Rev 8 to Electrical Trouble Shooting & Repair.
ML18087A729
Person / Time
Site: Salem  PSEG icon.png
Issue date: 03/11/1983
From:
Public Service Enterprise Group
To:
Shared Package
ML18087A720 List:
References
M3Z, NUDOCS 8303160518
Download: ML18087A729 (14)


Text

NOTE: PRESS HARD YOU ARE MAKING FIVE (II) COPIES ADMINISTRATIVE PROCEOURE 3 CHANGE TYPE: QN,,]"_HE'-spQ'

_Cl-fANGE'_

m "ERMANENTD

  • TEM,.ORARY

_________

E_IiE_cTim:

__ it:r._'E......._UIP

__ ME_NT_-rr_R_O_UB_LE

__ sH_OOT __ I_N_G __ -1 LJ (GltEEN) ' (ORANGE) PROCEDURE TITLE AND REPAIR *EXPIRES:

ALL ON-THE-SPOT CHANGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS. 0 UNIT I 0 UNITZ IDZ 8 l PROCEDURE NO.------------------

No. ____ CHANGE No. ___ _ PROCEDURE NO. ____ ID __ z ___________

_ 8 l REV. NO. ____ CHANGE NO. ___ _ PROPOS'ED CHANGE: CHANGE STEP .3 TO READ: 8.3 Obtain Shift Supervisor's approval to begin work using the references listed in Step 8.1, on the following equipment:

EQUIPMENT WORK ORDER NUMBER I SERIAL NUMBER NAME PLATE DATA SHIFT SuPERVISOR DATE 2) ADD. TO THE PROCEDURE STEP SIGN-OFFS FOR THE FOLLOWING.

STEPS: 9.1 9.2 9.3 REASON FOR CHANGE: CLARIFICATION OF STEPS/DOCUMENTATION ACTION TAKEN FOR OTHER UNIT: SAME FOR BOTH UNITS AUTHORIZATIO

    • SIGNATURE ALSO VERIFIES THAT APPLICABIL.ITY TO BOTH UNITS HAS lilEEN CONSIDERED.

ACCEPTABLE:

POST CHANGE*REVIEW/APPROVAL YES NO D.D DD c:rlNt:J I DEPARTMENT HEAD SQAE SORC I.CHAIRMAN)

MANAGER *SALEM GENERATING STATION RETURN COMPLETED OR REJECTED FORM TO DE .. ARTMENT ltEQUESTING CHANGE. FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN: ce r 8303160518 830314 i PDR ADOCK 05000272 . S PDR PERFORMED BY:

RETURN TO DEPARTMENT HEAD FOR ltOUTING THROUGH "OST CHANGE*REVIEW/A

.... ROVAL CYCLE. 1-* 1-8 DATE DATE DATE DATE DATE DATE

      • ' . " * (_. ------------MAINTENANCE PROCEDURE A-11 ENCLOSURE 1 PROCEDURE APPROVAL COVER SHEET PROCEDURE NUMBER: M3Z TITLE: ELECTRICAL EQUIPMENT TROUBLE SHOOTING AND REPAIR REMARKS:.

t REV. NO. SUBMITTED DATE ECD APPROVED DATE MGR *. QAD APPROVED DATE -----THIS PROCEDURE IS SAFETY RELATED. ALL DOCUMENTATION.SHALL BE MAINTAINED FOR A PERIOD OF FIVE (5) YEARS. THIS PROCEDURE HAS BEEN REVIEWED AND DETEPMINED TO BE IN COMPLIANCE WITH TECHNICAL SPECIFICATION REQUIREMENTS.

7 . 8 ,; ' N/A N/A N/A 'N/A' NDE LEVEL III APPROVED N/A N/A DATE AI. REVIEWED 'DATE N/A N/A -, SQAE REVIEWED41 DATE LA.rt{ ' '\!. cil v MAINT. MGR. J APPROVED <7 .... DATE \_ \ I U .. '° ' ,, S.O.R.C.

MTG. NUMBER *\'>' ... vv ...

