MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18102B6681997-10-0101 October 1997 Rev 8 to Inservice Testing Manual for Pumps & Valves Program. ML18106A8291997-09-0404 September 1997 Rev 2 to Reactivity Manipulations Documentation Guide. Page to Training Manual NC.TQ-TP.ZZ-0302,encl ML18102A7941997-01-21021 January 1997 Event Classification Guide,Technical Basis, for Hope Creek Generating Station & Salem ML18102A7931997-01-21021 January 1997 Event Classification Guide,Technical Basis, Salem Generating Station ML18102A6661996-11-19019 November 1996 Rev 2 to Pse&G Simulation Facility Certification Program. ML20115B7791996-07-0303 July 1996 Final Draft, Hope Creek Event Classification Guide, Sections 1-9 ML18101B1141995-11-14014 November 1995 Revised Salem Generating Station Event Classification Guide, Including Rev 46 to Table of Contents,Rev 37 to Attachments Signature Page,Rev 26 to Attachment 6,Rev 25 to Attachment 7 & Rev 24 to Attachment 9 ML20091M9911995-10-15015 October 1995 Event Classification Guide HCGS, Including Revised Eals, Technical Basis Document & NUMARC EAL-to-Hope Creek Comparison Summary ML18101A6911995-05-31031 May 1995 Nbu Issue Mgt & Prioritized Action Plan, Dtd May 1995 ML18101A7711995-05-11011 May 1995 Rev 1A to Vol a of Salem Generating Station Unit 2 Second 10-Yr Insp Interval ISI Program Plan. ML20134K0831995-02-27027 February 1995 Pse&G/Nuclear Business Unit Organizational Effectiveness Assessment Plan, ML18101A6751995-02-16016 February 1995 Rev 11 to EOP 1-EOP-TRIP-1, Reactor Trip or Safety Injection. ML18101A6761995-02-16016 February 1995 Rev 12 to EOP 1-EOP-TRIP-2, Reactor Trip Response. ML18101A5381995-01-27027 January 1995 Revised Salem Generating Station Event Classification Guide. ML18101A2111994-08-17017 August 1994 Revised Salem Event Classification Guide. ML18101A6771994-07-11011 July 1994 Rev 10 to EOP 1-EOP-TRIP-3, Safety Injection Termination. ML20147B1601994-04-23023 April 1994 Rev 3 to S1.OP-SO.CW-0001(Z), Circulating Water Pump Operation ML18100A8081994-01-0707 January 1994 Rev 30 to Salem Generating Station Event Classification Guide. ML20147B1491993-11-0202 November 1993 Rev 2 to Procedure S1.OP-SO.CW-0001(Z), Circulating Water Pump Operation ML18100A4201993-06-15015 June 1993 Justification for Sgs Units 1 & 2 Restart & Operation Rod Control Sys Failures. ML18100A3771993-05-0505 May 1993 Rev 27 to Salem Generating Station Event Classification Guide. ML18100A3661993-04-27027 April 1993 Rev 8 to Section 18 to Event Classification Guide, Correcting Typo on Pages 3 & 5 of 6 ML20147B1171993-04-13013 April 1993 Rev 1 to Procedure NC.NA-AP.ZZ-0015(Q), Safety Tagging Program ML18096B3251993-02-26026 February 1993 Integrated Scheduling Program. ML18096B2911993-02-10010 February 1993 Revised Event Classification Guide,Including Rev 25 to Table of Contents,Rev 14 to Attachment 6,Rev 13 to Attachment 7, Rev 8 to Attachment 8,Rev 13 to Attachment 9,Rev 3 to Section 10,Rev 4 to Section 17 & Rev 7 to Section 18 ML20147B1021993-01-21021 January 1993 Rev 5 to Procedure NC.NA-AP.ZZ-0009(Q), Work Control Process ML20135B6521992-12-29029 December 1992 Rev 0 to Loss of Overhead Annunciator Sys ML20147B1371992-12-22022 December 1992 Rev to Procedure SC.RP-TI.ZZ-0209(Q), Release of Items from Rca ML20147B2051992-09-21021 September 1992 Rove Time Keeping Procedure ML18096A9601992-08-28028 August 1992 Electrical Distribution Sys