Monthly Operating Rept for Nov 1997 for Re Ginna Nuclear Power Plant.W/971211 Ltr
ML17264B137
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/30/1997
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9712170424
Download: ML17264B137 (12)


Text

CATEGORY 1 REGULA Y INFORMATION DISTRIBUTIO SYSTEM (RXDS)ACCESSION NBR:9712170424 DOC.DATE: 97/11/30 NOTARIZED:

NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V'.

  • ~Rochester Gas E Electric Corp.WIDAY,J.A.

Rochester Gas&Electric Corp.RECIP.NAME RECIPXENT AFFILIATION DOCKET I 05000244 VISSING, G.S.

SUBJECT:

Monthly operating rept for Nov 1997 for RE Ginna Nuclear Power Plant.W/971211 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

C', T 05000244 E G RECXPIENT ID CODE/NAME PD1-1 PD COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME VISSING,G.

COPIES LTTR ENCL 1 1 0 INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 1 1 1'RGN1 NOAC CENTER 1 1 1 1 1 1 Y D 0 U E NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 II y///////////l/

///////////'/Ill/

/ll I/IIII/Ill/l 8K::::-ROCHESTER GAS~AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649.0001

/TELEPHONC AREA coof.Tld 546-2700 December 11, 1997 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for November, 1997 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of November, 1997.Very truly yours, a.d se A.Widay ant Manager xc: U.S.Nuclear Regulatory Commission Mr.Guy S.Vissing (Mail Stop 1482)Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector Attachments-i p Q3$q7%2i7042+

Q50Og cy7iiSO eoR>>o" pea 8 II!IIII!au!(i!!(ii(!izsizie((iiiizl

~, E 4 OPERATING DATA REPORT COMPLETED BY;50.244 D ber 11 1997 John V.Walden TELEPHONE (716)7714588 Notes 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: November 1997 3.Licensed Thermal Power (MWI): 1520 4.Nameplate Rating (Gross MWe): 517 5.Design Electric Rating (Net MWe): 470 6.Maximum Dependable Capacity (Gross MWe): 490 7.Maximum Dependable Capacity (Net MWe): 480 8.If Changes Occur In Capacity Rating (Items Number 3 Through 7)Since Last Report, Give Reason: 9.Power Level to Which Restricted, If Any (Net MWe): 10.Reason For Restrictions, If An: This Month Yr.-to.Date Cumulative*'1.

Hours in Reported Period 12.Number of hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On.line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor (%)20.Unit Availability Factor (%)21.Unit Capacity Factor (using MDC Net)(%)22.Unit Capacity Factor (using DER Net)(%)23.Unit Forced Outage Rate (%)720.0 280.8 0.0 248.5 0.0 290231.0 98024.0 92368.6 26.7 27.3 0.0 8016.0 7300.9 0.0 7268.2 0.0 10876859.0 3703585.0 3525061.6 90.7 90.7 91.6 93.6 0.0 245568.0 197215.2 1687.6*194194.7 8.5*276753129.0 91813894.0 87170928.4 79.1 79.1 76.5 76.5 5.6 24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): 25.If Shutdown At End of Report Period, Estimate Date of Startup: 26.Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION'UMULATIVE TOTAL COMMENCING JANUARY 1~1975"CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 l~~J 1 II' AVERAGE DAILY UNIT POWER LEVEL MONTH November 1997 DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: December 11 1997 COMPLETED BY: John V.Walden TELEPHONE:

7 6 771-3588 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17'15 2.3.4.5.6.18.19.20., 21.22.-15 21 145 271 8.9.10.23.24.25.26.390 440 354 255 12~13~27.28.29.480 497 497 14.15.16.-13 30.31.497 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.Compute to the nearest whole megawatt.

tl J D DOCKET NO: 50-244 UNIT: R.E.GINNA NUCLEAR POWER PLANT DA E: December 11 1997 COMPLETED BY: P.John V.Walden TELEPHONE:

716 771-3588 UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH November 1997 No.Date Type Duration (hours)Reason'ethod of shuting down reactors'icensee Event Report//System Code'omponent Code'ause&Corrective Action to Prevent Recurrence 10/20/97 471.5 C Unit placed on-line 11/20/97.2 11/25/97 F A Trip of heater drain pumps caused power reduction to less than 509o power.1 F: Forced S: Scheduled 2 Reason: A-Equipment (Explain)B-Maintenance or Test C-Refueling D-Regulatory E-Operator Training&Lecensee Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method: 1-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161)5 Exhibit 1-Same Source I I l NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.Qinna Nuclear Power Plant DATE: December ll 1997 COMPLETED BY: TELEPHONE:

John V.Walden 716 771-3588 MONTH November 1997 The refueling shutdown was completed on November 20, 1997.Full power was reached on November 24, 1997.A trip of the heater drain pumps caused a power reduction to less than 50'.on November 25, 1997.The unit was brought back to full power on November 27, 1997 and remained at full power through the end of the month.

0 e C ll