APPENDIX A ATWS TRAINING PROGRAM

  • --8303160473- 830314___ ---

PDR ADOCK 05000272 S PDR

--~

('-'*.~:;

~~-~.,-~?

  • Public Service Electric and Gas Company Nuclear Training Center 244 Chestnut Street Salem, N.J. 08079 March 11, 1983 Phone 609/935-8560 TRAINING OBJECTIVES Following are the objectives for Anticipated Transient Without a Trip (ATWT) training conducted at Salem Generating station.

Upon completion the student will be able to:

1. Define Anticipated Transient Without a Trip (Condition II FSAR Event with a common-mode-failure).
2. Describe how the inherent stability of the reactor will reduce reactor power on a "Loss of Heat Sink" (ATWT type event) .
  • 3.

4.

Explain how "dead-heading" of the centrifugal charging pumps could occur during an ATWT type event.

State which ATWT type event will cause the highest pressure transient on the reactor coolant system.

5. Explain why pressure could increase to 2974 psia on an ATWT type event.
6. Knowledgably discuss the ATWT event of February 25, 1983 and know it was classified as an Alert, in accordance with our Em~rgency Plan, classified a Significant Event, in accordance with 10 CFR 50.72, and required Immediate Notification (within one hour).
7. State which reactor trip breaker coils are operated when:
a. An automatic trip signal is generated via the SSPS (Solid State Protection System) .
b. The ~ (handle-type) reactor trip switches are used.
c. The "bezel" pushbuttons for the reactor 'trip breakers are used .

The Energy People

  • 8. State which coil(s) energize to trip the reactor trip breakers.

9o State which coil(s) de-energize to trip the reactor trip breakers.

10. Identify which component within the reactor trip breaker prevented an automatic reactor trip on February 25, 1983 and probably prevented the automatic reactor trip on February 22, 1983.
11. List the Immediate Actions (both automatic and manual) for a Reactor Trip, EI-4.3.
12. State which reactor trip breaker and* bypass breaker is operated via SSPS Train "A" actuation.
13. State which reactor trip breaker and bypass breaker is operated via SSPS Train "B" actuation.
14. Explain the difference between a demand and a confirmation trip signal .
  • 15.

16.

List the five "confirmation" trip signals displayed in the control room for a reactor trip.

Describe and explain the design and function of the safety-related systems and sub-systems at Salem Nuclear station for mitigation of ATWT Events.

17. Outline the steps that the Senior Shift Supervisor and Operations Manager must perform after a reactor trip in accordance with AD-16, Post Reactor Trip/Safety Injection Review and Unit Startup Approval Requirements.
18. Explain the approval process for reactor plant startup following:
a. Planned unit outages.
b. A reactor trip/safety injection actuation with the cause known.
c. A reactor trip/safety injection actuation with the cause unknown .
  • RES:jcp R.

Pr Supervisor

SALEM GENERATING STATION INSTRUCTOR LESSON PLAN TITLE: ATWT HANDOUT il LESSON NO:

DURATION:

REVISION NO: DATE: 3/8/83 SUBMITTED: R. SWE~NEY DATE: 3/8/83 APPROVED:-~~/. DATE:

ANTICIPATED TRANSIENT WITHOUT A TRIP TRAINING

( SALEM UNITS I & II )

OJ:?JECTIVES ....

Upon completion the student will be able to

1. Define Anticipated Transient Without a Trip (Condition II FSAR Event with a common-mode-failure).-
2. Describe how the inherent stability of the reactor will reduce reactor power on a "Loss of Heat Sink" (ATWT type event).

3.. Explain how 11 dead-heading" of the centrifugal charging pumps could occur during an ATWT type event.

4. State which ATWT type event will cause the highest pressure transient on the reactor coolant system.
5. Explain why pressure could increase to 2974 psia on an ATWT type event.
6. Knowledgably discuss the ATWT event of February 25, 1983 and know it was classified as an Alert, in accordance with our Emergency Plan, classified a Significant Event, in accordance with 10 CFR 50.72, and required Immediate Notification (with-in one hour).
7. State which reactor trip breaker coils are operated when:

a) An automatic trip signal is generated via the SSPS (Solid State Protection System}.

b) The W (handle-type) reactor trip switches are used.

c) The "bezel" pushbuttons for the reactor trip breakers are used.

8. State which coil(s) energize to trip the reactor trip breakers.
9. State which coil(s) de-energize to trip the reactor trip breakers.
10. Identify which component within the reactor trip breaker prevented an automatic reactor trip on February 25, 1983 and probably prevented the automatic reactor trip on Febru-ary 22, 1983.
11. List the Inunediate Actions (both automatic and manual) for a Reactor Trip, EI-4.3 .
12. State which reactor trip breaker and bypass breaker is operated via SSPS Train "A" actuation.
13. State which reactor trip breaker and bypass breaker is operated via SSPS Train "B" actuation.
14. Explain the difference between a demand and a confirma-
15. -

tion trip signal.

List the five "confirmation" trip signals displayed in the control room for a reactor trip.

16. Describe and explain the design and function of the safety-related systems and sub-systems at Salem Nuclear station for mitigation of ATWT Events.

~st

17. outline the steps that the senior Shift supervisor and operations Manager perform after a reactor trip in accordance with AD-16,Post Reactor Trip/Safety Injection Review and Unit Startup Approval Requirements.
18. Explain the approval process for reactor plant startup following:

a) Planned unit outages.

b) A reactor trip/safety injection actuation with the cause known.

cl A reactor trip/safety injection acutation with the cause unknown.

SAOP8303:3

INSTRUCTOR

REFERENCES:

TRAINING MATERIAL REQUIRED: OvE~HEl'rC PR~~ednk..

Sc...r:.: eerJ STUDENT HANDOUTS: # 1 CLASSROOM REQUIREMENTS:

NOTES I. Pref ace On the morning of February 25, 1983 a transient occurred on Unit #J during the start-up phase after the refueling. This transient fell under the category known as "Anticipated Transient Without a Scram" or "Anticipated Transient Without a Trip".

In 1969, a question was raised concerning the effects of anticipated transients without a reactor trip.

Initially, it was believed by the AEC that this was a very low probability event; until the AEC staff took a closer look to find that there were,..... lO/year/plant(co.i.Jd1T1ot1Jie<JC ..~

Thus, they concluded that the combined probability of anticipated transients ana*a common mode failure could be such that a safety problem did really exist.

Handout On Aug. 19, 1981, a Mr. Steitler put together a 4f 1 brief overall package concerning this matter.

Handout #1 contains a few pages of his discussion.

© TP-1 Condition II transients (15 listed in FSAR) in Chapter 15. The SSPS was evaluated for random conponent failures and the likelihood of no trip following ini~iation of condition I I events was on the order of magnitude of 2 x 10-7.

G> TP-2, 3, 4, 5, 6 R-=1()1RAOP:6 Page J ~ate 3/8/83

NITICIPATED TRANSIOOS WITHOITT SCRLII'1 A1WS ..

  • Al.JGUST 19) 1981

BASIC GROJNDRULES FOR A1WS TI-IAT HAVE NOT 01.6NGED Pl'ITICIPATED TR#JSIENTS - THESE ARE THE CQ\IDITICN II TPJ\NSIBITS IN TI1E FSAR. TI-!ESE TRflNSIENTS SHDt/ TRIVIAL RESULTS BECAUSE A fV\CTOR SCRPM IS GENEPATED.

wrrnrur SCRDM - SO'f}!Or/ Aa,f IN THE F£ACTOR P[)1ECTIO'~

--- " 4 SYSID1 PREVENTS THE PDIB FRCM FALLING rrrro COff. ALL INPUTS AND OlJTFUT TO THE FEACTOR PROTECTICN SYS"f8'1 FAIL AT THE SM TIJVE.

- . BECAUSE OF THE LOW PROBABILITY OF AntS EVENTS THE NRC HAS All.OtlED FOR TI1E USE OF BEST ESTirvlATE INITIAL CO'lDITI~S

A1WS LIMITS NO GROSS FUEL DPfv1AGE NO GffiSS GI.ER PfBSURIZATICN NO COOAINBIT PRESSURE EXOJRSICN

DIFFERENT TYPES OF ATh'S EVENTS REACT IV Ill' EXQJRS Ia~s ...

LOSS OF HEAT SINK IfGPJillATION OF HEAT ltlTh'AL IN RCS

LIBS OF HEAT SINK POrJER MI8"1ATG1 SU0-1 11-IAT PRIMl\RY HEATS UP FAS1ER TI-JPN SECCTIDARY CAN RB1JVt HEAT NET RESULT IS THAT PRIMC\RY CCOLPNr IDlFERATURES NID PRESSURE INCREASE NO~Y J THIS IS SENSED BY mff DIFFEIDIT TRIP SIGNALS

.PND THE PRHV\RY IS SH~ VIA ASCPJJM WITHOJr SCPAVJ - TI-lE PRIMl\RY SIDE IB1JE:M1UPE mo PRESSURE RISE ARE LIMITED BY INHEPfNTLY NEGATIVE TEMPEMTURE CCEFfI CIENTS EVENTS CCNS IDERED EXCESS LOAD INO£PSE LCSS OF NO~ FEEUIATER LCSS OF LOAD CllJRBINE TRIP)

IMPORTPNT PAR#'ffiRS CF INIERfST PRESSUff f.\ND TB'lPERAllJPE TRPNSIENT ARE DIRECTLY TIED TO THE:

  • i'ODERATOR IDPEPATU ff CCEFFI CI B'ff IDFPLER IDfEMTUff CCEFFICIENT PEAK PRESSURE IS ASTRCNG FUNCTICN OF FDRV 1 S Pl'ID SAFETY VN..VE v/ATER PELIEF PATES INITIAL FOYfR LP/EL

.S/G HEAT TBPNSFER CAPPJ31U.ITIES

-!it. HEAT SINK r1JST BE F£-ESTABLISHEn VIA AUXILIA.RY FEEIWATER

Nff ATWS EVENT THAT IS A HIGH PPESSUFf CCNCERN ALSO RESULTS IN INCREASE IN COOLANT T81F£RATUFE ll-1E INCffASE IN COJUWT TBYPERATUFf RESULTS IN NEGATIVE REACTIVE INSERT ICN illE TO NEGATIVE ID~E.RATURE CCEFf IC I8'IT TI1E NEGATIVE REACTIVE IS BAlJiN(f] BY IXlPPLER FEEDBACK SUGl THAT POtJER IS REDJCED - I.E. PLPNT STAYS CRITICA.L

SALEM GENERATING STATION INSTRUCTOR LESSON PLAN TITLE: ATWT HANDOUT *2 LESSON NO:

DURATION:

DATE: 3/8/83 REVISION NO:

DATE:

SUBMITTED:

DATE:

APPROVED:

INSTRUCTOR

REFERENCES:

TRAINING MATERIAL REQUIRED: oveRherx:i PR.o~ec.,~oR S.c,Re e. IJ STUDENT HANDOUTS:  :#: ;G CLASSROOM REQUIREMENTS:

T HANDOUT 2 NOTES II. Westinghouse Owners Group/Emergency Response Guidelines (WOG/ERG)

From the WOG/ERG seminars held, guidelines were set forth to handle various types of transients.

One of which was the ATWS (Anticipated Transient Without scram).

A. Purpose TP-1

1. Add -p when rods did not insert upon demand
2. Establish heat sink for primary
3. Prevent/minimize damage to fuel and release of radioactivity B. Symptoms
1. Rx trip bkrs. fail to open
2. Rod position indication
3. No rod bottom lites
4. @ level not decreasing Go thru 9 steps addressed in ECA-1 TP-2 c.

Step 1 ~ The first action is. to mitigate TP-3 the consequences as quickly as possible.

To do this, he must perform the 1st three steps. They are to be performed without delay.

Rx trip - }:i switches Pushbuttons Drive rods in Trip Turbine - this is especially important if th ATWT was caused due to loss of F.W.

Manual P.B.

OST switch Turning off EH pumps Manually R.B. turbine Date 3/8/83 Page 1 Rev. 0

TITLE: ATWT HANDOUT #2 NOTES 0 steps #2 and 3 Must maintain a heat sink for the primary. If need be, manually start MDEFP's; Open steam valves for SDEFP.

Ensure adequate inventory in AF storage tank.

Ensure ll's and/or 21's are operating properly.

Steps i4 and 5 If attempts have failed via C.R.

actions, then local operation must be accomplished. Principle concern would be the Reactor followed by Turbine, feedwater.

Opening Rx trip bkrs., deenergizing MG sets, local trip lever on turbine front standard.

0 91 Caution" During an ATWS, RCS pressure can rise above pump shutoff head and, therefore, the pump mini-flow valves must remain open in order to avoid dead-heading the pumps.

step #6 To get to Step *6, all attempts have failed to trip the reactor and neg.

must be added to bring reactor P subcritical.

Emergency boration Injecting the BIT S.I. actuation (Ke~p in mind, however, s.I. actuation also trips MFW pumps.)

  • Date 3/8/83 Page 2 R301SAOP:6 Rev. ---

0

.

  • NOTES If necessary to + RCS pressure below shut off head of charging pumps, the PZR. PORV's could be used, but ensure successful closure.

Q Step #7 When using PZR. PORV, there is a chance that the PRT rupture disk will blow.

Even though fuel failure is not expected, as a precautionary step, you should isolate cont. ventilation.

© step ,~s Boration must continue until an adequate SDM has been attained. If the PZR. goes solid, a bleed and feed method thru the pressurizer PORV will be reguired .

Pa e 3 Date 3/8/83

1--~~~~-----------

  • N OTES III. WOG/ERG Ao As stated previoudsly, Condition I I events are classified under 15 types of events covering events such as:

c Uncontrolled Rod group withdrawal from subcritical Rx 0 Uncontrolled Rod group withdrawal from power 0 start-up of inactive loop G} Blackout

~ Loss of normal f eedwater Because of the numerous types of events, the response of the primary initially may be quite different; however, the operator response is the same once he identifies an ATWT has occurred.

Additionally, the response of primary would be different for the same event, depending on when in core life it occurs; especially since the value of MTC changes throughout the fuel cycle. -For the worst cases, addressed as long as a reactor trip is generated within 10 minutes, a turbine trip within 30 seconds (for loss of MFW); aux. F.W. established within 60 seconds, acceptable consequences will result.

B. The one ATWT that causes the highest RCS pressure excursion is a main turbine trip from 100% due to loss of vacuum which additionally causes a loss of MFW.

RCS Pressure Transient TP-4 Pressurizer relief valve lifts in 5 sec.; S-G safeties lift in 11 sec.,

which corresponds to the 1st peak in pressurizer pressure. Water expanding causes pressurizer to fill solid and Date 3/8/83

? ae 4

TITLE: ATWT RANDO . 2 NOTES safety valves lift at 100 sec. Then peak pressure reached at 120 sec. of 2974 psia.

TP-5/6 Nuclear Power Transient By overlaying the graph of power upon RCS Tave, you will see that it is the inverse. Thus, as Tave t power +.

Power initially + to ~68% and continues to + at ~110 sec.

o At ~10 minutes, AFW is established.

