of Civil Penalty in Amount of $50,000,per NRC ML20056B4651990-08-20020 August 1990 Corrects Statement Made in 900716 Response to NRC Bulletin 90-001, Loss of Fill-Oil in Rosemount Transmitters. Identified That Only Half of Operating Crews Provided W/ Briefing on Bulletin ML20058Q1851990-08-17017 August 1990 Requests That Distribution List for TMI-2 Correspondence Be Updated to Be Consistent W/Recently Implemented Organizational Changes.Ee Kintner,Mb Roche & Wj Marshall Should Be Deleted ML20058Q1821990-08-13013 August 1990 Advises That Util Will No Longer Provide Annual Update to Dewatering Sys for Defueling Canisters Sys Description,Per NRC .W/Completion of Defueling & Shipment of All Defueling Canisters Offsite,Sys Has Been Deactivated ML20058Q1721990-08-13013 August 1990 Forwards TMI-2 Effluent & Offsite Dose Rept,First Quarter 1990, Update ML20058M7201990-08-0303 August 1990 Forwards Rev 2 to TER 3232-019, Div Technical Evaluation Rept for Processed Water Disposal Sys. Mods Include Elimination of Pelletizer & Relocation of Druming Station to Discharge of Blender/Dryer ML20055J4581990-07-27027 July 1990 Responds to Violations Noted in Insp Rept 50-289/90-10. Corrective Actions:Missing Support Brace on Cable Tray Support Found & Corrected ML20055J4561990-07-27027 July 1990 Advises That Info Contained in Generic Ltr 90-06,not Applicable to Current Nonoperating & Defueled Condition of Facility.Generic Ltr Will Be Reevaluated,If Decision Made to Restart Facility ML20055H6901990-07-20020 July 1990 Forwards Rev 25 to TMI-2 Organization Plan for NRC Review & Approval.Rev Proposes Consolidation of Plant Operations & Maint Sections Into Plant Operation & Maint Section ML20055G4431990-07-19019 July 1990 Forwards Rev 12 to 990-1745, TMI-1 Fire Hazards Analysis Rept & Update 9 to FSAR for TMI-1 ML20055G8781990-07-19019 July 1990 Discusses Compliance W/Reg Guide 1.97 Re Containment High Range Radiation Monitors,Per 900507-11 Insp.Physical Separation of Power Cables & Required Isolation Will Be Provided to Satisfy Reg Guide Category 1 Requirements ML20055F9601990-07-11011 July 1990 Forwards, 1990 TMI Nuclear Station Annual Emergency Exercise Scenario to Be Conducted on 900912.W/o Encl ML20044A9531990-07-0909 July 1990 Forwards Util Response to Weaknesses Identified in Maint Team Insp Rept 50-289/89-82.Corrective Actions:Engineering Personnel Reminded to Assure Documented Approval Obtained Prior to Proceeding W/Work ML20055E0481990-07-0505 July 1990 Documents Action Taken by Util to Improve Heat Sink Protection Sys & Current Status of Sys.Main Feedwater Logic Circuits Modified Prior to Startup from 8R Outage to Eliminate Potential for Inadvertent Isolation ML20055E0011990-07-0202 July 1990 Forwards Revs 1 & 2 to Topical Rept 067, TMI-1 Cycle 8 Core Operating Limits Rept, Per Tech Spec 6.9.5.4 ML20055C9971990-06-28028 June 1990 Forwards Rev 27 to Physical Security Plan.Rev Withheld ML20055D2071990-06-28028 June 1990 Forwards Certification of TMI-1 Simulation Facility,Per 10CFR55.45.b.5.Resumes of Personnel Involved Encl. Resumes Withheld (Ref 10CFR2.790(a)(6)) ML20055D0861990-06-25025 June 1990 Documents Deviation