|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
AVERAGE DAILYUNIT POWER LEVEL DOCKET VO COMPLETED BY TELEPHONE Lllla=
h(ONTH JULY 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL (MWe.Net) (MWe->%et)
I 645 17 647 650 l8 652 654 20 654 647 655 646 653 642 13 651 570 24 649 442 95 646 IO 16 638 634 7't 640 2g l3 637 19 645 30 IS 640 l6 645 INSTRUCTIONS On this format, list the avera((c daily unit p>>wer!eve( in MWe.Net for each day in the rep<>rtintt n>>>nth. C>>>npute to the nearest whole megawat t.
('>r77 j 80081 8031/
OPERATING DATA REPOR'T DOCKET NO.
~1980 DATE hug COMPLETED BY TELEPHONE
~~son
~i~3824 OPERATING STATUS I. Unit Name Turke Point Unit No. 3 Notes-Unit No. 3 operated at
- 2. Reporting Period:
approzimately 100% R.P.,
- 3. Licensed Thermal Power (MWt):
ex'cept for outage of July 760 8-9, 1980.
- 4. Nameplate Rating (Gross a(We):
- 5. Design Electrical Rating (Net MWe): 693
- 6. Lblaximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power'Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, lf Any'his Month Yr. to-Date Cumulative I I. Hours In Reporting Period 67 112.6
- 12. Number Of Hours Reactor Was Critical 744. 51 505.2
- 13. Reactor Reserve Shutdown Hours 213.3
- 14. Hours Generator On-Line 737.0 4 071.6 49 761.7 IS. Unit Reserve Shutdown Hours 121.8
'6. Gross Thermal Energy Generated (MWH) 1 612 271 8 797 278 100 265 912
<'JL 31 852 845 47 164 30 148 198
- 19. Unit Service Factor 74.1
- 20. Unit Availability Factor 99.1 79.7 74.3 68.0
- 22. Unit Capacity Factor (Using DER Net) 64.8
- 23. Unit Forced Outage Rate 0.9 1.4 '.5
- 24. Shutdowns Scheduled Over Next 6 Months IType. Date. and Duration of Each I:
Steam Generator Tube Tnsoection Program Oct. 5 Hov. 1, 1980.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION I'>/77 )
UNIT SIIUTDOIVNS AND POPOVER REDUCTIONS REPOR.I h(ONTII JUI.Y 1980 COhlPLETED UY a~ 2- 2 L
o Q ~
t Llccf<sec Cause Sc Coffel:tive Nii.
4l 4J o u Dale ~ A Evc>>l ~ n Acliu>> to u
Repi)fl )< o Pieveol Rccuffcoce
~ <I) 80-07-08 7.0 N/A HOTORX Unit No. 3 was removed from service due to low oil level in reactor coolant pump motor -No. 38. Cor-rective actions included adding oil.
(Nuclear system) 3 4 I 'ofced Reasoo: hletl<od: Exl)ibil G - Instructions S; Sclicd<<led A-EII>>ipo<e>>t Failure (Explain) I-hlaoual lof I (cpafalloo ol Data U.hlaiote<uioce or Test ~ 2.hlaoual Scram. Eolry Sl)eels I'oi Liccosee
( -Rct'ucli>>I, 3-Auloo<at <c Serio)<. Event Repi)rl (I.ER) File (NURI!G-D.RCII>>lalo<y Rcslrlclloo 4-Otl<er (Lxplalo) OI6))
I: 0pcfalo< Tfalolog k. Llccosi: I:xJ>>ll>>JI<o>>
I'.Adioioislralive G.Operalio>>al Lrrur (lixplai<i) Ex l lib it I - Saute Source (I/77) I I.OII<cf (Expl J>><)
0 AVERAGE DAlLY UNIT POWER LEVEL DOCKET iVO. 50 251 Turkey. Point IUI!t .
TELEPHONE MONTH JULY 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL
!MWe Net) (i'e-Net )
I 640 642 649 l8 647 645 l9 647 644 20 647 644 2I 642 646 22 641 23 645 641 24 643 641 25 638 lp 641 631 636 629 633 28 629 l3 4 79 631 636 30 IS 635 31 591
!6 638 INSTRUCTIONS On this form>>a. list the average daily unit power!evel in MWe Net for each day i>> the reporting tnonth. Cot>>pote to the nearest whole ...egawat!.