TP-7 c. There are 3 main results that need to occur for an ATWT:

o Trip reactor o Trip turbine 0 Establish AFW (Review Figure #6)

.. - ,...,.... r Page 5 Date 1L.§_l_83

{ ** l

!!~Rl"1.,/~

i 1 So pt.

~a!Jic 19'21 ACTION/EXPEcn.D RESPONSE RESPONSE NOT OBTAINED The purpose of this guideline ~ to add negative reactivity to the core when the control/shutdown banks are not irumed upon demn.nd, to establish and main-tain a heat sink for conditions amenable to long term cooling, and to prevent or minimize ~e to the fuel and release of e."tc:essive rad.ioru:tivizy.

Fol.lo~ are symptoms of an anrici'pared tran..c;ierit without scram condition:

l. Reactor trip bres!<.en fail to open
l. Rod position indicators 5how failure of CRDMs to insert J. Rod bonom lights not lit
4. Neutron le'Yel not decreasing r..q:iidly corresponding to large negative reaaivtcy i.ns<mion 1cl3

!. - ~ =i:::rl!~::!'3.

~~ S~fili'VJ. ~"°"' N<>../l>a'l"f>

ANilCl?ATEO TRA.1\.lSl~Ni WITHOUT SCfL~./Vl ~g~_d, jgCAml (C©n1o) l Sop'i. 1931 0 Mnt:i=*nrr=nr=~... ~,,... ......~,- mt e°'7'T$' ......... mcmc=t .......... ==s mmrm.cte ...,. ~

,. "-~~

  • ~~©'fl}; o Circled numbers show immedicae actions ne-ps.

o If at (JJ'ly time a reactor trip occurs immediately go 9 to E-0, REACTOR TRJP OR SAFETY INJECTION, STEP lo

_(0 P<3lrform r'Dllm:.11~ rlctioo::J m~

~ii'ini ~e;m:rm t'I. iry to mp iS"at:ror r:r~lly ci. iry to manually insert corrrro! rods.

b. Try to trip turbinra morruol!y b. Try to runbod< ruri:lin0.

© Orz-c1 bif\v Pu~ f!!Jw.Wg:

a. Motor0 driv~n pump br~ker ci. Manually start pumps.

indicator lights - LIT

b. Tuibinet-driven pump stoom b. Mornially open vclves.

supply valves - OPEN Omdr M"1':J '! filwo A!igm~errt:

ri. AFVJ valv~ - PROPER EN\ERGENCY a. Monuolly op-e~ or dose valves ALIGNMENT (.!J as ap~m:ipricr72.

0 01~ If TiKl F~llcr:1irrg 1ri~ Nisr-J0 Ct:airro.cl:

a. Rsoctcr trip a. If r.ot, try ttl trip r20ctor lc:allly.
1) [Em~ plant sp~cific means.]

-b. Turbin\! trip b. If not, try to trip turbin@

lcailly.

1) ['Emilf plant sp;a-cific: meons.]

fl) Emttr plmlr ~fie /i.rz.

12~ N~. ;r:..rm,___;,,,~

1~-1

~v-~mttr..r1 ANT1ClPAiED iRANSlENT WliHOUi SCRAJV1 g\ci;;, i c:

(Corr~.) l Sept. l9~

==-====~---_,.,.~~~~~~--~---- ...... ~~~-~~

p\CTJON/'EXPt;Cit:D RE..s?ONSE  !'<EPONSE NOT o~rr Al NED

( V@ri-fy AfW j:L;:

fl. AFW flow im;licotors ~ CHKX o. Pmorrn actions of st~ps 2 and 3 FOR A.OW lccally.

~~ Charging pW7ip mirdflow valves must rrmwin open whm RCS presswe is fP'ea.ur rha:n pu:mp shutoff h!Zculo lrfri"imo fI©lpicl B-0.'V?irm Of hlei 1i:J O~-n:iin Ad~t:'rrtu Sh<ml~

f~:

a. Start chorgiruJ pumps
b. Align borotion flO\"i/ pm+t fjJ
e. Ol~ RCS pressu~ - Lm e. Open p~ssurizi:r PORVs, as iHAN E! FSlG l'lei:esscry, until RCS pressure is !!.! µsig.

Vo-rifv Cc!:T'roi.m:il-Qm Viom-il..'Zl'i~~ ~ isolation hos NOT OCUJrred, la~;,;;r~ioo lliQi monuolly isolate CDnttiinmerrt Vl;}rrtilcrtion.

l'vllili~ii'I Adsqoota S1u.rtdot7n t'k.iw-gm G@ t@ ~-0, fiUCTO~ ITl!lP CJ~

S.AfITT IW.J~CT10N, SiU' ~.

J

{}) Emar pltmr spmfic ~

f2) Emu ptmi1 sp;r:;:fic ;JW'711J sfruio ff lta:a!i..

fJJ £nuu 200 psi~ btziow pl.Mr sp..."Otic pumrwnuoff hmJd.

I

\,

BACKGROUND INFORMATION FOR WESTINGHOUSE EMERGENCY RESPONSE GUIDELINES ECA-1 ANTICIPATED TRANSIENT WITHOUT SCRAM BASIC REVISION SEPTEMBER 1, 1981 ECA-1 4256B:l

I o INTRODUCTION The guideline ECA-1, "Anticipateo Transient Without SCRAM (HT\~'.::>), spec-11 ifies the mitigating actions required followin~ ATWS events - a family of Condition II accidents requiring a reactor trip but, through some failure in the protection system, the trip is not obtainedo The reactor coolant system conditions at the time the operator identif~es an ATWS event can be very different depending on the initiating event. Loss of main feedwater, control bank withdrawal at power, and a spurious opening of a pressurizer PORV are examples of the differing nature of ATWS

( events. The required operator actions following identification of an ATWS event are the same but the reactor coolant system conaitions may be very different; press~rizer pressure can exceed 2800 psia following a loss of main feedwater ATWS but will never exceed the nominal operating pressure following the spurious opening of a pressurizer PORV. Opera-.

tors must be aware of such system responses ana not rely on any signals or indications other than those for reactor trip.

Transient response is also highly dependent on the time in fuel cycle at which an ATWS occurs. Response is much more severe very early in cycle lifetime than later in the cycle. For example~ primary pressure may exceed 3000 psia for a turbine trip ATWS at beginning of cycle life but not exceea 2575 psia (the pressurizer safety valve setpoint + accumula-tion) near the end of cycle life.

This guideline only addresses the short-term operator actions. The operator must attempt alternate means of reactor trip and maintain a secondary-side heat sink via turbine trip {for a total loss of main feedwater) and auxiliary feedwater actuation. Analyses have shown that if a reactor trip is generatea ~1ithin 10 minutes~ a turbine trip within 30 seconds (for a loss of main feedwater), ana auxiliary feedwater actu-ated w_ith in 60 seconds 1 acceptable consequences result. These times are

( for the limiting ATWS transients. Tur*bi,1e trip and actuation of auxi-liary feedwater would normally be 1enerJteo by the reactor protection system b.ut it is assumed that the :.ame fault that prevents a reactor trip also prevents these functions. Th~refore, the guiaeline proviaes ECA-1 42568:1 for these functions to be performed without delay by the operator in the

)

control room.

Long-term coolaown to c61d shutdown conditions is not adaressed. Plant coo1down in a controlled manner is to be performed utilizing normal procedures as much as possible.

II. DESCRIPTION OF EVENT TRANSIENT The ATWS transient analyses were performea using composite plant parame-ters to bound as many Westinghouse plants as possible, rather than using parameters for any specific plant. Sensitivity stuaies were performeo for the limiting cases to demonstrate that the conclusions are valio for all plants covered by the generic approach. The analyses consioereo 2-,

3-, and 4-loop plant configurations with 51 and 44 Series and Moael D and F steam generators. The reference plant was defined to be a 4-loop, 51 Series steam generator plant.

Though numerous ATWS events have been analyzed, this section will be devotee to a description of the loss of load transient only, since this is a limiting ATWS transient with respect to peak pressure. For a more detailed treatment of this transient and descriptions of other ATWS transients, refer to the two ATWS reports listed in the Reference sec-tion (Section V) of this document.

For. loss of load without reactor* trip:

A major loss of load could result from either a loss of external elec-trica) load or from a turbine/generator trip. In either case, unless a loss of ac power to the station auxiliaries also occurs. off-site power would be available for the comninea operation of plant components, such as the reactor coolant pumps. In this case. the loss of loaa acciaent was analyzea assuming that the control roes fail to drop into the core following .a turbine trip from full power, which would prpduce the maxi-mum possible load loss. The most severe plant conuit"ions that coula result ~rom a loss of load occur following a turbine trip from full

Since the main feedwater pumps may be turbine driven viith steam exhaust

( to the main condenser, loss of feedwater may also result from a loss of condenser vacuum.

Plant behavior was evaluateo for a turbine trip ana loss of main feeo-( ~ater occurring from full power with the assumption that the control rods fail to drop into the core following generation of a reactor trip signal. This evaluation showed the effectiveness of RCS pressure-relief devices and the extent of any approach to core safety limits. The

( results are presented below for the reference plant only (4-loop, 51 Series steam generator plant).

Figures l through 5 show the plant transient response for a loss of load without reactor trip for a 4-ldop plant with a 51 Series steam generator and a moderator temperature coefficient valid for 95 percent of core life (95 percent MIC). Sequence of events for this transient are shown in Table 1. The first peak in pressurizer pressure occurs when the

  • steam generator safety valves lift, and the second, higher peak (maximum system pressure* of 2974 psia) occurs after the pressurizer is filled with water oue to a coolant volume surge resuJting from a rapia reouc-t ion of steam generator heat transfer. Nuclear power decreases to a value of 68 percent due to negative reactivity feeaback causea by mooer-ator (coolant) heating. Further coolant heatup, causeo by loss of steam generator heat transfer, decreases nuclear power further, starting at about 110 seconds.

The DNB ratio does not drop below its initial value during the transient.

"* It should be noted that there is a difference between "pressurizer pressure" and "system pressure" as used here. When pressurizer pressure is given, it refers to the pressure in the pressurizer, whereas the system pressure is defined to be the pressure taken at the discharge of the reactor coolant pump, the maximum pressure in the ~eactor coolant system. The system pressure oefinition inc*uaes pump head and elevation heao and ~*1ill be higher than pres*'.u r~ze:

0

  • l pressure by as much as 100 psi.

ECA-1

~3-42568: 1

At ten minutes into the transient, conditions are stablized, with auxi-liary feedwater prbviding heat removal capability and with an intact Reactor Coolant System and core. Thus, the operator could begin shut-down operations through roe insertion, actuation uf the safety injection system, or through the BORATE or EMERGENCY BORATE modes of the Chemical and Volume Control system.

Transient results for 3-loop and 2-loop plants with 51 Series steam generators are similar to those presented for the 4-loop case. A peak reactor coolant system pressure of 2861 psia results for a 3-loop plant, and a peak pressure of 2753 psia results for a 2-loop plant conf igura-tion.

The following conclusions have been drawn from this particular AT~~

event - loss of load:

During a loss of load with failure of roa insertion after a reactor trip signal generation, core safety limits are not exceeded since the DNB ratio does not go below its initial value and the peak reactor coolant pressure is limited to 2974 psia for the 4-loop, 51 Series reference case. Furthermore. plant conditions are stabilizea at 10 minutes such that the operator can begin shutdown operations.

ECA-1 TABLE 1

  • SEQUENCE OF EVENTS FOR LOSS OF LOAD ~ITHOUT A REACTOR TRIP FOR THE REFERENCE CASE*

Time (seconds)

Event

(

Turbine trips 0

i Reactor trip signal generated on turbine trip

\.

Pressurizer relief valves lift 5 High pressurizer pressure reactor trip setpoint reached 6.4 Overtemperature t.T reactor trip setpoint reached 8 .4 Steam generator safety valves lift 11.

Auxili~ry feed pumps begin delivering flow 60 Pressurizer safety valves lift and pressurizer fills 99 with* water 120 Maximum reactor coolant pressure (2974 psia) reachea

  • Reference case: 4-loop plant with a 51 Series steam generator. 95 percent M1C ECA-l 4256B: l

\

II LOSS OF LOAD ATiiS REFERENCE CASE 95:!. ITTC Fllil.JRE l

  • ECA-1 42568:1

( 700.00 650.CO 0

u..

l.!J 0::

i 600.00 I-
§ I.I.I

_g_

..... 550.00 I-I-

~

....J 0

Cl

<.,)

500.00 t!l

~

I.I.I

. 450.00 400.00 0

0 o* g 0 0 0 0 0 8N 0

0 8 0

0 ""'

TIME (SEC}

LOSS OF LOAD ~illS REFERENCE CASE 95,; MTC FIGURE 2

  • l ECA-1 42568:1

3000.0 2750.0 2.500.0

'2 2250.0 c:;::

i Vl 2000.0 c:. -

Q,,.

a:. 1750.0

-°"..,.,

N

l 1500.0 Vl L>.l

~

Q,,

12.50.0 l 000.0 900.0 0 0 0

0 g 0 0 0 g 0 0

g 0

a q

0 TiflE (SEC)

LOSS OF LOAD A"l)lS REFERENCE CASE.

95~ MTC FlGlJRE 3 ECA-1 11

\.

2000.0 1750.0

~ 1500.0

i

..SI

..... 1250.0

1::
i c5 iCOO.D N

~

i 750.0 w

ci:;

( Cl-500.0 250.0 100.0 c 0 00 .

8 g 0 0 8 0 8 c:::i 0 g 0

~ 0 8N ....

0

...... \g c

T!f1E (SEC)

LOSS OF LOAD AT\:!S REFERE!lC.E CASE 95% ITTC

  • FIGURE 4

(

ECA-1 42568:1

130Q.ur--~~~--,.._..,.......,=o=~p~~_.,===,.,,__..~.....,.~..-~-=.,,,.,.~.-.--,_,.~.-..--,..,..,.,

12so.o~*,----~---~~~~~~~~~~~~--~~~~~~~~~1 1000.00 >

c:t:

V'I c.. 750.00'""

c::

i 0::

c.. 500.00

~.....

I'-

V'I 250.00?

0.0 0 0 0 0 0 c:0 0

0 0

c: c:

0

~

0 00 0 0 0 0

g ...,

0 0

'<tr o.n '° N

0 TrnE {SEC)

LOSS OF LO.a.D AT'dS REFERENCE CASE 95% l'ITt:

FIGURE 5 ECA-1 Ill. RECOVERY DESCRIPTION

  • The recovery technique employed in guideline ECA-1. "Anticipatea Tran-sient Without SCRAM." is composea of three main functions - reactor trip, turbine trip, and auxiliary feedwater actuation - that must be performed without delay from the control room, org if this proves unsuc-cessful, operators must be dispatchea to perform these actions locally.

( If the reactor is tripped, the operator is i~structea to leave this guideline and proceed to E-0, "Reactor Trip or Safety InJection," step

2. However, if the reactor cannot be tripped, a rapia boration of the RCS must be initiatea and continueo in oraer to establish adequate shut-( down margin. As a precautionary measure, containment ventilation must be isolated at this time. The final step of the recovery involves main-taining adequate shutdown margin once it is achieved. A block aiagram description of steps in guideline ECA-1 is given in Figure 6 .

