ML18102B632

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position
ML18102B632
Person / Time
Site: Salem  PSEG icon.png
Issue date: 10/21/1997
From:
Public Service Enterprise Group
To:
Shared Package
ML18102B631 List:
References
NUDOCS 9710270012
Download: ML18102B632 (5)


Text

Document Control Desk LR-N97109 Attachment 3 LCR S95-19 SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 MODE APPLICABILITY OF THE POWER RANGE, NEUTRON FLUX REACTOR TRIP AND SURVEILLANCE REQUIREMENTS TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES The following Technical Specifications for Facility Operating License No. DPR-70 are affected by this change request:

Technical Specification Page Table 3.3-1 3/4 3-2 Table 4.3-1 3/4 3-11 The following Technical Specifications for Facility Operating License No. DPR-75 are affected by this change request:

Technical Specification Page Table 3.3-1 3/4 3-2 Table 4.3-1 3/4 3-11 Page 1 of 1

~--.-- - ---~-*- -- *----

. 9710270012 971021 -- --------\

. PDR ADOCK 05000272 I P PD_ij

TABLE 4.3-1 REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL MODES IN WHICH CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL WII CHECK CALIBRATION TEST REQUIRED

1. Manual Reactor Trip Switch N.A. N.A. R(9) l, 2, and
  • I s 1, 2) ~3
2. Power Range, Neutron Flux D'2' , .;11 Q and 0(6)
3. Power Range, Neutron Flux, N.A. R'" Q 1, 2 High Positive Rate
4. Power Range, Neutron Flux, N.A. R"' Q 1, 2 High Negative Rate
5. Intermediate Range, Neutron Flux s R' s/u< 1, 2 and *
6. Source Range, Neutron Flux sm R' 0 and S/u'- 11 2, 3. 4, 5 and *
7. Overtemperature 4T s R Q 1,

'2

8. Overpower 6T s R Q 1, 2
9. Pressurizer Preseure--Low s R Q l, 2 10.

11.

12.

Pressurizer Preeeure--High Pressurizer Nater Level--High Lose of Plow - Single Loop s

s s

R R

R 0

Q Q

l, 1,

1 2

2 SALBM - UNIT 1 3/4 3-11 Amendment No. 176 I

tAIU& ~:3-l BlaCIQB IRlf SX§I~H IHSIBUMIHIAtIOH

...~

en 1111 MINIMUM <:

TOTAL NUMBER CHANNELS CHANNELS APPLICABLE c: [UNg'.IONAL UNII OF CHANNELS TO TBIP OPERABLE HODES ACTION

I

.+

N 1. Manual Reactor Trip 2 1 2 1,2 and

  • 12
2. Power Range, Heutron Flux* 4 2 3 1,2 0-MC~t

' 2

3. Power Range, Neutron Flux 4 2 3 1,2 2 High Positive Rate
4. Power Range, Neutron Flux, 4 2 3 1,2 2 High Negative Rate
5. Intermediate Range, Neutron Flux 2 1 2 1,2 and
  • 3
6. Source Range, Neutron Flux w

w I

A.

B.

Startup Shutdown 2

2 1

0 2

1 2##, and

  • 3,4 and 5 4

5 N

1. Overtemperature AT 4 2 3 1,2 6
8. overpower AT 4 2 ,3

\

1,2 6

9. Pressurizer Pressure-Low 4 2 3 1,2 6
10. Pressurizer Pressure--High 4 2 3 1,2 6

TABLE 4.3-1 r:

REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL MODES IN.WHICH CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK CALIBRATION TEST REQUIRED

1. Manual Reactor Trip Switch N.A. N.A. R'" 1, 2, and *
2. Power Range, Neutron Flux s om, .r11 Q 2 a,,.._J.. 3 1, }

and Q

9,

3. Power Range, Neutron Flux, N.A. R Q 1, 2 High Positive Rate
4. Power Range, Neutron Flux, N.A. R'" Q 1, 2 High Negative Rate
5. Intermediate Range, Neutron Flux s Rcc.1 s;u<<*> 1, 2 and *
6. Source Ran~e, Neutron Flux sm Rl6> Q and s/u< 11 2, 3, 4, 5 and *
7. Overtemperature 6T s R Q 1, 2
8. Overpower 6T s R Q 1, 2
9. Pressurizer Pressure--Low s R Q 1, 2
10. Pressurizer Pressure--High s R Q 1, 2
11. Pressurizer Water Level--High s R Q 1, 2
12. Loss of Flow - Single Loop s R Q 1 SALEM - UNIT 2 3/4 3-11 Amendment No. 111/