MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18102B6681997-10-0101 October 1997 Rev 8 to Inservice Testing Manual for Pumps & Valves Program. ML18106A8291997-09-0404 September 1997 Rev 2 to Reactivity Manipulations Documentation Guide. Page to Training Manual NC.TQ-TP.ZZ-0302,encl ML18102A7941997-01-21021 January 1997 Event Classification Guide,Technical Basis, for Hope Creek Generating Station & Salem ML18102A7931997-01-21021 January 1997 Event Classification Guide,Technical Basis, Salem Generating Station ML18102A6661996-11-19019 November 1996 Rev 2 to Pse&G Simulation Facility Certification Program. ML20115B7791996-07-0303 July 1996 Final Draft, Hope Creek Event Classification Guide, Sections 1-9 ML18101B1141995-11-14014 November 1995 Revised Salem Generating Station Event Classification Guide, Including Rev 46 to Table of Contents,Rev 37 to Attachments Signature Page,Rev 26 to Attachment 6,Rev 25 to Attachment 7 & Rev 24 to Attachment 9 ML20091M9911995-10-15015 October 1995 Event Classification Guide HCGS, Including Revised Eals, Technical Basis Document & NUMARC EAL-to-Hope Creek Comparison Summary ML18101A6911995-05-31031 May 1995 Nbu Issue Mgt & Prioritized Action Plan, Dtd May 1995 ML18101A7711995-05-11011 May 1995 Rev 1A to Vol a of Salem Generating Station Unit 2 Second 10-Yr Insp Interval ISI Program Plan. ML20134K0831995-02-27027 February 1995 Pse&G/Nuclear Business Unit Organizational Effectiveness Assessment Plan, ML18101A6751995-02-16016 February 1995 Rev 11 to EOP 1-EOP-TRIP-1, Reactor Trip or Safety Injection. ML18101A6761995-02-16016 February 1995 Rev 12 to EOP 1-EOP-TRIP-2, Reactor Trip Response. ML18101A5381995-01-27027 January 1995 Revised Salem Generating Station Event Classification Guide. ML18101A2111994-08-17017 August 1994 Revised Salem Event Classification Guide. ML18101A6771994-07-11011 July 1994 Rev 10 to EOP 1-EOP-TRIP-3, Safety Injection Termination. ML20147B1601994-04-23023 April 1994 Rev 3 to S1.OP-SO.CW-0001(Z), Circulating Water Pump Operation ML18100A8081994-01-0707 January 1994 Rev 30 to Salem Generating Station Event Classification Guide. ML20147B1491993-11-0202 November 1993 Rev 2 to Procedure S1.OP-SO.CW-0001(Z), Circulating Water Pump Operation ML18100A4201993-06-15015 June 1993 Justification for Sgs Units 1 & 2 Restart & Operation Rod Control Sys Failures. ML18100A3771993-05-0505 May 1993 Rev 27 to Salem Generating Station Event Classification Guide. ML18100A3661993-04-27027 April 1993 Rev 8 to Section 18 to Event Classification Guide, Correcting Typo on Pages 3 & 5 of 6 ML20147B1171993-04-13013 April 