I

  • \

ECA-1 42568:1 FIGURE *6. ANTICIPATED TRANSIENT WITHOUT SCRAM (ECA-1)

(

TRIP REACTOR Ml-'\11UALLY TRIP TURBINE ~~NUALLY

(

ACTUATE AUXILIARY FEEDWATIR TRIP TURBINE LOCALLY

_ ACTUATE AF\-1 GO TO E-0 STEP 2 LOCALLY RAPlDL Y !!.ORATE RCS ISOLATE COITTAHrrlENT VENTILATION MAINTAIN P.DEQu~

SHUTDOWN MAR~

GO TO E-0 STEP Z EC.~-1 42568: l

IV. DISCUSSION OF SPECIFIC GUlUELlNE STEPS~ CAUTIO~S AND NOTES

  • Step 1 Once an operator has diagnoseo an ATWS event using the ;noications 1isteo in the SY~lOMS section, his first actions must be an att~pt to miti-got* th* consequences in the quickest means possible, i.e., from the

( main control board. lhe note before this step alerts the operator that the first three steps are immediate actions to be performed without delay.

In the control room, the op er ator must f,i rs t attempt to trip the reactor

(

by use of the manual trip buttons or, if necessary, by manually insert-

ng the c ont,ro l roos. If the trip is s ucces sf ul l y obtained, the A11,s portion of the transient is terminated with the consequences then being no more severe than those of the initiating transient. 1he note instructs the operator to immediately proceea to guideline E-0, "Reactor Trip or 5-af ety Inject ion," step 2 if, at any time during the conouct of the ATWS procedure, a reactor trip occurs. In guideline E-0, diagnosis of the initiating event is performed.

The operator should next attempt a turbine trip, if one has not automa-tically occurred to maintain steam generator inventory. A turbine trip is required for the loss of main feedwater ATWS. For the remaining ATWS events, with the exception of the case when a turbine trip is the initi-ating event, manual tripping of the turbine will create an unanalyzed situation, superimposing a loss of load tyµe of event on the initiating ATWS transient. This unanalyzed case may yield a somewhat higher system pressure depending on the initiating event and time in core life, The turbine can be tripped in the control room by the manual trip buttons, use of ~verspeed test s*itch, and turning off EH control oil

  • pumps.: If these method* fa i 1 , the operator shou1a at tempt to manua 11 Y run back the turbine.

ECA-1 42568:1

Steps 2 and 3 The second component in maintaining a secondary side heat sink is the actuation of auxiliary feedwater. lf the auxiliary feedwater system doesn't start automatically, the following actions should be performed from the control room:

a. Manually start motor-driven AFW pumps;
b. Manually open turbine-driven AFW pump steam supply valves;
c. Manually open or close AFW valves as appropriate for proper valve alignment (observe valve status lights)
d. Verify that the water supply to the suction of the AF~ pumps is available by observing CST level indication, absence of CST low level alarms and AFW suction pressure low alarm, ano aaequate pres-sure at the suction of the AFW pumps.

~tep 4.

If any of the required functions in Step 1 have not been successfully achieved when attempted from the control room, an operator should be dispatched to perform the actions locally. The local actions are done after those from the control room since they are more time consuming; the control room actions can all be completea quickly without signifi-cant impact on the time of 16cal attempts should they be necessary.

Local reactor trip actions are perforrneo first since the sooner a trip is obtained tl1e less severe the AHJS transient wi 11 be The reactor can r

be trtpped locally by opening all reactor trip breakers, de-energizing the MG .sets providing power to the rods, or other plant specific means of cutting power to the rods. Plant specific means may i~cluae de-ener-gizing buses that supply power to the MG sets, opening o~sconnect switches '.that supply power to the power cabinets, etc.

~CA-1 42568:1 i

I

Local attempts for turbine trip and auxiliary feedwater actuation are needed to mainta'ln a secondary side heat sink. Analyses have -tal<en credit for il tllrbfoe trip sooner than auxi1 *i ary f.2ed*;1ater actuation so the 1oc'11 actfons ¢lre to be performed in that order. P1 ant specific

&rveans for tripp'irig the turbine may include using the 1oca.1 trip lever,

( using local ovei"speed test equipment, locally securing EH pumps. venting EH system, closing the main steam1ine isolation valvesp etc.

Step 5

(

Total auxiliary feedv1ater flow is required following ;rr,1s events.

Therefore, any of the actfons of steps 2 and 3 that cou1d not be pe:r-form2d *in the control room shou1 d be done 1oca11y **io obtain fu11 ,!l.FW f1 (;';{.

Step 6 The operator has progressed to this step only if a11 means of obtaining

\ a reactor trip have failed. Negative reactivity must be added to the core through lxlrati on of the reactor cool ant system to bring the reactor subcritical. The caution precedfr1g this step has been added for the protection of the charging pumps that are required for boration. Unc..~r normal conditions, the charging pump shutoff head is greater than the RCS d;es *i gn pressure. Howe'ler ~ during an AHJS event RCS pressure can rise above the pump shutoff head and, therefore, the pLllTlp rniniflow valves must remain open in order to avoid dead-heading the pumps.

ihe method of boration is a function of plant configuration and, hence, the boration flew path ttnst be aligned according to plant specific ~ans.

Methods of boration include err~rgency boration~ injecting the BITP and safet~ injection actuation. It should be ~oted that SI 4ctuation ~nl1 trip the main feedwateiA pLimps. If th*is is undesirab1eD the operator can

(

manua11y align the system for safety injection. However, the R\'IST valves to the ~uction of che Sl pumps shou1 d be opened first before ~peni.1g up the BIT '\Jal ves.

1.

ECA-1 42568: 1

  • 1f RCS pressure is above the shutoff head of the charging or SI pumps, borati on wil 1 be impeded o Therefore, pressurizer PORV s must be opened, as necessary, to reduce RCS pressure and obtain injection fl c-w. The PORVs sh ou1 d be closed when primary pressure drops 200 ps *i bel v;;J the operating boron injection pump shutoff head. The operator must verify successful closure of the PORVs, closing the backup isolation valves, if necessary o SteE.. 1 The pressurizer relief tank rupture disk may have burst during the event.

_If containment ventilation has not been automatically isolated the operator should do so manually. This is ;;i precautionary measure; analy-sis has sho\'m that fuel failure is not expected following an Anis event.

Step a

  • Boration must continue to establish the required Technical Specification shutdo1tm margin and cool the RCS to no-1 oad Tavg* A l'lb1 eed and feed" method of boration through a pressurizer PORV ~r!l1 be required if the pressurizer goes water solido In this case a PORV should be opened as needed to permit injection of borated µ1ater through reduction of RCS pressure and rsr:oval of 1o>v1-concentrate liquid volume from the RCS. The operator must verify successful ci osure of the PORV. closing the. bad up isolation valve if necessary.

Once adequate shutdown margin is established, the operator is instructed to maintain this condit*fon. It should be noted that shutdoWf'l margin cal cu1 ati ons shou1 d compensate for any rods that wi11 not insert.

Step~

Once reactor coolant system conditions have stabilized and the reactor is subcritical the operator should proceed to E-0. "ReactorJrip or ECA-1 42568:1 Safety Injection" step 2 to establish conditions allo-wing the ope,rator to continue to a cold shutdoi;m condition; Technical Specifications require this if two or more control rods are Mt fully inserted upon tiEw.and.

\

ECA-1 4256B: 1

V. REFERENCES

  • 1. Anticipated Transients Without SCRAM for Westinghouse Plants, NS-TMA-2182, Letter Anaerson to Hanover, December 30, 1979.
2. Westinghouse Anticipated Transients Without Trip Analysis, WCAP-8330, August, 1974.
  • ECA-1 42568: l

\_. WESTINGHOUSE OWNERS GROUP EMERGENCY RESPONSE GUIDELINES CONFIGURATION CONTROL SHEET GUIDELINE DESIGNArOR:. ECA-1 GUIDELINE TITLE: Ant'icipated Transients ~Jithowt SCAAM REVISION: Basic DATE: September 1 s 1981

(

The guideline described above has been revi e'r1ed and approved for implementation by the ~fostinghouse Ovmer 1 s Group Procedures S_ubcomrnittee and the \*lestinghouse Nuclear Technology Division.

  • NOTICE: THIS GUIDELINE REVISION IS TrlE ORIGINAL ISSUE OF GENERIC GUIDANCE ON ITS SUBJECT MATTER FOR THE rnERGENCY RESPONSE GUIDELINE SET *. ANY GENE.RIC GUIDANCE ON THIS SUBJECT BEARING AN ISSUE DATE EARLIER THATJ SEPTEMBER *1 , 1981 IS SUPERSEDED BY THE EMERGENCY RESPONSE

~

GUIDELINE SET.

File this sheet \>-'Jith the approved version of this guideline in your Emergency Response Gtlidel *!ne Set.

~- / ? /~/

//'-~/~C~

Manager, Standard Plant Engineering Westinghouse Nuclear Technology Div~

( J

/

l

~*-

SALEM GENERATING STATION INSTRUCTOR LESSON PLAN TITLE: ATWT LESSON NO.:

DURATION:

DATE: 3-08-83 REVISION NO.: 0 DATE: 3-08-83 DATE: j~f-f3

TITLE: ATWT NOTES II. Feb. 22, 1983 Transient At 2155 with reactor @ 20% Group Bus 'F' was in the process of being transferred from the SPT to the APT. Due to a faulty limit switch on the APT bkr it prevented the closing coil from energizing, resulting in a de-energized bus. Most important load dropped was #13 RCP.

Being < 36% power no auto Rx/Turbine occurred as is designed.

Another load lost was 14 MAC panel which dropped control power to #12 SGFP. Supervisor noticing

  1. 13 SG level dropping rapidly ordered that the unit be manually tripped. Other events took place during this transient; the one of concern at this particular point is when did the reactor actually trip?

TP-1 000 => 21:56:35 1163 > 21:56:54.4 1163/60 = 19.4 sec.

Rx trip should have occurred due to Lo-Lo level in #13 S/G 1381 => 21:56:58 1381/60 = 23 sec.

Operator went to trip with W switch 1385 => 21:56:58.1 sec. 1385/60 = 23.08 Rx trip bks open This was initially not picked up due to other numerous events that had occurred due to dropping of a bus; swapover of the lB vital bus to the #12 SPT, acutation of S.I.; lifting of the PZR PORV 1 s; no spray flow, etc .

  • '---------'-------------=----=--------------------

8305-SAOP:l Fage 1 Date 3-8-83 *-----*

Rev. 0

---~*~*~*ill 11;Ja;: *,*zc,r,::;;:;~1

  • ,*7 hi!Dn .~I ll_jil.il':' r:~ rurir- sr.;;;.; ___

fr~

lJ.J..:L..[1L.L.LJi1[:__SJ_et(.Z,...,__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _,,__ _ _ _ _ _ _ _ _ _ _ _ _ _~

_/ i i ; ;:; " L 0;:. 1D"1 7i. J :; rN G"!1 L {; L {) I_ .J Fl\ r rF\.. :; c r 1:;81C 'iGG(1~vo f\E-i"lC;lOf;: HHtH!t"1l H'lF' ,. i'Jl HT ~

~1r*-~

uJ~~ll MIU ll YZOOJG"l ru;;:srnr: n\IF iF:lF

'i'GC:Dt>G*-(l ~U1c1or..* M1'Ur! lj;'ff ~Kl.',; l~H'

  • !1 Qj}; D "o fl ri1c.LQ.iL.11t1 flJ rn !£_£hf._...,_.._,_._*..,_,_!!_ _'t--'-!-'--

. / ~.,. \if-*f

_<_c._:_5_a___,,~-fr--4-,.,-r[1)---------------------+----/------------t~

I j  :.£;;< or r-V"rNT<: ;.r 11:56::=.r,

-i 1 :ct, : ')ill .-\

---~-------+-----"--------~~----------------lr-~----'----------l i..lGODB '1'LG.J5G"'l il.ir\'3!1lc "EHorE EflcKG TKIF ,.

___ :_.iJCGilC 'i03i:ili= l il!h.E;JiJE-S..tOL.li.lL.l.3_clo5EO OGOZC YDJilD~l fURGlNE sror v~ !1 CLOSED 00~;c voJ;~G=i ru~~!Nt*sro~ vn 14 cLos~n

~C.G[it>i ou O>-'ili.Ji uu, ' *or.er" ru nrn*< _rn1' -'"'- '"u

'(7(13![;=1 F\W ~*r*G rnr.N IH Cl ~:.n l<:ft"1CTOK 1~11-

' I

'u II uGuoi Y1DJZD-:l F\1E t\llG CHi'1!< 1 0 Gilf- ~ 'Ci G:i :'iD ~ 1 nlL_E_N.Lelid.~Lll..

111 (.; Rttfc r;;:; rJ\F Ser HLIL atilt. E!\T H"L..5 ....* " ' - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 II ."

OOG"' ....~DJJD-, 1 F'\lK: ~IJG ClltiH ~ fl( Q f<t"tTt Fl\r rRF ::>Er

\}G\:'16 *,*;oJ:.!J" I FllR f;l-JG CW'<l'l 3 MI Q f.'AH: f-l':l He~ SEY I~

-- _Ili:i.H1Ll!.IliJ ! 1D"O FHLI1JLL£1Il.._ffi LHf:U~cS ,_;:_,_r_*-------------------------------------------iI",,

c;c:;JI~ HGGl~[J.-O r11i;* ~*!-JG:.; rrn r"1 l*f<H H3El n o;-; 1; ~ rrno l "o"u FllF. rnr; ; n1> PR r r-i;-H R<::>r: r

____ Q~!J.L_k__ill1Q.HD=O fWf..; t\HLJ,_Q_JL 'i' _1.FF.:. f;Lf:. E.!:. l i 1---------------------------~-------------------1.,."

