Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity
ML18106A878
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/17/1998
From:
Public Service Enterprise Group
To:
Shared Package
ML18106A877 List:
References
NUDOCS 9809240303
Download: ML18106A878 (11)


Text

ATTACHMENT 3 LR-N980358 TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES Th'e following Technical Specifications for Facility Operating License No. DPR-70 are affected by this change request:

Technical Specification 3.8.2.2 3/4 8-7 3.8.2.4 3/4 8-10 3.8.2.6 3/4 8-13 BASES 3/4.8.1 and 3/4.8.2 B 3/4 8-1 B 3/4 8-2 Note: Change to Bases page B 3/4-2 consists of text displaced by changes made to page B 3/4 8-1 only.

The following Technical Specifications for Facility Operating License No. DPR-75 are affected by this change request:

Technical Specification 3.8.2.2 3/4 8-9 3.8.2.4 3/4 8-12 3.8.2.6' 3/4 8-15 BASES 3/4.8.1 and 3/4.8.2 B 3/4 8-1 B 3/4 8-2 Note: Change to Bases page B 3/4~2 consists of text displaced by changes made to page B 3/4 8-1 only.

r-~~9-e~o~9=2~4~0~3~0~3~~9~eo~9~1p7;------:~~~~I I PDR ADOCK 05000272 p PDR

EI.ISTJSICAL PO!flll SXSTIJSS A.C. Qil'l'IIIQTIOI

  • SIWTpOW!f LIKITl.. CDllDITIOll POil OPIRATION
            • 1------******--*********************************e************************

J*.a.2.2 A8 a aiAiaua, two A.C~ electrical bu* train* *ball be OPIRABLI and ener9iaed from *ourc** of power other than a di***l generator but aligned to an OPIJltAal.I: di***l.;enerator with each train con*i*tin9 of1 l 4 ~lt Vital lu*

1 - 460 volt Vital lu* and ***@eiat~ ccntrcl cente~~

1 - 230 .-olt Vital lu* and a*90Ciated control center*

1 - 115 .-olt In*tr11ment lu* *narvised from it* r*9P8CtiYe inverter connacted to it* r**pective D. c~ bu* train.

N;TIQl1 1th 1*** than the aboYe compl....nt of A.c. bu*. .**--io5'Jau~IS-..and. enar9iaed,

    • ~uli*b HllTldmlft' IH'RGIU'l'Y within I bou*.

'keyci ALE vu i ./- H :r::- NSar I IUJlWl?.LAllCS DQVIUKDTI 4.1.2.2 TM apacified A.C. bu8H8 *hall be detarained O.U.11'.I and enerqized from A.C. 90Urca* otMr than th8 die..1 CJ9Mr&tor* at lea8t once per 7 day* by verityin9 cornet breaker aliqnmant ancl indicated pcNer a*ailability.

  • SAUK
  • mrrf 1 3/4 ,_, a..*dment Mo. 137

ELECiRICAL ~ SYSi°U"S

, 25-VOL T 0. c. ors~ I BUT.ION - SHUnowH LIMITI~ CONOIT!ON FOR OPERATION J.s.2*.4 As i mfnimum, th1 fo11ow1ng O. C. t1KtFkil equi~nt and bus sh1 l1 be tn1rg1 zed and OPERABLE:

2 - 125-vclt O.C. buss1s, ind 2 - l25-vc1t batteries, each ~1th at 1e1st one fu11 c1p1c1ty ch1rser, 1ssociattd with each cf th* abcv1 o.c. buss1s.

APPL!CASibITY: MOCES S a"d !.

ACTION:

~& OPEAABLE, SURVEILLANCE REOUIRE?-IENTS 4.8.2.4. 1 'ihe abovt required 12S-vclt O.C. bussts shall be dete~ined OPERABLE and energizl-d It lust cnca ~i1r 7 days by vei-ifying ecrreet breaker alfgnment and 1nd1c1tld ~r.av111abi11ty.

4.8.2.4.2 'ih* above ~ufred 125-~lt b&tteries and ehar'9ers shall be d~nstrated OPERABLE per Surv1111rnc1 Requirement 4.S.2.3.2.