from Requirements of Reg Guide 1.97,per Insp on 900507-11.Based on Most Limiting Analysis,Existing Range of 0-1,200 Psi Sufficient.Deviation Consistent W/B&W Owners Group Task Force Evaluation of Reg Guide ML20043H4031990-06-18018 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issue Resolved W/Imposition of Requirements or Corrective Actions. ML20043H4851990-06-18018 June 1990 Forwards Application for Amend to License DPR-50,consisting of Tech Spec Change Request 179 ML20043F9921990-06-11011 June 1990 Forwards Listing of Exam Ref Matl Sent on 900601 in Response to 900505 Ltr ML20043F0661990-06-0404 June 1990 Forwards Inservice Insp Data Rept for Period 880816-900304. Owner Rept for Repairs or Replacements Performed on ASME Section XI Class 1 & 2 Components,Also Encl ML20055C9041990-05-23023 May 1990 Advises That App a to Rept Is Set of Recommendations from Safety Advisory Board on Possible Research Opportunities ML20043B2391990-05-18018 May 1990 Revises Commitments in Encl Met Ed 800430 Ltr Re QA of Diesel Generator Fuel Oil.Requirement for QC Review for Acceptability Prior to Filling Diesel Generator Fuel Oil Storage Tanks Deleted from Procedure ML20043A5441990-05-16016 May 1990 Discusses Status of Safety & Performance Improvement Program Portion of B&W Owners Group EOP Review Project ML20043A5311990-05-15015 May 1990 Responds to Violations Noted in Insp Rept 50-289/89-82. Corrective Actions:Periodic Insp Program Established Utilizing Checklist for Stored Equipment & Existing Tool Rooms Will Be Purged of Controlled or Unneeded Matls ML20043A2321990-05-11011 May 1990 Forwards TMI-1 Reactor Bldg 15-Yr Tendon Surveillance (Insp Period 5) Technical Rept 069.Evaluations Conclude That Test & Insp Results Demonstrate TMI-1 Reactor Bldg post- Tensioning Sys in Good Condition ML20042G2741990-05-0404 May 1990 Forwards Semiannual Update of Projects Listed in Categories A,B & C of long-range Planning Program Integrated Schedule ML20012F2621990-04-0202 April 1990 Responds to Violation Noted in Insp Rept 50-289/89-26. Corrective Actions:Util Policy of Shift Supervisor Involvement in Bypassing & Resetting Safety Sys Expanded to Include Shutdown Conditions & Technicians Briefed ML20012F2611990-04-0202 April 1990 Provides Supplemental Response to Station Blackout Rule. Target Reliability of 0.975 Chosen for Emergency Diesel Generators.Diesel Generator Reliability Program May Change Based on Final Resolution of Generic Issue B-56 ML20012F2731990-03-30030 March 1990 Confirms 900328 Conversations & Provides Technical Basis for Planned Actions to Correct Present Power Limitation Due to High Steam Generator Secondary Side Differential Pressure. Main Turbine Will Be Tripped from 80% Power ML20042D8281990-03-23023 March 1990 Fulfills Requirements of Tech Spec Section 4.19.5.a Re once-through Steam Generator Tubes post-inservice Insp Rept for Unscheduled Outage 8U-1 ML20012D7001990-03-22022 March 1990 Forwards Util Response to Generic Ltr 90-01 Re NRC Regulatory Impact Survey.Site Mgt & Staff Hour Categories Added to Response ML20012D7121990-03-21021 March 1990 Forwards Rev 0 to TMI-1 Cycle 8 Core Operating Limits