O*il iC IWG! ::io~.11 F'llR l<l~G LG g 1 rr.r BL~ ;;'.i:Scl "

GGlOi NGOIZO~Q ~W~ RNG I t10 E~l ~RM ~ESfl

- - - !:1i1Z ;;c YIJ 17<'12.LlliEil.ltl~ 1.QE_ Yti. l;:. CLOScO _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 "r; ~j

.:; (' :, c; l . r (' :, C' 0 G.- I l :, :: 111 l l*l r !I I r l .:; I r " 1 l H' ::r l :x

.-,5~ FiJ
.<i;-o~-1 l
, *;rn LH<
nr r 'i 3! r;;1 r;;;-* sc
r ,,
JQ;;~

n

,___ P.Q ~iircu..:i___a1:Ll..tiL HL L ! - ~ J f F, L l FE__:,[ L ____ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1Ill Fo:,ao,,1 !Z 3fH UJc HI F 1 3£ f!\f 3Cf 007~<< rG~770=! lZ SJH LNC HI F Z SI F~I l~F SEl f;:\i-'

.. .. ,. ,, )

!:t' UQZ~1 ~U~blDs!' I~ SfH ~14EJI[ .E ~ 31 i'!\J _fRF ...S~J __ -----~---~~---------------------~------------~txJI IX 1'1

  • - * - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - j!"
.1 .. *)I l'.:1N1-. 1il ,.  :~7:r;o "

ij ij .) iJ tr rt) ** 0 7 u~. i Ll r 11 l '~;: H i F I". r ;;- r t: r "

1 ~;i..*GGLLt!'.iC:.btL".LlL HI 1 ~-r: "

__ Ld[ Hl r~.1 (l . - . -- __ ,,_ ---*- --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - \

Ui..~GGv t=iJ:r:,uc,- t l J i'i1 J.,!C HI F r:;; r L j 1 it: ... ,-, TM l *Ir ,,1  ; Fi ( i (i\*(11 iJ


~~Jj~J!r_[il:~;,jG-.L1i_

l).- J  ; *'

ft! Gr~ft L(, i=-

, r' 1:1

  • ~

' ,. . ' : " r n .. : :, r. "' I i :; 1 M ;~; n l r; t  ::r 1

\

OPERATIONS DEPARTMENT REPORT ON REACTOR THIP/SAFETY INJECTION February_ 22. 1983

~ *,

- I \

. ~. At 20~6 hours~ February 229 1983~ Salem Unit 1 was synchronized and the. turbi~e loading wa~ i~cr0asing in accordance with established Operations Department procedures. At 20 3*reactcr powerv epprczimately 200 Mwe electrical load, procdure ~tep 5.34 of IOP~3~ Hot Standby to.Minimum Load, required that the 4Kv Group Bus power supplies be transferred from the Station Power Tran sf armers to the Au~~ili a:ry Poo-1 er Transf orme:r.

The 1G 4Kv.Group Bus was successfully transfered and at 2155 hours0.0249 days <br />0.599 hours <br />0.00356 weeks <br />8.199775e-4 months <br /> the operators attempted to transfer the 1F 4kv Group Bu5 to the Auxiliary Power Transformer. Upon depressing the close push button for the Auxiliary Power Transformer infeed breaker. the Station Power Transformer infeed breaker openedv however, the infeed breaker from the Auiiliary Power Transformer failed to close. The failure of the Au~iliary Power Transformer to close cau.sed the 1F l\Kv Group Bus to deenergize. The opening of the Station Power Transformer Breaker prior to the closure of the Auxiliary Power Transformer Breaker is in accordance with the power transfer design scheme. *

~~; Upon the less of pouer to the 1F 4Kv Group Bus all equipment powered from the bus was deenergized. The most important equipment deenergized Ba5 13 Reactor Coolant Pump and 14 MAC 115 volt distribution panel. The control room lighting was also lost.

However 9 this. did not present a problem as the emergency lighting provided sufficent light.

There was no immediate Turbine/Reactor trip on loss of reactor coolant flow to the 13 reactor coolant loop because the Reactor Protection System allows single loop los5 of flow below 36 $

power. The loss of 14 MAC panel~ however, causect*12 Steam Generator Feed Pump to trip due to the loss of feed pump control po~er. The less of the feed pump interrupted the feedwater flow to all steam generators and 2team generat6r levels started to immediately decrease. The operators noted that 13 Steam Generator level was decreasing rapidly due to the combined effects of the lcs~ cf feedwater flow and the shrink in the steam generator due

  • - tO-.lo.&S" *or :reactor' cooL-:mt flO\tJ. In addi t.ion to the loss of the fe~d pUIDp, a significant amount of in:strument.ation lost po';Jer when 14 MAC panel*was de-energized. This caused the instruments to fail to the mid-soale posi~ion.

The supervisor in the control room at the time of incident

,..ealized that with the f'ate of clecrea_s_e-in 13 Steam Gen-erator level it-~ould not be possible to bring the reactor to less than 10 ~ power in a cont~olled manner so he ordered the Unit to be manually tripped. At 2157 hours0.025 days <br />0.599 hours <br />0.00357 weeks <br />8.207385e-4 months <br />, simultaneously, with the j

issuance of the order, the reactor was autcmaticly tripped by the

( eactor Protection Sy~tem on 13 Steam Generator LO-LO level.

~11 equipment functianad aa designed ~hen called upon by the Reactor Trip. The Reactor Trip/Turbine Trip set up the automatic transfer circuit for the ~roup buses to be tranafered from the Auxiliary PoBer Transformer to the *station Pohler Transformer. The

~H and 1E 4Kv Group were already 5upplied po~er from the Station RoBnr Transformers as the~*Mere nev~r swapped over to the i.i.uxiJ.iary T:ransfarrner:. 1'~1.er 1G L~Kv Group Bus swapped over ES per design. The transfer scheme also provided a close signal to the Station PoBer infeed breake~ to the 1F 4Kv Group Bus, causing the breaker tc close and the bus to become re-energized.

The simultaneous etarting of all the connected loads on the 1F 4Kv Group Bus caused the 11 Station Power Transformer voltage to decrease. The decrease in the transformer voltage ~as sensed by the second level of undervoltage protection en the 1B 4Kv Vital Bus and the bus ~as automatically sBapped over to 12 Station Power Tran~former. The locked rotor relay protection for 13 Reactor Coolant Pump operated shortly after the bus was reenergized due to the inability of the pump to start without the aid of the lift pump and the lo~ voltage condition on the bu~.

At 2204 hou~s~ Bn automatic Safety Injection occured because the steam pres.sur~ in *13 Stea!r.:l Generator 'l.:1as 100 psi less then the steam pressure in any other 2 stea~ generators. The cause of the steam pressure decreasing 100 psi was due to the combined effects cf the addition cf cold feedwater by the Auxiliary Feedwater Pumps which started automatically on response to the LO-LO level in 13 Steam Generator? the cooling effect cause by the dra~ off of steam from the 11 and 13 Steam Generator by the turbine driven auxiliary

_feedwater pump~ the reduced circulation in the Reactor Coolant System due to the loss of 13 Reactor Coolant Pump and the fact that the MSIV's had been closed to control the decrease in Tave.

The closure cf the NSIV 1 5 to limit the cooldown following a reactor trip is 5tandard practice early in core life when there is little or no decay heat available to maintain RCS temperature.

All required Safeguards Equipment functioned as designed. causing the pressurizer level to increase during the Safety Injection.

As pressurizer level increased the bubble Has compressed and pressurizer pre5sure increased cau5ing the Power Operated

-Relief Valve5 to relieve to the Pressurizer Relief Tank. The i:ncre2~~ in pres.su:rizer p1essur"2 Hould normally be held below the

~et point cif the Power Operated Reliefs by the pressurizer ~pray valves. HoBevar 9 in this case no spray flow hlas ~vaileble since 11 end 13 Reactor Coolant Pumps were cut of servic~. No.11 Reactor Cool&int .P1J.mp ha¢ tripped zt 2206 for no apparent rea~on. c 2

The operators responded to the Safety Injection in accordance with the Emergency Instructions for Safety Injection. The duration of

~he Safety Injection ~as 7 minutes. Upon establishment of the

~afety Injection reset criteria by the operators, the Safety Ir1j acti or2 i;J3:3* te:t'!ni nat~d 2 t 2211 hours0.0256 days <br />0.614 hours <br />0.00366 weeks <br />8.412855e-4 months <br /> in accord a.nee with

  • procedures

. t and tha Unit uas returned to a stable shutdown

. c cmd:l."ti on ..

An _investigation uas conducted by ~~int~nance and relay department per!5onn~l into th,a incident. "The i'1vest1gatj.o:n reveal,~d a faulty 52 I/S limit s~itch in the 1F 4Kv Group Bus = Au~iliary Power Transformer infeed breaker. This switch is normally closed uhen the breaker is fully racked up and is wired in series with the closing coil cf the bre~ker. The faulty limit switch therefore prevented the closing coil from energizing when the transfer control scheme called fer the breaker to clc5e.

The investigation did not reveal any apparent problem with the ralay protection fer the 11 Reactor Coolant Pump nor did it reveal any cthar reason for the tripping of the pump.

The Engineering Department has been requested through* a Design Change Request to provide undervoltage lockout relay protection for all Reactor Coolant Pump Motor~. This Hill provide a breaker trip/lockout cf the coolant pumps in the event cf a total loss of voltage on the supplying bus. Th~s will prevent the uncbntrolled s ta:rting cf the Rea cto:r. Cool ant plirops upcn1 bus :re~ener gi.z ati on.

3

r--*----------------

  • 1 SALEM GENERATING STATION INSTRUCTOR LESSON PLAN

~*-* -------

\ TITLE: ATVIT I LESSON NO o:

II DURATION:

REVISION NO 0: -0 DATE: 3-08-83 DATE: 3-08-83 SUBMITTED: Rick APPROVED

JJ4t -

S~e~n~y

/15 I ~:r /

-Vt/ ~

DATE: -)~ f ~ 8 :~

\

I

\

  • _l,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

\

\

-l

TITLE: ATWT NOTES IV. Reactor Trip Feb. 25, 1983 was taken off 0 At 1200 on Feb. 24 the turbine successfully.

line to perform OST. test grid with power 0 At OQ12 the generator -sync to

@ 14%.

o Probs. experience with #12 S/G level and the S/G reached lo-lo level rx trip setpoint of 18%. The logic for the rx trip being 2/3 detectors on 1/4 S/G should have caused the trip.

e The first out OBA F-10 actuated "S/G 12 Lo-Lo Level R.T." However, the OHA F-46 never actuated "Rx trip Turbine Trip". This*

annunciator is actuated by P-4 which is actuated by having 1 A 1 and 'A' bypass bkr op~n or 'B' and 'B' bypass br~aker open.

© In approx. 25 sec. the operator recognized Rx and turbine did not trip and performed a manual reactor trip.

© The lo-lo level signal did leave the SSPS cabinets because the MDEFP's did start.

o Alert was declared at 0130 and terminated at 0200.

10CFR50. 72 ->- significant event+ notification w/in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> by phone.

0021:38 #12 S/G Lo-Lo level channel #4 0021:43 #12 S/G Lo-Lo level Rx. ttip (Ch. #1) 0021:43 The SSPS called for Rx trip 0322 0021:43~ #11/12 AFP start 0022:08 Operator went to trip with trip switch 1820 0022:08.4 Turbine Trip signal 0022:08.4 Rx main trip bkr 'A' tripped 0022:08.4 Rx main trip bkr 'B' tripped From the time that the SSPS called for a reactor trip to tne time that the opetator'turned the trip switch was:

1820 - 322 = 1498/60 = 24.96 sec.

Date 3-8-83 1

Rev. 0 8305-SAOP:l

~

  • NOTES There was a time lag in which the event occurred and when the NRC was informed. The s3 anticipating the NRC question on how do you know it was an actual ATWT had the I&C Dept. run various tests to ensure it was a breaker failure and not a SSPS failure .

Date 3-8-83___ _

8305-SAOP:l Rev. 0

REACTOR TRIP FEBRUARY 25,1983 On Februrary 24,1983 Unit 1 was in the startup phase following a refueling outage. At approximately 1200 the turbine was taken off the line in order to complete the overspeed test. Following the successful completion of the test the unit was returned to power. At 0012 on February 25,1983 the generator was synchronized to the grid. Reactor power was approximately 14%. Problems were experienced controlling the level in No.12 Steam Generator and as a result the level decreased to below the Lo-Lo Level Trip Setpoint of 18%. A reactor trip signal was generated by the Reactor Protection System, however, the Reactor Trip Breakers failed to open. The operator, upon surveying*the controi

_room indications as directed by EI~I-4.3, Reactor Trip, observed there were no Rod Bottom Lights illuminated, the Individual Rod Position Indications still showed the control rods to be withdrawn and the turbine did not indicate it was tripped. Upon recognition of these facts, the operator concluded that the Reactor Trip had failed to initiate and manually initiated a trip utilizing the trip handle on the console. This ocurred approximately 24.8 seconds after the Reactor Trip .signaJ.. was gernerated, (see the attached s,,equence of events printout attached) and resulted in a su~cessful reactor trip. All automatic functions associated with the reactor trip were then verified to have ocurred. (All control rods were fully inserted and the turbine tripped.)

The operator had concluded that a trip was warranted because the actual level indicated in No.12 Stearn Generator was below the trip setpoint of 18$ and all of the alarms associated with the Steam Generator levels. both on the console and the Overhead Alarms were illumiated. Also, the Motor Driven Auxiliary Feedwater Pumps had started automatically. These pumps start when the level in any Steam Generator decreases to less than 18%.

As directed by the Emergency Plan Procedure EP-I-0 Part 2 Item 16, an Alert Classification was declared at 0130. All notifications were made in accordance with EP-1-2 1 Alert. The event was terminated at 0200.

Attached are copies of the recorder charts for all four Steam Generator Levels, both narrow and wide range .

I 1

(_ . * (

( ./

  • RJ;;AQT()!l_ '!'!ll!'__n11sT OU'.\'__ ~-- --- - --c--- --- - - -------+ ----~.T~~~~~E*aii~Ir *---- -~
  • --~

PR RC LO FLOW REACTOR sTM OEN 11 . sTM GEN rr isr:rM nri:P p=----* coNDENSER sTM GEN rr H RANGE OR RCP BKR COQLANT LOW-LOW FEEDWATER . LOW Pl VACUUM HI-HI H

n FLUX OPEN & P-8 HI PRESS LEVEL LO LVL & FLO SI LOW LEVEL c TRIP JREAC TRIP . REAC TRIP REAC TRIP rEAC TRIP f{EAC TRIP , TURB TRIP TURB TRIP 1 . 2 3 11 . 6 '37 1 51 C1 PR !RC ----1.-

LO FLOW R_E_A_C_T_O_R_ _ , STM OEN 12 i,STM GEN 12 STM pIFF P rrURBINE STM GEN 12 RANGE IOR RCP BKR ~COOLANT LOW-LOW ~EEDWATER 1 LOW P2 BEARING HI-HI H FLUX OPEN & P-7 LO PRESS LEVEL ~O LVL & FLO SI LOW OIL LEVEL c TRIP I]. 'REAC TRIP <g REAC TR+.P 'l REAC TRIP 1t; ~1EAC TRIP u HEAC TRIP 1 z_ TURB TRIP']'J ; TURB TRIP c(o IR I*

KV -PRESSURIY'E"'i=C'-sfM OEN i°3 ~. ~Ti*f-GEN 13 '*sTM DIFF P'd? - rr*URBINE l1 ST'M.GEN 13 H FLUX GRP BUSES HIGH LEVEL LOW-LOW fEEDWATER LOW P3 THRUST HI-HI BRO FAIL ~q LEVEL 1

C TRIP \7 REAC TRIP IUNDERFREQ 1~ IREA9 TRIP I~

LEVEL lLO LVL & FLO SI

.REAC 'rRIP 16 rEAC TfUP 1'7 ~EAC TRIP _'"15 ' TURB TRIP ~~B rr*~IP )

! . t..f.

