ML18087A737
ML18087A737 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 11/24/1982 |
From: | Public Service Enterprise Group |
To: | |
Shared Package | |
ML18087A720 | List:
|
References | |
1PD-18.4.002, NUDOCS 8303160579 | |
Download: ML18087A737 (31) | |
Text
NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES
\. .
PROCEDURE T.ITLE ADMINISTRATIVE PROCEDURE 3 ALL ON-THE-SPOT CHANGES TO BE CONSIDERED FOR APPLICABILITY TO BO H UNITS.
- TEMPORARY (ORANGE)
[ZJ UNIT 1 PROCEDURE NO. \ ~D- \ 8. :\
- QQ""'.}._ REV. No. _ _ a__ CHANGE No._...) _ _
,Kl UNIT 2 PROCE~URE NO*.¢, tJo- \ s. L.\
- 00 ;i._ REV. NO. _ _ _ o__ CHANGE NO. _ _\...__
PROPO:ED CHANGE: \'?.~e_ 7 . c::":.4~ 8. \ ~~~ ~
~~. s:~~ <O.~.\ \....:(...\- \.-0~'1""'--'>":~ f\ \~-~~y.;:;,
\:>..SI/ PC!.
"n'\p.._~-~~ .e_...:,w-T;\"L....._~ ~':ii 'r1C)'i:.,;_?.._
\ ..... ""C""":..v .... \..- e REASON FOR CHANGE: '"'-""'"'~-N?.'- ~
f!!.!'
ACTION TAKEN FOR OTHER UNIT:.
I
/
AUTHORIZATION: /,- -rs--8"7-DATE
- SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.
ACCEPTABLE: POST CHANGE-REVIEW/APPROVAL YES NO o~.
MEETING NO.
~~ ({/z~<& ATE I __,-I I I MANAGER *SALEM GENERATING STATION
/~/~
RETURN COMPLETED O"R REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:
( 8303160579 830314 PDR ADOCK 05000272 S PDR PERFORMED BY:
SIGNATURE DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE*REVIEW/APPROVAL CYCLE.
FORM AP-3*t REV, 9
- .-.--... ~*-:-*.-. "":=" .. -.._-"~*:~~~---1-~*--*-~*.. -:::*::--** -* -:-** *,*-. - . **--~- -~ ....... -- *-* ~ -*--* **.* ~-. __ ::!_ _ _*_ _* _ _ _ _
NOTE: PRESS HARD YOU ARE MAKING FIVE (5) COPIES ADMINISTRATIVE PROCEDURE 3 CHANGE TYPE:
D
- ON-THE-SPOT CHANGE r\71 PERMANENT *TEMPORARY
~ (GREEN) (ORANGE)
PROCEDURE TITLE
- s.s.~.'" *EXPIRES:
ALL ON-THE-SPOT CHANGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS.
[2SJ UNIT I PROCEDUREN0. _ _ ,:.......>.~~\?"--~---'\~~~*--~..:_*0__;;0~"2-=-------~ D REV. NO. _ _ _ _ CHANGE NO. _ _ __
0 UNIT 2 PROCEDURE NO. d-..\)t> - \'a* 4 '- '00 '"Z..--- REV. NO. _ _ 0....___ CHANGE NO. _ _,\.___
PROPO~ED CHANGE: \'"~~ _\ <t) 3:. "'°i<=... ~\-: \:,-..;:)
- ).. ~'-.
- > ~ (a V'N '~ \ C...C* -.0 \- r() l-s.~,
REASON FOR CHANGE:
ACTION TAKEN FOR OTHER UNIT:
- s: T'\"'f' E;:_
AUTHORIZATION: *A~~L!w, /
{
- s1GNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.
ACCEPTABLE: POST CHANGE-REVIEW/APPROVAL YES ( NO MEETING NO.
[ihJ ~
I a I I MANAGER - SAL.EM GENERATING STATIO.N RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
FOLLOW-UP TO REJECTED ON*THE-SPOT CHANGE
- ACTION TAKEN:
PERFORMED BY:
SIGNATURE DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.
FORM AP-3-f REV, 9
- ~**~****"f;*""," *-:--:-*-:*,**~**,***,*-..,--.** *. -**.****.**:-*""-C:""*-'"-*"****--.-.-.ro--,.-**"** ""-'.*--:*:~~*' _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
"*"':'-,"*".,_ .. -_._**:...-"_--;;:.*_".;,_'°_*--*--*-*-*-*_*__.:..__....;*:...*~'-_;'*;..."
SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET SAFETY RELATE[
PROCEDURE: lPD-18.4.002 - RESPONSE TIME TEST OF SOLID STATE REMAR.KS: PROTECTI.ON SYSTEM LOGIC - Rx TRIP, TRAIN A EEO QA PERF. ENGR. SORC STA. SUPT.
