ML18101A676

From kanterella
Jump to navigation Jump to search
Rev 12 to EOP 1-EOP-TRIP-2, Reactor Trip Response.
ML18101A676
Person / Time
Site: Salem PSEG icon.png
Issue date: 02/16/1995
From: Beattie J
Public Service Enterprise Group
To:
Shared Package
ML18101A674 List:
References
1-EOP-TRIP-2, NUDOCS 9505020324
Download: ML18101A676 (13)


Text

SALEM OPERATIONS l-EOP-TRIP-2, Rev. 12 REACTOR TRIP RESPONSE USE CATEGORY: I REVISION

SUMMARY

  • The following changes are editorial (Revision Bars were not utilized for this change):

+ Step 3 on sheet 1 has been changed to remove the action steps which manipulated the MSlO controls.

These controls were enhanced in DCP lEC-3325 and remote board operation is no longer required to relbOve the "reset and windup" within the valve controller.

+ Step 10 on sheet 1 has been changed due to PSE-94-776, Salem RCP Seal Injection Path Resistance Calculation. Seal Injection flow rate is 6 to 10 GPM vice the old 6 to 13 GPM. This new value is to ensure that the operating nows for charging and seal injection will be met while still maintaining the limiting accident ECCS flow.

  • Step 16 on sheet 2 has been changed to update this procedure to the Tech. Spec. Amendment which altered our SIG Lo-Lo Trip setpoint. The setpoint was changed to 9% and affects our AFW Interlock.

Step 16 has been revised as follows:

WHEN AT !&\§! I!IBfili. SG Lo-Lo LEVEL BISTABLES ARE RESET AS INDICATED BY:

  • JRP4
  • OHA
  • BEZEL INDICATION THEN SEND OPERATOR TO RESET IMS52 IMPLEMENTATION REQUIREMENTS:
  • Issue of Information Directive 95-004 9505020324 950421 \'

PDR ADOCK 05000272 I S PDR ,

EOP-TRIP-l TABLEl CONTINUOUS ACTION

SUMMARY

CONDIDON ACTION RCPs WITIIOUT CCW STOPRCPs SI ACTUATION GO TO EOP-TRIP-1 STEP 7 LESS THAN TWO VITAL BUSES ENERGIZED GO TO EOP-LOPA-1 AFST LEVEL LESS THAN 14% SHIFT AFW PUMP SUCTION SALEMUNITl TABLE 1-1 REV.12

EMERGENCY OPERATING PROCEDURE EOP-TRIP-2 REACTOR TRIP RESPONSE 1.0 Entry Conditions See Flow Chart 2.0 Operator Actions 2.1 Immediate Actions None 2.2 Subsequent Actions See Flowchart 3.0 Attachments List 3.1 Tables CAS TABLE 1-1 3.2 Figures None 3.3 Graphs None 3.4 Check Off Sheets None End of Procedure Final Page SALEMUNITl Page 1 REV 1:2

PAGE CHANGE CONTROL SHEET List of Pages 1-EOP-TRIP-2 SHEETl Rev.12 l-EOP-TRIP-2 SHEET2 Rev.12 1-EOP-TRIP-2 SHEETJ Rev.12 1-EOP-TRIP-2 SHEET4 Rev.12 1-EOP-TRIP-2 CAS TABLE 1-1 Rev. 12 SALEMUNITl Page 2 REV12

SC.OP-DD.Z7rAD44(Q)

A'ITACHMENT 1 EOP CHANGE REQUEST DISPOSITION FORM Procedure Number: 1-EOP-TRIP-2 Date Received: 8 Feb.1995

~--------~----------------

Procedure

Title:

REACTOR TRIP RESPONSE EOP Change Request Number Assigned: 95-003 Disposition: 1. The change request:

181 a) warrants a change D b) does not warrant a change (see comments)

D c) requires :further research (see comments)

2. If a change is warranted, it will be made:

181 a) immediately (within two weeks)