SALEM-UHlT. 1 3/C 8-10

ELECTRICAL POW~R SYSi~~S 28-VOLT O.C. DIS7~I3UTiON - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.2.6 As a minimum, the following D. C. electrical equipment and bus shall be energized and OPERABLE:

l volt O.C. bus, and .

1 volt battery and at least one full capacity charger associated with th~ above O.C. bus.

SURVEILLANCE REQUIREMENTS 4.8.2.6. 1 The above required 28-vo1t O.C. bus shall be detennined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and power availability.

4.8.2.6.2 The above required 28-volt batteri~s and charger shall be demonstrated OPERABLE per Surveillance Requirement 4.8.2.5.2.

SALEM-UNIT 1 3/4 8-13

3/4.8. ELECTRICAL POWER SYSTEMS BASES 3/4.8.1 and 3/4.8.2 A.C. SOURCES AND ONSITE POWER DISTRIBUTION SYSTEMS The OPERABILITY of the A.C. and D.C power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety related equipment required for 1) the safe shutdown of the facility, and

2) the mitigation and control of accident conditions within the facility. The minimum specified independent and redundant A.C. and D.C. power sources and distribution systems satisfy the requirements of General Design Criterion 17 of Appendix "A" to 10 CFR Part 50.

The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation commensurate with the level of degradation. The OPERABILITY of the power sources are consistent with the initial condition assumptions of the accident analyses and are based upon maintaining at least two independent sets of onsite A.C. and D.C. power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss of offsite power and single failure of one onsite A.C. source.

The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that 1) the facility can be maintained in the shutdown or refueling condition for extended time periods and 2) sufficient instrumentation and control capability is available for monitoring and maintaining the unit status.

If'JSer+ 4-? The surveillance Requirements for demonstrating the OPEBABILITY of the diesel generators are based upon the recommendations of Regulatory Guide 1.9, "Selection of Diesel Generator Set Capacity for Standby Power Supplies," March 10, 1971, and Regulatory Guide 1.108, "Periodic Testing of Diesel Generator Units Used as Onsite ..

Electric Power Systems at Nucle01r Power Plants," Revision 1, August 1977. Regulatory Guide 1.108 criteria for determining and reporting valid tests and failures, and accelerated diesel generator testing, have been superseded by implementation of the Maintenance Rule for the diesel generators per 10CFRS0.65. In addition to the Surveillance Requirements of 4.8.1.1.2, diesel preventative maintenance is performed in accordance with procedures based on manufacturer's recommendations with consideration given to operating experience.

For the purposes of est~lishing initial conditions for surveillance testing, "ambient conditions" mean that the diesel lube oil temperature is 120 +/- 20 degrees F. The minimum lube oil temperature for an OPERABLE diesel is 100 degrees F. Lube oil heaters are designed to IU.i.ntain the oil temperature at approlti.mate1y 120 degrees F.

3/4.8.3 ELECTRI:CAL EQUJ:PMENT PROTECTIVE DEVICES Contaimwent electrical penetrations and penetration conductors are protected by either deenezqizinq circuits not required during reactor operation or by demonstrating the OPERABILITY of primazy and backup overcurrent protection circuit breakers during periodic surveillance.

The surveillance frequency applicable to molded case circuit breakers and lower voltage circuit breakers provides assurance of breaker reliability by testing at least one representative sample of each manufacturer's brand of molded case and lower voltage circuit breakers. Each manufacturer's molded SALEM - UNIT 1 B 3/4 8-1 Amendment No. 203

  • . ELECTRICAL POWER SYSTEMS A.C. DISTRIBUTION - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.2.2 As a minimum, *two A.C. electrical bus trains shall be OPERABLE and energized from sources of power other than a diesel generator but aligned to an OPERABLE diesel generator with each train consisting of:

- 4 kvolt Vital Bus

- 460 volt Vital Bus and associated control centers

- 230 volt Vital Bus and associated control centers

- 115 volt Instrument Bus energized from its respective inverter connected to its respective D.C. Bus Train.

