ML18106A196

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4
ML18106A196
Person / Time
Site: Salem PSEG icon.png
Issue date: 12/11/1997
From:
Public Service Enterprise Group
To:
Shared Package
ML18106A195 List:
References
LCR-S97-33, NUDOCS 9712160340
Download: ML18106A196 (5)


Text

' Document Control LR-N970779 Attachment 3 LCR S97-33 SALEM GENERATING STATION UNIT NO. 1 FACILITY OPERATING LICENSE DPR-70 DOCKET NO. 50-272 CHANGE TO TECHNICAL SPECIFICATIONS ONE TIME EXEMPTION TO ALLOW CONTAINMENT PURGING IN MODES 3 AND 4 TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES The following Technical Specifications for Facility Operating License No. DPR-70 are affected by this change request:

Technical Specification 3.6.1.1 3/4 6-1 3.6.1.2 3/4 6-2 3.6.1.7 3/4 6-Ba 9712160340 971211 PDR ADOCK 05000272 P PDR

3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT CONTAINMENT INTEGRITY LIMITING CONDITION FOR OPERATION

==================================================================

3.6.1.l Primary CONTAINMENT INTEGRITY shall be maintained.

APPLICABILITY: MODES 1, 2, 3 and 4. ~~

ACTION:

Without primary CONTAINMENT INTEGRITY, restore CONTAINMENT INTEGRITY within one hour or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS

=================================================.=================

4.6.1.l Primary CONTAINMENT INTEGRITY shall be demonstrated:

a. At least once per 31 days by verifying that:
1. All penetrations* not capable of being closed by OPERABLE containment automatic isolation valves and required to be closed during accident conditions are closed by valves, blind flanges, or deactivated automatic valves secured in their positions, except for valves that are opened under administrative control as permitted by Specification 3.6.3.1.,

and

2. All equipment hatches are closed and sealed.
b. By verifying that each containment air lock is OPERABLE per Specification 3.6.1.3.
  • Except vents, drains, test connections, etc. which are (1) one inch norni~a~

pipe diameter or less, (2) located inside the containment, and (3) locked, sealed, or otherwise secured in the closed position. These penetrations s~a~~

be verified closed at least once per 92 days.

( J)JS~fZT A SALEM - UNIT 1 3/4 6~1 Amendment No.

CONTAINMENT SYSTEMS CONTAIN_MENT LEAKAGE LIMITING CONDITION FOR OPERATION

==================================================================

3.6.1.2 Containment leakage rates shall be limited to:

a. An overall integrated leakage rate of ~La, 0.10 percent by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at design pressure, ( 47. o psig).
b. A combined leakage rate of ~ 0.60 La for all pene:rations and valves subject to Type B and C tests, when pressu*rized to Pa.

APPLICABILITY: MODES 1, 2, 3 and 4. 1f ~

ACTION:

With either (a) the measured overall integrated containment leakage rate e~ceeding 0.75 La, or (b) with the measured combined leakage rate for all penetrations and valves subject to Types B and C tests exceeding 0.60 La, restore the leakage rate(s) to within the limit(s) prior to increasing the Reactor Coolant System temperature above 200°F.

SURVEILLANCE REQUIREMENTS

==================================================================

4.6.l.2 The containment leakage rates shall be demonstrated at the follows:

a. Type A tests shall be in accordance with 10CFR 50.54 (0) in conformance with Appendix J of 10CFR 50, Option B, using the methods .and provisions of Regulatory Guide 1.163, September 1995 as modified by approved exemptions.
b. Type B and C tests shall be conducted in conformance with Appendix J of 10CFR 50, Option A, with gas at design pressure (47.0 psig) at intervals no greater than 24 months except for tests involving air locks.
c. Air locks shall be tested and demonstrated OPERABLE in convormance with Appendix J of 10CFR 50, Option A, per surveillance Requirement 4.6.1.3.

!}-

SALEM - UNIT 1 3/4 6-2 Amendment No. 189

e e.

t;NTlIHMEN'T SVWS COWT'AINMtHT vnfT!UT!ON SVS!p!

~rnHG_~MomoM ~* o'ruT'toM J. 1.1. 7 n.. CDMairm"°' P"Pll tun11 IN taftaua't fMlltiOft Y&1"9* llla11 H clo11d. (Valves immobilized in ahut position with contzol air to **lve operators isolated and tagged out of service).

"')ICA!!L!'T'V: fCJDE.S 1, 2. J, and 4. #.,~

AC'TIOH:

W1~ OM =nt.li1'9eft\*PUrp IUAly tttd/O'P aftaul\ il011tilft ,., .. '""* clo11 i:ie **n v1h1(1) wtuiin on*

ft&I\ I "°u"

"°"'" or M fn n 1eut MDT STNCCIY wf1Jl1n 1nd in =~ ~ wtiain iM fol111riftl JO '*'"* =a SURVE!l.l..ANC! *E,SUIR£'4MS

4. 5. i. 7 n. r=nuirMni DU"11 ""ly Md *Ulllusi iso1~i* wa1'u lfta11 M dmta"ined cloa-4 *ai 1eui onca ,., J1 dlyt.

.J>>s~*r f}- '

/'

  • TG anui,..nt pn11uPW-1ICW9 ,..H1f fN11'&i* M1¥et 111 M * *
  • on .,,
  • iftUNittan\ aas11. lilftdlp *1ftilirt&1we ClftVl1, - MU*MZJ' . . *U.*ty

'-* *- ~ r8Cl'IWwn~ *f llKUicaU- J.a.i.*.

SAUM * \lltT l JI...... '-ndment No. 41

INSERT A

  • A one-time change is granted to have the containment purge supply and/or exhaust isolation valves open in Modes 3 and 4 following the steam generator replacement outage (1R13) . The cumulative time for having the valves open in Modes 3 and 4 is limited to fourteen (14) days. Each valve will be immobilized in the shut position prior to initial entry into Mode 2. The one-time exemption expires with initial entry into Mode 2 following 1R13.