REV SUBMITTED APPROVED REVIEAWED APPROVED REVIEWED APPROVED fD/2-~1 .fi,.J/~!frv :lcr1~ 'f}ti) ~z-6'.r" IJ~J'. (1; 11~41t ~
~
f.:>}Z.\}.:n.
n ~po /)A ~
NIA -:"N\P Pt 'L.if'-1*1"'
- r
'.J J ... -1
- ***-:v**~":f.'j"*;;J.*.n-*~.....,-*.-... ...~ .......,.!'"'":~*...... ~~,-r~--. __ ,.._.,e .. *.-*-:-:-;. -,* *":":--*-~* :_**-**;":""::_**::--:..;:.*
- ..:.._:*-~**::::*.-**:::_:~**--::..:_*-*~*
- _:_:_.:::...:..:._::........:_:___::__ _ _ _ _ _ _ _ _ _ _ _ _ _~
- x SALEM GENERATING STATION NUMBER - lPD-18.4.002 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
DATE 5/3/82 TEST PROCEDURE PAGE
- OF 28 TITLE RESPONSE TIME- TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A
1.0 Purpose
1.1 To obtain the response time from the Hagan bistabie switches and other inputs through the SSPS Lo9ic to the reactor trip breaker UV coil.
1.2 To obtain the response time from the UV coil to the opening of the reactor trip breakers *
- 1.3 To be used in conjunction with other procedures for the .
total response time of the Reactor Trip signal from sensor to the opening of the reactor trip breakers.
2.0
References:
2.1 Performance Department Manual.
2.2 Reactor P~otection System Logic Diagrams - 221050 thru 221065.
2.3 Westin~house Instruction Manual - Solid State Protection.
2.4 Hagan Interconnection Diagrams - 220000 thru 220092 .
I & C - 001
'x .
... NUMBER- _l_P_D~--1_8~._4_._0_02__
SALEM GENERATING STATION REV.NO. 0 PERFORMANCE DEPARTMENT (I & C)
DATE 5/3/82 TEST PROCEDURE PAGE _2__ OF 28 TITLE_ RESPONSE TIME- TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A
~ *3.0 Precautions:
3.1 Special care should be taken in the removal and handling of wire, connections, and test equipment on energized equipment.
3.2 Care should be taken in the use of the visicorder, such that a minimum quantity of the light sensitive paper is wasted.
4.0 Limitations and Actions:
4.1 None stated .
I & C -001
- x SALEM GENERATING STATION NUMBER - _l_P_D_-_1_8_._4. :. . *0..:....0~2;;..__
REV. NO. O PERFORMANCE DEPARTMENT (I & C)
DATE 5/3/82 TEST PROCEDURE PAGE _3=--- OF 28 TITLE RESPONSE TIME- TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A 5.0 Test Equipment:
. Device PD No. Recal. Date Visicorder Model 1912 Test Leads & Jumpers N/A N/A Test Resistor for
- Hagan Input Signals Toggle Switches (4)
Latern Type 6VDC N/A N/A N/A N/A Battery (2) or Equiv
- N/A N/A I & C - 001
- X
- SALEM GENERATING STATION NUMBER - lPD-18.4.002
- PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE REV. NO.
DATE 0
5/3/82 PAGE _4_ _ OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A
6.0 Prerequisites
6.1 The Reactor will be shut down and the plant will be in the refueling mode of operation (Modes 5 or Mode 6).
Senior Shift Supervisor/Shift Supervisor
- Date/Time 6.2 The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure *.
Senior Shift Supervisor/Shift Supervisor Date/Time
- 6.3 The individual assigned to perform this procedure is qualified to do so in accordance with the Solid State Protection System Qualification Card *
- Job Supervisor I & C
- 001
.X SALEM GENERATING STATION NUMBER- lPD-18.4.002
- PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE REV.NO.
DATE
~O~-----~
=5~/~3~/-8=2~~~-
PAGE _s__ OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A
6.0 Prerequisites
- (Continued) 6.4 The Control _Operator responsible for the portion of the plant to be tested is aware of all the alarms and indi-cations which will be affected by the performance of this procedure. Specifically, Coolant Temperatures must be determined from Loop Wide Range Indication, Coolant *Pressure read from the Loop Hot Leg Indication,
- Pressurizer Level from the Cold Calibration Channel Indication, and Steam Generator Level from the Wide Range Indication.
Control Operator 6~5 Have the Control Operator place the pressurizer level controller in Manual.
