ML18106A392
ML18106A392 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 03/13/1998 |
From: | Public Service Enterprise Group |
To: | |
References | |
PROC-980313, NUDOCS 9803250427 | |
Download: ML18106A392 (14) | |
Text
~IC SERVICE ELECTRIC & GA.OMPANY
~ DOCUMENT DISTRIBUTION NO -E PAGE 1 OF 1 TRANSMITTAL: DOG 0028290 TO: NRC *- WASHINGTON *0028290*
DOCUMENT CONTROL DESK COPYHOLDER: SECGOlOl WASHINGTON, DC 20555 DESCRIPTION: LEC/019 EP PROC FO~ MAR~ A.
PLEASE INSERT THE FOLLOWING DOCUMENTS INTO YOUR CONTROLLED FILE/~UA~~
SUPERCEDED DOCUMENTS MUST BE SO MARKED AND PHYSICALLY REMOVED OR:;OESTROYED .:f . . ..* .
SHT/
CLASS DOCUMENT ID VOL INST REV STAT TYPE F~T Q~Y
*--~~--- ~--
PROC ECG-ATT.04 002 A SECG Hi. 001 PROC ECG-SECG-TOC 009 A SECG 1('. 001
/
9803250427 980313 "
PDR ADOCK 05000272 F PDR THIS ACKNOWLEDGEMENT RECEIPT MUST BE RETURNED WITHIN 5 WORKING DAYS TO:
PSE&G DMG/MC N04 PO BOX 236 HANCOCKS BRIDGE, NJ 08038 YOUR SIGNATURE BELOW VERIFIES THAT (1) THE ABOVE DOCUMENTS HAVE B~EN FILED AND SUPERSEDED DOCUMENTS HAVE BEEN REMOVED AND DESTROYED OR CLEARLY MARKED AS OBSOLETE (2) THE MAILING ADDRESS AND COPYHOLDER INFORMATION ARE CORRECT OR CORRECTIONS HAVE BEEN IDENTIFIED ON THIS TRANSMITTAL.
SEE MY INSTRUCTIONS ABOVE CHANGE COPYHOLDER INFORMATION REMOVE FROM DISTRIBUTION (DOCUMENTS MUST BE RETURNED)
D_?l}l'C:
- SALEM GENERATING STATION EVENT CLASSIFICATION GUIDE March 13, 1998 CHANGE PAGES FOR REVISION #9 The Table of Contents forms a general guide to the current revision of each section and attachment of the Salem ECG. The changes that are made in this TOC Revision #9 are shown below.
- 1. Check that your revision packet is complete.
- 2. Add the revised documents.
- 3. Remove and recycle the outdated material listed below.
ADD REMOVE Pages Description Pages Description ALL TOC 9 ALL TOC 8 ALL Attachment 4 2 ALL Attachment 4 1
- Salem-ECG 1 of 1
ECG T.O.C.
- ~N Pg. 1of4 SALEM EVENT CLASSIFICATION GUIDE TABLE OF CONTENTS/SIGNATURE PAGE TITLE REV# PAGES/o'bATE T.O.C. '"{able of Contents/Signature Page 08 4 . 02/27/98 ii 111 1.0 Introduction and Usage Gl~sary
'\.
of Acronyms & Abbreviations Critical~unction Status Trees (CFSTs), Unit 1 Critical F~n.,ction Status Trees (CFSTs), Unit 2 Fuel Clad C~llenge 2v 00 00 23 00
/
j,Q/
6 6
6 1
01/21/97 01/21/97 02/27/98 08/19/97 01/21/97 2.0 RCS Challenge\ 0- 1 01/21/97 3.0 Fission Product B~riers (Table) 00 1 01/21/97 4.0 EC Discretion \, 00 1 01/21/97 5.0 Failure to TRIP '\ 00 1 01/21/97 6.0 Radiological Releases/O'c~urrences
'\.,
6.1 Gaseous Effluent Re~ase 00 4 01/21/97 6.2 Liquid Effluent Release, 00 1 01/21/97 6.3 In Plant Radiation Occu'fr.e ces 00 1 01/21/97
\
6.4 Irradiated Fuel Event \, 00 2 01/21/97
\,
7.0 Electrical Power \
7 .1 Loss of AC Powe Capabilities \~ 00 2 01/21/97 7.2 Loss of DC Po er Capabilities \" 00 1 01/21/97 8.0 System Malfunctioni \
8.1 Loss ofH at Removal Capability ~O 2 01/21/97 8.2 Los~6verhead Annunciators 00 1 01/21/97 8.3 Loss f Communications Capability 0 1 01/21/97 8.4 Con rol Room Evacuation 00 1 01/21/97 8.5 Tefchnical Specifications 00 1 01/21/97 9.0 Hazards Internal/External 9.1 Security Threats 00 01/21/97 9.2 Fire 00 1 01/21/97 9.3 Explosion 00 " 01/21/97 9.4 Toxic/Flammable Gases 00 2 ~01/21/97 9, Seismic Event 00 1 01/21/97 I. High Winds 00 1 o'i/2-1191 6*6 I .7 Flooding 00 1 01121/97--
9.8 Turbine Failure/Vehicle Crash/ 00 1 01/21/97 Missile Impact 9.9 River Level 00 1 01/21/97
- SGS PSE&G CONTROL SEC&
COPY # 01ol Rev. 08
I) l '
- ECG T.O.C.