1993 Rev 1 to Procedure NC.NA-AP.ZZ-0015(Q), Safety Tagging Program ML18096B3251993-02-26026 February 1993 Integrated Scheduling Program. ML18096B2911993-02-10010 February 1993 Revised Event Classification Guide,Including Rev 25 to Table of Contents,Rev 14 to Attachment 6,Rev 13 to Attachment 7, Rev 8 to Attachment 8,Rev 13 to Attachment 9,Rev 3 to Section 10,Rev 4 to Section 17 & Rev 7 to Section 18 ML20147B1021993-01-21021 January 1993 Rev 5 to Procedure NC.NA-AP.ZZ-0009(Q), Work Control Process ML20135B6521992-12-29029 December 1992 Rev 0 to Loss of Overhead Annunciator Sys ML20147B1371992-12-22022 December 1992 Rev to Procedure SC.RP-TI.ZZ-0209(Q), Release of Items from Rca ML20147B2051992-09-21021 September 1992 Rove Time Keeping Procedure ML18096A9601992-08-28028 August 1992 Electrical Distribution Sys Functional Insp (Edsfi) Methodology & Plan. ML18100A3151992-07-28028 July 1992 Rev 1 to Process Computer Maint & Mod Control Program. ML18096B3191992-07-17017 July 1992 Rev 8 to Salem Nuclear Generating Station Odcm. ML20147B1691992-05-0707 May 1992 Rev 1 to Procedure NC.NA-AP.ZZ-0013(Q), Control of Temporary Modifications ML18096A6791992-04-30030 April 1992 Vols A-D of Salem Generating Station Unit 2 Inservice Insp Program (Second Insp Interval) Long-Term Plan. ML18096A4421992-01-15015 January 1992 Rev 17 to Salem Generating Station Event Classification Guide ML18096A3211991-10-0404 October 1991 Rev 13 to Event Classification Guide,Including Table of Contents,Section Signature Pages,Spill/Discharge Notification Form & Related Pages ML18096A1431991-06-28028 June 1991 Rev 12 to Salem Generating Station Event Classification Guide. ML18095A9661991-05-30030 May 1991 Artificial Island Salem Event Classification Guide, Rev 11 ML18096A1191991-05-28028 May 1991 Rev 2 to NFU-0039, Salem Reactor Physics Methods. ML18095A9391991-05-16016 May 1991 Revised Replacement Pages to Facility Inservice Testing Program 1999-09-10
[Table view] |
Text
ENCLOSURE 2 REPLACEMENT PAGES FOR THE IST PROGRAM 9105220275 910516 PDR ADOCK 05000272 *::
p PDR
SALEM UNIT 1 PUMP A~D VALVE INSERVICE TESTING PROGRAM
_ SYSTEM:
c L
A DRAWING VALVE ACTU-VALVE- S- & CATE- VALVE ATOR NORMAL TEST RELIEF
- NUMBER ~ COORDINATE GORY SIZE TYPE TYPE POS TYPES REQUEST 11SW2 3 205242-l-C7 c 20 CK SELF 0 1 12SW2 3 205242-1-E7 c 20 CK SELF 0 1 13SW2 3 205242-l-G7 c 20 CK SELF 0 1 14SW2 3 205242-2-C7 c 20 CK SELF 0 1 15SW2 3 205242-2-E7 c 20 CK SELF 0 1 16SW2 3 205242-2-G7 c 20 CK SELF 0 1 11SW5 3 205242-1-CS c 30 DCK SELF 0 1 YES 12SW5 3 - 205242-1-ES c 24 DCK SELF 0 1 YES 13SW5 3 205242-1-GS c 30 DCK SELF 0 1 YES-14SW5 -3 205242-2-GS c 24 DCK SELF 0 1 YES llSWS 3 205242-1-85 B 1. 