SR- I- l i "-ll\V in f1r~e' ISTM I

. PZR LO LVL STM GEN GEN l I DIFF p 11 TURBINE STM GEN 14 H FLUY. ORP BUSES & RC LO LOW-LOW fEEDWAT~R LOW P4 . lovERSPEED HI-HI I¢'f UNDERV.OLT iic PRESS sr '?- 1 LEVEL zz ~o LVL & FL.O ;sr LEVEL I C TRIP REAC TRIP REAC TRIP REAC. TRI)? rEA~ TR~P ~~J,REAC -~TRI? 2-at TURB TRI*P !l? ; TURB 1:1RIP ti~

NEUTRON x RATE - . ~I COHTAimlENT PRESS HIGH I STM HI FLO

& LO PRESS ISOL SI

-'TURB TRIP

& P-7 E-H DC PWR FAIL I! REACTOR TRIP Ii C TRIP "25 !REAC TRIP Zl 21 REAC 'l'RIP .7S. er* jREAC TRIP cio TURB TRIP ,,,- TURB TRIP u. ,

f

  • I ~ ~y

=*R=-=p'""'o.,...,w=E~R--ffl'EifrrEMP MAN AL . . '!VfANUAL -~ --*- ' GENERATO' /fJl}T~-

I 6T I

Ll.T SI ACTUATION. I 1:PROTECTION AC~T-R_r_P~3-'~.J~R~-E~~-C-T=R-I~P--~---~~'~~~~-'-)-->~'-R_E_A_c~T-R_r_P_3_~~~.i'--~~~~'--~-~~-~~-:A_.o~~-:_r_P_~~1~_,_t~URB TRIP~n*~ TURB TRIP/f~

...~ Rev. l

0*&.-1.\ l iur.i

.t

<~"**

,°E

~J

_ j -.:'* , lf~?; \

.):,,__,) _l.::.,,i *-"-.,

J *~ ;\.J """"'

. U:i 1 ifT.\l ~ f) ~ j'.\j °&~

. iJ LbJ If,,,. tl ra ~ T1) rr'\ 'F:( ?

lf-1 ..=J. Vo-* ~

e~ ~ ~1 1.1 R E?OR r *,o. -~==~==-~~~-

. *\ ..

~nc~~~l:\1JTIATI~:=-12.~"Tef i~~~o:,.3~r::1t=Oo'cu--:---=;;;"'-=..";.-=~~"'~"=-:.~:

~-=~~..i=--*twrnn~--~.L....,.,_~;r.r;~\:':-....-~\l:~_._-.,;11~p_~~~*""-"-'!.,:i:.~~-'Z..-C.~*~~~"'*~~"t!)...-.,,-.;.*.~-=:=~~,.:

1 -~ iT::-:c-1"' ITT ~u " r::.**y

.- ~~; r ~~~i' -~~/:Fl1<;:;;;:1:v?=-~731~ ;:;;:;z;;:;-z;;;c~-=:::7r;~io/1r=-=*=~~~"~==~~=~

-1lt!..CJ:~-='-~-~--=~~-==><-~=-~_,_=<;:===~~~..==-~=)===--='*~.l~.=-==*~-=-~=,~o="~~~-,~

/i?.1:J(),,qL ... K!Actolt /F.1P

~~~--._.....,., ..--~~.....-~-;"'~.;::'C~=........,;!1~~~~~~*-=--**~~*

,!Jr~IZ. llltt{)/71:4ric T.vf ~oJo N67 ..

t>c...c{J,(.,

L~~~~--=----.;n~~.-*:..~-

1.E Uf<lrt ca.-=rn}hr-,==-==*~" 1.£1 ~:::fJtJ~ -==*-,;L=,,.=-=~~. 1.1 I.RX PO';;;';!fl.,.,,,,..__{~LL~==- 1.2 Uf;J!T t LO;.\D =,J~~l Yl~

1

/

1.!J O~~IY'ilCJ?j OP i!V~'rrB:

  • A.!::TJQf,J !J"i;..\l'JJ:i"1.Hl'r,'©\i!_'JS.,.i_.3,,_/~----~ ~Mi~?'lED-4l!i.._TEf{Ml1'L~,-1ED J'.l~

irr t.Jr,,"'IJ..J

  • UtJ rr.:..'1:1 1tl;cJr;.iJab "T~ * ;rx.,, "'rP.1f StC,..>J/)L "b~:e~ 10 Aeri~c.. LJ:;:,,._; L-Nii
  • "' ...q '.2 *
  • Lf\ft:.L ~>} * -"' 1~ ~~A1~ 6':~\l'Bt.~rnCL "' 1f,ft OVER..MfPJ> r-'i}JNu.vc..lf.'r('cii_ ALA~ f.l;J!J =nn::

~lRHJ CEH.i~rr1t>iJ ( ~:rlJ.. ~(:s, l!l4J-LJ;;k5 L~.l/B;;) wrs*r~b H~w;.~v*Efl. TH:'E ~~qcn)(l litiP BKElFtJ "f-. l *"'- ~ 'M""'(" =rf;' f'> A,!).-§ ~J 1 lj'IW **'-"-.,,.I I

""'"'>\ r \:.JiJ ~,, t;J R;~rit...\:z!J;~fr..~ l;J~ 1Q,;,:.f)c7~;t t~';:}S -~~rJi;S... <"'J:l..lTlGQL t~;,,'ll Pr J;tJf C:-DN.01nt;,J 'b1ei -B.ictrr _~TE CD;J;&\;"J~ of?~Aif:lt Br;,~11n1;,:rr~Y m.lt\l~~H.,.Vr !tZ1?i'z1 n-12 RiP,cr;:,P,., lrr -rw.1r c~.v;;l.:))1_ c:~v.?!:i=:j

, **rHr! c,.,d-ra'D~ c~~~-;Js R,!--c..rA.J~J.$J) *f1-b*":I\ 1~.;,~ "~:.._;~~*AL ""?RJ p f:.;ut; fTKf.. Cr!-a..tL.r,J*i 1*L r r/Ji

=hlr: Lt".J rr 1;J t!;;;r (

Sia).;'J:)i) ~r f:co~ a).i.

I~5(.., *i01.S fmfl'\t;;)IR'T~...,\{ CJK~ ti~& -mzy fif':E C;~1'1X~1t&.Y PN~IT1~1:~hJ&. L,;~J\f "1;'~$~ i

-rx.iJ g,{£;.;:;~S 1:'.>!D rJvT ~\rft-.1'1ffii('~')U,."( t;(ir cf~s,'5 ~,

Rf-r'dl.. £5Ji~..};g;~ !.W ~ fkcfD'k'-lr CL.Di.SJ1 F1cxni.J 6-UJ.O.~ -nH: S:-c:jJ t.~ ~/.-liJ;I- Sufe.t. ViS:;,z., E11r;

  • ff~- a (A\J'..,;'l.~r) .£ft O!:E>o....C-~\.~ l9 ~Jt f0.C'r ~~ ;<;P:~i? ff.3!/,;'.C'/"'1hl~ S"'/Si.t,~ ft11U;:), /l) n>J'F(

!}!:£ f.?\,l'J:)f-Mfft{,..* "isUP Ifµ =n+1':. . +11.)::'(!Jf L..1'~ ri;-AAlcJ.i."ric.;) fr'i l\,.\.~C>-:;> /'i {/,.if,,. C.l\U.S ~:ffe:z.E f:r';.~~b;::;: It~

1.HJ8~- FH:..:iUCni ~"-l CJo~ PWS::IJ~i...!E tlS.JbTil O!'l ll\:.t:'m:.;:m:

fMu~tz Cf i'{"~C{f}l2._ ~T~e-~*i:i.?J* S'r~Ji\ lo 1"2tnf'11l: ~rJ_.b omii.s.-nr ,q !Kif ..

1.12 1.13

  • '- Oi . - . . 'I

.:.e~~~--::;;.r:..~.,,...,..':"' 1*-::-:..._.~~;._...~......!.!!::::...~1i..-~~~.;;:::--:,.~-;:-;;-:::~::.l'Z::s:~::C""~.... ,~ * ~-r:--:-..z:-~*~~'7Z::r.::::-;:;.~~~~.;:;;z--.._s--~::~~~....:.z.~"':;:T.::::~~'"::.:t::~zx:::.:-:::,r.:-1'

~Ci!ON 2 - fil..~tl...\J}:!l -~~= "" ~=*===~=~=,~-~,=*~*~=:

21 OOA5. l'JOTlrlG:> r:..u~ --"""""~-=-===-.,,...~-=---

z...:z ~~OR CA~.J~: r.:J wlJIPMIE'IT );lAH~UR\ii 0 NOT REPORTABLE 2..4 JUiJ'i!~i~TIOlll OP Cl../lE2!~1CATIQj';j: .

.1~."'r; f'.Jm *Fie.Ai 11'!.0 wrr-i~ w.~rtr;....l FCLLowuf G..9J,, ~ o,.

~---..___

(

~,

~au.a~ ~ **~~~ ~!:f' OOO:=!l'lATlNG l:l..!\li:2ll'l. t\A1-:l &U.:l

=-~---~'---mms..=.1a~~---~* ocrw ~.~.:-v::r~~----~~~::..!1'1',,,..,..._... .......v----"'11,~~ ...-.ir.,:..*

'"'-!~!m rtlCl-1: M.;},f'J,:.\GE:,~ - ~s 5'-llr-1' SU?v*s. FOf>llC~

_LFL REA.(.' 'S ;...l -(.HS,':.A R::: J =>=<

MA.NUAL 8R(AK($.\ 1'RIP 1----J------<..fV (l.AAIJ\I CONfR:OL BOAH:;'I) r,,c; TR.A1N

..8 ~

11'>1 T£S/

Jr PA~5 6~1?

-<>~1*

S.Z/iJYB AClE:;> IN

( 1..ow ... c*.,11 STM G.EN ..,..,.,,ER: l..~ve.L It;-

t-~~o~w~--~~~~~~~W~A.~T~E~g~~~~c~o~w~---------------------~~

5-C:A.M :_:::,~.(.-..10E{

~.?  !.*c.>.."'\..S (SN. l)

~*~~~*~~H'-'-'L~E~y~E"-"'~'i'~N~-~E~R~c~O~~==~~~~D'-'e"'"-Y_P~-~l~---------------------<I'*

j :.::;.:,,:~:::~:y' 7C'1.cQCKE0 ~y j,

kOW ?'RC.5SvQ..:;:: ( r*...i.T!!..f.t..'-Oc.K;;;:o ('?.'< P..1) t!>

.,..~.,;- s.c.. ........ _s, (s~c.i lN  ?-<' ~~- I I NOTES:

u*~(..':.K.*.1c--;...~'!: '.:1..:-~.:<-ur.k..Z.Q DY P-1) .p-6. I I- NO!lr..t ... L Q.E~C..To;a. oP .. ~,i..~ ON.~ -o ~::. "",..~ t<E.AC.TO~ --c...~ 3- A..L..'. C.1 ~C.UtT:; 0 I B<E."-<.e..:l~ S'lj;;tf1' AND S.l/RT:::i IN ..Y~~ .... c.=. e,.... Pl\S!i. ~c..r....J::i.t.. f!io"':'.-

1,¥~'1.LC.0~,"~' r.ow OR'1.EA'1 (.OOLA ... r P..MP B<'<'- OP~"(""',,,. ,_GCV* J,n<_cco<fo !OY P-~

A..i-.10 I B~EA"(C:::<.G 5"J./ eYA.. ......... o 5"2/ Q"'( 0 \NI T~DQ..c...w""'. 4- n-.~ ~'1'7A.~ 8~'!.:

P.:.1.::::>o_.r.,,.,,l "So'f~-!U

>UR.1"'1C, "':'E.ST ON.2. ~'1*PA.SS OR.e ..... ..:.!!..R. 1S Jo 8~ PUT IN 'NH~t.i. °CO, M e>"'t'

"':'"~? s . .o. ....... _'t.(.~ 5~ l.Ow ?n1 Q?c,LJ::.,NT ~\.OW VRll!!N:.T.(.oolMT (VMPB\l.:.~5 Q?('t:J~r4Lo~P~"4TEQL~~..?-~\~J I O?S.R"'lE. PoC:.\1 SE~YIC.E. ,e...t-.JQ 1HE."-J THE RE.'5PE!.C.T \Vt;.. ~G.AC.70R. 'TR.1p


~;

OyE.R. Powr= g. A 'T I B~r.:>.K.E.R. 15 OP!!."-""TE.O WS1NC,;..... S1MULJ...,T!!~ Ri:!A.C..T.)~

I TR1P 51C.NAL. I~ THE. Ta"'"' <Jl-.IO~Q. TE!.,.T. T~~E :;z:E.A.C..To~ W*lL I t-.Jor 5E TR1PPC!.D 5'1' THE 'S1Mu1.A.TI!:;:> "=>'"'~"L SnJC.E. T1-tE::

pov..::::.; ~,A..NC...E LOW SE"" ?Qir,,, .... H1&.H r1..UX(~.!""Jl(~L.OC.K!.D BY P*_10_)~-----~. I C'i' P.&.S5 eR:-:.Aic~t? 1:> c..o~TR.OLLa::o F'l?.o~ it-.E. o*...ic.~ W.A.n*J.

j  ! ~lf~1-1_J _,~:/~~,:-~:Mx>I'{ ?u~~"s RA.NG.IC ?oo>'~ ~*.

1 I ONL"f ONE ~f!~C.ioR.. TKIP BRE"-r<.Cft.1$ To 21'4 TE.~7"e.D AT A TIME.,


~* -,.. 1-l*"-,_.,

I1..i-:Rtv.o::::i1.-...-~ ~J>..NC.:!

St" 1--"C:..rl FuJ'><

h.r..i.-. FLui<\ TNTE:\.i:.\..oc.1<.~D n~ P-10)

_:.q*

v

'l.-

f--------r-- =~ ~:',",~,S:, =i' ...,::;.:. tj*C...r-t i:-_uxl Ih.-F:i.1.oc.1<.E.D BY P*G.r_~'-~P-*_*~o~)_ _ _ _ __

. *- * ._,_. ~*'-~ "' ,,. °'" -a

---~-~--:..-----= *-

'"!, *.\*~~"::: ...

. .* l , .. . \ l . *-  : I ' f*! ~ ~

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,.!__ _ _ _ _ _ _ _ _ _ _ ------*----*--*---------- - - - - - - - - - - - - - - - - * . n .. '.r.. '* ., .

' \ 1\ \)

\(\ . \~~!./~. '** *,' :::* * '*

\) -r (U~r

-hJr~ ;' .* i *. , *: .


*-----------,<------,-------~w-.1.,,,_.*. 6s% 1-'--':.~_..,...*. ._*A->-"- - -


* *~-~,-,_4_/______

  • . . . : 1 ,1,i'u~ ~"-f

~ ,_,0 ... *' . =r 3.* ,. ~-,-:...,,,.

_________..____________,...,,.~-'-v'-->-__,Lc._,ULz.~_:*-~-~-~.,~**~:-"~~:t ~!.~rl.' :* :_.,(. ~ ,

I " ,/

0021 ~ 17 Slh GEH lo LO L 4 FRY TRF LD~~~Dm ~~~ET Ii i.1 . *'

l>'*ii; rj i. .1 8 9 E £--0-~ Efr9-1--0-R-f~d. .

000011 u:i1,2;:,[jmft fie.: srn GEN lO to IL ti irc;:r TH BH I o~~~g UH~?~"'~ !Z ~!ri ~EM LO l? l ~EC1C!OR rn!~ .

--93~-ldH'C'~"'-"~~fr..r+~.. l&N-!:{l-+-~J-t:--.;;-f-'ITT-1-IH'~-"H~-

rJ..Jrnc vnn::m"'a n! flux fl~ rmH~ e'!H\Rf IJ3£0C \'HlJf,.IJ .., a h~ flWt Hr nmr- Bli'iRl .

U0gg.._,.~~-Jt}n--"~H--f{*i-GEN-t-B-~e-t--\rf!fni"'!:-fRb:L8f T D~bOB LD4Z~Dan Ii Bin GEM LO LO l 3 F~J T~P s~1*

1---.+:~9~;';-G-r:N~-mG~,-rl1-0:G-ZHl~E~FR%---------------------------------------*--,..,1-_,,...,,.,,_-.,,,..~

rnrnc rnm.PJ!Jmv rzrnc10R ~iC1!H.!At rn~r- ~ mr m!P ' * '"(: f:,:."*~*-,t/~'~~*/:t.l?i*'~?

t' ~l p

~ I 1'..

~__,.-------I

-"----;h%+:-¥BG£lb!J=O-F.f.-

Atn~o vrnoJo.,,.,A rurrn.i:m: rnff rnXP

,' i .: . '.:* ' I *  :

  • ' ..... ,. * . .'.~**_:.',:#:}j 1\1 i/.<..
  • '>,G-f-vR-fJP:f:ll-t~I-11-Si~~-h--1'f:-itf----'-----------------_;_-:___ _ _ _...L._:___--.._:___.;_:,:.,'-""'..:..<,;;..:..-_c..:.i.;_~-""'-.~...:..--~-----1 d . I ' " "

rnz;o vmrnrn,.;u fH:ACiOH l*Arn HHF BKR ~ rnxr-i0"7!l '1':2005D"a lUf.'S!ME RHWH'= rnEu;-G H\H' !RH'

,c&-0~11;-vQ~i9-rn~1.rneiN~f~r-v~ ~-t:11c1JsE9------------------------------:__--.,..--~-__,..,,.,.._,..,,......,..,,,,_~-------i

~4U;.~

~i, ~ n ~ ,\:~*':*_', . :L'.*~i*.

  • 1 1f(JOO*HJ" R!t AC 1 OR NANUAl ¥!'\li P ! HU r '. ._:t***;**..*. '. ,.:_* .*._*. '...... ..'_*.::.:\.:"*. * **:***1.'::-.*.*.

t*

HnG~JDaD FHR ~HG J PlU FRr F~n RESEI .- ..