Functional Insp (Edsfi) Methodology & Plan. ML18100A3151992-07-28028 July 1992 Rev 1 to Process Computer Maint & Mod Control Program. ML18096B3191992-07-17017 July 1992 Rev 8 to Salem Nuclear Generating Station Odcm. ML20147B1691992-05-0707 May 1992 Rev 1 to Procedure NC.NA-AP.ZZ-0013(Q), Control of Temporary Modifications ML18096A6791992-04-30030 April 1992 Vols A-D of Salem Generating Station Unit 2 Inservice Insp Program (Second Insp Interval) Long-Term Plan. ML18096A4421992-01-15015 January 1992 Rev 17 to Salem Generating Station Event Classification Guide ML18096A3211991-10-0404 October 1991 Rev 13 to Event Classification Guide,Including Table of Contents,Section Signature Pages,Spill/Discharge Notification Form & Related Pages ML18096A1431991-06-28028 June 1991 Rev 12 to Salem Generating Station Event Classification Guide. ML18095A9661991-05-30030 May 1991 Artificial Island Salem Event Classification Guide, Rev 11 ML18096A1191991-05-28028 May 1991 Rev 2 to NFU-0039, Salem Reactor Physics Methods. ML18095A9391991-05-16016 May 1991 Revised Replacement Pages to Facility Inservice Testing Program 1999-09-10
[Table view] |
Text
SALEM GENERATING STATION OPERATIONS DEPARTMENT DOCUMENT APPROVAL COVER SHEET an
Title:
Removal and Return of Safety Related Equipment to Operable Status 1/2 1 No.: OD-10 Unit: Rev.:
Remar~s: Expanded safety related equipment list to include SSPS, e
vital electrical systems, valves, SEC. Added section on Surveillanc .,
Added Procedure Guidelines. Expanded return* to service section.
examples~
x Safety Re~ated Review (Ref. AD-13): S/R yes no Author's Checklist Comp~eted: yes y Author :fba~/ &?~~ :$ Date 3/13/8 SRO
,~-~ Date 3fl3/83 Ops. Enq. ~~~~ Date 3/13/83 t
SOS+ Nr::'.A ~ Date3/13/83 Ops., Mqr.
oji£___ Date 3/13/83 QA ** Q (£'µ~, I Date 3/13/83 SORC ** :I~ .. Date 3/13/83 3/13/83 General Manager ** ,d~~, ,, Date
- required for SPM documents only
+ required for EOP validation acceptance only
- required for safety related documents and fire
. ~ ___ protecti~t'L..do_cument-s_
' 8303160610 830314 i
- PDR ADOCK 05000272 s PDR I Salem Unit 1/2 AD-l-B-1 MASTER
OPERATIONS DIRECTIVE - 10 REMOVAL AND RETURN OF SAFETY RELATED EQUIPMENT TO AN OPERABLE STATUS The purpose of this directive is to establish departmental policy on the removal, for planned or unplanned reasons, and return of safety related equipment to an operable status.
The following systems are designated safety related:
AUXILIARY FEEDWATER (AF) MAIN. STEAM (MS)
BOILER FEED (BF) REACTOR COOLANT (RCS)
CONTROL AIR (CA) RESIDUAL HEAT REMOVAL (RHR)
COMPONENT COOLING (CC) SAFEGUARDS EQUIPMENT CONTROL (SEC)
CHILLED WATER (CH) SAFETY INJECTION (SJ)
CONTAINMENT SPRAY (CS) SAMPLING (SS)
CHEMICAL and VOLUME CONTROL(CVCS) SOLID STATE PROTECTION (SSPS)
EMERGENCY DIESELS (DA and DF) SERVICE WATER-NUCLEAR (SW)
FIRE PROTECTION (FP) VITAL ELECTRICAL DISTRIBUTION This directive is concerned with the Safety Related Systems listed ab6ve and is specifically focused at the major Safety Related Equipment listed below:
MAJOR SAFETY RELATED EQUIPMENT Rotating Equipment
- 1. Emergency Diesels
- 2. Diesel Fire Pumps
- 3. Containment Fan Coil Units
- 4. Charging Pumps
- 5. Safety Injection Pumps
- 6. Component Cooling Pumps
- 7. Auxiliary Feedwater Pumps
- 8. Service Water Pumps
- 9. Residual Heat Removal Pumps*
- 10. Boric Acid Transfer Pumps
- 11. Chilled Water Pumps
- 12. Containment Spray Pumps . t.
