Monthly Operating Rept for Sept 1997 for Ginna Station. W/971009 Ltr
ML17264B068
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/30/1997
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9710170075
Download: ML17264B068 (10)


Text

II CATEGORY 1 REGULATO INFORMATION DISTRIBUTION .STEM (RIDS)

ACCESSION NBR:F710170075 DOC. DATE: 97/09/30 NOTARIZED: NO DOCKET ((:

FACIL: 50-244 Robert Emmet Ginna Nuclear Planti Unit ii Rochester G 05000244 AUTH. NAME ~ AUTHOR AFF1LI ATION NALDENi J. V. Rochester Gas h Electric Corp.

WIDAYz J. A. Rochester Gas & Electric Corp.

RECIP. NAME RECIPIENT AFFILIATION VISSINGI G. S.

SUBJECT:

Monthly operating rept for Sept 199'7 for Ginna Station.

N/971009 1 tr.

DISTRIBUTION CODE'E24D COPIES RECEIVED'TR ENCL SIZE:

TITLE: Monthl 9 0 p eratin 9 Re p ort ( p er Tech S p ecs)

NOTES: License Exp date in accordance with 10CFR2i 2. 109(9/19/72). 05000244 REC IP IENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 VISSINGs G. 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 T~CENQ~~ 1 1 NRR/DRPM/PECB 1 OC/DBA/PAD 1 RGN1 1 1 EXTERNAL: LITCO BRYCEi J H NOAC NRC PDR D

0 E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED'TTR 10 ENCL 10

I

/ /////////////I /I///////////

/'/III//)XIII IIIIIII/I///I I/gl/// IIIIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TKLEPHOkf AREA COOK 715 546.2700 October 9, 1997 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for September, 1997 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of September, 1997.

Very truly yours, Joseph A. Widay Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments 97iOi70075 970930 5 PDR tt'ADGCK 05000244

'R PDR Q lllllllllllllllllllllllllllllllllllllll

1 OPERATING DATA REPORT 50-244 ober 9 1997 COMPLETED BY John V. Walden TELEPHO P16) 771 3588

1. Unit Name: '.E.
2. Reporting Period:

GINNA NUCLEAR POWER PLANT Se ternber 1997 Notes:

3. Ucensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 517
5. Design Electric Rating (Net MWe)'. 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 480
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, If Any (Net MWe:
10. Reason For Restrictions, IfAn:

This Month Yr.-to-Date Cumulative'*

11, Hours in Reported Period 720.0 6551.0 244103.0

12. Number of hours Reactor Was Critical 720.0 6551.0 196465.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6
14. Hours Generator On-line 720.0 6551.0 '93477.5
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
16. Gross Thermal Energy Generated (MWH) 1092051.0 9898648.0 275774918.0
17. Gross Electrical Energy Generated (MWH) 370106.0 3371057.0 91481366.0
18. Net Electrical Energy Generated (MWH) 351756.0 3209736.0 86855602.8
19. Unit Service Factor (%) 100.0 100.0 79.3
20. Unit Availability Factor (%) 100.0 100.0 79.3
21. Unit Capacity Factor (using MDC Net) (%) 101.8 102.1 76.7
22. Unit Capacity Factor (using DER Net) (%) 103.9 104.2 76.7
23. Unit Forced Outage Rate (%) 0.0 0.0 5.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

The refuelin andmaintenance outa e isscheduled forOctober20 1997. The lanneddurationis23da s.

25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Force st Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1 1975 ~

  • 'UMUlATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: October 9 1997

f. LJ John V. Walden TELEPHONE: 716 771-3588 MONTH Se tember 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 487 17. 489 2 ~ 486 18. 489
3. 486 19. 489 487 20. 489 488 490
6. 488 22. 490 488 23. .490
8. 488 24. 491 489 25. 490
10. 491 26. 491 496 27. 492
12. 497 28. 492
13. 493 29. 492
14. 490 30. 492 488 484 31.
16. 489 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DOCKET NO: 50-244 UNIT: R.E. GINNA NUCLEAR POWER P ANT TE: October 9 1997.

COMPLETED BY John V. olden

'NIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH Se tember 1997 No. Date Type'uration Reason Method of Code'omponent System Code'ause A Corrective Action to (hours) reactors'icensee shuting down Event Prevent Recurrence Report 0 1

F: Forced 2 S: Scheduled Reason: 3 4 A-Equipment (Explain) Method: Exhibit G - Instructions B-Maintenance or Test 1-Manual for Preparation of Data C-Refueling 2-Manual Scram. Entry Sheets for D-Regulatory 3-Automatic Scram. Licensee Event Report E-Operator Training & 4-Other (Explain) (LER) File (NUREG-Lecensee Examination 0161)

F-Administrative G-Operational Error (Explain)

H-Other (Explain) 5 Exhibit 1- Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPER1ENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: October 9 1997 COMPLETED BY:

John V. Walden TELEPHONE: 16 771-3588 MONTH Se tember 1997 The unit operated at full power for the entire month of September. The average power level was 99.8'%

k