~Document Control LR-N970603 Attachment 3 LCR S97-14 SALEM GENERATING STATION UNIT NOS. 1 AND 2 CHANGE TO TECHNICAL SPECIFICATIONS HYDROGEN ANALYZER CALIBRATION FREQUENCY TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES The following Technical Specifications for Facility Operating License No. DPR-70 are affected by this change request:

Technical Specification 4.6.4.1 3/4 6-18 The following Technical Specifications for Facility Operating License No. DPR-75 are affected by this change request:

Technical Specification 4.6.4.1 3/4 6-21 9711040231 971024 PDR ADOCK 05000272 p PDR

CONIAINMENI SYSTEMS 3/4.6.4 CQMBQSTIBLE ~ CONTRQL HYDRQGEN ANALXZERS LIMITING CONDITION FOR OPERATION 3.6.4.l Two independent containment hydrogen analyzers shall be OPERABLE.

APPLICABILITY: MODES l. and 2 .*

ACTION:

With one hydrogen analyzer inoperable., restore the inoperable analyzer to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

With both hydrogen analyzers inoperable, restore at least one analyzer to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.4.l Each hydrogen analyzer sh~:l be demonstrated OPERABLE by the performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a CHANNEL FUNCTIONAL TEST at least once per 92 days, and at least once pertRef~eling)by performing a CHANNEL CALIBRATION using sample gises containing:

a. Two volume percent hydrogen (low span), balance Nitrogen, and
b. Six volume percent hydrogen (high span), balance.Nitrogen.

SALEM - UNIT l 3/4 6-18 Amendment No. 153

'J " ..

CONTAINMBRT SYSTDJS 3/4.6.4 CODOSTIBLB GAS CONTROL HYDROGEN ANALY%ERS , :. ~

LIMITING CONDITION.FOR OPERATION 3.6.4.l Two independent containment hydroqen analyzers shall be OPERABLE.

AEPLICABILITX: tl:>DBS 1 and 2 .

ACTION:

With one hydrogen analyzer inope~able, restore the inoperable analyzer to OPERABLE status within 30 days or be in at least Har STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

With both hydrogen analyzers inoperable, restore at least one analyzer to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least Har STANDBY within the naxt 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.4.1 Each hydrogen analyzer shall be demonstrated OPERABI.B by the performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a CHANNEL FUNCTIONAL TEST at least once per 92 days, and at least once pe~efueliii}>by performing a CHANNEL CALIBRATION using sample gas containing:

a. Two volume percent hydrogen (low span), balance Nitrogen, and
b. Six volume percent hydrogen thigh span), balance Nitrogen.