(o lii)
OPERATING DATA REPORT DOCKET NO.
DATE 4~~~80 COMPLETED BY ~~hi3.son TELEPHONE ~05 552-382E OPERATING STATUS Turkev Point Unit No. 4 Notes- Unit No. 4 operated at I. Unit Name: approximately 100% R.P.,
- 2. Reporting Period: a except for load reduction
- 3. Licensed Thermai Power (MWt): of July 30-31, 1980.
- 4. iVameplate Rating (Gross iPIWe): 7 0 S. Design Electrical Rating (iVet MWe):
- 6. iiPIaximum Dependable Capacity (Gross SIWe):
- 7. maximum Dependable Capacity (Viet MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
IO. Reasons For Restrictions, lf Any:
'
This Month Yr. to-Date Cumulative I I. Hours In Reporting Period 744. 0 5 111.0 60 840.0
- 12. Number Of Hours Reactor Was Critical 744.0 3 788.1 44 615.9 l3. Reactor Reserve Shutdown Hours 1 6.
- 14. Hours Generator On-Line IS. Unit Reserve Shutdown Hours 12.3 31.2 o 4 Ig. Net Electrical Energy Generated (MWH) 474 472 2 366 113 26 896 109 l9. Unit Service Factor
- 20. Unit Availability Factor 100.0 72.6 70.5
- 22. Unit Capacity Factor (Using DER Net) 6 .8
- 23. Unit Forced Outage Rate 0.4 3.0
- 4. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Re e in maintenance and inspections Nov. 9 1980 Jan. 10 1981.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup.'6.
Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (o j77)
I)OCKET NO.
UNIT SIIUTDO)VNS ANI) PO'iVER REI)UCTIONS REPORT hlONTII I
i CI o Cause Er. Corrective o .) Ltccnscc o 4l o ~
iVii. l)ate ~ A Event ~ A Action lo o Repiwt > I Icvcnt I(ecurlcncc o
~ C/l 80-07-30 B N/A HA VAI.VEX Load reduction to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves. (Non-nuclear system)
I 3 I': Forced Reason: Method: llxliibitG - Instructions S: Scbcdulcil A.l!quipu)ent Failure (Explain) I.hla>>ual I )r I ri'pJr Jlii)n ol Data B.hlaiiileiiance or Test . 2.hlanual Scram. I:))try Sliecls I'or l.icensee
( -Reflieliilg 3 Ault)IAJtiC SCrani. Evcol Report (LER) File (NUREG.
I) ltegiilaiory Rcslfti;lion 4.Oilier (llxplain) 016I )
I:.Operali)r Training k. Ltcciisc Exainiiialion I "Ad))III)IstralIvc G Operation Jl L'irI>r (Explain) I'xliibll I - Saine Source I'>/77) I I Oilier (Lxplaui)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT COMPLETED IIY <- T. Chilson MONTH JULY 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-iVet) (il(We.iVe t )
I 767 l7 790 733 l8 658 789 791 30 796 788 13 716 34 789 '75 793 IO 16 797 793 797 3S 7 6 l3 791 59 792 733 30 793 15 782 3l 795 l6 791 NOTE: Ave age daily power level greater than 777 NWe due to cooler condenser cooling water.
INSTRUCTIONS On this format. list the averaile daily unit power level in MWe.Net for each day tn the reportintt tnonth. Coittpute to the nearest whole ate(Iawat t.
'0 0 OPERATING DATA REPORT DOCKET NO.
DATE COMPLETED BY
~~80
~~~son TELEPHONE ~~~3824 OPERATING STATUS St. Lucie Unit No. 1 Notes - Unit operated at
- l. Unit Name:
approxiataeely 100% R.P.,
- 2. Reporting Period: 'ezcept for load reduction
- 3. Licensed Thermal Power (MW:): 2560 850 of July 2-3, 1980.
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe): 2
- 6. tglaximum Dependable Capacity (Gross agWe): 822
- 7. Maximum Dependable Capacity (Net MWe): 777
- 8. If Changes Occur in Capacity Ratings (Items ltlumber 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period '11.0 3I 655.0
- 12. Number Of Hours Reactor Was Critical 744.0 3 280.2 24 789.9
- 13. Reactor Reserve Shutdown Hours 129.5
- 14. Hours Generator On. Line 24 8.