5 GB AIR M 1,5 12SW8 3 205242-2-35 B 1. 5 GB AIR M 1,5 11SW13 3 205242:-l-C4 c 0.75 CK SELF 0 1 12SW13 3 205242-l-E4 c 0.75 CK SELF 0 1 13SW13 3 205242-:l-G4 c 0.75 CK SELF 0 1 14SW13 3 205242-2-C4_ c 0.75 CK SELF 0 1 15SW13 3 205242-2-E4 c 0.75 CK SELF 0 1 16SW13 3 205242-2-G4 c 0.75 CK SELF 0 1 11SW17 3 205242-l-G7 B 30 BFY MO 0 1,2,6 12SW17 3 205242-2-C7 B 30 BFY MO 0 1,2,6 llSW20 3- 205242-l-C7 B 30 BFY- MO 0 1,2,6 12SW20 3 205242-1-ES B 24 BFY MO 0 1,2,6 13SW20 3 205242-2-F7 B 30 BFY MO 0 1,2,6 14SW20 3 205242-2-G? B 24 BFY MO 0 1,2,6 llSW21 3 205242-3-H6 B 8 BFY MO 0 1,2,6 12SW21 3 205242-3-HG B 8 BFY MO 0 1,2,6 11SW22 3 205242.:...3-G5 B 24 BFY MO 0 1,2,6 12SW22 3 205242-3-G5 B 24 BFY MO 0 1,2,6 11SW23 3_ 205242-3-F5 B 24 BFY MO - -C 1,2,6 12SW23 -3 205242-3-F6 B 24 BFY MO c 1,2,6 11SW24 3 205242-1-CG B 4 DIA AIR A 1,5 12SW24 3 205242-1-EG B 4 DIA AIR A 1,5 13SW24 3 205242-1-GG B 4 DIA AIR A 1,5 14SW24 3 205242-2-CG B 4 DIA AIR A 1,5 15SW24 3 205242-2-EG B 4 DIA AIR A 1,5 16SW24 3 205242-2-GG B- 4 DIA AIR A 1,5 1SW26 3 2a°5242-1-C8 B 30 BFY MO 0 1,2,6 YES 11SW34 3 205242-3-H? c 6 DCK SELF c 1 12SW34 3 205242-3-H7 c- 6 DCK SELF c 1 11SW36 3 205242-3-G7 c 6 DCK SELF c 1
_l2SW36 3 205242....:3--G7 c 6 DCK SELF c 1 11SW38 3 205242-3-F? c 6 DCK SELF c 1 12SW38 3 205242-3-F7 c 6 DCK SELF c 1 11SW39 3 205242-3-HS - B 6 PL AIR c 1,2,5 REV. 02 -PAGE 109 OF 121
SYSTEM:
SALEM UNIT 1 PUMP AND VALVE INSERVICE TESTING PROGRAM c
L A DRAWING VALVE ACTU-VALVE .s & CATE- VALVE ATOR NORMAL TEST RELIEF NUMBER s COORDINATE GORY SIZE TYPE TYPE POS TYPES REQUEST 12SW39 3 205242-3-GS B 6 PL AIR c 1,2,5 13SW39 3. 205242-3-FS B 6 PL AIR c 1, 2, 5 llSW42 3 205242-3-ES B 6 BFY AIR M 1,5 12SW42 3 205242-3-09 B 6 BFY *AIR M 1,5
. 13SW42 3 205242-3-CS B 6 BFY AIR M 1,5 11SW44 3 205242-3-E9 c 6* DCK SELF c 1 12SW44 3 205242-3-09 c 6 DCK SELF c 1 13SW44 3 205242-3-C9 c 6 DCK SELF c 1 11SW47 3 205242-3-ElO c 8 OCK 'SELF c 1 12SW47 3 205242-3-010 c 8 OCK SELF c 1 11SW49 3 205242-3-89 B 8 PL AIR M 1,5 12SW49 3 205242-3-89 8 8 PL AIR M 1,5 11SW51 3 205242-:-6-Hl c 16 OCK SELF 0 1 YES 12SW51 3 205242-5-G3 c 16 OCK SELF 0 1 YES 11SW53 3 205242-6-El c 10 OCK SELF 0 1
. 12SW53 3 205242-6-01 c 10 OCK SELF o* 1 11SW57 3 205242-6-H2 B 8 BALL AIR M* 1,5 12SW57 3 .205242-6-F2 B 8 BALL AIR M 1,5
