Forwards Weekly Status Summary of Joint Ebasco & C-E Task Force for 820809-13.Remaining Design Input Received.Revision 1 to Program Procedure EVP-001/SL-2 Issued
ML17213A348
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/13/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-105-SL-2, NUDOCS 8208190193
Download: ML17213A348 (9)


Text

REGULATOR'NPORMATION DISTRIBUTION "0'EM (RIDSI ACCE'S SION NBR: 8? 08190193 DOC ~ DATE: 82/08/13 NOTARIZED: NO DOCKET FACIL:50"389 St, Lucie Pl anti Uni~t '2P Florida Power 8 Light Co. 05000389 AUTH ~ NAME AUTHOR 'AFFILIATION BLODGETTrT.H. Ebasco Servicesi Inc, (subs. of Enserch Corp.)

RECIP ~ NAME RECIPIENT AFFILIATION EISENHUTEDSG, Division of Licensing

SUBJECT:

For wards weekly >status summary of Joint Ebasco 8 C E -Task Force for 820809"13 'emaining design input. receivedsRevision 1 to program Procedure EVP 001/SL '2 =issued, DISTRIBUTION CODE: BOOIS iCOPIES RECEIVED:LTR g ENCL TITLE: PSAR/FSAR AMDTS and Related Correspondence

/

NOTES; RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID 'CODE/NAME LTTR,ENCL A/D LICE NSNG 1 "0 LIC BR P3 BC 1 0 LIC BR 03 LA 1 0 NERSESPV ~ 01 1 1 INT1ERNAL: ELO/HDS2 1 ~

0 IE FILE 1 1 IE/DEP EPOS 35 IE/DEP/EPLB 36 3 3 NRR/OE/CEB NRR/DE/GB il 28 1

1 2

1 1

2 NRR/DE/EQB NRR/DE/HGEB 30 13 3

'2 3

2 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 24 1 1 NRR/DE/SEB 25 1 NRR/DHFS/HFEB40 1 NRR/DHFS/LQB 3?. 1- 1 NRR/DHFS/OLB 34 1 1 NRR/DHFS/PTRB20 1 1 NRR/OS I/AEB 26 1 1 NRR/OS I/ASB 27 1 1 NRR/DSI/CPB 10 1 1 NRR/DS I/CSB 09 1 1 NRR/DS I/ETSB 1'2 1 1 NRR/DSI/ICSB 16 1 1 NRR/DS I/PSB 19 1 1 NRR/DSI/RAB 22 1 1 NRR I/RSB 23 1 1 NRR/DST/LGB 33 1 1 04 1 1 RGN2 2 2 RM/DDAMI/MIB 1 0 EXTiERNAL: ACRS 41 10 10 BNL(AMDTS ONLY) 1 1 DMB/DSS (AMDTS) 1 1 FEMA REP OIV 39 1 1 LPDR 03 1 1 NRC 'PDR 02 1 1 NSIC 05 1 NTIS 1 1

.TOTAL NUMBER OF COPIES REQUIRED ~ LTTR 58 ENCL,53

)I 11 4

L: O f ~ fI 1

O II' I')

}

f1 lg

'l5

En eering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y. 10048 August 13 1982 Ltr No. EVP-105/SL-2 Office of Nuclear Reactor Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D C 20555

Dear Mr Eisenhut:

Re: ST LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS StR1MARY FOR PERIOD AUGUST 9 AUGUST 13, 1982 Attached for your information is the Weekly Status Summary of the Joint Ebasco and Combustion Engineering Task Force for the period August 9 through August 13, 1982.

Very truly yours, T H Blodgett Joint Task Force Chairman THB/McG Attachment cc: Robert E Uhrig, FPL w/attach D L Christian, FPL w/attach 8208i90193 820813 PDR ADOCK 05000389 R PDR

ENGINEERING VERIFICATION PROGRAM << SL2 EBASCO TASK FORCE WEEKLY STATUS

SUMMARY

FOR PERIOD AUGUST 9 AUGUST 13,'982-1 The Task Force received the remaining existing design inputs in response to its initial request for'nformation list. References'o the FSAR were pro-vided where specifically requested documents'were not generated for the St Lucie Project. i 2 - A second information request was submitted August,13, with preparation of a third nearing completion. E 3 Completion of the design boundaries for all six A/E verification items will be realized early next period.

4 A meeting of the FPL, C-E and Ebasco EUP Task Force Managers was held on August 12 in Windsor, Conn.

5 - Revision 1 to the overall program procedure EVP-001/SL-2 was issued during the period.

1 I*

F 1,I .~

U l~

ENGINEERING VERIFICATION PROGRAM/SL 2 C-E TASK FORCE WEEKLY STATUS

SUMMARY

August 9 August 13 Hi hli hts

l. A joint. Task Force meeting was held atiWindsor.August .12, to discuss design verification boundaries and formal design input status. This meeting: provided the FPL Task Force Manager an. opportunity to observe the C-E EVP facilities and.

to confirm independence of the 'operation.

2. Agreement has been,reached'on C-E verification item boundaries transmitted with original design input request.
3. The C-E Engineering Verification Program Technical'Procedure, will be updated to include any revisions in the progiam basic procedure (EVP-001/SL2) but will remain an internal document designed to guide C-"E's EVP activities.

Status E

A review of HPSI Pump safety interface requirements is complete.

Calculation of the'inimum flow vs. head requirements to satisfy controlling accident conditions is in process.

Design basis accident conditions affecting the SI Tank Isolation Valve design are being reviewed.

p I'l' I I

4 V.H n'v-.c:~ i< 1 +!' P

('~

ENGINEERING VERIFICATION PROGRAM SL2 WEEK OF 08/09/82 DATE OF PARTICIPATING GENERAL SUBJECT PREPARER OF TELECON ORGANIZATIONS OF TELECON TELECON RECORD August 9 C-E/FPL Arrangements for.FPL/Ebascq',~rC-E EVP Task C-E, EVP Task Force Manager's Force Mgr meeting August 10 C-E/Ebasco EVP administrative details; Ebasco EVP Task meeting agenda Force Mgr August ll Ebasco/FPI, P

Request clarification of verification item equipment Ebasco EVP Task Force Mgr tag no.

August 13 FPL/Ebasco Verification item equipment Ebasco EVP Task tag no.'larified Force Mgr

L< 'k I'