MONTHYEARML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 ML18102B6081997-10-0606 October 1997 Proposed Tech Specs Revising LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys. ML18102B5571997-08-27027 August 1997 Proposed Tech Specs,Providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, Which States That Three CCW Pumps Required to Meet LCO ML18102B5301997-08-19019 August 1997 Proposed Tech Specs,Providing Addl Operational Flexibility to Allow Orderly Resumption of Startup & Preclude Unwarranted Power Transients at Salem Unit 2 ML18102B5341997-08-18018 August 1997 Proposed Tech Specs,Incorporating Plant Computer (P-250) Into TS Bases for Movable Control Assemblies ML18102B4891997-08-0101 August 1997 Proposed Tech Specs Section 4.2.1 Rewording Section to State Util Will Adhere to Section 7,Incidental Take Statement Approved by Natl Maring Fisheries Svc ML18102B3911997-06-12012 June 1997 Proposed Tech Specs,Representing Addition of New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B3061997-05-14014 May 1997 Proposed Tech Specs,Revising SR 4.7.6.1.d.1,to Indicate That Specified Acceptable Filter Dp Is to Be Measured Across Filter Housing & Reflecting Filter Dp Acceptance Value Greater than 2.70 Water Gauge ML18102B2631997-05-0101 May 1997 Proposed Tech Specs,Adding New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B2601997-05-0101 May 1997 Proposed Tech Specs 3/4.7.7 Revising Certain Allowed Outage Times & Creating 3/4.7.11 to Address Switchgear & Penetration Area Ventilation Sys ML18102B0341997-04-25025 April 1997 Proposed Tech Specs 3.5.2 Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2 1999-08-25
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 1999-09-10
[Table view] |
Text
ATf~C'\"\M,t,llJ '\ -L
-R.-N qq 0'363 PLANT SYSTEMS 3/ 4 .. 7. 7 AUXILIARY BUILDING EXHAUST AIR FILTRATION SYSTEM LIMITING CONDITION FOR OPERATION 3.7.7.1 At least one Auxi iary Bui ing exhaust air HEPA filter train, associated with the one charcoal adsorber bank, and at least two exhaust fans shall be OPERABLE.
MODES 1, 2, 3 and 4.
ACTION:
- a. With the above required HEPA filter train inoperable, restore the HEPA filter train to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- b. With the charcoal adsorber bank inoperable, restore the charcoal adsorber bank to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. _ r--::>
~====-~~-=====~~==------=-'~
With only one exhaust fdn OPERABLE, restore at least two exhaust fans to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the followin 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
4.7.7.1 The above required Auxiliary Building exhaust air filtration system shall be demonst~ated OPERABLE:
- a. At least once per 31 days by initiating, from the control room, flow through the HEPA filter and charcoal adsorber train and verifying that the filter train and each fan operate for at least 15 minutes.
- b. At least once per 18 months or (1) after any structural maintenance on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire or chemical release in any ventilation zone communicating with the system, by:
(
9908310168 990823 1 PDR ADDCK 05000272 !
P PDR SALEM - UNIT 1 3/4 7-22 Amendment No. 3
~\11\C~\"i:.IN\ ,t
-L-rt- 'tJ qq 036 3 PLAN"!' SYSTEMS BA.SE.S z====**=========z*========a===**~E=E======E===========================
The OPERABILITY of this system in conjunction with control room design provisions is based 9n limiting the radiation exposure to personnel occupying the control room to 5 rem or less whole body, or its equivalent. This limitation is consistent with the requirements of General Design Criterion 19 of Appendix "A", 10 CFR SO.
3/4.7.B SEALED SOURCE CONTAMINATION The limitations on removable contamination for sources requiring leak testing, including alpha emitters, is based on 10 CFR 70.39(c) limits for plutonium. This limitation will ensure that leakage from byproduct, source, and special nuclear material sources will not exceed allowable intake values.
SALEM - UNIT l B 3/4 7-Sc Amendment No.190
A."111\Ct-\ M~~ \- \
L. '2. - 'O q q 0 ~6 3 PLANT SYSTEMS 3/4.7.7 AUXILIARY BUILDING EXHAUST AIR FILTRATION SYSTEM LIMITING CONDITION FOR OPERATION 3.7.7 At least one Auxiliary Building exhaust air HEPA filter train, associated with the one charcoal adsorber bank, and at least two exhaust fans shall be OPERABLE.
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION:
- a. With the above required HEPA filter train inoperable, restore the HEPA filter train to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- b. With the charcoal adsorber bank inoperable, restore the charcoal adsorber bank to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
With only one exhaust fan OPERABLE, restore at least two exhaust fans to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.7.7 The above required Auxiliary Building exhaust air filtration system shall be demonstrated OPERABLE:
- a. At least once per 31 days by initiating, from the control room, flow through the HEPA filter and charcoal adsorber train and verifying that the filter train and each fan operate for at least 15 minutes.
- b. At least once per 18 months or (1) after any structural maintenance on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire or chemical release in any ventilation zone communi-cating with the system, by:
SALEM - UNIT 2 3/4 7-18
e ~TI ~q*\ "'-~!JJT 1
?:.A."lT SYS7::.~s 1-12 _ v qqo ~63.
BASES
==================================================================
The OPERABILITY of this system in conjunction with control room design provisions ::.s based on limiting the radiation exposure to personnel occupying the control room to 5 rem or less whole body, or its equivalent. This limitation is consistent with the requirements of General Design Criterion :9 of Appendix "A", 10 CFR ?art 50.