Rept. ML20012C4771990-03-12012 March 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implication of Control Sys in LWR Nuclear Power Plants,' Per 10CFR50.54(f). Current Design Adequate W/O Addl Tech Specs ML20012B8241990-03-12012 March 1990 Forwards Application for Tech Spec Change Request 199 to License DPR-50,revising Tech Specs Re Steam Generator Tube Insp Requirements ML20011F5251990-02-23023 February 1990 Documents Interpretation of Tech Spec 5.3.1.1 Re Design Features of Fuel Assemblies in Light of Issuance of Generic Ltr 90-02.Tech Spec Change Request Re Utilization of Dummy Fuel Rods or Open Water Channels Will Be Filed by 900420 ML20055C3931990-02-23023 February 1990 Documents Interpretation of Tech Spec 4.19.5.a Re once- Through Steam Generator Tube post-inservice Insp Rept for Refueling Interval 8R.Total of Eight Tubes Removed from Svc by Plugging ML20011F6651990-02-22022 February 1990 Forwards Updated Status Summary of Consideration of TMI-1 PRA Recommendations as of 891231.Changes to Torque Switch Settings for DH-V-4A & B Will Be Implemented in Refueling Outage 8 Re Closing Against High Differential Pressure ML20006C2901990-01-26026 January 1990 Provides Addl Info Supporting Deferral of Seismic Qualification Util Group Walkdowns to 10R Outage.Performance of Walkdowns Provide Proper Scheduling & Priority for Resolution of USI A-46 for TMI-1 ML20011E1221990-01-26026 January 1990 Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Audit Rept Determined That Operation of Decay Heat Closed Cooling Water Sys Consistent W/Design Basis Documents ML19354E8601990-01-25025 January 1990 Requests Approval for Use of B&W Steam Generator Plugs Mfg W/Alternate Matl (nickel-base Alloy/Alloy 600).Alloy 600 Has Superior Corrosion Resistance to Primary Water Stress Corrosion Cracking 1990-09-10
[Table view] |
Text
N RC sORM,195 U.S. NUCLE AR REGUL ATC COMMISSION OOCKET NUMBER
,,s q (2 8A FILE NUMBER j NRC DISTRIBUTION FOR PART 50 DOCKLi MATERIAL ;
TO. FROM. DATE OF DCCUMENT
- e tro oli tan ' : i s , o~' 'n:< ,y,,-- i
- r. retor 7tello, '-
. c._ ,. -. .. e. ., , , , , , ,
oATE RECcivEo
". C. 'rnal 3,f,,,,; .
A ETTER O NOTORi:E o PROP INPUT FORM NUMBER OF COPIES RECEIVED t URIGIN AL M NC L ASSIF I E D 'O'
. t i '.N C CCPY DESCRIPTION ENCLOSU RE
- Ltr. re 11/ 3/i; telenone Conversation. .
. . tra .s th follouin : ie, ort of the status of 7: 1-1 i t r2s7eCt to artions c? t,7cH i.: A to brtnCS teCiniC:.
o s i tion ' ' C 3 "> 0 3-1 "?2.121Lnes f or rira PLANT NAME: Three 110 ! s i c-' e !! 2rotection for 2 Clear ?o"Or "lan t3 10C' 9 tr Prior to Jul: 1, l ~ S . "
DISTRIBUTION OF FIRE PROTECTION INFO PER S.SHEPPARD 9-22-76 FOR OPERATING REACTORS n-n c ,-n DO NOT REMOVE ACKNOWLEDGED SAFF.TY FOR ACTION /INFORMATION I?/15/~6 '"
t XI BRANCH CHIEF: "mi' l Y PROJECT MANAGER: - e t ~ - i N LIC. ASST: In:rn, 4
6 I i x INTERNAL DISTRIBUTION nEG FILE'l r_NRCPDR h
I&E (2)
OELD BENAROYA l
M EISET!UT g BL7LER (5) l
% k'AMBACH t
9 l
EXTERNAL DISTRIBUTION CONTRCL NUMBE R LPDR: -- ',,"--- '-
~
, TIC: _
M k,2)A
M NSIC.
ACRS 16 CYS : m ;1: 'SENT TO F.1 [p
/
y // f. /J g f f by l
NRC F ORM 195 e2 76) c) g Q ,
"w w- 7 Wo G .