Db) when the next full revision is made to the procedure (see comments)

D c) prior to full revision (see comments)

3. Training requirements:

[8] a) Information Directive D b) Shift Briefing D c) Simulator Session Comments: First, l-EOP-TRIP-2 is being revised to remove the steps which manipulate the MSlO controls. These controls were enhanced in DCP IEC-332S and remote board operation is no longer required to remove the "reset and windup" within the valve controller. Second, Seal Water Injection flow rate has been changed to 6 to 10 GPM. This change came about due to PSE-94-776, Salem RCP Seal Injection Path Resistance Calculation. Finally, Tech. Specs. have been amended changing the S/G Lo-Lo Trip setpoint which affects the AFW Interlock , SIG sample valves, and the reset on the MS52.

Prepared: Jeff Beattie ~ Date: 9 Feb. 1995

~--~--~(E_O_W~~-OP~Coo-----r-.~M--!or-)-----+-.(}'Lf-=--------------

Verified: ~e.,..Zt2.

~---f<----::i~7(~0per:::::::atin~*~gE~o~gin=e=~*)~~-----------====;:::>-~

Date:

Salem Common Page 65 of91 Rev.1

SC.OP-DD.ZZ-AD44(Q)

ATTACHMENT 2 EMERGENCY OPERATING PROCEDURE APPROVAL COVER PAGE Procedure Number:

Procedure

Title:

REACTOR TRIP RESPONSE Unit Number: 1 Revision Number: 12 Remarks:

  • The following changes are editorial (Revision Bars were not utilized for this change):
  • Step 3 on sheet 1 has been changed to remove the action steps which manipulated the MS10 controls.

These controls were enhanced in DCP tEC-3325 and remote board operation is no longer required to remove the "reset and windup" within the valve controller.

  • Step 10 on sheet 1 bas been changed due to PSE-94-776, Salem RCP Seal Injection Path Resistance Calculation. Seal Injection flow rate is 6 to 10 GPM vice the old 6 to 13 GPM. This new value is to ensure that the operating flows for charging and seal injection wiU be met while still maintaining the limiting accident ECCS flow.
  • Step 16 on sheet 2 has been changed to update this procedure to the Tech. Spec. Amendment which altered our SIG Lo-Lo Trip setpoint. The setpoint was changed to 9% and affects our AFW Interlock.

Step 16 bas been revised all follows:

WHEN AT LEAST THREE SG Lo-Lo LEVEL BISTABLES ARE RESET AS INDICATED BY:

  • 1RP4
  • BEZELINDICATION THEN SEND OPERATOR TO RESET lMSSl

REVIEW I APPROVAL------------

SOTS: Date:

Senior Reactor Operator:

! \ .1 Operating Engineer: _ _ _......_v.:_.-..;.;1--'---.:..=**-=----'Ls'/')--;) /.

-L-:::,,,.,___,_*;-_*___..;..-:.;_*_-_.~......1_ _ _ _ Date:

(

Salem Common Page 66 of91. Rev.1

ATTACHMENT 3

  • SC.OP-DD.ZZ-AD44(Q)

EDITORIAL VERIFICATION FORM Evaluator (SRO): ---~-.(-~_.\.,..)11.....~t:_J__________ Date: l l t ') )~ ')

Procedure Number: 12 Procedure

Title:

REACTOR TRIP RESPONSE VERIFICATION CRITERIA DISCREPANCY NUMBER Jt;'

1. Legibility
2. Format Consistency

,,, It.

fl.

3. Identification Information
4. Information Presentation
5. Procedure Referencing NOTE For each discrepancy, a Verification Discrepancy Sheet (Attachment 4) is required to be rdled out and attached to this form.