- 13SW57 3 205242-6-E2 B 8 BALL AIR M 1,5 14SW57 3: 205242-6-C2 B 8 BALL AIR M 1,5 15SW57 3 205242-6-82 B 8 BALL AIR M 1,5 11SW58 2 205242-6-H3 B 10 BFY AIR 0 1, 2_, 5, 6 12SW58 2 205242-6-F3 B 10 BFY AIR 0 1,2,5,6 13SW58 2 205242-6-E3 B 10 BFY AIR 0 1,2,5,6 14SW58 2 205242-6-C3 B 10 BFY AIR 0 1,2,5,6 15SW58 2 205242-6-83 B 10 BFY AIR 0 1,2,5,6 11SW65 3 205242-6-H? B 10 BFY AIR M 1,5 12SW65 3 205242-6-F? B 10 BFY AIR M 1,5 l3SW65 3_ 205242-6-E? B *10 BFY AIR M 1,5 14SW65 3 205242-6-C? B 10 BFY AIR M 1,5 15SW65 3. 205242-6-87 B 10 BFY AIR M *1,5 11SW72 2 205242-6-H? B 10 BFY AIR 0 1,2,5,6 12SW72 2 205242-6-F? B 10 BFY AIR 0 1,2,5,6 13SW72 2 205242-6-E? B 10 BFY AIR 0 1,2,5,6 14SW72 2 205242-6-C? B 10 BFY AIR 0 1,2,5,6 15SW72 2 205242-6-87 B 10 BFY AIR 0 1,2,5,6 11SW77 3 205242-6-E9. c 10 OCK SELF 0 1 12SW77 3 205242-6-09* c 10 OCK SELF 0 1 11SW79 3 205242-3-Cll c 24 OCK SELF 0 1 YES 12SW79 3 205242-3-Cll c 24 OCK SELF Q. 1 YES 11SW92 3 205242-5-F4 B 4 GB* AIR 0 1,2,5 12SW92 3 205242-5-04 8 4 GB AIR 0 1,2,5 13SW92 3 205242-5....,.C4 B 4 GB AIR 0 1, 2., 5 13SW93 3 2 0 5.2 4 2-5-C 8 B 4 PL AIR M 1,5 REV. 02 - PAGE 113 OF 121
~--~-
SYSTEM:
SALEM UNIT 1 PUMP AND VALVE INSERVICE TESTING PROGRAM c
L A DRAWING VALVE ACTU-VALVE s & CATE- VALVE .ATOR NORMAL . TEST RELIEF NUMBER .§. COORDINATE GORY SIZE TYPE TYPE POS TYPES REQUEST 11SW99 3
- 205242-5-E6 c 4 CK SELF 0 1 12SW99 3 205242-5-D6 c 4 CK SELF 0 1 13SW99 3 205242-5-B6 c 4 CK SELF 0 1 11SW102 3 205242-5-FS B 3 BALL AIR M 1,5 12SW102 3 205242-5-D9 B 3 BALL AIR M 1,5 11SW122 3 205242-3-B3 B 20 BFY AIR A 1,2,5 11SW127 3 205242-3-Bl B 16 BALL AIR M 1, 2, 5 11SW129 3 205242-3-C4 B 1. 5 PL AIR A 1,2,5 12SW129 3 205242-4-G6 B. 2 PL AIR A 1,2,5 1SW137 3 205242-3-C4 B 2 GB AIR A 1,2,5 11SW145 3 205242-3-03 B 1.5 PL AIR A 1, 2, 5 12SW145 3 205242-4-B? B 1. 5 PL AIR A 1,2,5 12SW150 3 205242".""4-B3 B 1 PL AIR M 1,5 11SW153 3 205242-3....:G4 B. 1. 5 GB AIR A 1,2,5 12SW153 3 205242-4-F6 B 1. 5 GB AIR A 1,2,5 12SW158 3 205242-4-F3 B 1 PL AIR *M 1,5 1SW163 3 205242-3-G4 B 1. 5 GB AIR A 1,2,5 1SW169 3 205242-4-C? B 1.5 GB AIR A 1,2;5 lSW175 3 205242-4-C? B 2 GB AIR A 1,2,5 1SW185 3 205242-4-D? B 1. 5 GB AIR A 1,2,5 1SW191 3 205242-4-D? B 2 GB AIR A 1,2,5 1SW199 3* 205242-3-E4 B 1. 5 GB AIR A 1,2,5 1SW205 3 205242-3-E4 B 2 GB AIR A 1,2,5 1SW213 3 205242-4-B? B 1. 5 GB AIR A 1,2,5
- 11SW223 3 205242-6-H9 B 8 BALL AIR M 1,5 12SW223 3 205242-6-F9 . B 8 BALL AIR M. 1,5 13SW223 3 205242-6-E9 B 8 BALL* AIR M 1,5 14SW223 3 205242-6-C9 B 8 BALL AIR M 1,5 15SW223 3.. 205242:....6.,...B9 B 8 BALL AIR M. 1,5 11SW305 3 205242-3-BS B 8 PL AIR M 1,5 12SW305 3 205242-3-BS B 8 PL AIR M 1,5 1SW308 3 205242-l-A6 B 8 .BALL AIR M 1,5 1SW311 3 205242-2-H4 B 8 BALL AIR M 1,5 12SW376 3