Valves
- 1. Major Valves associated with ;i the systems and equipment listed above and others that are included in the Inservice Inspection Program Salem Unit 1/2 1 Rev. l
OD-10
- c. Electrical
- 1. Vital Electrical Distribution Equipment Such as:
Infeed Breakers Equipment Breakers
- Transformer Breakers D. Instrumentation/Control Equipment
- 1. Solid State Protection Equipment
- 2. Reactor Trip Breakers
- 3. Safeguards Equipment Control REMOVAL OF SAFETY RELATED EQUIPMENT FROM SERVICE Normally, durinq power operations, major safety related equipment will not be removed from an operable status for preventive maintenance or surveillance inspections. However if the need does arise, prior to removing any of the above listed equipment from an operable status, the appropriate limiting condition for operation (LCOJ in the Technical Specifications shall be consulted to determine the impact of the intended actions.
In all cases, the action statement and any additional surveillance requirements in the Technical Specifications shall be complied with. If the Technical Specifications do .not delineate any special surveillance requirements, then as a minimum for Rotating Equipment, a functional- test of the remaining redundant equipment shall be 'conducted to verify operability.
The functional test requirement is that the redundant equipment shall be started and run as long as necessary to ascertain acceptable operating parameters. This does not mean that a formal SP(0)4.0.5-P is required, unless the Technical Specification specifically require this type of test.
Salem Unit 1/2 2 Rev. 1
OD-10 After the functional test is completed and found to be satisfactory, an entry shall be made into the narrative section of Operations Log No. 1 to document the performance of this test.
Example~
In preparation for the removal of 11 BAT Pump from service for impeller inspection, 12 BAT Pump was functionally tested IAW OD-10 and was found SAT.
If during the functional test of the redundant equipment, it is discovered that the equipment's performance is unacceptable, the equipment must be declared inoperable and the Technical Specifications complied with. The other piece of equipment, originally scheduled to be removed from service, shall be left in service.
RETURN OF SAFETY RELATED EQUIPMENT TO SERVICE When any of the listed safety related equipment has been removed, and subsequently returned to an operable status for any reason~
such as equipment repair, preventative maintenance, surveillance inspection, trouble shooting or administrative control in accordance with procedures, the equipment' shall be tested as requ~red by the Technical Specifications or the Inservice Inspection Program to determine its operability. If the Technical Specifications or the Inservice Inspection Program do not delineate any specific surveillance requirements, the Senior Shift Supervisor/Shift Supervisor shall ensure that the responsible department determine and perform the required testing. As a minimum, if no other requirements exist, an equipment functional test shall be performed.
The functional test of rotating equipment requires that the equipment be made ready for service, started and run as long as necessary to ascertain acceptable operating parameters.
The functional test of other equipment shall be .the minimum necessary to ensure that the portion of the system which was inoperable will fulfill its desired function when required.
Examples~.
Valves will seat properly.
Valve operators will stroke freely.
- Circuit breakers will open and.close on their designed functions and within their. reauired time.
Instrumentation performs its design functions.
Control and Protection Systems perform their design functions.
Salem Unit 1/2 3 Rev. 1
OD-10 After completion of the testing, an entry shall be made into the narrative section of Operations Log No. 1 to document the completion of the testing. This entry shall include the procedure number or a description of the type of test performed. Only after satisfactory completion of the required testing, shall the equipment be declared operable and the Action Statement terminated.
Salem Unit 1/2 4 Revo 1
OD-10 Examples:
- 1. No. 11 Charging pump was tagged out for Maintenance to change the impeller-functional test on No. 12 required before*
11 is removed from service, SP(0)4.0.5-P is required on No. 11 before it *is declared operable.
- 2. No. 11 Charging pump was removed from service for Maintenance to work on the breaker-functional test on No.. 12 required before No. 11 is removed from service, functional test on No. 11 is required before it is declared operable.
- 3. No. 23 Service Water pump was removed from service for Maintenance to repack it-functional test on No. 24 (other pump on that bus) "required before No. 23 is removed from service, functional test on No. 23 is required before it is declared operable.
- 4. No. 12 Boric Acid Transfer pump tagged out to replace seal and flush internals-functional test on No. 11 BAT pump required before No. 12 is removed from service, SP(0)4.0.5-P is required on No. 12 before it is declar~d operable.