DATE \ , ' GEN. MGR. -v v SALEM OPS. i APPROVED DATE -I .. \ I 0 A-11 .. . Enclosure 1 Page 1 of 1 Rev. 22

... * * *-**-----*-

-M3Z TlTLE: ELECTRICAL EQUIPMENT TROHRJ,';"-

SRY)TING .Z..N'D REPAIR THIS PROCEDURE IS SAFETY RELATED. ALL SHALL BE MAINTAINED FOR A PERIOD . OF FIVE ( 5) Y:::..Z..RS.

THIS PROCEDURE HAS REVIEWED AND TO EE I!: CO!*l.PL:;.2:::::.

WITH TECHNICAL SPECIFICATION I--* I .* ?;8. I I I I 5 6 I St::E:*:!TTE:>

lZr"?> Rwl.J. DA'!E k ECD A?PRO\"ED N/A N/A. DATE Ql-.:l J..?FROVE:;)

N/A N/A D.ro.'TE l\::>E LEY EL III J..F F R:J'.'E!:l . N/A N/A 'DF.'Z"E J..1 FZ.'IE".\ED D.Z..':E N/A N/A z::.*--..:..

\ I ', fi ( '4.' DJ..':'E . ' ' ' ' ' Ir\\ .

--v\\: I !JpY 1".J..INT.

ENG. APPROVED ,_.go .Ji'I DATE i. ... -i"" \ / S.O.R.C *. .

81-i'"J .!l.TG. l\O./ 12-10 *r" . -c-D.hTE

... ;\ ,___ S_TA. ti!:;R. . \,,0-!0_

'--f;* """ APPROVED \ \ , ' 1 u I£/, ,'I 1

\ DJ..':'E J..-11' I ENCLOSURE l Page l of l : I I I I I I I I I ; i I i* I ' l I I j i I I I I ! I I I I I . I I i I I I I I I i I ! I : I I l I I I I i I I I I . I I I I I I I F-** , 0 .:: ,,, . -.,,

  • SALEM GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY MAINTENANCE DEPARTMENT PROCEDURE APPROVAL COVER SHEET PROCEDURE
M3Z
  • TITLE: Electrical Equipment Troubles::.ooting

& Re-::.e.ir REMARKS: 0 _____ I REVISION I 1 .2 3 -This procedure is safety related. All documentation shall be maintained for a period of five (5) years. This has been reviewed and determined to be in compliance with Technical Specification I -*a / / !"-!-' I .. . . . .

-. -* *---. EED APPROVED Jv//' . I': EED QA S.O.R.C. STATI0!\1

!*!1-.NAGER .AP?ROVD ,

... ,* .*. --__,/'" ** ;" :: .* : -* ....f,. SUBHITTED APPROVED S.O.R.C. MTG. NO. STATION !1.1.ANAGEn APPROVED (Not Req . (Format R vision Only) {Format R

.. "*" Rev. 4 SKD-17-774 i i

(. *

  • GENERZ\.TING STATION MAINTENANCE DEPARTMENT MANUAL MAINTENANCE PROCEDURE M3Z l.O TITLE Electrical Equipment Trouble Shooting and Repair. 2
  • C F..:'P-POSE purpose of this procedure is to guide personnel investigating anc repairing safety related, as well as, r,o::-i-safety relateC. electrical
-:c-.lfu:--ic-::ions.
3.

This procedure is applicable to both Salem Unit #1 and Unit #2.

4.0 REFERENCES

5.0 E. :J 4.1 Administrative Procedure (AP) 15 -Safety Tagging Program. ENCLOSURES Enclosure l -Jumper Log. Enclosure 2 -Disconnect Log. E::.closure 3 -Data Sheet .*

E.l It is responsibility of the Supervisor in charge of the job tc ensure that: 6.1.1 Adequate reference materials are used for troubleshooting and repair. 6.1.2 Technical specifications are considered and not violated.

7.0 PRECAUTIONS

AND LIMITATIONS

-*-.:...:...

