ML18106A424
| ML18106A424 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 03/26/1998 |
| From: | Public Service Enterprise Group |
| To: | |
| Shared Package | |
| ML18106A423 | List: |
| References | |
| NUDOCS 9804060373 | |
| Download: ML18106A424 (2) | |
Text
-*
ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER DISTRIBUTION SYSTEMS A.C. DISTRIBUTION - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.1 The following A. C. electrical busses shall be OPERABLE and energized from sources of power other than the diesel generators:
4 kvolt Vital Bus I 2A 4 kvolt Vital Bus I 28 4 kvolt Vital Bus # 2C 460 volt Vital Bus # 2A and associated control centers 460 volt Vital Bus # 28 and associated control centers 460 volt Vital Bus # 2C and associated control centers 230 voli Vital Bus # 2A and associated control centers 230 volt Vital Bus # 28 and associated control centers 230 volt 115 volt 115 volt 115 volt APPLICABILITY:
ACTION:
Vital Bus I 2C and associated control centers Vital Instrument Bus I 2A and Inverter ~},_Jd.
Vital Instrument Bus # 28 and Inverter ~
Vital Instrument Bus # 2C and Inverter ~
-=---~~~~~~~~~~~~-
MODES l, 2, 3 and 4. t\\dd-ll5~~~tt v~t.ii ~ l.f\\ShOriMPll't Bi)S it 2.D
~
Xll11u h'.o * *
- a.
With less than the above complement of A.C. busses OPERABLE or energized, restore the inoperable busses to OPERABLE and energized status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
Add-c9A,2B,o.- 2C
- b.
With one inverter inoperable, energiz~Jth~ associate
, al Bus within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />; restore the inoperable inverter to OPERABLE and energized status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hour3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />s~ ~~~-~-s-~-e-T-A--,1 SURVEILLANCE REQUIREMENTS 4.8.2. 1 The specified A.C. busses and inverters shall be determined OPERABLE and energized from A.C. sources other than the diesel generators at least once per 7 days by verifying correct breaker alignment and indicated voltage on the busse*s.
- An inverter may be disconnected from its D.C. source for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for :he purpose of performing an equalizing charge on its associated battery bank proviaec (1) its vital bus is OPERABLE and energized, and (2) the vital busses assoc~atea with the other battery banks are OPERABLE and energized.
SALEM - UNIT 2 3/4 8-8 9804060373 980326 ____ -~ --
~-- ------....,
PDR ADOCK 05000272 P
p,gmICjN. PQ!I! SXSIIMS l/t.1.2 QllI'ZJ PQH11 DIITBIDQTIQI SXSTJISS A.S. Qll'l'l118TIQI - QPIJSATIHC I.DII'1'tm c:::iamDI'rlOK POil OPmtATlOIC 3.8.2.l The followin9 A. c. *l*ctrical bu**** *hall be OPKJUUILE and *n*rqiz*d f~ lilc:nu:*c=e of ~r other than the di*-l 9enaratora1 t kYolt Vital 1\\18 I lA t kTolt Vital lu* I lB t kYolt Vital Ill* I lC J..d..
111.olt Vital Inatrument Bu* I 18 and llmlfter ~
f>t t60 YOlt Vital Ill* I lA and **eociated control center*
t60 volt Vital lu* I 18 and ***ociated control center*
t60 \\l'Olt Vital lu* I le and ***ociated control center*
230 \\l'Olt Vital Bu* I lA and ***ociatecs control c*nter*
230 YOlt Vital lu* I 11 and aa90Ciated control center*
230.olt Vital lu* I lC and a*aoc1&ted control* center*
111 YOlt Vital I~nt Bu* I U
&Dd ln..ner ~ '\\
!l-5 volt Vi.~l Iutrwnt Bu* I lC &Dd In~~
Jc\\
i\\S \\IO\\.t V lt~t lflsht:!M.ffl+ \\1"S ff lb W,~ ~lJilf lei/'~~
pn.1cuntn1 MaDU 1, 2, 3 and t.
Mj'UQl1
- a.
With l*** than tba ~
compl... nt of A.C. bu*... OPSJll'aI* or enerq~&ed, reaton tba i.noper&bl* bu* to oPD.*RLI &ad eaeqi&ed *tatu* vithi.n a boura or be iD at leaat mr STAllDU vLtlU.A tbe ~
6 bcNra and i.n cou:i SBWWW vit!U.D ~
followin9 30 houn.
A~d-\\tA) te) bf \\Cl
- b.
Vi.~ cme ~
inaper&bl*, **1:91* ~
UMCiated A. c. Vi~&l. Bu*
wi*1a I~' re*ton the inoper&bl*f~TeRer to OPm.IU and enerqi.:ed 8ut1l8 vi~ 24 hour* or b9 in at leaat ml' l'l'Almft vitbin th* :-.en 6 balln &lld 1A c:au>> IBV'fbOWll within tbe follovi119 JO bou.r*O~
G!-1~-S-BJt_T_A---.f SU'llWIU.AllCS UQOIUKD'fS 4.1.2.1 Th8 *pec:ified A.C. bu**** *hall be deterained O~
and enerqi.&*d from A.c. llOUZ'c** other than th* di***l 9enerator11 at lea*t one* per 1 day* by verifyinq correct bre&Aar aliqnment and indicated poiw9r &Tail&bility.
~**>'~Br<.T* S\\
SAT ft -
Ulll'l' 1 3/t 1-6 Amendmene No...