-===AefLI~*

~lish ACT! O; --------------::::::::--.....::::::::-

~~~~omplement of A.C. busses~--Hw.erters OPERABLE and C-ON+Af.NMENT INHGRITY within S ho~ __,

{2£PL.Ac_" tJ 1177 ~s~a..r I SURVEILLANCE REQUIREMENTS 4.8.2.2 The specified A.C. busses and inverters shall be deter~ined OPERABLE.

and energized from A.C. sources other than the diesel generators at least once per 7 days by verifying correct breaker alignment and indicated voltage on the busses.

SALEM - UNIT 2 3/4 8-9

ELECiR!CAL ?OW'ER SYSTEMs - .,,,

125-VOLT O.C. OISTRIBUT!ON - SnlJTOO"WN L!MiiING CONDITION FOR OPE-RATION 3.8.2.4 As a minimum, tht fol1owing 0. C. e1ectr1cal equipment and bus shall be entf"9ized and OPERABLE:

2 lZS-volt O.C. buss1s, and 2 - 125-volt batteries, each with at least on* full capacity charger, a..ssociatad with each of th* a.bove O.C. buss1s.

ACTION:

With less .than-t-hrillfovlc:om?lemant of O.C. equipment an "Sts~RA8LE-

~ GGHTAINMEXT IHTEGR-lTl' _.it.hi Ft 8 heu~--~-------------=..!..___-'----===--

SURVEILLANCE REQUIREMENTS 4.8.2.4. 1 Thi a.bov1 l"'tquired 125-volt O.C. busses shall b1 det1M11ined OPERABLE and energized at least onc1 per 7 days by verifying correct breaker alignment and indicated power availa.bi1ity.

4.8.2.4.2 Thi above* rtquired 125*vo1t battaries and charg1rs shall be demonstrated OPERABLE per Surv1illanc1 Requi~nt 4.8.Z.3.Z.

SALEM - UNIT 2 3/4 8-12

e e

.~u:mrc:..t.t: ~SY~

Z!-YOLT o.e. orm:!!JT'!OJf

  • s-~

L.!JIITTn4G ~ IT7CM FOR OPE?J. T! CH 3.1.2.5 .U a rfrrf-. t."'- fal1owin.; O. C. c1~..Mal ~1;=mnt &nd b~ s/'1111

0. OPOAIU &nd eM~:.::
  • %9-vo a a. c. bus , w 1 * %9-talt b.at+..ary and l t hut. c:n. ful 1 ~ty C".&r*;u*

u soc:1 rt.ad w1 t.."t t."" &bcv* 0. c. bus~ .

~rtm:----lllDB-!-tnd-6. ~ ~

.ACT!C.i:..-~ .,;;::::~.

nr;1Ud~Ul)t~-sn-e::KTAIJtEXT~--¥it.lt1.n....a ~. *-

R~.PL - Ac~ iJ ,I)-;

_L µ .5 'r7_ ' I 3 SUM!LUHC! itEXJ!W£1ITT 4.S.%.5.1 ihc ~ ~r.d %!-vc1t O.C. bl.ti sr.11 0. d9t.arrfned OPERABll w ~ l"'q1 :.a n 1aut. ~ pc,. 7 c!iy1i by vt?"1 fY1 ni; c::r."Y.C"t l: l"'Ki:&r . 11 i ~

Ill. VO 1t.11;8 Cft t..ll)e bus. .

4.!.2.5.2 Th9 ~ ~~ %!-tclt ~..anu &nd ~,. sMll ~ d..:ns-:~~a OPERAl!l.E ~*,. s~~111&nea R.oqu1~ 4.8.2.S.2.

SJ.LDt - UM IT Z 3/4 a-l.5

ELECTRICAL POWER SYSTEMS BASES 3/4.8.l and 3/~.8.2 A.C. SOURCES AND ONSITE POWER DISTRIBUTION SYSTEMS The OPERABILITY of the A.C. and D.C power.sources and associated distribution systems durinq operation ensures that sufficient power will be available to supply the safety related equipment required for l) the safe shutdown of the facility, and

2) the mitiqation and control of accident conditions within the facility. The minimum specified independent and redundant A.C. and D.C. power sources and distribution systems satisfy the requirements of Generai Desiqn Criterion 17 of Appendilc "A" to 10 CFR Part so.

The ACTION requirements specified for the levels of deqradation of the power sources provide restriction upon continued facility operation commensurate with the level of deqradation. The OPERABILITY of the power sources are consistent with the initiai condition assumptions of the accident anaiyses and are based upon maintaininq at least two independent sets of onsite A.C. and D.C. power sources and associated distribution systems OPERABLE durinq accident conditions coincident with an assumed loss of offsite power and sinqle failure of one onsite A.C. source.

The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems durinq shutdown and refuel.inq ensures that l) the facility can be maintained in the shutdown or refuel.inq condition for EU1:tended time periods and 2) sufficient instrumentation and control capability is available for