Control Operator 6.6 Instrumentation shall have been energized and operating for at least one half hour to attain equilibrium conditions *
- Job Supervisor I & C - 001
- x lPD-18.4.002 SALEM GENERATING STATION NUMBER -
REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
DATE 5/3/82 TEST PROCEDURE PAGE _6=--- OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A 7.0 System Line-up:
7.1 None stated
- I & C
- 001
....- .. *-*-**#**.. *~--* --_._!_'!_""~' ......11'.**~":"°'"- ......... _ ... ~~,.:--:**--***,*** . * . ** ***** - .* ,. :-*~*- ---~- .. - * * ---****-* *****-----~*-** .,,., . * * * .
- _____ ...... _**** -~* ..
x SALEM GENERATING STATION NUMBER - lPD-18.4.002 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
DATE 5/3/82 TEST PROCEDURE PAGE _7..:.....__ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A
8.0 Instructions
Initial 8.1 Lift the following leads at the NIS:
8.1.1 Rack 78 .- TB123-l 8.1.2 Rack 79 - TB223-l (s.-R.. ~,-.i. 'O\oc..¥-. c:*'tl.'J .
- 8.2 8.~.\
Install a jumper across TB507-4 and TB507-5 in both Train A and Train B.
- r. \ '
L:J. \: '-'.:~,- .. ~ *. ~ \'f~,v.:;i
~!'.\v...."t"\C...l \ ,..._'\rf\\N.~\5 ....,.. '-
"'i'-~n-(.....
- t:l ~ <..; }..C\.
- "-'t*H..
. .i 1*~\"l.-<.Q.
f.:1::i.5-.ioc:..""\~
~~~)
,~,,.,.:"\)"L..>!>...<C, A
B
~ Tr f'. ~ N *- \<, le ;i.. c\ \ , < "'~V(. ~ \..-..~ c~
(2-..,.vrc..<:.... Q_,,_,.._.(\.:... \\*~~)\,, F\v...'>t t'\\- ':;\,~-\- "°"v...;.,.,t ~....o .....:. ,\.\1-.rrn,)
8.3 Place the Input trroi Inhibit switch for Train B in the "Inhibit" position.
8.4 Place the Train A Mode Selector switch in the "Test" position.
8.5 Clear all Reactor Trip Signal~ by installing test jumpers or resistors as specified in Table I.
8.6 Connect Visicorder Channel 1 to the output terminals of the Bistable Switch under test as shown in Table 2 (115 VAC) .
- I & C
- 001
- -*-*~* .... --.*-:- -1*;- .. .....:,,.-- ....... .,. . ..... ---.-,.-. -- ... ,. -
~
I
. *1* <***-**--**-***-. --.
x
- SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
REV. NO.
DATE lPD-18.4.002 0
5/3/82 PAGE --8"'-_ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A
8.0 Instructions
(Continued) Initial 8.7 Connect Visicorder Channel 2 to UV coil terminals TB508-l and TB508-2 (+43 VDC) in SSPS Train A Output Cabinet.
8.8 Place the coincident bistable.switch or switches as listed in Table 2 to the TRIP position
- 8.9 Adjust the visicorder to obtain a good quality step function trace.
8.10 Verify the UV coil voltage at approximately 43 VDC on the LOGIC TEST PANEL meter (UV COIL VOLTAGE) in the SSPS OUTPUT LOGIC BAY.
8.11 Start the visicorder and immediately place the bistable switch under test to the TRIP position.
B.12 Stop the visicorder after the UV coils are de-energized.
Record on Table 2 the elapsed time from the trip signal to the time the UV coil voltage decays to 30% of its initial value. Label all visicorder traces, and store visicorder paper for future reference *
- 8.13 Repeat Steps 8.5 through 8.12 for the bistables as indicated in Table 2, Step 1 through 4.
I & C *001
- x SALEM GENERATING STATION NUMBER - lPD-18.4.002 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
DATE 5/3/82 TEST PROCEDURE PAGE _9__ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A
8.0 Instructions
(Continued) Initial 8.14 For Steps 5 through 48 in Table 2, the P7 permissive must be present. Actuate P7 by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42 and increase (clock-wise) the Detector A and Detector B Test Signal until the POWER RANGE PlO PERMISSIVE .light energizes *
(Note: Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" .at the control bezel when power range test signals are above the P7 permissive and reset the rate trip as necessary.)
8.14.1 For Steps 25 through 36, connect channel* 3 of the visicorder to coil contacts.5 and 6 on K633.
8.14.2 For Steps 25A through 36A, connect channel 3 of the visicorder to coil contacts 5 and 6 on K634.
NOTE: The UV Coil will remain de-energ.ized for this step.