~~~Ot;__+~J~Oii:t-S~1URRE~Hi--~*q.~~VA- &~-~~-OSGIJ-------~----------------'------------*~'-_;..,;;...;.;...;,..;..;..:.;.;:..;""'-'...:...~-~----"-~

. AD50~ NOGlZD~a FWR ~MG 2 Flci FRr FRH RE3Ef HISP flGO! HJr.(l HI!' RNG ~ no f!\T f'f\!1 r;'.Vi1:!

V!.'5 µ;_~lQQU.~~HR-f\l!G-~.O--!;l--4-i f.i;"-!>l.t~- f\~~8+-

!"!1lf.Hl5' ~ 1WDi~Dr:!J n1!1. !\:NG I 0 g 1 Yfi:F f3UC Rf

  • . . ";.r'**.\ 'j~:- .:** ;- .

-C..10~..

I

,*.1i;:._1.Rz.r__.af-J_Jjf~u.:__noN n;:w;:or... __ .. -.--:;:~ia- Of---tcVE:M-l-e:--Ai Jd~~~~O~lf'..-F. N.C-4-4ULr;'.F~~!--$,t,,it~'

mrnzc vns;:::,0 .. 1 rur-Hrnc :Hor- VA H c1.o:::r;D

(

\

\

.I Il

\

l

\

I

\

\

\

(

.\

\

. ~o;~"4:.. ...., ~

~i~._1

)

J I!

\

I J

7'-1'::*

,:".$j_*_~* .. *_o;* .. ~

1-1, GP!\PlHC CONl!i.OL'B ~OnPOPJ\ilOM DUFfJ\lO, NEW YOfH~

-~

\.) ')

'* " J

' 0 () () 0 n \~} 0 () () __

m1>r..",:.1

.~, "'

--*-*-----~~ . --*..-~,..,.- ..-.. . -.,...-,. . . . . . ~___,....... ,. . .-.-.. ~,Jo;*-J*--**~. . . . .., . . . . .__,."..-.,...-----~-~~. . . . . -;--.~--"""'7"'** .. ,-....__~.....-__....__7"'". __ ~---**-:-~*--**-~- ...... _,.. ........~ ..... _,,,_-.............. -.......-.-.-........... ,,.~-...-....,...,..~.----*:.-~-,_.....- .... ':"'....,_~- .......... - ...............-.--------~~"';'""'~A.:i.~.-..., ............":"'"_.---:""'""'.j.... --..1

\

)

  • ~

t::r*,

~~-:. ~'*~

~:,1,\t:'

1 Wl-li' i~ml*~~~'IW11J1lli1 ill l 1~:11 ~ -' Jf :rl~~\t~t\ :r: :; '

1 1 11

,11 ml_~~~ *fl I 1 IJ~, __ l ll!1Jll <*1 II_ _.~JJ _(l 1 I J1]1 I - . _____ - -~ ..... , ij e; %il~l t

,_.,_. ,- , 1~:>1 "') 2;::~:1 l i

,1aJIJ1 1TIIJJJ 1m JIJ

  • ri*-1 Im Ill I

.1Hrn u 1: o I IIT I " ' I"~'""'  !'

,1 l'll[~I 1 ll 1 I ~ll'IJ~ 1~*.**:~-:c->Jc**-"*d*-.

1l!l -

J 1 j -~ =-::$.-~.f-*':~~~~~~~~.

,!~-,W-r ~ \~ ~ t f~~0~:,.~_

r j I -4 1 1  :. . .

0

-,-l 11

  • --- 1-*- * - -r  :  : 'I :

~ .:* '<.: y~ . ~--

1t~111:~J]JJlllmm jl 111;~ ] )Lillill:,1 ~ '. .~~Ph - L ~

  • j 1 o , , }.

~iLfl111 l_lll[!JJ]llll1llTii] 11~1 J~ltlfi1~ 0 f*:i-*-*2* };-,,,,~~1:--*'

~1 m1illlJTI1111 m11 111111 JlliWJJl 1~' ~ ~~ \;$qi~ 11.f . t:\

    • - "'J,<*-. - i'.

111m1 11 l1T1iTill1111111tt11tH1 I 11 lillllllllffi. c kl;;_ \;~,,_,,,3 l *' l'* ' i 1!'

j1i1r1Jrr1**111-*1*1*l*1*1-111lll_ JI ~J~u1111111r*-j*]1~1* lr-::1~,: g:,:~~-x~~'-r: . ~

111 II 11 ' 11 u_u ,J I I ,I ' ' ullL]J I c ~::~ ' ~}%5~"~ t. *_ _** . 'i-'i '"'

i J,, - ,

f' 1

I!

ln1rjl1irr1w 11]1~ I r 11T1 In* 1111~1 Il !JTI' Wt~.{j i f.f~t~~;~;:,~~ ~ ; '. :rz: . t*~ n H+1r --: -m L_ :