,/nw me / a th*, , A.ern pop onOGorss METHOPOLIIAN EDISON COMPANY POST OFFICE BOX 542 AEADING. PENNSYLVANI A 19603 TELEPHONE 215 - 929-2001
%L 1656 December 6, 1976 Ifawwa h.[,5
- ("J ua *j **"W.' .
g e -,.j- "Q 1g)" ' N 4/ 7, i J
{
Director cf :iuclear Reactor Regulation -
Attn: 73ctor Stello, Jr., Director Division of Operating Feactors U. 3. IIuclear Regulatory Consission
'4ashington, D. C. 20555 Dear Sir; Three Mile Island !uclear Station Unit 1 (D!I-1)
Docket :To. 50-289 Operating License To. PPR-50 Enclosed please find a report of the status of 31I-1 with respect to Portions of Appendix A to Branch Technical Position APCSB 9.5-1 " Guidelines for Fire Protection for !!uclear Power Plants Docketed Prior to July 1, 1976." A: I indicated in ry :!cvember 3,1976 telephone convercation with Mr. R. 'd. Reid, those portions ccncerning personnel, crganizaticn and training will be addrecced at this time. (Positions Al and B)
A descripticn of the DII-l fire protection system can be found in Sections 9.3.6 and 9.3.7 of the 311-1 FSAR.
Response to the remaining portions of APCSB 9 5-1 Appendix A depend upon the cenpleticn of the fire hazards analysis. Thic fire hazar12 analysis is in progress. 'de expect it will be complete, ard we vill provide you the renaining respence by May 15, 1977.
Sincerely, 2 ,
v e
tG.
4-
\~f m W 1; e R. C.'Arncid
,j ,g 9v Vice President
/'6 Su .?'
d, 4 a>
J P e 2
- @e .,
(ci N l f,;
zncl=aure .(, o Wv &,s c lla.3 N s w
- p - 1484 182 W
V* ' l \\
t~otM
Note: Numbering used is that of Appendix A to 3TP APCSB 2.5-1 A. Cverall Requirements Of Huclear Plant Fire Protection Procram
- 1. Percennel Respcnsibility for the overall Responsibility for the overall fire protection program should fire protection program lies be assigned to a designated with the Vice President - Generation.
person in the t;per level of Currently, the Vina President -
management. This persen shculd Generation utilises the Manager-retain ultimate responsibility Generation Engineering, the even though formulation and Manager-Operational Quality assurance of program implementaticn Assurance, and the Man e r-is delegated. Such delegation Ge.le.ation Administratr .. to of authority should be to staff assist in fonnulating, ar perscnnel prepared by training assuring implementation of the and experience in fire protection fire protection progr12. These and nuclear plant safety to managers meet the standards of provide a balanced apprcach in ANSI N18.1. Station management directing the fire protection and supervision perscnnel are programs for nuclear power responsible for day-to-day plants. The qialificatien implementation of fire protecticn requirements for the fire program activities. Documentaticn protection engineer or con- of assigned responsibilities sultant who will assist in the will be acccmplished by means of design and selecticn of equipment, a " Fire Protection Program Plan" inspect and test the ccmpleted which will te issued by the Vice physical aspects of tl system, President -Generation no later develop the fire protecticn than April 1, 1977. At present, program, and assist in the fire the FSAR does not specifically fighting training for the operating discuss the training and updating plant should be stated. Subsequently, provisions regarling fire prctection.
the FSAR should discuss the The FSAR vill be updated to training and the updating previsions conform to this position by such as fire drills provided for September 1, 1977 maintaining the competence of the station fire fighting and operating crew, including The Manager-Generation Engineering personnel respcnsible for is designated as Met-Ed's " Fire maintaining and inspecting the Protection Engineer". The fire protecticn equipment, qualificaticns and experience of 1484 183 (1)
the incumbent are set forth in Attachment A. As part of the effort necessary to respond to Appendix A, the design of the fire protection system, and the associated equipment, is being reviewed under the direction of a consultant who is a me=ter of the Society for Fire Frctection Engineers (SFFE). The fire protection equipment has been inspected, and test program results reviewed, by a number of different organizations and individuals with special expertise in fire protection systems and equipment such that Met-Ed is assured of the ability of the installed s/ stems to function as necessary to meet their design objectives. System improvements, modifications and additions necessary as a result of the aforementioned design review in response to AFCSE 9.5-1 will be designed under the direction of a censultant who is a =c=ber of SFFE as appropriate.