8.15 Repeat Step 8.6 through 8.12 for the bistable as indicated in Table 2, Step 5 through 36
- I & C -001
- x SALEM GENERATING STATION NUMBER - lPD-18.4.002 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
DATE 5/3/82 TEST PROCEDURE PAGE 10 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A
8.0 Instructions
(Continued) Initial 8.16 For Steps 37 through 48 in Table 2, the PB permissive must be present. Actuate PS by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42. Increase (clockwise) the Detector A and Detector B Test Signal until the POWER RANGE P8 PERMISSIVE light energizes. (Note:
Depress BL9CK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when the power range test signals are above the P7 permissive and_ reset the rate ~rip as necessary.)*
8.17 Repeat Step 8.6 through 8.12 for the bistable as indicated in Table 2, Steps 37 through 48.
8.18 For Steps 37 through 63 in Table 3, the P7 permissive must be present. Actuate P7 by placing the Operation Selector switch to the.Detector A and B position on power range drawers N41 and N42. Increase (clockwise) the Detector A and Detector B Test Signal until the POWER RANGE PlO PERMIS.SIVE light energizes. (Note:
Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when the power range test signals are above the P7 permissive and reset the
- rate trip as necessary.)
I & C - 001
. x SALEM GENERATING STATION NUMBER - lPD-18.4.002 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
DATE 5/3/82 TEST PROCEDURE PAGE 11 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A
8.0 Instructions
(Continued) Initial 8.19 CAUTION: Terminals may be energized (llSVAC)". Connect channel 3 of visicorder to coil contacts 5 and 6 on K632. Short terminal 1 to 5 on A.R. timer.
8.20 Disconnect the field wires connected to the terminals listed in Table 3, Steps 37 through 40 *
- 8.21 Connect a toggle switch across terminals.
switch in OFF position will produce a trip.)
(Toggle 8.22 Connect visicorder channel 1 across the terminals.
8.23 Repeat Steps 8.7 through 8.12 for Table 3, Steps 37 through 40. (For a coincident channel trip, place the toggle switch to OFF.)
8.24 Remove the toggle switches from terminals of Table 3, Steps 37 through 40 and reconnect the field wires.
8.25 Disconnect the field wires connected to the terminals listed in Table 3, $teps 41 through 44.
8.26 Connect a toggle ~witch across each termi~al. (Toggle
- switch in .OFF. position will produce a trip.)
8.27 Connect visicorder Channel 1 across the terminals.
I & C - 001
x SALEM GENERATING STATION NUMBER - lPD-18. 4. 0 02
- PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE REV.NO.
DATE
_O_ _ _ _ _ __
_5~/_3~/8_2~~~~
PAGE 12. OF 28 TITLE RESPONSE TIME- TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A
8.0 Instructions
(Continued) Initial 8.28 Repeat Steps 8.7 throu~h 8.)2 for Tabl~ 3, Steps.41 through 44. (For a coincident channel trip, place the toggle switch to OFF.)
8.29 Remove the toggle switches from the terminals of Table 3, Steps 41 through 44 and reconnect the
- NOTE:
field wires
- For Steps 45 through 56 in Table 3, the channel under the coincident channel.bistables are actuated by placing the operations selector switch to the Detector A and B position on the power range drawers in the NIS cabinets, and increasing (clockwise) the Detector A and Detector B Test Signal.potentiometers until the required trip light energizes on the drawer.
8.30 Connect visicorder Channel 1 to the terminals listed in Table 3 for the channel under test. Repeat Steps 8.7 through 8.12 for Table 3, Steps 45 through 55.
8.31 Connect ~isicorder Channel 1 to the terminals listed in Table 3 Step 56 .
I& c -001 I
~~i&**~~=*~*!*~ '~~-*-**-~-- * ****-~*--~---*-- **.--****-**~~M~-~~-
- -~--~*--~*-~*.;~*~-*~*~~-~-~~~~~~~~~~~~~~~~~
x
- SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
REV. NO.
- DATE PAGE lPD-18.4.002 0
5/3/82 13 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A
8.0 Instructions
(Continued) Initial 8.32 The Senior Shift Supervisor/Shift Supervisor has verified the following breakers are cleared and tagged: No. 11 Control Rod Power Supply M-G breaker on No. lE 460VAC bus and No. 12 Control Rod Power Supply M-G Breaker on No. lG 460 VAC bus .
- Senior Shift Supervisor/Shift Supervisor Date/Time 8 *. 33 Connect Channel 3 of the visicorder to the Spare "B" contact of the auxiliary switch of Reactor Trip Breaker A.
8.34 Connect the spare conductors of cable RP363-AT (located in the bypass breaker terminal cabinet) to TB3 terminals 11 & 12 in the Trip Breaker terminal cabinet.