11

-- t G

~~~~d~1!::¥l . ~~ - \. \

1umwm1~w w1J umllluJll~ i~J'11~i-~ 1r1i __ ~ ~I~.~s 1 t;~~~ .1

  • _. * ~

1 I

_h1-1JII11\*!1 11 ILiiI I~ nil i

1

! 111.11111!lii,! n-~r I Tfl1 t tic 1.;:~.;0:-: :'J; ;<'-.*.*,'~. ~*.;-~--

1r " ., ,_.,r*i:-.... 1

, . / >

~, *..*-..~~--"'*-..;.

K*~~-

  • -.(

";~\"

.-*~

1~

i-r* i1r1 JI 111I j It I- lllr " _,_, .,. , *---, (j*

, .: ' " -~ \.'*

r*

'~{***1 E-1*11-l \_i,~jj*Sjfil'.IL\*-~. .--i,~l:~ji@--:-1 j~ff't-j--j*JI \~ji j)~~j B0 iI:~r;~; v~:~+-.J~; t< '. ~f<:~ tn r},

  • fi*,-I \Ji *i-1*

t

  • 1' i

I

  • l U I\ * \. I 1

1)'1 1 ij*I* :~ 0** t~~~~~:il~*-i ~;;z~Jt;N$~::: i ' ' ~: ~~F b:.,,,;.*'µ*c ("--c"°'.:';;:o.>,;,* l. : .*!-. .\I) *~

l I 1',

Td-J-~\-rr- _, *1* .- .

Dj. l ,_.

I I i I. Il~ 1*.~1*

11,JJ I

..;.J _: -

I Ill i]~~1

.J "ft::~-'~;

. p~~ (<;ft?~.:~.~;~.};*c. '. , ~1~~ .:

o ~}~~'i't ~ ) .Sl"i-~~,;~,: '! : * ; : U :::

H L

H~1,11~Jfj~~1~1~~ ~ ~:fj' t=::+* t-. r :r1)i*,jHJ~-*

'LL ftt1

  • f~'.1111111 I JJ . I'11111trfl L~.c:=:*1.J1 ~  !tf I ' U+}Mt~i ~~ c:i.i. ri~~-~s.::'~'.

- 111i111111i*t: 1:J~:t~~~ ~\;*~ifr'f ~',.~-~0;~.;.x:; r..2< {t _.{  :,t,~:,'::'

*t*:-~<:::--._
    • 1*

j-mn1 111 *1 i 11 mnrmTfil1] t r111 m*1111.&: ~: ~?~~* ~~~.If! ~\~. 1 i  !* , _ i*

qttx:rrn.)Ji'IJi----j . ITj.r1r11*1**,-1"'.-11*l*1*~1*--i-J / l-j'11-r11111s*!~ . r~~:::_\?21'. V3~§~~,f2,~ r . *_ %~-:- -:: . : .t

~

);

u*r*hllt I I ;J_1 ~JJl 11----.J.u LlJ-W]l1 c r~.*~!_fi!j;p7.~ t~i.~2~~ {-~ : ?~t'~-~i:*,*:. _;

j ji \j J

n. r I

lttriifl 11Ulm]1m WI II Ill[J 111 1111111111. ~ I*~~' f1'l~ l ; ;~e:;.~-;: ' ii t t

. 11.rr1 I I 11 /I Hj I tj-11 .. _..

11

_1J I I*---.l 1 1

j 1 \{11[JJJJJI1 111

. .--...~--J-!L--.

1 1 I ,_U.

I ]

' .'\I- k~-d I

~ 1 1 c~- 1-~~\;;i~ l~~:.~:.~27~ CE;1¥;{~~~

i -~:;~;.2~~;;_. ~ -;~ :.

t : * :.* ~<~-'::\.

~.{" ~-1 ,*_~*. > 'f

._m . IJllliJ IIIJltJ~_1_1 !__mm-m------..- .~-. .,~ . . _... -*-*. _ _ ,. ..-...

c 1 i~~?:~}~ ~:fr~t~~:~~~--- !, . ~ .! .K (~~: ~ . ~

i I !! * ~-- ~"*~.- *--:.*-~*-:>"'"-- ...- * - -..

I I I.. I I I l:*' , ..... - - \

I I I 1i11111111l1IIIIT\.I1 11111\1 I 1111 r I IP I Jt~t.~-~ *-. l~}T, _._,...\~~-- --ft1 ~14 .L--~~:r-~--- ~I 1 c !t~:-;;;i_ ~~~r,~~:.:::> t ~: { ~?t~~ : ~-:'.:*, b * *:

  • 1.~

Il 1H-l i Ii I I1111 !I11 1 I~ 111llJJJl1III U~_l I i l];J c t'f;'§~fk ~~rt£},~*~~~~-~ r 1!;! 15 c 1*~-,it:r-8 z;-~r:ti~~-- ~ i< '.- fi *i;?:'~~~t:_:_s:~;:: t :" -

i :t_ .: n*1l~~~~~-:::-: ~ r

-Lr-- - . - } - *

  • 11' *
  • ll11lll.l' ln~1_!] J_:;,: ~. c~ij~~;~0. ~ ~r ~::{:!~:-,_~~et/-\

1 I

11*1 llT 11-1 11111_11.1 IJ.J.1 1

  • l{]¥if¥ 1

--:*n*~-,~;-~1Tili--1-iiTl1* I I \ I I 1i I I I ~ I ITT I !il! i i I l I ti I !~1': C- ~'-" -'*'*:- -': _;:- ".'it ** ..,., .- * ... \ . .* '-~,* \.:** ;~- * ... ,,.... \, . *

+i i ;. ) -.* : .

~------------***-*----------*-----------------------*---*-------*---------

\.

1'ITLE:

\

DURA.TI ON~

\ DATE: --------

I\ :r:rnv1~;:i:oN NO"~ 0 DATE: 3-08--83 I

\

I I

\

l

~

\

\

\

\l___________,_____,:___ _._________________, _________________ __ --*.... ------~--*--..-*-----*-*----**'

TH[ FOi LO'NIHG Aff,\CilfACIHS CM{

[I[ '.,\J?f\.i[O \'!I-ii i(1UT INCH[1\SllJG

  • ~~

OVE f',1\Ll OlMUl SIOl*I s:

--El~ I ~3-I Jrnqt i

I f1UXILIARY SWITCHES 2 SHUtH 1RIP 02 CIRCUIT ~J.AX) I 3 UND[IWO:_TAGE TRIP (WIT\\ OR WITHOUT

-~~-El3- 4 f-t_NlM S'IJITCH rnA[ DEL/IY)

£J{J.LN[MA__5}j1_

5 [L EC Tf\IC LOCKOUT 6 OPERATION COUtHER fRONT '/l[W Of STUD LC(A TIONS fOR MOUl/Ti~~G 2 POL[ flREAllEft WITH 2 OVfRCURR[NT rn1rs AND REVERSE CURRENT TRIP.

\

REVE115E cummn Tf11P Fig. IA - Tyr;11 DB-50 Three Position Drawout Outline Dimensions

I L------~---------*-------------~*-

--~-------------------------_,.-..-- ...- - - - -.. .--=----*-L'-""*"'~_...,,,

I

\ Cl~'SSROOX Rf.QUIREf!ENTS: \

\

l

\l

\

  • \

1

  • I I

\

\,---*-*--*----*_. _,._. . . . ~---"'-~. . . . --.. --.. -~-. ------*----"">A___. . . . ----* . . . .*. #-**-----*_,.._-.. . -..-..--*-------*-~-----*. .-~-~-*---***. . -**~-** ,._o~.:*

'l' i tle: ATWT

      • ---*--**--1*---------------

]:lOI.ES 1

v. DB-50 ckt.

operation of undervoltage trip attachment.

0 When energized the moving core is held against the stationary core which allows the rod to keep the reset lever in the reset position. (4BV DC coil) When voltage +

spring overcomes the magnetic attraction of

\ the 2 cores and rotates the reset level which releases a latch pin and releases the latch.

Now trip spring rotates trip lever. Thru

\I rnech. linl<:.2>.ge blzr .. opens.

\

Operation of Shunt trip device (125 VDC).

()

Fig :\t-16 This device also uses the moving ana stationary core idea. And also uses the trip spring and trip lever. This device energizes

\I to perform its function and is actuated thru the manual trip switches on the board as is

\' the UV coil also.

The reactor trip breaker pushbutton on

\ console operates the shunt trip device.

I

\

\

\

l

  • page 1 Date

~------***-~----*-

03/08/83 Rev * -----C-.

-- 1

and associated pTaductive equi.pmenL This breaker is built to oi:1erats with a minL:-num of mai:c-,tenance, *while at -~he sarne time Us simplified construction perrnits maximum

.-' accessj_bility for inspection and ad)ustn:..ent

'i V/hen requirecL The ease vrith which at-

.:( tachments may be added or :removed is an

'l outstanding feature of the "DB" design.

For the greatest :measure o-£ safety to operating personnel and also to minimize maintenance requirements, the brealzer should be mounted in an enclosure suitable to local operating conditions, A selection of standard enclosures is available for v;:i.rious applic~ations,

\J,\ P 0 R T AH T : To a s s u r e p r o p er fun c ti on i n g ,

inspect ead*, br,:oker at n~gular int:::rvols in ac-

'

  • I ,* * * \_ .1 l coroance wi'tn o systemonc mo1nrenonce scn2ou e.

k<.. **-L--* I The h;~quenq und choroc'r2r of the insp<~ctiiJnS

'~.:;;::;;.:;_;,7~::-;--: .~:=:*JJ w i i ! for th" rn o st pad he de t e :min *2 d by the s e -

'1erd)' o-rr tne

' d* uty pe:*rorrnec.

r l -r\_ne rn1n1mum

.. re-quirements, howe'1er,. should consis*i* of a light mon'ihly inspecticn, with a *ihoroU*]h inspection serni-cmnuolly. Occasional d112cks on calibrn-tion as well es en coordinotion and freedom of all rnoYing ports, must be includ2d in the mainte-nance schedule. Consult Westinghouse engineer-ing end ser*1ic2 p2rsonnel for iecomrnendotions Type 1iDB" aJ.:r r:;i:r-cuit bre?J<:er is design2d peri'aining *to specie\ op<::ruting of maintenance to give continuous and :reliable service ss condilions.

the :protecti v2 li cl: between foe power source

I -

DB-50 C\RCUlT port' ~l\r_,,_l,i'<EC' I\

1600 i'.\llPERES 60_Q VOLTS -A-C I

I

\

\ I

_____.______\l l CLOSED TRIPPED

- -.. - - - - - - - - - - OPE~J (RESET)


~------*- -

L ...- - - - -* - -

rzg. 3 - Cross-Sectional v*.w:.* -----

- , i ~ DB of Tvoo . --------

-- c .rrcm

. -:;0 .I Breaker L

Page 12

  • In -r -nl::ic'n*r *,,.... . _ .l .... ~ ., co;l be s11r"'

1-., :.::- clos'ncr *t-o ra..- on right hand side of solenoid yoke (1) and 0

.l . ....., _t-' - - .J. * ~ (_, ., c. . -

  • *. _ce brP.ss tuoe (0) so tciat sts.t10nary cor:; allow moving core (3) to drop into brass (4) 2.nd I.noving core (3) a:re aligned in ths: tube (5). Pick up closi!1g coil \vith brass tube. Re-2.ssemble closing coil anJ details tube ancj moving core and bring out through in reverse order from reE1ovaL the U-shapecl foot oil breaJ.;:er.

li the circuit break.er is pen:nancmtly Re-a.ssemble closing coil and details mounted ne2r the floor so that the closing in reverse order from removal. Take care coil cs.nnot be dropped far enough for re- to align stationary core ( 4) and moving core moval then follovr these directions. Tr-ip (3) irr brass tube (5).

breaker and :remove breaker manual op-erating handle and breaker fac.:; plate, Dis** OVERCURRENT TRIPPING DEVICE connect closing coil leads from control cir-cuit wiring. Ta2.ze off bolts (9), w2,shers The overCLffr:::nt trip is an air del2.yed (12), 2*elay :release arm (8), bolts (lOi, device that can be supplied \vith various washers (11) ancl plate (2). Drop closing rating coils ranging from 200 to 1600 am-coil {'7) with brass tube (5) so that pin (6) peres. The construction, except for the is exoosed. Push pin (6) to right into ho1e coils, is simila:r foT all ratings.

SPRlt'G MECHANiSM CIRCU!T BREAKEF\

1500 AMPERES, 500 VOLTS A-C Fig. 3A - Type DB-50 Spring Closing ,Assembly

      • .::-....,,~---..,..-,.-.--- -** ___ . ___ ____

, _...,.~_- .., - ,-


~---~--i

\

I I

\

I1* I I

\

TEST FOSIT\ON 1.1ARK Ii r i I Ii I

I

\

l I

\

I i

I I

I Fig. 3B - Type OIJ-50 Three Posirinn 01wr~1tin1~ M<'<'linnism

'~\

..)

  • *26 SHUNT TRIP ATTACffi1,IENT Ene:cgize relay operating coil. Slowly close foe brea.1.::er

. manually. The :relay The shunt trip mounts on top oi the platform release arm should 01)erate the :celay trip immediately to the right of the operating assernbly and the relay trip s:';sembly mechanism. {See Fig" 16 ,)

should 0:9en the relay contacts just before the breaker lsi.tches. This position can best 1t is non-adjus'cable and is intended for L'B determined by wat.ching the pawl in foe intermittent duty only. The shunt trip cir-*

brea1cer opera.ting mechanis~n, *\vhich should cuit must alv.rays be opened by an auxiliary snap in place just after the relay contacts switch contact. Tripping currents are open. If this operation sequence is not tabulated in Table No. 2, Page 7.

correct, the relay release arm should be bed to sui.t. l\lake sure that the :relay re~ Inspection lease arm does not rub on either side of the relay trip assembly lever aperture. V{hen With the breaker in the open position, the b:reaker is latched, de*-energizing and manually push the moving core against the then energizing the relay operating coil stationary core and rotate the breaker should not cause the relay contacts to move handle tci the closed position. The breaker toward the closed position. Tr*ip brea..1.zer. should be trip free.

The trip le,1er of the shunt trip should Reconnect closing coil leads to the con- 'nave .1'_,:rom .l_, / 0,),:," t o .L. /8 --1ncn

. ' c l earance t o trol circuit wiring, Check electric cJ.osing the trip ba:r.

of breaker~

28 1--------*------..-c--*------------------------.----------------------------*-------------,

I I

Ij I

l

  • I

~\

J., . ./

l I

I l

Ij I'------------~-----

____________J Fig. 17 - Under-voltage Trip Attachment - Constn1ction Details o:f the arm<1.ture, to trip the breaker. The above. Check :for J.oose bolts and open cir-armature: si1ould move 'Nithout friction, and cuit b potential coil.

should have approximately l/~~2-inch over-t:cav-el after tripping, FIELD DISCHARGE S\V1TCH.

Final inspection should 0e made elec-- The DB:F-16 breaker is a two-pole DP,-50 tric~clly, after thr:; circuit COw"1ections are b *~0<olre*'"

). ...... ~\... J. ,,,,,1*n-

..._c_.. ~o ."'pec1'n]

_., Cl- arc

. _,

  • v-......:;_ nnd mo*li-**

cruto.:. Ct '-

complete as shown in }'ig. 2, Page 10. fied arcing contacts pJ.us a field discharg2 S\vitch mounted on the center pole (~ig, 20).

1Vl aint~~na11ce The field discharge switch is shipped R.emove all power fr01n the brea..1-:er and with the gap setting shown in Fig. 20, for

repeat "the II1echanical hS})ection given generator field protection. Hoyvever, the I

Fag e 27 trip, replacing movi:lg core cover. (See Fig. 17 .)

1l1e needle v~1~ ,:2 scre-?1 in th2 top regulr.t:;s th~

  • Chec:z for }oose bolts and faulty coil. opening through 'Y'ihich the ,?.iris forced 2.\. :.1 hl~nce the tirr1e delay. (S22 Fi~. 18.) rfhe attachrr1e7it does not have a qui.cl<: reset fe2ture and therefore approximately one minute should be 2110,,ved.

UNDERVOLTAGE TRIP ATTACHMENT between ope:r2tions to perrait complete resetting.

It is s"'t to trip *within 4 to 7 seconds.

The lmdervoltc.ge trip nE1ti.nts on top of the platform, to t1:1e :right of tl1e shunt trip. (S2e Fig.

17). H.s function is to trip the bre2.ker 'Nhen *tlJ.e volb.ge falls to betv1e2n 30 to 60 pe:ccsnt of no:msl.

Hold the trip ba.:r dov,rn a:nd close the bre,?ke::

Tf\..BDUally. H.elec.:;e the trip bar slmvly, allo ..ving 1

The movin~; co:re is noi-inaUy held m2-gneticaHy the undervolt<:cge trip spring to raise the trip bLix against the sb.tionary core to hold t.'rie i\1icarL".

2nd trip the breaker.

rc-rJ nr1d consequ2ntly tbe :csset 1ever, i11 tI1e reset position. \Vhen the coil voltage i0 :reducsd sufficiently, the res*2t leve:r spring overcomes the mc.gnet}c 2ttr2.ction of the cores a11cl rot2.tes the rilaintenance reset leve:* clock'\vi.se. r\.s the reset le*v91* ~otat2s, it c2.n::ies vrith it the latch pin which rntates relative Check for loose bolts <.:nd frmlty coils.

1 to *foe laf:ch until the latch is relezised. When the 1.3.tch rel:;ases, tt1e trip spring rotates -Che trip l2ver countercloc:z*,Nise to hip th-2 breaker. The latch is ye-.;et by the cross b3.r moving the adjustable re~et REVERSE CURR.ENT TRIP ATTACJ-E\'lEI\T lever as the breaker oi:;ens. Fig. 17 shows the c:rnss beer in the open position of the bre&.ker.

'This atfachmed I!'.ounts dii-ectly on the cent2r molded pole unit bise, iJ1 the space ordi.n2.rily The seH-loc1dng scre'N in the movir1g core is set occupied by the overcurrer:t attachment. (See at the factory and shm~kl not requixe 2djustm2nt.

Fig. 19.) It is used to trip foe breaker whe:i the It is used to s~;cme lat.ch release wh,~n the r:1oviDg di..rection of curTent ilov; in that pole iE reversed.

core is 7 /32 outside the :Cc*ame.

When the series coil ci.u~rent is flo'iv-ing in *::he

Eor'1va.rc1 direction, a.lTiiatLu~e Inovernent is pT2-Ahvays connect the coil to the li.ne side of the vented by a stop. When the series coil current i;:;

brea..1-<:er unless t11e att2c11ment is equipped Yrith a reversed, the armah.u*e rotates in the opposite time deJ.ay device. In this c2.se, the tiine delay *wil1 direction to trip t.l-ie b:teaker. Calibration adju.st-delay the tripping of the breaker long enough to ment covers 5 a.nd 25 percent reverse current, permit energiz.abon of t}1e unde1"'10ltage coil from based on noTrnaJ cru.Tent rating.

the le.ad side. Do "1ot use an au:x..'cliary switch con-tE:ct in the undervoltage ci.J:c1Jj_t.

P..:fter tripping the rev21se cu.-crent armat1-tL2 is reset by opening the potential coil circuit. For The t.rip lever of the undervoltage should hzwe *t.i.'-iis pm-pose 2n "a" . cont-J.ct of the brea}z2E approxirnat21y J/16 inch c1eatance to the trip ba:: auxi1iary switch should be connected in with the potentiaJ coil.

TJNDER.VOLTAG:s TLvlE DEL.A"_{ Inspection ATTACH!vtE;i'iT

'T'he undervolt2.ge ai..r da_shpot time delay 8.tt3.ch- Close the breaker rnanually, and push be.d::-

me21t n10i.mt..s on tb2 front of the undervo.lb.ge "\Vard on the sprinr-r, stud located on the bottom
  • ----~~"-~--~* -~---*-~~-*~,.*-**-~*---~-*--~---- . --..

---*----*~-------~--*~---~--~*1 SALEH C~ENERATING STATION INSTRUCTOR LESSON PLAN I

1-----*---~*------~----------- .*------------------------------

TITLE: ATWT 1

I DUR..:'.\ TI ON:

REVISION NO o ~ 0 DATE: 3--08-83 DATE; 3-08-83 D..Z\TE:

  • I I

I I

I 1___________,________;------* -:------ *----- ---------------------------------------.. _J

'.1 ,.---~.-- .. ~----*~---***----~----~---*--~-------~---*- .. --*----~-----~-----~------------* .......... - - ....... 1.

I .

INSTRUCTOR REFERENCES; I

~j*-~~~:~~~~-N-"*-:-~:~-u -\7-r.*o~U~~-:D -------*---------~*----------*-*--*-*- -.--------------!

r, I-.:1-*

. *-** "** -' *-""'-- .,n __,_,_, '-*'"*, . . -*-

l '

Ii

l I

I l

l I . .

ll

-----------*--*-----. .--------------------------------------. .*-------.. -.. _____, . ---..~-r l STUDENT HANDOUTS

l I

I I

J_____. ~*-*------*------------~----*-- ______._._.,.,_.,. ..._. ________ _______________

.,,. .....,. ___..~_.. ...~-.. __ ,,,, .................._

l! c-.l*.-.AS""-c'OOM

Oh ' -" R*--*yur~=x***"'"I

.<:A1. J:1.L* * ..::.11 .;) ;

Ij

  • I I-L~-----~--**-*--*---.-~~----~---- - *- . ------*. ---..------------------------..-------------~----. .- . - --- - . . ..

Ti t 1 e : AT'i-Yl.'

~-~1-~T;:.s ------.-------------------------------------------------------------------11' VI. I.E. Bulletin 83-01 t o Addresses the problem of failure of rx trip breakers due to a sticking of the under voltage trip attachment.

0 Additionally it sites similar failures that have occured at other *plants (H.B. Robinson, Conn Yankee, St. Lucie and Prarie Island).

Due to these problems I.E. bulletins, I.E.

I circulars and Westinghouse T2chnical Bulletins were generated.

I 0 Up to no~ these previous failures had not prevented a warranted rx trip because -1. *'-'- only involved one of the 2 series breakers.

o The required actions for this I.E. bulletin are:

l. Perform surveillance test of UV trip coil
2. Ensure maint. program co~forms with the W directive or freq. and lubrication of lhe trip mechanism
3. Review EI~.3

~. Provide written follow-up reply concerning actions performed.

I lI I j v.~,- ..--..~* ..**--*---- *~-----~t...------~ --~----**--*------------~-------~*--4---*~------~

SPi.OP8303;3 Page :!. Date 03/08/'lJ /

Rev , - - - * - --°Cl-------,


-------***-*--*---1

INSTRUCTOR LESSON PLAN

,-*-----*------- .. ~--**-*-----------*----*-**--*-*,,--:-~**----~-----~*~--------*--------..------*------

\

l -

TITLE: A'I'W'I' LESSON NO" :

DUR.c'\T I ON ~

P.EVI SION NO,~ 0 DATE: 3-08*-83 DATE: 3-08*-83 I

l . I I>>-----~--~----~~--.--~------------ -*-------------------~----------------- . -------------------.

l l

l

!I . l i

,--~~ffDEN~I--l~A,-..N-'D.OT,~L-"S-:- * * * - - - - - - - - - * - * - - - - - - :_______-------------------------.. 1*

I l

I I

.L____~-------*------------------**--~-_,-_____ -- I I CLASSROOM REQUI;:>,frIENTS:

-*----.-----------------------~---*-1 I

l I

L---~-----~-----------*--------*-----------*---**-*--**-----*----------*----*-------*--*------------------***---..-.. -..

rritle: 1\TV?r

--*--**-----------1--*-*....----~-*-------**------*--------------------

\

\v11. Modification to EI-4.3 actions.

a.nd "Manual" Review Immediate nAutornatic I

'J:P ],_

  • I lf .<;"i my recen~ rev. 1s ~~*

OD-15 use of

--~----**:-------Operations neot. procedures

, _ . _ _ _ _ _ _ _ _ _ w _ _ _ _ __._,, _ _ , P _

o The following procedures shall be performed in a step by step sequence as written in the body of the procedure unless the procedure specifically states otherwise:

Emergency Instructions overall operating rnstructions

\ surveillance procedures Radioactive Waste procedures

\

\

\

\

\j______________,._Jl______________________.~--~--- I D ate ___Qj__ /j)__Pu'. 8 J P 3.9 e 1 Rev. Q


~- ***1 SAOP2i303:3

~-

SSINS No_: f22G O!S No.~ 315G-OGDi2

    • f. :rn *{ i.'J ti C*tl ~)3 ti:  :

C~/30/85 lE.B 83=Dl IE E!..:LL£'f!r~ ND. E3-tn: f"fiiLURE OF ~EACiOR 1fUP SHEAXERS {'ut:ST!NGK.~3SE D-3~SD)

TO O?Er: on .~UT~.AT1t l'RlP .Sl~nA.L A\? i'Jf"e'5:Hi:. i1'20 ':::l~*t:e!."' ni.rc1:::~n \)!';l"-t2r '1';?;;1:~sta** 'f,_;;:i1*\t'\~c:; hcld-!ng rm c;:i,2-r~ti;;;g 1ice;"1;.2 {DL) 1or .ac~1.::n ~1r>.d tt~ cth~i"' lH>i::1'2i1r po*1N~f" ~z-Ji:tor hlci1lU<e".!. f J? 1 in *fo \;,;,.; t. i O'!"J

  • Thie vt.rrpc:;.-e tf ~t.t'ri:s t:>u1"ie't1n is to 1;fcn'E! CP ~ok.t.2:-s ~flrl lic:ie?.ist-~::; J.bo-:Jt r>1:-:-er.t fai iur.('!~ t:f 'r:i' D-B -:-.,,yp12 i:frc.w1t ~r-:ei!ken 1.D tr1p ci;.:?~ :on r~*ci;:fot of ~11

.lll;;<:.c::-i;~tit trip .s1~i~ai fro= the ree.ctttr prc't,~~t!cn sy:;t@i':': 0~P5) .;;1r;d to 1e-a1.ifr't!

  • o::t i ~r. '.'.;{ <:i 1 I 00.zrJ.t 1t:t; ~r-:~$.S.1.1ri Z'ed. ~,:;ti?!'" "t1b:lC'l:.GY'*S tn c'l~SlJ1'52 -pre~;~!" ©f)'27'Jt ') [.)}";

~f ~hos2 br~ek~~s i~ the fut~r2. * .,

  • r

'i O:i Febr;..ar.~* 25. 1983, Gur*i~c st2rti.:J:: :;r tl*]*:.~18'."t. Uri1t 1 pl.Jiit, both i'.PJ--5:1 i~?S br~B~ers fail~d t0 ~~~n ~ut;rnati:ally u;~n~~er~ipt cf a ~alict trfp s$gna1 o~

"tn*,*--i~,,..

t..*?'o l../i*

~..,.,,,.::i-

...,.:i.. .... _."':

1-*.t:.r.~i""'~"',,.. -:.,.~._,l:!>l

~~1*~.t:il\.."~I . . . .,.;<1;;,,.,.

"!'~1~ fC\iLJn: t.t:* -e.ri~ h,.;,s. !::2er1 at'tr~butec t~ Hi.Cfdr:g of th~ urirJcrve1ti:9e tr1p 2tt3th:::t:11't. Tf.-t r~a.cto'i"' ~JJ3'.!- trir;µi:d l!'Ji'r.Litl°l\t frn;r: the car.trDi r.001r. .Ca);::it1! 30 s;~::onds a-fti:.o-: L.~-i: .gi.rto;;;iitii:: t.r"l;c> s19ir<l l 'o'as: SJt?f:~r,Jt.cd. Th~ ;r,anua\1y 1r.iti{.lti:d 0

-~.

t:r~p \;:l.<iS tlC.::.c::-.rlLsh~d by tb: shur.i. r-~iay:s in"Site.11\!ri ~r. :;:-.ath DS-!~O br.2;j;;2r.

1i> so.::2 r2i0.t:tor ~~-ct'2::tion syst~iT, G'125igr:'!-, ~~t- odcr;.,;iti.!:: prot.recti~n '5ign.;ds

.:.ire f:E~ tiri1y ?;!'."! th~ i..;r.ti-.;;rvol t~gc: (\!'!) *~rip ~*n.ecrtmEl'Y"t rif ttie riz"'ctoT -:.r~i:i br~iJ.~12r'5~ th~ i:.-:t,r;u.:d ~~~m-0\s el"'-2 f~d b-vth ::.c :.r.~ IJ"\' tr*;J:' <:.nd tc.;;, si-<ur;t tdp ccil of '~Eich b~~k2r-.

j.,

.,,c;

"J*";.l l,.$ -

1 4::.J-i::f~h