3/4. 7. 7 AUXILIARY BUILDING EXHAUST AIR FILTRATION SYSTEM '/A.J.)[.'Z T :s
~~~~~~~~~~~~~~~~~-J 3/4.7.8 SEJU.ED SOURCE CONTAMINATION The limitations on removable contamination for sources. requiring leak testing, including alpha emitters, is based on 10 CFR 70.39(c) limits for plutonium. This limitation will ensure that leakage from byproduct, source, and special nuclear material sources will not exceed allowable intake values.
Sealed' sources are classified into three groups according to their use, with surveillance requirements commensurate with the probability of damage to a source in that group. Those sources which are frequently handled are required to be tested more often than those which are not. Sealed sources which are continuously enclosed within a shielded mechanism (i.e., sealed sources within radiation monitoring or boron measuring devices) are considered to be stored and need not be tested unless they are removed from the shielded mechanism.
SALEM - UNIT 2 B 3/4 7-Sc Amendment No.173
ATTACHMENT II LR-N990363 SALEM GENERATING STATION UNITS 1AND2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 AUXILIARY BUILDING VENTILATION SYSTEM (ABVS) 10CFR50.92 EVALUATION Public Service Electric & Gas (PSE&G) has concluded that the proposed changes to the Salem Generating Station Units 1 and 2 TS do not involve a significant hazard. In support of this determination, an evaluation of each of the three standards set forth in 10CFR50.92 is provided below.
REQUESTED CHANGE This submittal provides explicit requirements for the ABVS to be considered operable consistent with "Standard Technical Specifications Westinghouse Plants" NUREG 1431, Revision 1 (ITS) and applicable Bases. Specifically, it will:
- Require two Auxiliary Building Ventilation System (ABVS) supply fans to be operable.
BASIS
- 1. The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed change alters the number of fans which must be OPERABLE to ensure that a sufficient number of supply and exhaust fans will be operable, following a most limiting single failure, to mitigate the consequences of design basis accidents. The changes to the ABVS surveillance requirements still provide an appropriate means for demonstrating the operability of the ABVS.
The ABVS cannot initiate or otherwise cause any accident or operational transient evaluated in the UFSAR. Consequently, the probability of such events is not increased.
The ABVS cannot increase the consequences of a design basis LOCA unless: 1)
Auxiliary Building negative pressure is lost, resulting in uncontrolled, ground level release of radioactive material; 2) ABVS carbon adsorbers are bypassed, resulting in uncontrolled release of radioactive iodine from the plant vent; or 3) Auxiliary Building temperatures are not controlled, resulting in failure of accident mitigating equipment.
Page 1 of 3
ATTACHMENT II LR-N990363 SALEM GENERATING STATION UNITS 1AND2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 AUXILIARY BUILDING VENTILATION SYSTEM (ABVS)
By requiring OPERABILITY of all ABVS supply and exhaust fans, the proposed changes contained in this submittal assure Auxiliary Building negative pressure is maintained under all postulated post-accident, single-failure scenarios. The proposed changes to ABVS will not affect the elemental iodine adsorption capability of the system. Finally, engineering analyses conclude that these fan combinations, with single-active failures of the fans or their support systems considered, provide sufficient Auxiliary Building ventilation. Under the most limiting temperature conditions, the fans will maintain room temperatures within design limits. Accordingly, the consequences of a design basis LOCA, hence applicable design basis accidents or operational transients, are not increased.
Therefore, the proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
ABVS supply fans are not considered essential to the primary safety-function of preventing or mitigating radioactive releases, nor are they currently required to be OPERABLE. Similarly, accident analyses take no credit for operation of supply fans.
Accordingly, malfunctions of vital buses and ABVS exhaust fans are the only malfunctions of active ABVS related equipment important to safety that are previously evaluated.
The probability of failure of a vital bus is not increased by this proposal since the proposal has no direct effect on electrical power. Neither is the probability of exhaust fan failure increased by the proposal, since exhaust fans are not affected by this proposal, except that the number that must be OPERABLE is increased from two to three.
By requiring additional supply fans and exhaust fans to be OPERABLE, no single failure of either a vital bus or ABVS fan prevents (1) maintenance of negative Auxiliary Building pressure or (2) maintenance of temperatures within design limits.
Since ABVS supply and exhaust fans cannot initiate accidents, increasing the number of fans required to be OPERABLE cannot create the possibility of a new or different kind of accident from any accident previously evaluated.
Thus, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.
Page 2 of 3
ATTACHMENT II LR-N990363 SALEM GENERATING STATION UNITS 1AND2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 AUXILIARY BUILDING VENTILATION SYSTEM (ABVS)
- 3. The proposed change does not involve a significant reduction in a margin of safety.
The margin of safety is dependent upon the maintenance of specific operating parameters within designated design limits. Since iodine removal capability is not affected by the proposed changes, and negative Auxiliary Building pressures and temperatures will continue to be maintained within existing design limits under post-accident conditions, including consideration of the most limiting single active failure, the margin of safety is not reduced. By imposing new restrictions on the allowed outage times of ABVS components, the margin of safety is not reduced by the proposed changes to the ABVS Technical Specification Limiting Condition for Operation (LCO).
CONCLUSION Based on the above, PSE&G has determined that the proposed changes do not involve a significant hazards consideration. Public Service Electric & Gas has concluded that the proposed changes to the Salem Generating Station Technical Specifications do not involve a significant hazards consideration.
Page 3 of 3