Monthly Operating Data for December 1976
ML18347A812
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/03/1977
From: Adams W
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A812 (4)


Text

Docket Ale. consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 January 3, 1971 USNuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re: LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, Docket No. 50-255 Gentlemen:

Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear Plant for the month of December 1976. William E. Adams, General Engineer cc: JGKeppler, NRC RBDeWitt RB Sewell DEVanFarowe, Div. of Radiological Health, Lansing, Mich. Document Control 195

--. , " _ ... _ .-' APPENDIX D Palisades UNIT---------

DATE :January 3, 197i7 616 z,54 891:3

  • By _D_I_B_o_l_l_n_o_w

___ _ DOCKET No._5_0_-_2...:..5_5 ____ _ OPERATING STATCS 1. REPORTING PERIOD: __ 7_6_1_2_0_1

_________

THROUGH 761231 HOt:RS IN REPORTl'.'\G PERIOD: 744

2. CURRENTLY AUTHORIZED POWER LEVEL (MWth) 2200 MAX. DEPENDABLE CAPACITY (i\IWe*NET)-6..8..4..._
3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\Ve-NET):

_______ 4. REASONS FOR RESTRICTION (If ANY): 5 *. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. (l) THIS REPORTING PERIOD HOURS REACTOR WAS CRITICAL.

.**..*..****

' REACTOR RESERVE SHUTDOWN HOURS ...***. . HOURS GENERA TOR ON Lll';E *....*..**..***

l.rNJT RESERVE SHUTDOWN HOURS .....*.****

GROSS ENERGY : GENERATED

.*****.*.**.**.*.****

GROSS ELECTRIC AL ENERGY. -GENERATED

(:.IWH) *** : ***.**..*********

NET ELECTRICAL ENERGY GENERATED RE.-\CTOR AVAILABILITY FACTOR (l) ........ . UNIT AVAILABILITY FACTOR(:!)

  • .*.....***.

l'NIT C"..\P . .\CITY FACTOR (3) ..*....*....*.*

UNIT FORCED Ol'TAGE RATE (4) ........*..*

729.4 711.8. 1,531,608 491,480 464,343 98.0% 95.7% 91.2% 4.3%

TIVE YR TO DATE TO DATE 5,183.9 21,270.9 4,850.4 192824.2 9,663,024 32,682,984 3,038,550 10,185,200 2,847,033 9,528,679 59 .. 0% 48.5%' 55*.2% 45.2% 47.4% 34 .. 9% 14.2% 48.2% SHL;TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH): IF SlWT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF UNITS IN TEST STATUS (PRIOR TO OPERATION)

REPORT THE FOLLOWING:

REACTOR A\'AILABILlTY FACTOR AVAILABILITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION C0;\1MERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERATOR ON LINE HOURS IN REPORTl:-;G PERIOD DATE LAST FORECAST DATE ACHIEVED (3) lfNIT CAPACITY FACTOR NET ELECTRICAL POWFR GF'.'IERATED MAX. DEPENDABLE CAPACITY lMWc-NET)

X HOURS IN REPORTING l'EKIOLJ t:="IT FORCED Ol'TAGE RATE FORCED OUTAGE !!OURS HOURS GENERATOR ON Llt\E +FORCED OUTAGE HOURS l.l 6*D-1

  • .;;. ** ., ,, --AJ>PENDIX C *. DOCKET No?0-255 ------.UNIT Palisades DATE Jan. 3, 1977 COMPLETED BY DIBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH December 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (1\lWe-net) 1 326 17* 666 2 0 18 673 3 399 19 670 686 663 .4 20. 5 654 21 661 6 667 22 664 7 655 23 661 8 663 24 656 9 652 25 672 10 672 26 666 11 652 27. 667 12 662 28 669 13 663 29 663 14 669 30 666 1"5 676 31 662 16 673 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the avaage daily unit power level in l\1\Vc-net for each day in the reporting month. Compute to tht! ncan.:st whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum. dcpcnclablc capacity for the net dcctrical rating of the unit. there may be occasions when the daily _. average power level exceeds the I 00% line (or the rcstrkted power level* line). In such cases, the ) average daily unit power output shed should be footnoted to explain tile apparent anomaly. . . 1.16-C-I i:*

.

! f .*: . j NO. 18

  • *

.. ! ... ..,. .......

........,, ...... , ..... , .... , ..... , ..............

......... ) .......

  • ...... ; ..................

Jio'i'""'

...... *;.;..'a_

..... ....,. ..* I 5 I APPENDIX E UNIT SHUTDOWNS DOCKET NO. UNIT NAME DATE COMPLETED BY 50-255 Palis.ades

  • uamuary 3, 1977 DIBollnow REPORT MONTH __ D_e_c_e_m_b_er_l_9_7_6_

TYPE METHOD OF F*FORCED DURATION SHUTTING DOWN DATE S-SCHEDULED (HOURS) REASON (1) THE REACTOR (2). CORRECTIVE ACTIONS/COMMENTS 761201 F 32.2 A 3 Unit tripped due to loss of load caused by a malfunction of the generator voltage regulator.

I , I (1) REASON (2) METHOD A--EQUIPMENT FAILURE' (EXPLAIN)

I-MANUAL B-MAINT. OR TEST 2-MANUAL C-*REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC E--OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-*Ol'ERATIONAL ERROR (EXPLAIN)

H-OTJ-!ER (EXPLAIN)

-. . .

SUMMARY

Plant at a nominal 100% power _-throughout th!:! month. t' . *' L_ __ -.. .. ., ; ' \ \. \ l i r t *t f I .-1