Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2
ML18102B620
Person / Time
Site: Salem PSEG icon.png
Issue date: 10/14/1997
From:
Public Service Enterprise Group
To:
Shared Package
ML18102B619 List:
References
NUDOCS 9710210023
Download: ML18102B620 (3)


Text

  • e LR*-N970619 LCR S96-lO
  • REACiOR COOLANT SYSTEM PP.IP.ARY COOLANT SYSTEM PRESSURE ISOLATION VAL\\'~S LI~lT!NG OP::AATION 3.4.5.3 f'ia,iset2T P.eactor Cooi~nt System Pressure Isoi~tion Va1ves sha11 be operat ona *

~lt\\ce w;~ oPe/2ASLe

a. The integrity of a11 pressure isolation valves 1isted in Table 4.4-4 sha11 have been demonstrated, except as specified in "b". Valve leakage shall not exceed the amounts indicated.
b.

In t e event that the integrity of any ?ressure isolation va1ve specified in Table 4.4-' cannot be _demonstrated.

reactor operation may continue, provided that at

. 1 east two valves in each high: pressure 1 i ne havina a non-functi ona i valve are in, and remain in, the mode corresponcino to th~ isolated condition.laJ

~

~.i::iuc~:!LITY:

MODES, I 2; 3, and 4.

ACTION:

\\

If neither Condition "a" nor "b 11 can be met. an orderly shutdown sha11 be initiated within one hour and the reactor shal 1 be in at least HOT STANC6Y within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTOO~N within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

su~v::r LL.A.NCE ?.::OU! REMENTS 4.4.6.3

a.

Periodi~ leakagi.testing(b) on each valve 1Jsted in Table 4.4-4 shall be -accom~1ished!

1.

Each time the plant is placed in COLO SHUTDOWN conditicn for refueling.

2.

Each ti~e the plant is p1aced in COLO SHUTOO~N condition for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> if testing has not' been accomplished in the preced5ng 12 months.

Motor operated valves shall be placed in the closed position and power supplies deenergized.

b io satisfy ALAO.A l"'equirements. 1 eakage may be measured indirectly (as from the perfor~ance of pressure indicatol"'s) if accom?lished in accordance with approved procedures and su?~orted by co~putations showing tnat the*

~ethod is capable of de:.;onstrating valve comp1iance with the leakage criteria.


--- ~-...-..,

3/4 4-16a Order dated April 20, 1981

Attachment

e.

LR-N970619 LCR S96"-10 ?\\!.

3.

Prior to returning the va1ve to serv~ce foll~wing maintenance, re?air, or rep1ac~ent work on "the va1ve *

4.

ihe provision of specification 4.0.4 is not applicable for entry into Mode 3 or.4.

b.

Whenever integrity of a press>>.ire iso1 ation valve ~ i.s.ted in Table 4.4-4 cannot be demonstrated, the integrity of t~~

remiining ialve in each high pressure line having a leaking valve shall be determined and recorded daily.

In addition, the position of one other valve located in the high pressure line shall be recorded daily

  • 3/ 4 4-1 6b Order dated Apri 1 20, 19Si

Attachme~t 3.

K~CTOR COOLJ,Ni SYSiEM PRESSUKE ISOLAiION VAlVES Low Pressure Safety Inject1vn Loop 11, co1d leg Loop 12, cold 1eg Loop 13, cold 1eg Loop 13~ not 1eg Loo? 14, cold leg Loop 14, not leg Valve ~o.

11 SJ56 11 SJ43 12SJ56 12SJ4l.

13SJS5 I 3SJ4.3 13SJ156 13RH27 14SJ56 14SJ43 14SJ156 14RHZ7 In:2r:-:i~d1ate ?ressur~ Safety Injection Loop 11, cold leg 11SJ144 L"'"'"" _11, hot 1eg Loco 12, cold leg Loo;:i lZ, not 1e9 Loop 13, cold leg Loo~ 13, hot leg Loop 14, cold 1eg H, hot 1 eg 11SJ156 11SJ139 12SJ144 12SJ156 12SJ139 l 3SJ144 13SJ156 l3SJ139 14SJ144 i4SJi56 14SJ139 LR~N970619 LCR S96-10 l'!a:idr.11.':':t(a) {b)

A11owab1e Leakaoe

~5.0 G?M each valve

  • !S.O GPM each valve

!.5.0 G?M each valve

!S.O GPM each valve

!_5.0 G?M each valve

~5.0 G?M each valve

!_5.0 G?M each valve

~5.0 GPM each valve

!_S.O GPM each valve

~.O GPM each valve

~S.O GPM each valve

<5.0 G?M each valve

!:s.o GPM each valve

~.O GPM each valve

!:5.U GPM each vaive

!_S.O GPM each valve

!_5.0 G?M each valve

!_5. 0 GPl.f° each va 1ve

~5.0 GPM each valve

~5.0 G?M each valve

!,S.O GPM each valve

~5.0 GPM each valve

~5.0 GPM each valve

!,S_.O GPM each valve

~5.0 GPM each valve

~5.0 GPM each vahe Leaka;e ra:~s 1ess than or e~~!l to 1.0 g~~ are ccr.sicere~ accepta:le.

However, for ini:ial tests, or tests following valve re~air or re~lace r.:ent, leakage rates less than or e~~al :o 5.0 gpm ar! considered acceptable.

Z.

Leaka9e ntes ;rnter than i.0 g;r, but less than or e~uai to 5.0 S;:r.i are considerec ac:!ptable if th! lat!st measured rate has not exce!ded th! rate C!~!r~in!d ~Y the prev1o~s test by an amount that reduces th! ~ar;in cetw!en ~=asured leaka;e rate and t~e maximlJl'il p!m.issibh rate of 5.-0 S?ill !:y SC~ or greeter,

3.

Leaka;e rate~ gre!ter than i.O*s;~ but less than or e~uai to 5,0 g;:im are consi~ered u~a:ceptaole if the latest measured rate exceeded the rate dettl"':':iined by t~e previous test ~Y an a~ount that reduces the r.:ari:in be:... *een rreas:.;red 1eal:.a;e ra:e !:"id the maxir.:u::: ::iet"':':'.issibie rate cf S.O g~~ by SC~ or greater.

(o),..,inim:.o~ differential test ~ressi.:re shall not be 1ess than 150 psid.

,;L
::;. ~'NIT 1 3/4 4-16C Order dated April 20, iS~~