Evaluation Complete:

l....__, /" ( Evaluator Sign I Date )

Discrepancies Resolved and Incorporated:

OP Coordinator Sign I Date )

Editorial Verification Form I Resolutions Reviewed:

._ cf);_

Salem Common Page 67 of91 Rev. I

SC.OP-DD.ZZ-AD44(Q)

ATIACHMENT 5 TECHNICAL VERIFICATION FORM Procedure Number: 1-EOP-TRJP-2 Draft Revision: 12 Procedure

Title:

REACTOR TRIP RESPONSE Evaluator(s): ~ . [\**-1:;1J Scope of Verification: Full Partial ( specify steps or sections )

TABLE TOP V&V. Verify the bullets listed under the REVISION

SUMMARY

. Follow the guidance provided in SC.OP-DD.ZZ-AD44(Z) Sections 7.0 & 10.5.

VERIFICATION CRITERIA DISCREPANCY NUMBER Jr* i .1 111

1) Source Documents
2) Quantitative Values i' itr
3) Plant Hardware I
4) Conformance Items  :'f flJ(

NOTE For each discrepancy, a Verification Discrepancy Sheet (Attachment 4) is required to be filled out and attached to this form.

C) *. * (

Evaluation Complete: c '\\ '"\1

=._/ (Evaluator Sign I Date)

Discrepancies Resolved and Incorporated:

(EOP/

Technical Verification F onn I Final

/'l**) (

l) :I Resolutions Reviewed: ~;:;:....~?>--**. .. *!.-,

( Operating Engineer Sign I Date ) (J Salem Common Page69 of91 Rev.1

SC.OP-DD.ZZ-AD44(Q)

ATIACHMENT 6 TECHNICAL VALIDATION FORM Procedure Number: 1-EOP-TRIP-2 Date Performed:

Procedure

Title:

REACTOR TRIP RESPONSE Draft Revision: 12 Validation Method: TABLE TOP

~~~-- -------------------------------

Validation Scope: Verify the bullets listed under the REVISION

SUMMARY

. Follow the guidance provided in SC.OP-DD.ZZ-AD44(Z) Sections 7.0 & 10.5.

Plant Operations Personnel: Qualifications (SRO, RO etc.)

~ (". '\

\t ,,_; '1*\fV

'I - "* ~

sru Validation team Members Organization and Title JeffBeattie ~~ Ops-EOP I AOP Coordinator Ops-SRO A-NOTE For each Discrepancy, a Verification Discrepancy Sheet (Attachment 7) is required to be filled out and attached to this form.

Validation Exercise Completed:

(EOP/AO Discrepancies Resolved and Incorporated:

Validations and Resolutions Reviewed and Approved:

/ I ~

Salem Common Page70 of91 Rcv.1

looEOP-TAIP-2 2

REACTO~

3 TRIP RESPONSE 4 5 6 7 B q rn 11 12 13 14 15 16 17 18 __ )_'.!_ ___20 21 l-EOP-TRIP-2/SHl 22 II A ...,,.,

O>l!llWU'- "'""'-""""' A i

-~

LDI n.- !!!! -.. . . . ~

-1.ria.l..Qll-KI D:JTll~,_.,, ... ,

..,.1611 ... ..:Tm B B 0

FCEDWIIER r - -

nan f'Zll .. - -

LmL I STATUS I I

I c

lI c I I iI L I I

_,, I I

I I

~

I

-Cl~-

I D . . . . . fl'llRJll' I

I m L

  • IC!-.i-lli. DfARGlMi ... - -

llfll(XDlll~,.

~r;:r-- ""

STAM E

RCS,.--

F

--* F I.

I G

£~ I I

I I ~1~3~1 G I

i I

I I

I I

I L I

I I

I H I H I

I L I I

I I

I L__ I i

I I

1.

J I I

I I

I

  • ~'=:-s.~

..irua*'IMll'D' J

I I

I

  • IUll'. ..,lll-111,119' . . . . . . &l'l..,llUll I mlll'UCl*Mll' I L K I L_

L L M M HIJP-TR!P-2 i

I IH!ACTCll TRIP RESPCll'SE 11&1' H* 4 I

'°'""' . "" ...

N N snLEH GENERATING STATION IJIITI I:

2 3 4 5 6 7 8 q 10 11 12 13 14 15 16 17 18 19 2ll 21 22

- --- - - - ------ -- I

2 3 ~_j__s 7 8 9 !Ii! 11 12 13 14 15 16 17 18 19 20 _2.1 22 1-EOFJ-TflIP-2 1-EOP-TR!P-2/SH2 A ~

""""' .... A

~

--.;ru..

-.-*ra-Eil'-,__.lllD,

,,.,_mm111...a1M.m1 *-i11a*-~;--

9E'IE&..LDIT!mMi **----~---=mi:

B B I

~ . -- PZJlr--- I.

FUJII

'"TIS """"""

STAllJS I

c c l t*

D D I E

F I I

'~

F Ii I

G G i*

H rn--

  • IU&.DllDITDI DDl--l'Gll H

I Vi' I

I I L

!Utlii ... 1£111-*

.,.,...,,~.,,..

I I

I I

J J K

I L L II I

i.

M l-EOP-TRIP-2 REACTOR TRIP RESPCI<<

M I

Sl£CT 2 Df' ..

N N RE:f IZ FE'IDA'IE SALEM GENERATING STATION 2 3 5 6 7 8 '! 10 11 12 13 14 15 16 17 18 19 20 21 22

17 18 l'l 2121 21 L_2_2 I

1-EOP-lRlP-2 REACTOR TRIP RESPONSE l-EDP-TRIP-2/SH3 A

B lllEEEL ,..--

......TOR BTATUV PZR ,---

tt:i\Tt:"

B I 1.

c . '"'""

lrtllILAIJlUTf c

D

-~--- D I

I I

--R E I I

_.,,.,..m I

~*tmmmc c:l:-WJUN:...Unlll!D: I ll'rm-ma. "l 11¥WCwtra. I

  • raNXT~* I llHATIU)llllft1'UllO Mlll'IWll"IM1alr:lli

--'l't-llEl.llllll:Ol"lftltIICI

  • 11119:24 I

I I

i F

l_ -

    • ~

L<------'

I I

I STEAM.---

STl\lUS F I I

I I

I I

I G I G I

t__

I H I H I

I I

I I

I I

I tcf.'11..W I

I I

...... I u I I

J

......"" I L__

K I

I I

I I

L I I

I L<---~---'

I I

I I

I I

M II__ _ M CILT WO Uln1C:t' "-'TEW PlW 111.1. ITlllT.IOIEWJI,~ LDO Pl.IP FAlU TU ll'ftCT,nglllOO.l'N"il'VIU.ITl'RT.

~------------

1-EOP-TRIP-2 REACTOR TRIP RESPl>ISE N

SALEM GENERATING STATION UlOT 1 2 3 4 5 6 7 e 10 11 12 13 15 16 17 16 l'l 20 21 22

2 3_ 5 6 7 9 9 Hil 11 12 13 14 15 16 17 18 19 21.l 21 22 1-EOP-TftlP-2 1-EDP-TRIP-2/SH4 A A B B RJRC[-ftC'il . - - -

CDIU<llr STi'l'lllBI I

I c I I c I

I mJU .. - -

STATUS I

I I

D. I I

D I

I I

I 9 __ __

L--

I I

I E I er-..~

I I

I

--~

Lnra:-~

'I I

I e L

.a.a.a.mia:urr F 'I I

  • rz:ll!ICU1kll.I I

I I

l__

ACS .---

G ,..,

\'£:AlFDT1CJI r--- ........,...,,

,_,,_, 1 No\Tl.IW.I I

"""°""' I I I

'""I I I

I I I I I

H I I  !

I H

I I

I I

I I

J J K

I L

I I

L I

I l' __

M M t-EOP-TRIP-Z IHET 4 17 4 N >-- - - - - - ------<N llEV,,

SALEM GENERATING STATION ""' 1 2 3 4 5 6 7 R q II 12 !3 *14 15 16 17 18 19 20 \ 21 22