- 205242-4..;.H6 B 14 BFY AIR M 1 12SW377 . 3 *205242-4-H6 B 14 BFY AIR M 1 12SW378 3 205242-4-HG B 14 BFY AIR M 1 12SW379 3 205242-4-H6 B 14 BFY AIR M 1 12SW380. 3 205242-4-H4 B 14 BFY . AIR M 1 12SW381 3- 205242-:4-H4 B 14 BFY AIR M 1 12SW382 3 205242-4-H4 B 14 BFY AIR M 1
.12SW383 3 205242-4-H4 B 14 BFY AIR M 1 REV. 02 PAGE 116. OF 121
SYSTEM: Sampling SALEM UNIT 1 PUMP AND VALVE INSERVICE TESTING PROGRAM c
L A DRAWING VALVE ACTU-VALVE s & CATE- VALVE ATOR NORMAL TEST RELIEF NUMBER s COORDINATE GORY SIZE TYPE TYPE POS TYPES. REQUEST lPRl 1 205201-1-Fl B' 3 PL AIR c 1,2,5,6 1PR2 1
. 1 205201-:1-F2 B 3 PL AIR . c 1,2,5,6 1PR3 205201-1-F2 c 6 RV *SELF c 3 1ER4 1 205201-1-FJ c 6 RV SELF c 3 1PR5 1 205201-1-F4 c 6 RV SELF c 3 1PR6 1 205201-1-Fl B 3 GT MO 0 1,2,6 1PR7 1 205201-1-F2 B 3 GT MO 0 1,2,6 1PR17 2 205201-1-D9 A 0.375 PL AIR A 1,2,4,5,6 1PR18 2 205201-1-DlO A 0.375 PL AIR A 1,2,4,5,6 1PR25 2 205201-1-E9 A,*c 4 CK SE~F c 1,4 YES lPSl 1 205201-1-F5 B 1/2 GB AIR c 1,2,5,6 YES 1PS3 1 205201-1-D6 B 1/2 GB AIR c 1,2,5,6 YES
. 1RC4'0 1 205201-1-GS B 0.75 GB SOL c 1 YES 1RC41 1 205201-1-G7 B 0.75 GB SOL c 1 YES 1RC42 1 205201-1-GS B 0.75 GB SOL c 1 YES 1RC43 1* 205201-1-G7 B 0.75 GB SOL c 1 YES REV. 2 PAGE 71 OF 121
~
I
- e SALEM UNIT 2 PUMP AND VALVE INSERVICE TESTING PROtRAM SYSTEM:
c L
A DRAWING VALVE ACTU-VALVE s & CATE- VALVE ATOR NORMAL TEST RELIEF NUMBER §. COORDINATE GORY SIZE TYPE TYPE. POS TYPES REQUEST 21SW2 3 305342-1.:..c7 c 20 CK SELF 0 1 22SW2 3 305342-1-E? c 20 CK SELF 0 1 23SW2 3 305342-1-G? c 20 CK SELF 0 1 24SW2 3 305342-2-C? c 20 CK SELF 0 1 25SW2 3 305342-2-E? c 20 CK SELF 0 1 26SW2 3 305342-2-G? c 20 CK SELF 0 1 21SW5 3 305342-2-F9 c 30 DCK SELF 0 1 YES 22SW5 3 305342-1-CS c 24 DCK SELF 0 1 YES 23SW5 3 305342-2-GS c 30 DCK SELF 0 1 YES 24SW5 3 305342-2-FS c 24 DCK SELF 0 1 *YES 21SW8 3 305342-1-H5 B 1. 5 GB AIR M 1,5 22SW8 3 305342.-2-HS B 1. 5 GB AIR M 1,5 21SW13 3 305342,...1.:....c4 c 0.75 CK SELF 0 1 22SW13 3 305342-1-E4 c 0.75 CK SELF 0 1
- 23sw13 3 305342-1-G4 c 0.75 CK SELF 0 1 24SW13 3 305342-2-C4 c 0.75 CK SELF 0 1 25SW13 3 305342-2-E4 c 0.75 CK SELF 0 1 26SW13 3 305342-2-G4 c 0.75 CK SELF 0 1 21SW17 3 305342-l-G7 B 30 BFY MO 0 1, 2, 6 22SW17 3 305342-2-C7 B 30 BFY MO 0 1,2,6 21SW20 3 305342-1-F7 B 30 BFY MO 0 1,2,6 22SW20 3 305342-1-CS B 24 BFY MO 0 1,2,6 23SW20 3 305342-2-G? B 30 BFY MO 0 1,2,6 24SW20 3
- 305342-2-F? B 24 BFY MO 0 1,2,6 21SW21 3 305342-3-G6 B 8 BFY MO 0 1,2,6 22SW21 3 305342-3-G6 B 8 BFY MO 0 1,2,6 21SW22 3 305342-3-F5 B 24 BFY MO 0 1,2,6 22SW22 3 305342-3-F5 B 24 BFY MO 0 1,2,6 21SW23 . 3.. 305342-3-F5 B 24 BFY MO c 1,2,6 22SW23 3 305342-3-F6 B 24 BFY MO c 1, 2, 6.