,1 moni torinq and main taininq the unit status .

LAJsea+*~

The Surveillance Requirements for demonstratinq the OPERABILITY of the diesel generator-s are based upon the recommendations of Requl.ato.ry Guide l. 9, "Sel.ection of Diesel. Generator Set Capacity for Standby Power Supplies," Ma..rch 10, 1971, and Requl.ato.ry Guide 1.108, "Periodic Testinq of Diesel. Generator Units Used as Onsite llectric Power Systems at Nuclear Power Plants," Revision 1, Auqust 1977. Regul.atory '.

Guide 1.108 criteria for deteniininq and reportinq vaiid tests and failures, and accel.erated diesel. qenerator testinq, have been superseded by implementation of the Maintenance Rule for the diesel. qenerators per 10CFR.50.65. In addition to the Surveillance Requirements of 4.8.1.1.2, diesel. preventative maintenance is performed in accordance with procedures based on manufacttirer's recommendations with consideration qiven to operatinq mq>erience.

For the purposes of establishinq initiai conditions for surveillance testinq, "ambient conditions" mean that the diesel. lube oil teiiperature is 120 +/- 20 deqrees F. The mini.mum lube oil temperature for an OPERABLE diesel. is 100 deqrees F. Lube oil heaters are desiqned to ma:i.ntain the oil temperature at approxim.a.tel.y 120 deq%ees F.

3/4.8.3 ELECTlUCAL EQUI:PMEH'r PROTECT:rvE DEVICES Containmmit el:ectrical penetrations and penetration conductors are protected by either deenerqizinq cireuits not required durinq reactor operation or by demonstratinq the OPDABILITY of primary and backup overcurrent protection circuit breakers durinq periodic surve.il.lance.

The surveillance frequency applicable to molded case circuit breakers and lower voltage circuit breakers provides assurance of breaker rel.iability by testinq at least one representative sample of each manufacturer's briqld of molded case and lower voltaqe.circuit breakers. Each manufacturer's molded SALEM - UNIT 2 B 3/4 8-1 Amendment No. 185

ATTACHMENT 3 LR-N980358 INSERTS AND MARKED UP PAGES INSERTS FOR LCR 95-34 INSERT 1 APPLICABILITY:

MODES 5 and 6.

During movement of irradiated fuel assemblies..

  • ACTIONS:

With less than the above complement of A.C. busses and inverters OPERABLE and energized, suspend all operations involving.CORE ALTERATIONS, positive reactivity changes, and movement of irradiated fuel assemblies until the minimum required A.C. electrical power sources are restored to OPERABLE status.

INSERT 2 APPLICABILITY:

MODES 5 and 6.

During movement of irradiated fuel assemblies.

ACTIONS:

With less than the above complement of D.C. equipment and busses OPERABLE, suspend all operations involving CORE AL TERATIONS, positive reactivity changes, and movement of irradiated fuel assemblies until the minimum required 125Volt D.C. electrical power sources are restored to OPERABLE status.

INSERT 3 APPLICABILITY:

MODES 5 and 6.

During movement of irradiated fuel assemblies.

ACTIONS:

With less than the above complement of D.C. equipment and busses OPERABLE, suspend all operations involving CORE ALTERATIONS, positive reactivity changes, and movement of irradiated fuel assemblies until the minimum required 28Volt D.C. electrical power sources are restored to OPERABLE status.

LR-N980358 INSERT 4

  • ATTACHMENT 3 The Applicability of specifications 3.8.2.2, 3.8.2.4, and 3.8.2.6 includes the movement of irradiated fuel assemblies. This will ensure adequate electrical power is available for proper operation of the fuel handling building ventilation system during movement of irradiated fuel in the spent fuel pool.