Pg. 2of4 SALEM EVENT CLASSIFICATION GUIDE TABLE OF CONTENTS/SIGNATURE PAGE SECTION TITLE REV# PAGES DATE 10.0 Reserved for future use NIA 11.0 Reportable Action Levels (RALs) 11.1 Technical Specifications 00 3 01/21/97 11.2 Design Basis/ Unanalyzed Condition 00 2 01/21/97 11.3 Engineered Safety Features (ESF) 01 1 08/28/97 11.4 Personnel Safety/Overexposure 00 2 01/21/97 11.5 Environmental 00 1 01/21/97 11.6 After-the-Fact 00 1 01/21/97 11.7 Security/Emergency Response 01 1 03/13/97 Capabilities 11.8 Public Interest 00 1 01/21/97 11.9 Accidental Criticality/ 00 2 01/21/97 Special Nuclear Material/
Rad Material Shipments - Releases 11.10 Voluntary Notifications 00 1 01/21/97 WC Salem ECG Charts (Located In ERFs)
- SGS Rev. 08
r'
- 1
- ECG T.O.C.
Pg. 3of4 SALEM EVENT CLASSIFICATION GUIDE TABLE OF CONTENTS/SIGNATURE PAGE ATTACHMENT TITLE REV# PAGES DATE 1 UNUSUAL EVENT 00 9 01/21/97
'* 01 5 02/27/98 2 ALERT 3 SITE AREA EMERGENCY 01 6 02/27/98 4 GENERAL EMERGENCY 01 8 02/27/98 5 NRC Data Sheet Completion Reference 00 7 01/21/97 6 Primary Communicator Log 04 9 12/04/97 7 Primary Communicator Log (GE) 04 8 12/04/97 8 Secondary Communicator Log 01 8 02/27/98 9 Non-Emergency Notifications Reference 05 3 01/22/98 IO 1 Hr Report - NRC Regional Office 00 3 01/21/97 11 1 Hr Report (Common Site) Security/Safeguards 00 3 01/21/97 12 1 Hr Report - NRC Operatio.ns 00 3 01/21/97 13 4 Hr Report - Contaminated Events Outside 00 7 01/21/97 OfTheRCA 14 4 Hr Report - NRC Operations 00 3 01/21/97 15 Environmental Protection Plan 01 3 03/13/97 16 Spill I Discharge Reporting 00 7 01/21/97 17 4 Hr Report - Fatality or Medical 00 4 01/21/97 Emergency 18 4 Hr Report - Radiological 01 4 05/12/97 Transportation Accident 19 24 Hr Report - Fitness For Duty (FFD) 01 3 05/12/97 Program Events 20 24 Hr Report - NRC Regional Office 00 3 01/21/97 21 Reportable Event - LAC/ Memorandum Of 00 2 01/21/97 Understanding (M.O.U.)
22 T/S Required Engineering Evaluation 00 2 01/21/97 23 Reserved 24 UNUSUAL EVENT (Common Site) 01 IO 05/12/97 25 1 Hr Report (Common Site) - 00 3 01/21/97 Major Loss of Emergency Assessment, Offsite Response, OR Communications Capability
- SGS Rev. 08
['
- ECG T.O.C.
Pg. 4of4 SIGNATURE PAGE Prepared By: l/C I .J. d -/f?- 'j'g evisions Only, Last Approved Revi Date Section/Attachments Revised: __ AlT-'--'-1-=s-----'2'-i)~>'-1--t{---------- 2-l/S-9f (List Non Editdrial Only - Section/Attachments) Date Reviewed By: _ _ _ _ {]~"'>f/__,v)"-J\S,_0_C£_ArVY----=-c_J2,/)_____o='----------
VVstation Qualified Reviewer Reviewed By: _ _ _ _ _ _ _ l...,,~~-~~~~~------**________
~rtm;fi!Mamiger 1
,
- Reviewed By: -~...._.__
.. , ~--------'.\_'+"--'ff\~Jhc~------ c?JM/tff M{b°agef'- CA, EP, & IT Date Reviewed By: _ _ _ _ _ _ _ _ _r-J--f--/ +-&-~---------
Manager - Quafity Assessment - NBU DatJ (If Applicable)
SORC Review and Station Approvals Mtg. No. / Salem Chairman
~~ons
- )c}6-9'f5 Date Effective Date of this Revision:
Date SGS Rev. 08
- ECG ATT4 Pg. 1 of 8 ATTACHMENT 4 GENERAL EMERGENCY PSE&G CONTROLi S. EECG I. EMERGENCY COORDINATOR (EC) LOG SHEET COPY*# 0101 Initials A. DECLARE A GENERAL EMERGENCY AT HOPE CREEK EC EAL#(s) _ _ _ _ _ _~--------~ _ _ _ _ _ _ _ __
Declared at - - - - - - - hrs on - - - - - - -
time date B. NOTIFICATIONS
( ) I. CALL communicators to the Control Room.