21SW24 3 305342-l-C6 B 4 DIA AIR A 1,5 22SW24 3 305342-1-.E6 B 4 DIA AIR A 1,5 23SW24 3 305342-1-G6 B 4 DIA AIR A 1,5 24SW24 3 305342-2-C6 B 4 DIA AIR A 1,5 25SW24 3 305342-2-E6 B 4 DIA AIR A 1,5 26SW24 3 305342-2-G6 B 4 DIA AIR A 1,5 2SW26 3 305342-2-GlO B 30 BFY MO 0 1,2,6 YES 21SW34 .3 305342-3-HT c 6 DCK SELF c 1 22SW34 3 305342-3-G7 c 6 DCK SELF c 1 21SW36 3 305342-3-G? c 6 DCK SELF c 1
. 22SW36 3 305342-3-F7 c 6 DCK SELF. c 1 21SW38 3 305342-3-F? c 6 DCK SELF c 1 22SW38 3 305342-3-F7 c 6 DCK SELF c 1 21SW39 3 305342-3-HS B 6 PL AIR c 1,2,5 REV. 02 PAGE 109 OF 121
SALEM UNIT 2 PUMP AND VALVE INSERVICE TESTING PROGRAM SYSTEM:
c L
- A DRAWING VALVE ACTU-VALVE s & CATE- 'VALVE ATOR NORMAL TEST RELIEF NUMBER 2. COORDINATE GORY SIZE *TYPE. TYPE POS TYPES REQUEST 22SW39 3 305342-3-GS B 6 PL AIR c 1,2,5 23SW39 3 305342-3-FS .B 6 PL AIR c 1,2,5 21SW42 3 305342-3-ES B 6 BFY AIR M 1,5 22SW42 3 *305342-3-DS B 6 BFY AIR M 1,5 23SW42 3 305342-3-CS B 6 BFY AIR M 1,5 21SW44 3 305342-3-ES c 6 DCK SELF c 1 22SW44 3 305342-3-DS c 6 DCK SELF c 1 23SW44 3 305342-3-CS c 6 DCK SELF c 1 21SW47 3 305342-3-E9 . c 8 DCK SELF c 1 22SW47 3 305342-3-D9 c 8 DCK SELF C* 1 21SW49 3 305342-3-B9 B 8 PL AIR M 1,5 22SW49* 3 *. 305342-3-B9 B 8 PL AIR M 1,5 21SW51 3
- 305342:-6-Hl c 16 DCK SELF 0 1 YES 22SW51* 3 305342-5-G3 c 16 DCK SELF 0 1 YES 21SW53 3 305342-6-El c 10 DCK SELF 0 1
- 22SW53 3 305342-6-Dl c 10 DCK SELF* 0 1 21SW57 3 305342-6-H2 B 8 BALL AIR M 1,5 22SW57 3 . 305342-6-F2 B 8 'BALL AIR M 1,5 23SW57 3 305342-:6-E2 B 8 BALL AIR M 1,5 24SW57 3 305342-6-C2 B 8 BALL AIR M 1,5
- 3 305342-6-B2 B 8 BALL AIR M 1,5 21SW58 2 305342-6-H3 B 10 BFY AIR 0 1,2,5,6 22SW58 2 305342-6-F3 B 10 BFY AIR 0 1,2,5,6 23SW58 2 305342-6-E3 B 10 BFY AIR. 0 1,2,5,6 24SW58 2 305342-6"""'.C3 B 10 BFY AIR 0 1,2,5,6 25SW58 2
- 305342-6.:..B3 B 10 BFY AIR 0 1,2,5,6 21SW65 3 305342-6-H? B 10 BFY AIR M 1,5 22SW65 . 3 305342-6-F? B 10 BFY AIR M 1,5 23SW65 ~. 305342-6-E6 B. 10 BFY AIR .M 1,5 24SW65 3 305342.-6-C6 *B 10 BFY AIR M* 1,5 25SW65 3 305342-6-B? B 10 .