a The Met-Ed Fire Protection Engineer Shall review the Met-Ed " Fire Protection Progrs= Plan" for adequacy and cc=pleteness prior to issuance of the Plan.
The Met-Ed Fire Protectica Engineer shall periodically review the technical adequncy of the fire fighting training program.
(2) 1484 184
The fire protection staff should be responsible for:
(a) coordination of building laycut (a) Building laycut and systema design and systems design with fire review are the responsibility of the area requirements, including Met-Ed Fire Protection Engineer.
consideratien of pctential Consultants will be used as necessary hazardc associated with pcotulated when additional specialized design basia firec. qualifications are needed.
(b) design and maintenance of fire (b) Design control of systems is the detecticn, cuppression, and responsibility of the Met-Ed Fire extinguishing systems. Protection Engineer. Maintenance ic the responsibility of the Unit Superintendent.
(c) fire prevention activities, (c) Fire prevention activities are included in the industrial safety program under the Manager - Generation Adminictration.
(d) training and manual fire fighting (d) Training of plant perconnel is the activities of plant perconnel responsibility of the Manager - Cperationa_
and the fire brigade. Quality Accurance.
Supervisicn of manual fire fighting activities 1: the reopensibility of the Unit Cuperintendent and he has assigned specific fire fighting responsibilities to ctation perconnel in the Station Emergency Flan.
The manager licted above all have available the acciatance of the TMI Safety Supervicor for ccordinatien and direction of the implementation of these activities.
9p- . .n-(il
- 5. Administrative Frccedures, Controls and Fire Erizade Administrative procedures consistent Procedures ecvering these with the need for maintaining the subjects are in effect. The performance of the fire protection TMI-1 fire brigade organization system and personnel in nuclear power is in accordance with 3FPA plants should be provided. recctmendaticns and has been audited by UELPIA and the I!PC .
Guidance is contained in the folicwing publications:
NFPA h - Organization for Fire Services
'!FPA LA - Organization for Fire Department NFPA 6 - Industrial Fire Loss Prevention IiFPA 7 - Management of Fire Energencies IIFPA 8 - Management Responsibility for Effects of Fire en Operations IIFPA 27 - Private Fire 3rigadcs
- 2. Effective administrative measures Administrative measures controlling should be implemented to prchibit storage of ec=bustible material bulk storage of ec=bustible are now in effect. Additionally, materials inside or adjacent to periodic fire hazards inspections safety related buildings or are performed by the General systems during operaticn or Public Utilities (GPU) Fire Task maintenance periods. Regulatory Force. These inspections Guide 1.39, "Hcusekeeping Require- include audits of follow-up cn ments for Water-Cooled Nuclear open items. Should the fire Pcwer Plants", provides guidance hazards analyses indicate that on housekeeping, including the improvements in cctbustible disposal of ec=bustible cateri tls. caterial control are warranted, they will be implemented.
cu, 1484 186
- 3. Normal and abnormal conditicnc Normal and abncrmal conditions or other anticipated operations which are associated with maintenance such as =ccifications (e.g., and operations and which have the breaking fire stops, impairment potential to adversely affect of fire detection and suppression reactor safety are centrolled by systems) and refueling activities procedures apprcved by the Unit should be reviewed by appropriate Superintendent. Similarly, the levels of managenent and apprcpriate Manager-Generation Engineering is special actions and prccedures respcnsible for insuring modificaticns such as fire watches or temporary are ecnducted in accordance with fire barriers implemented to procedures which ensure reactor assure adequate fire protection safety. These members of management and reactor safety. are responsible for prescribing In particular: action necessary to ec=pensate for any temporary reduction in fire (a) 'dcrk involvin7 ignition protection or increased risk of cources such s velding and fire as a result of off-normal flame cutting should be conditions.
done under closely controlled conditions. Procedures Positicn 3(a) and 3(b) are currently governing such verk should met at TMI-1.
be reviewed and approvel by persons trained and equipped to prevent and ccabat fires. If this is not pcssible, a person qualified in fire protection should directly monitor the work and function as a fire watch.