'8.35 Connect the spare conductors of cable RP363-AT (located in the SSPS Train A Logic Cabinet) to the visicorder. (Note: In series with one conductor, connect*a 6VDC latern-type battery~
I & C-001
.X SALEM GENERATING STATION NUMBER - lPD-18. 4. 0 02 PERFORMANCE DEPARTMENT (I & c*) REV.NO. --'O'--~~~~~~
DATE 5/3/82 TEST PROCEDURE PAGE 14 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A
8.0 Instructions
(Continued} Initial 8.36 Close Reactor Trip Breaker A from the control console and repeat Steps 8.7 through 8.12 for Table 3, Step 5~.
To close the trip breaker, place the Mode Selctor Switch in *operate.
Response Time of Reactor Trip Breaker A ~~~~~~~~~~
8.37 Remove the connections made in Step 8.33. Place the Mode Selector Switch in Test.
8.38 CAUTION: Terminals may be energized (115VAC}
Disconnect the field wires connected to the terminals list~d in Table 3, Steps 57 through 59.
8.39 Connect a toggle switch across each terminal.
(Toggle switch in -OFF position will producie a trip.}
8.40 Connect visicorder Channel 1 across the terminals.
8.41 Repeat Steps 6.7 through 6.12 for Table 3, Steps 57 through 59. (For a coincident channel trip, place the toggle swit?h to OFF.)
- 8.42 Remove the toggle switches from terminals of Table 3, Steps 57 through 59 and reconnect the field wires.
I & C -001 I I .
.X SALEM GENERATING STATION NUMBER- lPD-18.4.002
- PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE REV.NO.
DATE
__,O'--~~~~~~
__;;;5~/~3~/~8=2~~~~
PAGE 15 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A
8.0 Instructions
(Continued) Initial 8.43 Disconnect the field wires connecten to the terminals listed in Table 3, Steps 60 through 63.
8*. 44 Connect a toggle switch across each terminal* (Toggle switch in OFF position will produce a trip.)
- 8.45 Connect visicorder Channel 1 across the terminals.
8.46 Repeat Steps 6.7 through 6.12 for Table 3, Steps 60 through 63~ (~or a coincident channel trip, place the toggle switches to OFF.)
8.47 Remove the toggle switches from terminals of Table 3, Steps 60.through 63 and reconnect the field wires .
I & C - 001
x SALEM GENERATING STATION NUMBER - lPD-18.4.002 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
DATE 5/3/82 TEST PROCEDURE PAGE 16 OF 28 Tl.TLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A 9.0 Return To Normal: Initial 9.1 Remove visicorder Channels l through 3 from the SSPS Equipment Cabinets.
9.2 Remove test resistors, jumpers, and reland leads in the Hagan and SSPS cabinets as indicated in Table I *
- 9.3 Remove test equipment and jumpers from reactor trip breaker terminal cabinet.
9.4 Return NIS power range drawers to normal and clear any associated alarms.
9.5 Place the Input Error Inhibit switch for Train A in "Inhibit".
9.6 Place the Mode Selector switch for Train A in the "Operate" po~ition.
I I & C -001
x
- SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
REV. NO.
DATE PAGE lPD-18.4.002 0
5/3/82 17 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A 9.0 Return To Normal: (Continued) Initial 9.7 Initiate the Safety Injection Blocks for both TRAIN A and TRAIN B from the Control Bezel.
Steam Line S.I. Block A
- Pressurizer S.I. Block B
A B
9.8 Place the Input Error Inhibit switch for both TRAIN A and TRAIN B in the "NORMAL" position.
~t>-.v..~10N °"~ r"l"'\"-lr.\S 1'r\;>.~\t,.;;_ <:.l\.l:..<°":~'~C l t"'S RLJ 'l~
(i_'1'.J.!.;'.*\.."">..:...
<J A
("\ ........
\ ,__,_ \ \
(_
- '\ - 0 \y.,:o...,1-) .*
B
<(_~
9.9 Remove the jumper from TB507-4 and TB507-5 in both TRAIN A and TRAIN B.
9.10 Verify that the Green and the Amber General Warning Test LED's in both TRAINS are LIT .
I & C
- 001
x
- SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
REV. NO.
DATE
- PAGE lPD-18. 4. 002
-..:::0:......__ _ _ _ __
-=5~/~3~/~8=2---~
18 OF 28
. TITLE RESPONSE TIME TEST OF SOLID STATE PROTE,CTION SYSTEM LOGIC -
Rx Trip, Train A 9.0 Return To Normal: (Continued) 9.11 Reconnect the Leads lifted at the following locations:
9.11.l NIS Rack 78 - TB 123-1 9.11.2 NIS Rack 79 - TB 223-1
- \ .\.- .\- 'n 'C.
~~S.:.~\.d '"':!:....,;.;_\~c\.,c,~
~.;
'c \- <;;-'--'-'\ d
~\oc.:"1-.