CAUTION
- A Protective Action Recommendation (PAR) SHALL be made on the Initial Contact Message Form (ICMF).
( ) a. REFER to Predetermined PAR Flowchart on Pg. 5 and CHOOSE the appropriate PAR.
( ) b. REFER to Recommended Protective Actions Worksheet on Pg. 6 to DETERMINE the compass designations for the downwind sectors affected.
( ) c. IF a Radiologically Based PAR is IMMEDIATELY available, THEN COMPARE the two P ARs and choose the most appropriate for inclusion on the IC:MF.
( ) 3. COMPLETE the INITIAL CONTACT MESSAGE FORM (IC:MF)
(last page of this attachment).
( ) 4. PROVIDE the ICMF to the Communicator (CMl) and DIRECT the CMl to implement Attachment 7.
( ) 5. DIRECT the Secondary Communicator (CM2) to implement Attachment 8 for a GENERAL EMERGENCY.
SGS Rev. 01
- ECG ATT4 Pg. 2 of 8 Initials
- 6. IF NOT done previously, OS NOTIFY the ITOC Operator on NETS x5027 (973-430-8153, 7190, 7191) with the following message:
"This is (your name), Operations Superintendent at Salem. Please IMPLEMENT EPIP 204S, Salem Emergency Response Callout, immediately. This procedure is being implemented for an Actual Emergency."
ITOC Operator name time (EP96-003)
- 7. Direct the OS (NETS 5121; DID 5200) to make the EC General Emergency page Announcement per ECG Attachment 4, Appendix 2.
- 8. NOTIFY the Hope Creek OS. (NETS 5224; DID 3027)
EC a. PROVIDE a briefing on the GE conditions.
- b. DIRECT implementation ofEPIP 101H, Section 3.2.
- 9. IF Security Related, EC THEN DIRECT the PSE&G Security Supervisor (x2222) to implement the Security Contingency Plan.
C. EMERGENCY COORDINATOR DUTIES
- 1. IF NOT done previously, EC THEN DIRECT the OSC Coordinator to ACTIVATE the OSC IAW EPIP 202S, OSC Activation and Operations.
- 2. COMPLETE and APPROVE the NRC Data Sheet (Attachment 5) for transmittal EC by the CMl within 60 minutes.
- 3. IF the Emergency Coordinator is the EDO or OS, OS/EDO THEN REFER TO EPIP 104S, General Emergency, AND IMPLEMENT emergency actions assigned to the EDO until relieved while continuing at Step C.5 .
- SGS Rev. 01
I W I I I
- ECG ATT4 Pg. 3 of 8 Initials
- 4. IF the Emergency Coordinator is the ERM, ERM THEN continue to REFER to EPIP 401, ERM Response.
( ) a. Notify the EDO of General Emergency details;
- Time of declaration
- EAL exceeded (Basis)
( ) b. Notify EOF Staff of the change in classification.
- 5. WHEN provided by the CM2, EC THEN REVIEW and APPROVE the Station Status Checklist (SSCL) for transmittal.
( ) a. REPEAT this step approximately every half hour.
( ) b. PERFORM immediately for any significant change in emergency status.
(operational or radiological)
- D.
( )
TURNOVER
- 1. WHEN turning over EC duties, THEN DIRECT your Communicators to turnover notifications responsibilities to the oncoming facility communicators.
( ) 2. IF relieved as EC prior to termination of the GE, THEN DOCUMENT the name of your relief below:
Name time E. TERMINATION
- 2. ENSURE appropriate reports are made IAW Section II, Reporting, of this OS attachment.
- SGS Rev. 01
I I I ' .J
- ECG ATT4 Pg. 4 of 8 II. " REPORTING INSTRUCTIONS
- 1. This is a permanent document.
- 2. ATTACH appropriate documents to this form and EXPEDITE the package through all steps.
Initials
- 1. PREPARE an Action Request (AR).
OS AR#
-- 2. FORWARD this attachment and supporting documentation, to the Operations OS Manager (OM).
- 3. REVIEW this attachment, the (AR) and any other relevant information for correct OM classification of event and corrective action taken.
