Forwards Engineering Evaluation of Wpps Unit 2 Sacrificial Shield Wall, Constituting Util Corrective Action Plan. W/O Encl
ML17277A428
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/01/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17277A426 List:
References
GO2-80-168, NUDOCS 8302040110
Download: ML17277A428 (3)


Text

Mr.R.H.Engelken, Director NRC Region Y Suite 202, Walnut Creek Plaza 1990 N.California Boulevard Walnut Creek, California 94596

Dear Mr.Engelken:

t ,4)4TERNA1-DISTRIBUTION WC Bibb OK.Earl e ,.LT Harrold;:::::::::::::::-:.I Harper'I'::::::::::::

I Johnson JO Martin DL Renberger NO Strand OC Timmins MD Yaughn ME Witherspoon SSII/fi I e DLR/lb OCT/1 b Docket No.50-397 sf 2 pf 1 THIS LETTER SATISF OMMITMENT NO.THIS LETTER IDOESI (DOES NOT)ESTABLISH A NEW COMMITMENT.

WPPSS CORRESPONDENCE NO 3Q August 1, 1980 G02-80-168 PQ~J'ubject:

MPPSS Nuclear Project No Docket Number 50-397 Sacrificial Shield Mall (SM)Correc ive Action Plan J lhO'A'IIV)O.i mO OO C)O IXIIA IO Oa NA oc Ol OIL'9A~ma.<

References:

(1)NRC ion V letter, RH Engelken to NO Strand, D o k, Repairs and Attachments to the Sacri-ield Wall, MNP-2, dated November 21, 1979.(2)Me r from RH Engelken, Director, Region V, to ornburg, Director of Reactor Construction pection, IE, MNP-2 Sacrificial Shield Mall, ipe Whip Restraints, and Related Structures, dated December 6, 1979.(3)NRC Region V Letter, RH Engelken to NO Strand, MNP-2 Pipe Whip Restraints and Sacrificial Shield Wall, dated February 8, 1980.(4)Letter, OL Renberger to RH Engelken, Sacri icial Shield Wall (SSM)Corrective Action Plan, dated March 25, 1980.(5)NRC letter, Y.Stello to NO Strand, dated June 17;1980.he purpose of this letter is to transmit to you a report entitled Eflgineering Evaluation of the WNP-2 Sacrificial Shield Mall".This report constitutes the Supply System's correc".ive action plan for-.he SSM, and as such satisfies the requiremen.

for subtnittal of such a plan discussed in refer ences 1 through 5.AUTHDR: OC Timmi ns SECTION FOR APPROVAL OF ibb ME l ithersooon j FoR slGNATURE DF: DL Renberaer APPROVED DAT i":/i'I 6'rl~'i/~i Z.~p c vga'Z~

PH Engelken Page 2 The Supply System believes this report in conjunction with the iden-tified actions therein closes the technical issues related to the SSM.This report will be referenced in the MNP-2 FSAR and supplements pre-viously submitted licensing documents to technically justify the as-built condition of the SSW.This report is considered to be the instrument used to obtain NRC Region V concurrence to proceed with construction on the SSM.In parallel, this report has been submitted to the Office of Nuclear Reactor Regulation.

The report in conjunction with the forthcoming August 6, 1980 meeting, provides sufficient information to them to allow NRR approval of the proposed replacement weld at elevation.

541'-5".Me request that you expedi te their technical review and approval of this proposed corr'ective action and subsequently remove'he construction hold on this repair in order to minimize schedule delays.Nonconformances in documentation associated

'with the SSM nave been technically evaluated in the enclosed report,.Conclusions drawn in several specific concerns relative to nonconformances having no structural significance are not intended to reflect an unconcerned attitude by the Supply System for the importance that the related Code or equality Assurance-requirements have or for corrective actions necessary to prevent similar reoccurrences.

Very truly yours, DLR:DCT:asm

Attachment:

(2)as noted cc: V Siello, NRC (w/att.-2)ND Lewis, EFSEC, Olympia JR Lewis, BPA JJ Verderber, B8R, New York RC Root, B8R Site WNP-2 Files AD Toth-NRC, Region V D.L.Renberger Assistant Director Technology