Forwards Suppl 3 to Engineering Evaluation of WNP-2 Sacrificial Shield Wall. Rept Closes All Previous Items & Discusses Work Performed to Complete Programs Outlined in Original Rept
ML17277A425
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/25/1983
From: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17277A426 List:
References
GO2-83-66, NUDOCS 8302040069
Download: ML17277A425 (4)


Text

fiE'8VEO Washington Public Power Supply System" P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 I%3 JhH 28 PII l: 2I IZlg pzzg pp~

January 25, 1983 REGtONV3i~C G02-83-66

'Mr. R. H. Engelken I Office'f Inspection and Enforcement

, Nuclear Regulatory Cotlnission Region V 1450 Maria Lane Suite 210 Walnut Creek, CA 94596

Subject:

NUCLEAR PROJECT NO. 2 ENGINEERING EVALUATION OF THE WNP-2 SACRIFICIAL SHIELD WALL SUPPLEMENT NO. 3 - FINAL REPORT

References:

(a) G02-80-168, August 1, 1980, D. L. Renberger (Supply System) to R. H. Engelken (NRC), "Sacrificial Shield Wall. (SSW) Corre'ctive Action Plan" (b) G02-80-183, August 20, 1980, D. L. Renberger (Supply System) to R. H. Engelken (NRC), "Sacrificial Shield Wall (SSW) Corrective Action Plan Supplement 1" (c) G02-81-556, December 29, 1981, R. G. Matlock (Supply System) to R. H. Engelken (NRC), Engineering Eval-uation of the WNP-2 Sacrificial Shield Wall Supple-ment No. 2" Reference (a) transmitted to the Office of Inspection and Enforcement ( I8E) a report entitled "Engineering Evaluation of the WNP-2 Sacrificial Shield Mall." Reference (b) transmitted Supplement No. 1 to the subject report, addressing 18E concerns and questions on the overall evaluation of the sacrificial shield wall. Reference (c) transmitted Supplement No. 2 to the subject report providing information regarding deviations from the original girth weld plan, a discussion of deficiencies identified during preparation of the girth weld joint, and revised tables.

The purpose of this letter is to transmit Supplement No. 3 which closes all previous items and provides a discussion of work performed to complete the programs previously outlined in the original report.

Additional deficiencies that have been identified and repaired since sub-mittal of Reference (a) do not fall outside the bounding assumptions made in the original SSW evaluation, nor do they invalidate the conclusions, with respect to the integrity of the SSW, made in that original evaluation.

8302040069 830i25 PDR ADOCK 05000397 A PDR

gr~

$ 1

~ p. A ~

ter. R. H. Engelken Page Two January 25, 1983 G02-83-66 This is the final supplement to the original evaluation and completes all related commitments previously identified to the NRC. Any future nonconforming conditions pertaining to the sacrificial shield wall will be dispositioned using normal project procedures and will be available for review by the NRC Resident Inspector as necessary.

. Hatloc,k -.901A .

WN -2 Program Director RGM/TNE/sms Attachments cc: WS Chin, BPA (399)

AI Cygelman, BSR (954W)

RA Feil, NRC Site ND Lewis, EFSEC-Olympia TA Hangelsdorf, Bechtel (982)

JC Plunkett, NUS JE Richardson, BSR Site RA Schwencer, NRC

' RE Snaith, Stello, B&R NY NRC AD Toth, NRC