ML17264A442

From kanterella
Revision as of 03:23, 19 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1996 for Re Ginna Nuclear Power Plant.W/960405 Ltr
ML17264A442
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1996
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9604110077
Download: ML17264A442 (6)


Text

CATEGORY 1 REGUDRTOk-INFORMATION DISTRIBUTION

%STEM (RIDE)E'l~DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.

Rochester Gas&Electric Corp.WIDAY,J.A.

Rochester Gas a Electric Corp.RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Mo rating rept for Mar 1996 for Gina Station./960405 1 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2;109(9/19/72).

'05000244 E RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB EXTERNAL LITCO BRYCE i J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME JOHNSON,A LE C TER.0 RGNl NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D N NOTE TO ALL"R1DS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESKI ROOM OWPN SD-S(EXT, 415"2083)TO ELIMINATE YOUR NAME PROM DISTRIBUTION LISTS POR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 76RK/HATE ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649-0001 TELt'PHONC ARcA cooc 710 546.2700 GINNA STATION April 5, 1996 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for March, 1996 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1996.Very truly yours, s h A.Wida lant Manager li.00"8 JAW:tjn Attachments c: Mr.Thomas T.Martin NRC (1)Vwoea<0077 960SSX PDR ADQCK 05000244', R PDR OPERATING DATA REPORT COMPLETED BY: ri 5 1996 50-244 John V.Walden TELEPHO (716)771 3588 Notes 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: March 1996 3.Licensed Thermal Power (MWI): 1520 4.Nameplate Rating (Gross MWe): 517 5.Design Electric Rating (Net MWe): 470 6.Maximum Dependabte Capacity (Gross MWe): 490 7.Maximum Dependabte Capacity (Net MWe): 470 8.It Changes Occur in Capadty Rating (Items Number 3 Through 7)Since Last Report, Give Reason: 9.Power Level to Which Restricted, If Any (Net MWe: 10.Reason For Restrtctions, If An.This Month Yr.-to.Date Cumulative-11.Hours in Reported Period 12.Number of hours Reactor Was Critica 13.Reactor Reserve Shutdovm Hours 14.Hours Generator On-line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor (%)20.Unit Availability Factor (%)21.Unit Capacity Factor (using MDC Net)(%)22.Unit Capacity Factor (using DER Net)(%)23.Unit Forced Outage Rate (%)744.0 662.5 0.0 659.8 0.0 947615.0 322337.0 306413.0 88.7 88.7 87.6 87.6 11.3 2184.0 2102.5 0.0 2099.8 0.0 3068799.0 1044176.0 992756.0 96.1 96.1 96.7 96.7 3.9 230952.0 185769.6 1687.6'82848.5 8.5 259932107.0 86106676.0 81740568.0 79.2 79.2 76.4 76.4 5.5 24.Shutdovms Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin and Maintenance Start 4/01/96 Duration 58 da 25.It Shutdown At End of Report Period, Estimate Date of Startup: 26.Units in Test Status (Prior to Commercial OperaVon):

Force st Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION'UMULATIVE TOTAL COMMENCING JANUARY 1, 1975**CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 G.~~'VERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: ril 5 1996 COMPLETED BY: John Walden TELEPHONE:

7 6 771-3588 MONTH March 1996 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)477 17.473 477 18.474 3.477 19.473 4~476 20.474 5.477 21.473 6~476 22.7.362 23.24'75 25.10.26.475 12.13.100 426 472 27.28.29.476 475 475 14~15.473 473 30.31.476 473 16.473 INSTRUCTIONS On this format, list the average daily unit power.level in MWe-Net for each day in reporting month.Compute to the nearest whole megawatt.

DOCKI:.T NO.UNll NAhfl: R E.CilNNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS I)A Il'-CohfPLI'.1 I'.D BY ohn V.Walden REPORT hfONTH+arch ql:LIIPIIO

.(716)771-3588 r Ho.Date 0 0 O~Pl C 0 0 0 Pl 0 c 0 0 0 0 4rl C 0 Ct Licensee Event Report II Ew 0 0 0 Vl Q C 0 ul 0 C Q D E 0 O Cause L Corrective Action to Prevent Recurrence 3-7-96 84.2 96-002 KE"B" Condenser Circulating Water ump tripoed causing a Secondary system transient.

The Reactor was manually scramed due to Turbine Operatin Limits being exceeded.See LER 96-002 for more details.l F: Forced S: Scheduled Rtv.4/85 4949 2 Reason: A-Equipment Failure (Explain)I3-hfaintenancc or Test C-Refueling D-Regulatory Restriction E-Operator Training Bc Liccnsc Examination F-Administrative G-Operational Error (Explain)II-Other (Explain)3 hfcthod: I-hfanual 2-hfanual Scram.3-Automatic Scram.4-Other{Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Liccnscc Event Rcport (LER)File (NUREG-0161)Exhibit I-Same Source NARRATIVE

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.Qinna Nuclear Power Plant DATE: A'l 5 19 COMPLETED BY: John Walden TELEPHONE:

716 1-3588 MONTH March 1996 A forced outage occurred on March 7, 1996 due to the trip of the"B" Condenser Circulating Water Pump.A manual reactor scram was initiated to prevent potential damage to the main turbine (see LER 96-002).The unit was placed on-line on March 11, 1996 and ran at full power for the remainder of the month.The average power for the month excluding the forced outage was 96%