-.i \ $ ( ) ' "':,:,
R '~~.\ i>t.\ '<:.U 'L..-:_
~ --.:> \- ~
~"' ... **\,9\\~ 1 ~"'-""'\;:.{"
-\-\.,. ~
~ ....'
,.;._, -N ... \ _~
d... o.,.._~ lo "1**'
\. .--.
.....-........ \
,_, ....... ~
\.
~~ ..... Ii:...
~\* *
' -, 'i;:..
C-c:-..~ \.~~\.- <""'\ {l " *....,,.\..r. r \ . .p r ~ \::- c-** --,- G . \.
'-- -*....., '"' Q..I(...\'" e:i. ..:. '"Y\""- ~' .l... * \"-~<:;;-...~
I & C - 001
- X SALEM GENERATING STATION NUMBER - lPD-18~4.002 PERFORMANCE DEPARTMENT (I & C)
REV. NO. 0 DATE 5/3/82 TEST PROCEDURE PAGE 19 OF 28 Tl_TLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A 10.0 Remarks: I.O.
- 11. 0 Completion:
- 11. l Completed By:
Technician Date Time
- 11. 2 Approved By:
Supervisor Date Time I & C - 001
-X SALEM GENERATING STATION NUMBER - lPD-18. 4. 002
- PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE REV.NO.
DATE
~O~~~~~~~
~5~/_3~/_8_2~~~~
PAGE 20 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A TABLE I A*. Test Resistors installed in the following Test Jacks and the CT switch placed in TEST:
I. REACTOR COOLANT TEMPERATURE TJ-411-1 Rack 2 TJ-421-1 Rack 6 TJ-431-1 Rack 13 TJ-441-1 Rack 15
- TJ-412-1 Rack 2 NOTE:
TJ...;422-1 Rack 6 TJ-432-1 Rack 13 TJ-442-1 Rack 15 To clear LOW TAVG signals, open states block connections 1, 2, 3, 4, 6, 7, 8 and 9 in the above racks.
II. REACTOR COOLANT FLOW TJ-414 Rack 3 TJ-424 Rack 3 TJ-434 Rack 3 TJ-444 Rack 3 TJ-415 Rack 7 TJ-425 Rack 7 TJ-435 Rack 7 TJ-445 Rack 7 TJ-416 Rack 12 TJ-426 Rack 12 TJ-436 Rack 12 TJ-446 Rack 12 III. PRESSURIZER PRESSURE TJ-455 Rack 1 TJ-456 Rack* 10. TJ-457 Rack 12 TJ-474 Rack 14 IV. STEAM GENERATOR LEVEL TJ-517 Rack 31 TJ-527 Rack 31 TJ-537 Rack 31 TJ-547 Rack 31 TJ-518 Rack 11 TJ-528 Rack 11 TJ-538 Rack 11 TJ-548 Rack 11 TJ-519 Rack 8 TJ-529 Rack 4 TJ-539 Rack 4 TJ-549 Rack 8 I & C
- 001
- X lPD-18.4.002 SALEM GENERATING STATION NUMBER -
REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
DATE 5/3/82 TES
T. PROCEDURE
PAGE 21 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A TABLE I (Continued)
B. Install the followi'ng Jumpers in SSPS INPUT RELAY BAY:
I. TURBINE AUTO STOP OIL TB-109-1 to TB-109-2 TB-209-1 to TB-209-2
- TB-308-1 to TB-308-2
.II. TURBINE STEAM STOP VALVES TB-109-3 to TB-109-4 TB-209-3 to TB-209-4.
TB-308-3 to TB-308-4 TB-407-3 to TB-407-4 III. REACTOR COOLANT PUMP BREAKERS TB-109-9 to TB-109-10 TB-209-9. to TB-209-10 TB-308-9 to TB-308-10 TB-407-9 to TB-407-10 I & C -001
__ .. *-* --- ... -.- *- ...***~1.*:............... ~-*-~-..~-:- ... ~"*... ,;.~:** .... -.~--:"':'-:'*-*-..---** ***-**-..*-*-*.*:.***-*-7.--*-**-,* .. **.. - *-- .. .