~~~J..JU!)

l....J'I b-~*l~

r*'f'"~\)'>\"*

~~y;.,\.~ t;..~o;.

.,,.,.._~¥..;-,,.,.

t.,1~~... 1::,...'). .l.,\.J~"'J r:..J.*1-

~1)'\

"**" ~

\'>,,,..'O"'-"'-*r

....,J '.,.t:,:)Ai,1

~q

~l,,J.,.

..,.i.l.-;:.

\..O -

-_1"1_,,,-

-~"'* ~1;..:"'1 fz.c:~}itv f2~°'\2tl *r..~ OP<<21'1 ,:iuto:?::1*U-ca"i1y 0;12 ~(.) :b~r.d~'f!Q rd 1;.h~ UV trip ~t'L:t.0.Jl\{~r:t .

- Th?'Y:t ::~*er.-:..s h;:i.v-c b~i:'i' *t";~.ort.2c:: *ir: L£5"{ 1 ;,; E2-D!Z/C3>.::...( ;Jn{.~ c~*-001/D::l\... J:1-

__ !,d~J'1~1cn. or, Fr:tr~i'Jry 22~ :i983 1 _Sii1-c::-: Vr.~t l ~-r*ipp2cl ~n 1ot><'-1o~-i *z,t~cm gz>:~r~*ttir

.r 1:.2V:ill; l*;0'J2\!'?.' .

7

, '.:;'J:'l'.:\; %.?>.:~ OD21:l'C0T*

mc'..r~;";Qi ily tr*\i,))';?.f;i *

"Ui~ i'c*?.CtDi~ Jt J t'Jf.'.'.'\'..

' ~l~cst cain~icienta~ ~ii~ ih2 ~utc~a~ic tTif si~nal, t~2 ~t1ua1 tri~ ~ech~ni~"

(1~111t:wa*i1 c-*r c}~.ftD:-.~t*lc} C.'.:il';f!~.:z~ ~~ ;E,C*i::r*~a~n~:! . . ~ I

IEB 83-01

,,' ~eb~uary 25. l9a3

~cge 2 of 3 S~oflar f~tl~re~ in~ol~ir.g the UV trip *ttachment co !he RPS'havt been rt9~M..ed to 'the. NRC .. Thest fa I 1vres oo1y *r.volv~d one of the t"a se~fes br@ak!r~.

~nerefore they did not ~esult in a failu~ tc iutcmatita11y tri~ the rtac~o~.

Said failures have occurrt!d &t M. s.* RonfnsonT Canrt.e,cticut ~-~nlee. Pr~1tit l3-1and and St. lut~e in addttiar. to those at Silem. A5 a resu1t.~f t~e~e ev~r.ti, t.nf HRC issutd iE Builet\n ~o. 71-02 *r.d IE Cfrcular No. Bl-1Z. and ~stfn~house*

issued Te~h~ic~l Bulletin Ho. NSD-78-14-1 dated J~r.vary 11. 1974 ind HSD Data Letter-?4-Z dated Ftbrvary l4. 1974.

Recu1~d ~~t1~r.s for All Ha1der~ of 02erati"g Licenses for ~N!s~uriz~d Wat.er Re.actors:

L1eensees ~tth WOB type brealers ~~ing ~noe~vgltage ~Ti~ lttachcent fn ReJctor Protective Syste: 1~pltc1tfons *re ~uested to:

l. ~erfo?"'lt surve~\lance test of undervoltage t~ip fu~c~tnn independe"t of the Shunt trip W'fth1n 24 ft~Ur'$ ctf r'!C~ipt cf this Buu*~tir. unless equf va1ent testfn; ha~ beeo perinrme~ Within 5 days. These plant5 for

~~ich en-line testab1l,ty ~i not pravid-ed Illy c~pl~'t.t this ite~ be1~~e resur::.i"lg C'1etation or \f currtt>tly o~vr*atfng * .at the nett plaf't shutdown_

Revie~ th~ ~aiqt~r.enee progra~ fvr c~nf~~ance to retotmiended ~ progra.

{attacnmer-t} in=ludin9 fre~uen~y an~ 1ubric1~~ a~plt~a to tr~~-mech~n!sa~

Ver1fy actual ~~p1em~ntati~n Qf th!! program. lf ~aint~nane* including 1>>bricatior. does not conf:nr:, i~it\att ;such ~a1nten1r.ce within S day~ ~f rece;p~ of this bulletin o~ provide an '.!1ternate ~ainter.anee ~regr~~.

Repe.a~ the testing requ1red in ite'l:': l ;fr~o:-- to c1ecl4r1ng tbe breaker OPERABLE. ..-.

J. Nottfy al1 11cerr;.ed of)erat.e>ri of th~ fi~ht!"'-e*te-tri;: ~v~n't. whi::h occvrred

~t Salte_ Rev~ew the a~pr~poribte !r?~g~ncy ~perating ~ro~~du~s for t.h.e e-,ent of fa n~l"'~-t.~-tri p with each ope!'~tlir upar. hi-s arriv& l on-sM ft ..

d. Prcvide written reply vit~iQ 7 days cf Teteipt of thi~ bu11!t\n *
a. fdent.if~*ing res..r1t~ of t~s.tins ?erforee~ ~" T'estsonse to it~m l,
b. i~entify~n9 confonr.ar.ce of t:ainteo~r.c! p,.ogral"'\ to~ reco~*noat~~
  • nd ci2scribin9 results of ~aintgnance p2rfor~ed direct1y ~~ A res~1t
f this Bull~t\n 1~ ~~pens! ~o item Zy
c. provid~ ~t2te~~r.t ~~at ~rovisi~n~ *~e ir. ~1ace t~ ~ot1fy 1iceft$ed *I c.perators of the Salem ~~ent ~nd ~ring to the{r attention appropriat! fa ila:re .. 1.-:::-tTip e~erger.cy pr-cttdu~es opor. th-ei r arrri'141 on-sr.i ft.
d. Vou a~~ rem1n~d of th~ ""tQuirements for p~~ot not1f1cat1on 1n aci:crdr.nce*w\tn 10 CFrt 50.:ZZ 1n thi- 'tf~nt. cf detect~ng u1 1noperaol' I RPS br-eaker.

~ .

tEB 83-01 f ebr~ry ~S. 1983 ..

Pa9e 3 of 3 Ucense!5 flOt using the $Ubjeet a*1'deryo\tag.e ~:rip atti~nnef'!t ind therefore

-~~ affec~ed by this bu1!~t{n shall submit* ne9*t;~e declaratfon withfn 7 days of tM: rece~?t~~ ~~i.s.-~l ..~-

The writt!n t~poT"t reQu'i~d sha11 be sub=1tt.e~ to the ap;>ro~:-1*te Regional

~fn1stratcT under Oith or *ffi~ti~n under provisfch$ ~f Sectio~ 18~a, At~mic E~e~gy Act cf 1954, a~ *~ended. Tht orig~nal CDPY ~f tn.e cover tett~rs end i :opy of the re~ort.s shail be transm1ttea to tb~ U. S, Nutlttr Re~ulat~r:I Co::tr.i$s1or.. _Oa~~n~ C~r.tro1 ~st. Washi~~t~n, _D.c.* ZuSS5 fer re~roductien ~nd d1s~r,oution. *

.. This re~ue5t for inforaation h'JS approved by the Ofnce cf )',ana9tt.ent-&l'd Budget under a blanket clearance n(J13'1.ber 3i5C~OOOl2 which e~pire~ Apr4~ 3Q, igss. Cotmients on bul'"den and d~plfeatfon :ay c.e d1rte~e: to the Office ~f

~~naqe~e"t and Sudget, Rep~rt.s ~~n~9e~~nt, Roum lZOB, New E~ecutiv~ Office Buiiding, Washington, D.C. 20503.

If y~u bav~ a~y ~utstions_ re91Tding ~hf\ r~tt~r. please 'C1)~Ct t~ RegiDnal

~.da:1~is~ratcr of the NRC R~giqnal Office ~~ the te~hnte1l contact 11~tf'd be 1ow.

.Original slg"ed*by £, L. Jor-dan

~ithard C. ~e~o~n9, Director Offt~e cf !n1p2c~\on irtd E~~or~emen~

I

..~

Technical *ccn~ac~: I. V411alv1. IE !lii*

3Cl-¢9Z-9~35

v. Trot:".aS' IE 30l-49Z-47S~

J. T~ S!ard, NRR lnl-491!-7465 Attac~s;ient:

l.

T~an5cript1~n ~f West1nsh~~se ~"SO ltr.

74-Z ... ..

2. lis~ of Recently !!sued IE Bullttins .....
  • l. .,
  • ~