IS. Unit Reserve Shutdown Hours 32.0 it. Grata Electrical Energy Generated (gtWH) 25 18 844 750
- 18. Net Electrical Energy Generated (MWH) 579 531 2 395 835 17 723 731
- 19. Unit Service Factor 100. 0 62.4 75.9
- 20. Unit Availability Factor 100.0 62.4 76.0
- 21. Unit Capacity Factor (Using MDC Net) 100.2 60.3 72.1
- 22. Unit Capacity Factor (Using DER Net) 58.4 69.8
- 23. Unit Forced Outage Rate 13. 2 6.5
- 24. Shutdowns Scheduled Over Next 6 i4Ionths(Type. Date, and Duration of ch) e
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
UNIT SIIUTI)0'IVNS AND POIVER RE!)(ICTIONS l)OCKET NO.
UNIT NAhIE St. Lucie 0 I . No.l
Llcc))sec Cause Ec Curreclive Ni). l)alc IA Event Action lo Q
Rcport > Prevent Recurrc>>ce 10 80-07-02 -G- N/A FILTER Load reduction Lo approximately 50% R.F . to clean condensate pun)p suction st:rainers.. (Non-nuclear system) 4 I': I o)ced Reason: hlelhod: I.xl)ibit G - Instructions S: Scl)cduled A-L'Iluipment Failure (Explain) I 4lanual II)r I rcpafall)nl ol Data It hlaintenance nr Test ~ 2 h4nual Sera)n. Lnlry Sl)cuts for Licensee C-Ref) li)t', 3 Au)on>atic Sera>>). Event Report (I.ER) File (NUR-l).)let,ulatory Restriction 4 Oll)cf (Lxplau)) EG f> I )
I .Opelalol' ran))l)g 8c License I:xan)u)i)lion
'F.Administrative G.Ot>erational E)rur (Expl>>in) Exl)ibil I - Sa)nc Source Il Oll)er t Explain)
P.O. BOX 5291GO,'IAiiII, FL 33152 FLOAIOA POWER 5 LIGHT COMPANY August 10, 1980 Office oz Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the July, 1980, Ope ating Summary Reports zor Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.
Very truly yours, A. D. Schmidt.
Vice President Power Resources VTC/DDC cc: Nr. James P. 0"Reilly Robert Lowenstein, Esquire PBOPLB... SBRVI'VG P"=C~LB
SUMMARY
OF OPERATiNG EXPERiENCE DOCKET NO '0 250 Turkey Point UNIT Unit No. 3 DATE August 10, 1980 COMPLETED BY V. T.. Chilson TELEPHONE (305) 552-3824 REPORT MONTH JULY, 1980 Unit No. 3 operated at approximately 100% R.P., except for outage of .
July 8-9, 1980. Refer to "Unit Shutdowns and Power Reductions" section of July, 1980, Operating Status Report =or additional infor-mation.
Major Sa ety-related maintenance activities performed during the month included:
inspections'nd reauirements of'E Bulletins and NUREG-0578 are'ontinuing.
Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.
SUMMARY
OF OPERATlViG EXPERIENCE DOCKET NO. 50 251 Turkey Point UNIT Unit No. 4 DATE Au ust 10, 1980 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT i~!ONTH JULY, 1980 Unit, No. 4 operated at approximately 100% R.P., except for load reduction of July 30-31, 1980. Refer to "Unit. Shutdowns and Power Reductions" section of the July, 1980, Operating Status Report for additional infor-mation.
Major Safety-related maintenance activities performed during the month included:
inspections and requirements fo ZE Bulletins and NUREG-0578 in progress.
Florida, Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.
SUMMARY
OF OPERATiNG EXPERiENCE DOCKET NO. 50 - 335 St. Lucie UNiT Unit No. 1 DATE A'u ust 10, .1980 COMPLETED BY V. T. Chilsc~n TELEPHONE (305) 552- 3824 REPORT MONTH JULY 1980 Unit operated at approximately 100% R.P., except for load rec;uction of July 2-3, 1980. Refer to "Unit Shutdowns and Power Reductioris" section of the July, 1980, Operating Status Report for additional inf'ormation.
Major Safety-related maintenance activities pe formed du ing the month included:
inspections and reauirements of iE Bulletins and NUREG-0578 are continuing.
Florida Power & Light Com.-.,any commitments for NUREG-0578 implementation are continuing: Refer to correspondence between FPL and NRC for ad-ditional information.
!