7.1 When Maintenance Procedures require working around electrical equipment, safety precautions and work habits specified in the Public Service _Safety Manual shall be observed by all personnel involved in ment of those procedures.

7 .2 Wnen slings must be used to accomi:lish Maintenar,ce Procedures, t!-iey shall be used in accorcance -v:i th t:-:.e requirements of Maintenance Procedure Page 1 of 6 Rev. 8

' I I,_ * (" \ * * ;::::z 7.3 When Maintenance Proced\,lres require working on Stainless Steel components of the system, the following items shall not be used: 7.3.l Carbon Steel wire brushes and scrapers.

7.3.2 Chlo_rinated

solvents, e.g. 0 trichlorethylene.

7.3.3 Unapproved

masking tape, other than for use on protective 7.4 Only qualified in accordance with Maintenance Procedure (h-3), Maintenance De:;_:,a.rbnent Training Program, shall perfo:::-::i this Proced*.l:?:'s.

7.5 As with all electrical circuits, voltages will be present ca:?:'e must be taken to prevent electrical shock. 7.6 All circuits shall be analyzed for inadvertent starts or trips of equipment when lifting leads or using jumpers. 7.7 Components, equipment or material handled over or in proximity to irradiated fuel or safe shutdown eguipment shall be lifted in accordance with Maintenance Procedure M2R. 7.8 During repair and maintenance of station eqJipment, fire barrier integrity must be maintained or restored prior to equipment operation.

If integrity is questioned, evaluation should be requested from the Electrical Engineering Department.

7.9 Prior

to applying solvents to electrical verify components are to the solvent. On W-2 switches, no solvent cleaning is required or authorized.

Clean with a dry cloth only . 8 .1 SUPERVISOR/WITl\ESS

  • (SW) The following
reference material s:iall be used for the perforrr,ance o: the work: 1. Electrical Schematics:
  • 2. Technical .Manuals: . 3. Other: Page 2 of 6 Re\*. 8
  • 8.2 SUPERVISOR/WITNESS The Supervisor in charge of the job shall determine if calibrated and Test Equipment will be used to record ments during the performance of this Procedure.

If so, !1e shall (SW) enter the equip:nent

10::r.e:nclature below, and initial, if not shall mark N/A on the first line and initial. test ec;uip:nent is withdrc.v.7' for use, t!"le electrician perfor::.i::-.g t!-!e job the serial calibration date, calitratior. date and initial. :;--r--

S:JP:S?.VISO?.

EQUIP:.Sl*iT G-LIE?-ATION er.LIE RP/I: ON


*-* I!JIT'IALS SERIAL DUE DATE

  • 8.3 Obtain Supervisors approval to begin work, using the references listed in Step 8.1, on the following equipment:

Equipment . Work Order Number I Serial Nu.".lber l\ame Plate Data Sl:ift Supervisor Dc.te S. C 1 ?ROCE!)U?2

  • CAUTION USE EXTREHE CAUTION WHEN OPERATING A BREAKER IN THE TEST POSITION BECAUSE THERE *MAY BE AN AUXILIARY CONTACT TO OTHER EQUIPMENT WHICH MAY .CAUSE AN TRIP OR START OF THAT EQUiPMENT.

NOTE:

LOGS

1) AND Drscmm:=:cT.
...OGS (ENCLOSURE
2) SHALL BE USED IN THE PERFORI-W-JCE OF THE WOPJ<. 9 .1 Perfor.n t:'1e troubleshooting in accordance with references prov idea. 9.2 All measurements taken during the troubleshooting shall be recorned on Enclosure
3. Record equip:nent tested/malfi.:nctions found. Page 3 of 6 Rev. 8
  • -.*
  • 9.3 When the malfunction found*, immediately notify the Supervisor in charge of the job before proceeding further. 9 .4 SUPERVISOR/WITNESS Reccr3 .the cause of the malfunctiori below. Using the reference matsr :.al, det.E.=::-1:.ne tI:e correc-c.ive action to be ta.ken an:: spa.rE: parts to be 2eccra in the s?aces providec.