. X, lPD-18.4.002 SALEM GENERATING STATION NUMBER -
REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
DATE 5/3/82 TEST PROCEDURE PAGE 22 OF 28 TITLE RESPONSE ~IME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A TABLE II STEP BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE*
UNDER TEST HAGAN RACK CHANNEL UV COIL OVERTEMPERATURE DELTA T 1 BS-411C 2 TB 1-11&12 BS-441C 15 2 BS-421C 6 TB 2-5&6 BS-441C 15 3 BS-431C 13 TB 3-3&4 BS-441C 15 4 BS-441C 15 - TB 3-3&4 BS-431C 13 SSURIZER PRESSURE/LOW (ABOVE P7) 5 BS-455C 1 TB 1-7&8 BS-474A 14 6 BS-456C 10 TB 2-9&10 BS-474A 14 7 BS-457C 12 TB* 4-1&2 BS-.474A 14 8 BS-474A 14 TB 3-1&2 BS-457C 12 PRESSURIZER PRESSURE HIGH 9 BS-455A 1 TB 1-1&2 BS-474C 14 10 BS-456A 10 TB 2-f~4 BS-474C 14 11 BS-457.A 12 1 TB 3-7&8 BS-474C 14 12 BS-474C 14 TB 2-11&12 BS-457A 12 LOSS OF FLOW TWO LOOP (ABOVE P-7 AND BELOW P-8)
- 13 BS-414 3 TB 2-7&8 BS-416 12 BS-424 3 BS-425 7 14 BS-415 7 TB 2-7&8 BS-416 12 BS-424 3 BS-425 7 BS-416 12 TB 2-3&4 BS...:414 3
.5 BS-424 3 BS-425 7 \
I & C -001
. x '
SALEM GENERATING STATION NUMBER - lPD-18. 4. 002 PERFORMANCE DEPARTMENT (I & C) REV.NO. --"O~--,-.~~~~
DATE ~5~/_3~/_8_2~~~~
TEST PROCEDURE PAGE 23 OF 28 TITLE RESPONSE TIMg TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A TABLE II STEP BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL 16 BS-424 3 TB 2-11&12 BS-426 12 BS-414 3 BS-415 7 .
17 BS-425 7 TB 2-11&12 BS-426 12 BS-414 3
~8 BS-415 7 BS-426 12 TB 2-7&8 BS-424 3 BS-414 3 BS-415 7' 19 . BS-434 3 TB 3-3&4 BS-436 12 BS-414 3 BS-415 7 20 BS-435 7 TB 3-3&4 BS-436 12 BS-414 3 BS-415 7 21 BS-436 12 *TB 2-11&12 BS-434 3 BS-414 3 BS-415. 7 22 BS-445 7 TB 3-7&8 BS-446 12 BS-414 3 BS-415 7 23 BS-444 3 TB 3-7&8 BS-446 12 BS-414 3 BS-415 7 24 BS-446 12 TB 3-3&4 BS-444 3 BS-414 3 I & C -001
.x
- SALEM GENERATING STATION NUMBER - lPD-18. 4. 002 REV.NO. _O_ _ _ _ _ __
PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE DATE 5/3/82
-~..;..__ _____
PAGE
- OF 28 TITLE RESPONSE TIME- TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A TABLE II STEP BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL
- K633.
BS-415 7 STEAM GENERATOR WATER LEVEL LOW-LOW 25 BS-517B 31 TB 1-9&10 BS-519B 8 26 BS-518B 11 TB 1-3&4 BS-519B 8 27 BS-519B 8 TB 2-5&6 BS-517B 31
~
BS-527B 31 TB 2-3&4 BS-529B 4 BS-528B 11 TB 1-11&12 BS-529B 4 30 BS-529B 4 TB 1-3&4 BS-527B 31 31 BS-537B 31 TB 2-9&10 BS-539B 4 32 BS-538B 11 TB 2-7&8 BS-539B 4 33 BS-539B 4 TB 1-7&8 BS-537B 31 34 BS-547B 31 TB 3-3&4 BS-549B 8 35 BS-548B 11 TB 3-3&4 BS-549B 8 36 BS-549B 8 TB 2-9&10 BS-547B 31 I & C -001
. x... '
SALEM GENERATING STATION NUMBER - lPD-18.4.002 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
DATE 5/3/82 TEST PROCEDURE PAGE 25 OF 28 TITLE RESPONSE TIME- TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A TABLE II STEP .BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL K634 25A BS-517B 31 TB 1-9&10 BS-519B 8 BS-549B 8 BS-548B 11 26A BS-518B 11 TB 1-3&4 BS-519B 8 BS-549B 8 BS-548B 11 A BS-519B 8 TB 2-5&6 BS-517B 31 BS-549B 8 BS-548B 11 28A BS-527B 31 TB 2-3&4 BS-529B 4 BS-549B 8 BS-548B 11 29A BS-528B 11 TB 1-11&12 BS-529B 4 BS-549B 8 BS-548B 11 30A BS-529B 4 TB 1-3&4 BS-527B 31 BS-549B 8 BS-548B 11 31A BS-537B 31 TB 2-9&10 BS-539B 4