(b) leak testing, and similar procedures such as air flev determination, should use one of the ec mercially available aerosol techniquec.
Open flames or ecsbustion generated smoke should not be permitted.
(c) Use of ecmbustible material, The use of conbustible material in the e.g. EEPA and charcoal TM1-1 Centrolled area is limited. If filters, dry ion exchange the fire hasards analyses indicate resins or other cc=bustible that further controls are necessary, supplies, in safety related they will be in effect by September 1, areas should be controlled. 197~. Ucn-treated vcod will not be Use of vcod inside buildings used incide buildings c;ntaining containing safety related safety related systens.
systems or equipment should be permitted only when suitable non-ccmbustible substitutes are not available.
If voed must be used, only fire retardant treated vocd (scaffolding, lay devn blocks) shculd be permitte2. jq-i.
(s/
Such materials shculd be allcwed into safety related areas only when they are to be used immediately. Their possible and probable use should be considered in the fire hasard analysis to determine the adequacy of tne installed fire protection system.
L. Nuclear power plants are frequently TMI-1 is self-sufficient with respect to located in remote areas, at some fire fighting activities.
distance frcs public fire departments. The Manager-Generaticn Administraticn has Also, first response fire departments primary responsibility for optimising the are often volunteer. Public fire supplemental er backup capability of public department respence should be considered fire departments.
in the overall fire protection program.
However, the plant should be designed to be self-sufficient with respect to fire fighting activities and rely on the public response only for supplemental or backup capability.
5 The need for good organisation, training and equipping of fire brigades at nuclear power plant sites requires effective measures be implemented to assure prcper discharge of these functicnc. The guidance in Regulator-/
Guide 1.101, "Energency Planning for
- luelear Power P11nts", should be followed as applicable.
(a) Successful fire fighting requires While we are confident that the intent of testing and maintenance of the the provisions delineated here are currently fire protection equipment, being met, scme of the documentation and emergency lighting and cennunicaticn, prccedural formalisation implied in this as well as practice as brigades positicn may not be overtly stated. Any for the pecple who =ust utilise additional documentation and procedural the equipment. A test plan that formalisation found to be necessary during lists the individuals and their the current review will be required by the respcncibilities in connection Fire Protection Plan discussed ander item with routine tests and inspections A.1, above, of the fire detection and protecticn systems should be developed.
The test plan should contain the types, frequency and detailed procedures for testing. Procedures
, m Ao) 1484 '8P
shculi also contain instructions on maintaining fire protection during thoce perieds when the fire protection system is impaired or during periods of plant maintenance, e.g., fire watches or temporary hcce connections to vater systema.
(b) Easic training is a necessar/ This position is, at present, met at TMI-l element in effective fire fightin8 vith the exception of participation of local operation. In order for a fire fire companies in drills annually an1 with brigade to operate effectively, the implication of the exictence of a fixed it muct operate as a team. All locaticn, pre-designated offaite cc= mand members must kncv vhat their poet. With respect to participation of individual duties are. The7 local fire ecmpanies,it is impractical to must be familiar with the laycut achedule drills involving these ecmpanies of the plant and equipment since they are volunteer companies and location and operation in order catisfactory participaticn for fire drill; to permit effective fire fighting is difficult to obtain. Furthermore , it ic operations during timec when a not necescary to drill thece fire ecmpanies particular area is filled with ~
to respcnd to alarms. However, local fire accke or is insufficientl7 companies have agreed to assist at TMI and lighted. Such training can on17 are receiving annual training at the cite.