- 4. CONTACT the LER Coordinator (LERC) and request that the required reports be OM prepared. Provide this attachment and any other supporting documentation to the LERC.
- 5. PREP ARE required reports.
LERC Report or LER Number
- 6. FORWARD this attachment to the Central Technical Document Room for LERC microfilming.
- SGS Rev. 01
L I I l .;J
- ECG ATT4 Pg. 5 of 8
- APPENDIX 1 PREDETERMINED PROTECTIVE ACTION RECOMMENDATIONS PAR REQUIRED FOR GENERAL EMERGENCY GE BASED ON 10 YES EVACUATE ALL SECTORS 0-5 MILES POINTS ON >---- EVACUATE DOWNWIND+/-. 1SECTOR 5-10 MILES BARRIER SHELTER ALL REMAINING SECTORS 5-10 MILES TABLE
?
NO
CAUTION:
IF TRAVEL CONDITIONS PRESENT AN EXTREME HAZARD (SEVERE ICE, SNOW, WIND, FLOOD, QUAKE DAMAGE, ETC. ), CONSIDER SHELTER INSTEAD OF EVACUATE IN THE ABOVE SELECTED PAR
- SGS Rev. 01
l
- l l ~
- ECG ATT4 Pg. 6 of 8 APPENDIX 1 (continued)
RECOMMENDED PROTECTIVE ACTION WORKSHEET WIND DIRECTION PAR AFFECTED SECTORS FROM DEGREES COMP ASS DOWNWIND +1 SECTORS 349-011 N ::::::> SSE- S - SSW 011-034 NNE ::::::> S- SSW- SW 034 - 056 NE ::::::> SSW-SW-WSW 056 - 079 ENE ::::::> SW-WSW-W 079 - 101 E ::::::> WSW-W-WNW 101 - 124 ESE ::::::> W-WNW-NW 124 - 146 SE ::::::> WNW-NW-NNW 146 - 169 SSE ::::::> NW-NNW-N 169 - 191 s ::::::> NNW-N-NNE 191 - 214 SSW ::::::> N-NNE-NE 214 - 236 SW ::::::> NNE-NE-ENE 236 - 259 WSW ::::::> NE-ENE-E 259 - 281 w ::::::> ENE-E-ESE 281-304 WNW ::::::> E-ESE- SE 304 - 326 NW ::::::> ESE- SE- SSE
- 326 - 349 NNW ::::::> SE - SSE- S NOTE: CONSIDER ADDING A SECTOR TO THE PAR IF THE WIND DIRECTION (FROM) IS WITHIN +/-3° OF A SECTOR DIVIDING LINE.
3490 10 MILES 0110 281°
- SGS 191° 169° Rev. 01
l ; l l *
- ECG ATT4 Pg. 7 of 8
- APPENDIX2 GENERAL EMERGENCY PAGE ANNOUNCEMENT SOUND the Radiation Alert Alarm ANNOUNCE over the page the following:
"Attention all personnel, Attention all personnel" "Salem is in an General Emergency due to "All PSE&G personnel assemble at your accountability stations.
All contractors leave the Owner Controlled Area immediately" (REPEAT)
- SGS Rev. 01
I ,1 l I f
- ECG ATT4 Pg. 8 of 8 INITIAL CONTACT MESSAGE FORM I. THIS IS - - - - - - - - - , COMMUNICATOR IN THE D CONTROL ROOM (NAME) 0 TS C DEOF AT THE SALEM NUCLEAR GENERATING STATION.
Ila. D THIS IS NOTIFICATION OF A GENERAL EMERGENCY WHICH WAS DECLARED AT ON - - - - - - - - -
(TIME - 24 HOUR CLOCK) (DATE)
EAL #(s) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
DESCRIPTION OF EVENT: - - - - - - - - - - - - - - - - - - -
lib.
0 THIS IS NOTIFICATION OF A PROTECTIVE ACTION RECOMMENDATION UPGRADE WHICH WAS MADE AT HRS ON - - - - - - -
(24 HOUR CLOCK) (DATE)
- III. D D
NO RADIOLOGICAL RELEASE IS IN PROGRESS.
THERE IS A RADIOLOGICAL RELEASE IN PROGRESS.
}
see NOTE for release definition 33 FT. LEVEL WIND DIRECTION (From): WIND SPEED: _ _ __
(From MET Computer) (DEGREES) (MPH)
IV. Sectors Dist.- Miles D WE RECOMMEND EVACUATION AS FOLLOWS 0 WE RECOMMEND SHELTERING AS FOLLOWS EC Initials (Approval to Transmit ICMF)
- NOTE:
SGS Radiological Release is defined as: Plant Effluent> Tech Spec Limit of 2.42E+05 µCi/sec Noble Gas or 2. lE+Ol µCi/sec 1-131.
Rev. 01