IF AD.TJSTMENTS AF.E MADE WHICH WILL AFFECT MEASliREMENTS, RECORD "AS LEFT" READINGS ON ENCLOSURE

3.

Cause: Deficiency Report Required:

Corrective-Action: Yes Parts to be Replaced (Include Serial Numbers.or Purchase Order #) Page 4 of 6 (SW) (IBP) No

_ .. * *

  • 9.5 SUPERVISOR/WITNESS HOLD ?DINT Perfo:::-m th.e corrective action outlined in Step 9.4. Ensure all :!=-a:?:"ts rer:;laced are recorded \*:ith their serial or Purcl-.c.se INSPECTIOS EOLD POINT Determine, if necessary, the retest to be perforwed.

List the retest, supporting used to determine test, notification of other Departments and dates below: 1)

2)

Used to Determine Retest: 3) Results of Retest: 4) Other Departments notified of retest: Department Order i*:ork Order :-1ork Ore er ;*;rork Ore er Person Notified i*:r i tten l*<ritten i_tten *,;r:::-itten

  • Yes No Yes No Yes No Yes No Notified by w.o.# 1*;. 0. # l*i. o. # i*:. 0. # Page Time Date to to to to 5 of 6 (SW) (IHP) 9.5 (IHP) Dept. Dept. Dept. De,I:t. Rev. 8

. .

  • 11. 0 CLOSEOUT AND FINAL REVIEW 11.1 Performed by: Electr icia:: 11.2 Reviewed by: l*'.aintenance Supervisor Quality 11
  • 3 R'S:*:AR:::.S
* ::3Z Page 6 of 6 Date Da-:.e Da-:.e Rev. 8 I. I " I J ' ' I 'ti ru tQ (1) 0 ,. h ' Tj in ..... . , (l) *' Terminal lJ Prom M N p o. E Term. Term. R Block No. -** -------*' . -*-----INST.1\Lr.rm HEMOVTm ---------Location Hef. Verification Ref. IJcr:i. f :i.cn ti on To Dwq. IJwg. Rev. Rev. No. No. . Term. Term. Initials Date Initials Date No. No. ----------*** -*--****--*
    • ------------*--*----

-* Electrician/Qttalifiecl Person Mainte'1ance Super'\risor


SND-20-1173 , . M fj ti H 2: G1 2: 0 . -j

. ; , ___ *w Terminal I N r..Ocatio'n R o. E Term. Term. ' Block* No. * --' ...... tv ---_,, DISCONNECTED RECONNECTED Ref. VF.IUFICI\TION

  • Ref. VERIFICJ\TION Dwg. Dwg. Rev. Rev. No. Initials Date *No. Initials Date *-. . -... --* --j ---. Electrician/Qualified Person 'Maintenance Supervisor I I fr f f, ,. l t '*

. .

TO 3?:.

?r.=:::-fo:::-med by: :.::;,z MAINTENANCE PROCEDURE M3Z ENCLOSURE 3 DATA SHEET P.EFERENC:E USED Maintenarice Supervisor Quality Assurance P.EA::>INGS "AS FOi.JN0" Enclosure 3 Page 1 of 1 Date Date READINGS "J...S LE::T" AFTER IS ?.3Q'JI?.ED Rev. 8

  • Appendix C Technical Department Procedures lIC 18.1.010, SSPS Train 11 A 11 , Reactor Trip Breaker Functionl Test 1 IC 18.1.011, SSPS Train 11 B 11 , Reactor Trip Breaker UV Coi 1 Functional Test lPD 18.l.D04, SSPS Reactor Trip Breaker and Permissive P-4 Test -Train A lPD 18.1.005, SSPS Reactor Trip Breaker and Permissive P-4 Test -Train B lPD 18.1.008, SSPS Functional Test -Train A lPD 18.1.009, SSPS Functional Test -Trafn B lPD 18.4.002, Response Time Test of SSPS Logic -RX Trip, Train A lPD Response Time Test *of SSPS Logic -RX Trip, Train B