be acccmpliched by conducting In the future, this training vill include drills several times a year (at practical demonstrations of fire fighting least quarterly) 30 that all peculiar to a nuclear plant. With recpect to memberc of the fire brigade the implied fixed location, pre-designated have had the opportunity to offaite cc= mand post, it is our position train as a team, testing that this ic not nececcary. During the itself in the major arenc of the conduct of fire fighting, remote location plant. The drilla should include ecmmand posts are established as needed on a the simulated use of equipment case by case bacia. The optimum location in each area and 1hould be for such command posta is quite often cncite preplanned and post-critiqued to and virtually impoccible to pre-designate.
establich the training objective of the drilla and determine how well thece objectives have been met. These drilla should periodically (at least annually) include local fire lepartment participation where possible.
Cuch drills also permit supervising percennel to evaluate the effectiveness of ecmmunicatienc within the fire brigade and with the en scene fire team leader, the reactor operatcr in the ecntrol rocm, and the off:it ?
ecmmand pcst. j4}4 }Oh
( ~, 3e
3 To have proper coverage during all Members of all shifts are trained in fire phases of operation, members of each protection. Local fire ec=panies are shift crew should be trained in fire annually instructed in the areas listed. In protection. Training of the plant the future, this annual training will be fire brigade should be coordinated coordinated insofar as this coordination with the local fire department so is and remains within the control of Met-Ed.
that responsibilities and duties are delineated in advance. This coordinaticn should be part of the training course and implemented ir.to the training of the local fire department staff.
local fire departments should be educated in the operaticnal precautions when fighting fires on nuclear power plant sites. Local fire departments should be made aware of the need for radioactive protecticn of personnel and the special hazards associated with a nuclear power plant site.
- h. NFPA 27, "Frivate Fire Brigade" This position is currently met at TMI-1.
shculd be followed in organization, training, and fire drills. This standard also is applicable for the inspection and maintenance of fire fighting equiptent. A=cng the standards referenced in this document, the following should be utilized: :iFPA 19h, " Standard for Screv Threads and Gaskets for Fire Hose Couplings",
NFPA 196, " Standard for Fire Hose,"
NFT A 197, " Training Standard on Initial Fire Attacks", NFPA 601, "Reccnnended Manual of Instructitns and Outies for the Plant Watchman on Guard." NFPA booklets and pamphlets listed en page 27-11 of Volume 8, 1971-72 are also applicable for good training references. In addition, courses in fire prevention and fire suppression which are recognized and/or cpensored by the fire prctection industry should be utilizen.
/CT
\vl 1484 190
Metropolitan Edison's Fire Prctecticn Engineer received a 3.S. Degree in Mechanical Engineering frcn the Pennsylvania State University in 1952 and received additional tra' .g in nuclear pcver reactor engineering in 1967 from the University of Pdchigan. He has been a licensed professicnal engineer in the Ccnsonwealth of Pennsylvania since 1963. This individual has 25 years practical engineering experience associated with design, construction, testing, and operation of various types of techanical equipment with emphasis en ec=bustion, steam generation, and electrical generaticn equipment. For the past 13 years, he has been primarily associated with fossil and nuclear generating stations. The first 5 of these years were spent on the operating staff of a two unit, fossil-fired ' 00 4 SN electrical generating station, including intimate kncvledge of design, inspection, operation, maintenance, and testing of fire protection systems and training of the in-plant fire brigade. During the = cst recent 8 years, he was involved with the design and operation of one SCC MW nuclear unit and the design of a 900 MW nuclear unit. These efforts included participation in the establishment of fire protection design parameters and selection of equipment, involvement in the determination of test requirements and acceptance criteria for the physical fire protecticn system, and involvement in developing the overall station fire protection program.
1484 191 Attachment "A"