- 5. No. 21 RHR pump tagged out to replace impeller lockwasher~~
functional test on No. 22 required before No. 21 is removed from service, SP(0)4.0.5-P is required on No.21 before it is declared operable.
- 6. No. 23 Auxiliary Feedwater pump removed from service to replace turbine governor valve-functional test required on both No. 21 & No. 22 before No. 23 can be removed from service, SP(0)4.0.5-P required on.No. 23 before it is declared operable.
- 7. No. 21 Safety Injection pump tagged out to replace outer thrust bearing~functional test required on No. 22 before No. 21 is removed from service, SP(0)4.0.5-P is required on No. 21 before it is declared operable.
- 8. No. 15 Containment Fan Coil unit tagged out to replace leaking coil-functional test is required on all fan coil units not in service (run CFCUs in low speed),
SP(0)4.6.2.3.a is required on No. 15 before it is declared operable.
Salem Unit 1/2 5 Rev. 1
OD-10
- 9. No. 2A Diesel removed from service to replace prelube pump-SP (0) 4. 8.1.1. 2 required on 2B & 2C before 2A is removed from service and every eight hours thereafter, when 2A is ready SP{0)4.8.l.l.2 is required before 2A diesel is declared operable.
10.. No. 12 Auxiliary Feedwater pump is removed from service for Performance to work on the controls circuitry-functional test required for No. 13 before Nq. 12 can be removed from service, functional test required on No. 12 -before it is declared operable.
- 11. No. _15 Service Water pump removed from service to replace broken pin in screen~functional test on No. 16 (other pump on bus) required before No. 15 is removed from service, function test on No. 15 required before it is declared operable.
- 12. No. 1 Diesel Fire pump removed from service to change oil-functional test required on No. 2 before No. 1 is removed from service, functional test required on No. 1 before it is declared operable.
13.- No. 21 Containment Spray pump removed from service to replace packing on valve 21CS2-functional test required on No. 22 be-fore No. 21 is removed from service, functional .test required on No. 21 before it is declared operable.-
- 14. No. 21 Charging pump 4kv breaker racked out for inspection-functional.test required on No. 22 before No. 21 is removed from service, functional test required on No. 21 before it is declared operable.
- 15. No. 11 Service Water pump 4kv breaker 125 VDC control power breaker racked out for inspection-functional test required on No. 12 (other pump on bus) before No. 11 is removed from service, functional test on No. 11 required before it is declared operable.
- 16. No. 11 & 12 Containment Spray pump returned to service when the plant goes from Mode 5 to Mode 4-function test required on pumps before they are declared operable.
Salem Unit 1/2 6 Rev. l
OD-10 17.. Reactor Trip Breaker removed from service for inspection - No pretest is required - Functional test (including manual and automatic actuation) required before it is declared operable.
- 18. 11CC16 is removed £rom service to inspect th~ motor - No pretest is required - SP(0)4.0.5-V (including stroke time) is required before it is declared operable.
- 19. 11CC16 is removed from service to repack the valve - No pretest is requried - SP(0)4.0.5-V (including stroke time) is required before it ~s *declared operable.
END OF PROCEDURE FINAL PAGE Salem Unit 1/2 7
Appendix H Field Directive S-C-A900-NFD-077, Use of the Master Equipment List, Salem Units 1 and 2
1- I/\/ /'C....
PUBLIC SERVICE ELECTRIC AND* GAS COMPANY
~UCLEAR DEPARTMENT
- DATE: March 11, 1983 TO: *H. J. Midura General Manager - Salem Oper~tions FROM: D. J. Jagt Assistant General Manager - Nuclear Engineering
SUBJECT:
FIELD DIRECTIVE S-C-A900-~FD-077, REVr 0 USE OF THE MASTER EQUIPMENT LIST SALEM UNITS 1 & 2 Attached is the subject Field Directive which provides:
(a) *Detailed instructions regarding utilization of the Salem Master Equipme:nt List by**Station personnel, and
( b) Requhlments for Salem ~dministrati ve Procedure revisions.
JDC:dlf Distribution: J. M. Zupko L~ A. Reiter R. L. Gura T. N. Taylor A. Thomson E. A. Liden ..
P. M. Krishna A. Nassman
- c. Mullen B. E. Hall R. T. Stanley*
H. B.. Baranek E. H. *Schmieder M. J. Ryan M. R. Peterson
/ /' .