. BS-549B 8 BS-548B 11 32A BS-538B 11 TB 2-7&8 BS-539B 4 BS-549B 8
-A BS-548B 11 BS-539B 4 TB 1-7&8 BS-537B 31 BS-549B 8 BS-548B 11
- l&C-001
- x. '
SALEM GENERATING STATION NUMBER - lPD-18.4.002 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
DATE 5/3/82 TEST PROCEDURE OF 28 PAGE 26 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A TABLE II -
STEP BISTABLE RACK TERMINALS COINC-lDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL K634 STEAM GENERATOR WATER !.EVEL LOW-LOW AND START MOTOR DRIVEN AUX F.W. PUMP 34A BS-547B 31 TB 3-3&4 BS-549B 8 BS-529B 4 -
BS-528B 11 35A BS-548B 11 TB 3-3&4 BS-549B 8 BS-529B 4
' BS-528B 11 36A BS-549B 8 TB 2-9&10 BS-547B 31 BS-529B 4 BS-528B 11 RC LOSS OF FLOW SINGLE LOOP (ABOVE P8) 37 BS-414 3 TB 2-7&8
. BS-416 12 38 . BS-415 7 TB 2-7&8 BS-416 12 39 BS-416 12 TB 2-3&4 BS-414 3 40 BS-424 3 TB 2-11&12 BS-426 12 41 BS-42~ 7 TB 2-11&12 BS-426 12 42 BS-426 12 TB 2-7&8 BS-424 3 43 BS-434 3 TB 3-3&4 BS-436 12 44 BS-435 7 TB 3-3&4 BS-436 12 45 BS-436 12 TB 2-11&12 BS-434 3 46 BS-444 3 TB 3-7&8 BS-446 12 47 BS-445 7 TB 3-7&8 BS-446 12 BS-446 12 TB 3-3&4 BS-444 3 I & C - 001
. >s. *
- SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER-REV.NO.
DATE lPD-18.4.002
~O.__~~~~~~
-=5~/~3~/=8=2~~~~
PAGE 27 OF 28 TITLE RESPONSE TIME TEST OF SOLID* STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A TABLE III STEP CHANNEL SSPS INPUT SSPS INPUT COINCIDENT TIME RESPONSE UNDER TEST TERMINALS TERMINALS CHANNEL UV COIL K632 RCP UNDER VOLTAGE (ABOVE P7) 37 Bus H TB 109-5 TB 109-6 Channel 3 (F) 38 Bus r! TB 209-5 TB 209-6 Channel 3 ( F) 39 Bus F TB 308-5 TB 308-6 Channel 1 (H) 0 *Bus G TB 407-5 TB 407-6 Channel 1 (H) p UNDER FREQUENCY (ABOVE P7) 41 Bus H TB 108-9 TB 108-10 Channel 3 ( F) 42 Bus E TB 208-9 TB 208-10 Channel 3 ( F) 43 ... Bus F TB 307-9 TB 307-10 Channel 1 (H) 44* Bus G TB 409-1 TB 409-2 Channel 1 (H)
POWER RANGE LOW FLUX LEVEL TRIP 45 N41 TB 102-7 TB 102-8 N42 46 N42 TB 202-7 TB 202-8 N41 47 N43 TB 301-7 TB 301-8 N41 48 N44 TB 401-7 TB 401-8 N41 POWER RANGE HIGH FLUX LEVEL TRIP 49 N41 TB 102-9 TB 102-10 N42 50 N42 TB 202-9 TB 202-10 N41 51 N43 TB 301-9 TB 301-10 N41 52 N44 TB 401-9 TB 401-10 N41 I & C - 001
- SALEM GENERATING STATION NUMBER - lPD-18.4.002 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
DATE 5/3/82 TEST PROCEDURE PAGE 28 OF 28 TITLE RESPONSE TIME.TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train A TABLE III STEP CHANNEL SSPS INPUT SSPS INPUT COINCIDENT TIME RESPONSE UNDER TEST TERMINALS" TERMINALS CHANNEL UV COIL POWER RANGE NEGATIVE RATE TRIP 53 N41 TB 106-7 TB 106-8 N42 54 N42 TB 207-1 TB 207-2 N41 55 N43 TB 304-11 TB 304-12 N41 56 N44 TB 405-9 TB 405-10 N41 -,
&INE AUTO STOP OIL PRESSURE SWITCHES 57 1. TB 109-1 TB 109-2 2 58 2 TB 209-1 TB 209-2 3 59 3 TB 308-1 TB 308-2 1 TURBINE STEAM STOP VALVES 60 1 TB 109-3 TB 109-4 2, 3, 4 61 2 TB 209-3 TB 209-4 1, 3, 4 62 . 3 TB 308-3 TB 308-4 1, 2, 4 63 4 TB 407-3 TB 407-4 1, 2, 3 I & C - 001