Monthly Operating Rept for Oct 1997 for Re Ginna Nuclear Power Plant.W/971111 Ltr
ML17264B094
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/31/1997
From: WALDEN J V, WIDAY J A
ROCHESTER GAS & ELECTRIC CORP.
To: VISSING G S
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9711140275
Download: ML17264B094 (11)


Text

CATEGORY 1 REGULA Y'INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACCESSION NBR:9711140275 DOC.DATE: 97/10/31 NOTARIZED:

NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NM4E AUTHOR AFFILIATION WALDEN,J.V.

Rochester Gas 8 Electric Corp.WIDAY,J.A.

Rochester Gas S Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.

SUBJECT:

Monthly operating rept for Oct 1997 for RE Ginna Nuclear Power Plant.W/971111 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 G RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN1 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME VISSING,G.

FILE.CENTE 01 OC/b COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D 0 U E NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 I I Il a I

(~e~t Zs~nsirZZ j iIIiiiIii AND>'rizjyiz zsiizisia~iz~u/Zl~iizszzz 5TATE ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N Y.14649-0001 TELEPHONE AREA CODE Tld 546.2700 November 11, 1997 US Nuclear Regulatory Commission Document Control Desk Attn: Guy ST Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for October, 1997 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5, attached is the monthly operating status report for Ginna Station for the month of October, 1997'ery truly ours, s h A.Wi ant Manager xc: U.S.Nuclear Regulatory Commission Mr.Guy S.Vissing (Mail Stop 14B2)Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector Attachments W&'97iii40275 97i03i P DR ADOCK'50O0244 R PDR ll!llll!ill!

IIIlllIllllllllllllll flI

OPERATING DATA REPORT COMPLETED BY: DOCKET NO: 50-244 November 11 1997 John V.Walden TELEPHONE (716)771 3588 Notes 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: October 1997 3.Licensed Thermal Power (MWI): 1520 4.Nameplate Rating (Gross MWe): 517 5.Design Electric Rating (Net MWe): 470 6.Maximum Dependable Ca pacity (Gross MWe): 490 7.Maximum Dependable Ca pacity (Net MWe): 480 8.If Changes Occur in Capacity Rating (Items Number 3 Through 7)Since Last Report, Give Reason: 9.Power Level to Which Restricted.

If Any (Net MWe: 10.Reason For Restrictions, If An: This Month Yr.-to-Date Cumulative-11.Hours in Reported Period 12.Number of hours Reactor Was Critical 13.Reactor Reserve Shutdovm Hours 14.Hours Generator On-line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit SeNice Factor (%)20.Unit Availability Factor (%)21.Unit Capacity Factor (using MDC Net)(%)22.Unit Capacity Factor (using DER Net)(%)23.Unit Forced Outage Rate (%)745.0 469.0 0.0 468.7 0.0 687980.0 234504.0 222957.0 62.9 62.9 62.3 63.7 0.0 7296.0 7020.0 0.0 7019.7 0.0 10586628.0 3605561.0 3432693.0 96.2 98.0 100.1 0.0 244848.0 196934.3 1687.6*193946.2 8.5*276462898.0 91715870.0 87078559.8 79.2 79.2 76.6 76.7 5.6 24.Shutdowns Scheduled Over Next6Months(Type, DateandDurationof Each): Refuelin outa e started October 20 1997.Scheduled duration is 23 da s.25.If Shutdown At End of Report Period, Estimate Date of Startup: 26..Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION'UMUlATIVE TOTAL COMMENCING JANUARY 1, 1975"CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 Ji Il I A J AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: November 11 1997 COMPLETED BY: TELEPHONE:

John V.Walden 16 771-3588 MONTH October 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY.POWER LEVEL (MWe-Net)492 17.452 2.492 18.447 3.492 19.439 492 20.169 5.492 21.-10 6.491 22.-10 7.492 23.492 24.9.492 25.10.491 26.12.492 491 27.28.13.483 29.14.488 475 468 30.31.16: 462 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.Compute to the nearest whole megawatt.

DOCKET NO: 50-244 UNIT: R.E.GINNA NUCLEAR POWER PLANT r DAT:-ovember 1 1997.i COMPLETED BY: John V.Walden, UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH October 1997 No.Date Type Duration (hours)Reason'ethod of shuting down reactors Licensee Event Report¹System Code4 Component Code'ause&Corrective Action to Prevent Recurrence 10/20/97.276.3 C 1 F: Forced S: Scheduled 2 Reason: A-Equipment (Explain)B-Maintenance or Test C-Refueling D-Regulatory E-Operator Training&Lecensee Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method: 1-Manual 2-Manual Scram..3-Automatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161)5 Exhibit 1-Same Source (V I NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.Qinna Nuclear Power Plant DATE: COMPLETED BY: TELEPHONE:

John V.Walden 16 771-3588 November 11 1997 v MONTH October 1997 The unit operated at full power from October 1, 1997 to October 12, 1997.Power was reduced from October 12, 1997 to October 20, 1997 due to end of fuel cycle coast down.The unit was shutdown on October 20, 1997 for refueling and maintenance.