- BFY AIR M 1,5 21SW72 2 305342-6-HS B 10 BFY AIR 0 1,2,5,6 22SW72
- 2 305342-6-F? B 10 BFY AIR 0 1,2,5,6 23SW72 2 305342-6-E? B 10 BFY AIR 0 1,2,5,6 24SW72 2 305342_;_6-CS B 10 BFY AIR 0 1,2,5,6 25SW72 2 305342-6-BS B 10 BFY. AIR 0 1,2,5,6 21SW77 3 305342-6-ElO c 10 DCK SELF o* 1 22SW77 3 305342-6-DlO c 10 DCK SELF 0 1 21SW79 3 305342-3-Cll c 24 DCK SELF 0 1 YES 22SW79 3 305342-3-ClO c 24 DCK SELF 0 1 YES
.21SW92 3 305342-5-F4 B 4 GB AIR 0 1,2,5 22SW92 3 305342-5-E4 B 4 GB AIR 0 1,2,5 23SW92 3 30S342-5-D4 B 4 GB AIR 0 1,2,5 21SW99 3 . 305342-5-F6 c 4 CK SELF 0 1 REV. 02 PAGE 11.3 OF 121
REV~ 02 PAGE 116 OF 121
- e SALEM UNIT 2 PUMP AND VALVE INSERVICE TESTING PROGRAM SYSTEM:
c L
A DRAWING VALVE ACTU-VALVE s & CATE- VALVE ATOR NORMAL TEST RELIEF NUMBER s COORDINATE GORY SIZE TYPE TYPE POS TYPES REQUEST 21SW305 3 305342-3-B8 B 8 PL AIR M 1,5 22SW305 3 305342-3-C8 B 8 PL AIR M 1,5 2SW308 3 305342-1-BG B 8 BALL AIR M 1,5 2SW311 3 305342-2-H4 B 8 BALL AIR M 1,5 REV. 02 . PAGE 117 OF 121
- SYSTEM: Sampling SAL.EM UNIT 2. PU.MP AND VALVE INSERVICE TESTING PROGRAM c
L A DRAWING VALVE ACTU-VALVE s & CATE- VALVE ATOR NORMAL TEST RELIEF NUMBER .§. COORDINATE
- GORY SIZE TYPE TYPE POS TYPES REQUEST 2PR1 1 305301-1-Fi
- B 3 PL AIR c 1,2,5,6 2PR2 1 30530l-l-F2 B 3 PL AIR c 1;2,5,6 2PR3* 1 305301-1-F2 c 6 RV SELF c 3 2PR4 1 305301-l-F3 c 6 RV SELF c 3*
2PR5 1 305301-1-F4 c 6 RV SELF c .3 2PR6 1 305301-1-Fl B 3 GT MO 0 1,2,6
-2PR7 1 305301-l~F2 B 3 GT MO 0 .1, 2, 6 2PR17 2 305301-1-09 A 0.375 PL AIR A 1,2,4,5,6 2PR18 .2 305301-1-DlO A 0.375 PL AIR A 1,2,4,5,6 2PR25 2 305301-l-E9 A,C 4 CK .SELF c 1,4 YES 2PS1 1 30530l~l-E5 B 1/2 GB AIR c .1,2,5,6 YES 2PS3 1 305301-1-D6 B 1/2 GB ., AIR c t 2., 5 r 6 I YES 2RC40 1 305301-1-H7 B 0.75 GB SOL c 1 YES 2RC41. 1 305301'.""1-H7 B 0.75 GB SOL c 1 YES 2RC42 1 305301-l-H7 B 0. 75 GB SOL c 1 YES 2RC43 *1 305301-1-H7 B 0.75 GB SOL c 1 YES REV~ 2 PAGE 71 OF 121