Rove Time Keeping Procedure
ML20147B205
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 09/21/1992
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20147B009 List:
References
FOIA-96-351 NFW-OP-001, NFW-OP-1, NUDOCS 9701300065
Download: ML20147B205 (4)


Text

_;

. ;= ;_ _ -.. _ - -

MgR06'9316818 HRC OFFICE HOPE CREEK P01 l

SALEM / HOPE CREEK RESIDENT OFFICE FAX COVER SHEET DATE:

.3 3

TO:

M k

v FROM:

TOM JOHNSON, SRI STEVE PINDALE, RI STEVE BARR, R1 KIRKE LATHROP, RI V,,

KATHY VENUTO, OA 0

h

' g< p.o

~

z NO. PAGES:

(INCLUDING COVER SHEET)

Oh PIIONE NO.

(609) 935-3850/5151 9y13pgo m,<<,g5 970124 g

. e.,

REMARKS:

")y MJ4M M y fM uAa + w aw sg>+g h y&

& d dk/W M Y 4% u @ h ve nac cuc h w h i"' f! W

l'arif\\ 00 N 10s10 NKL Uf* f" A bt:. fiUl"'t". LKbt".N Pd2 L

FOR INFORMATION ONLY 3

PROTECTION TECMMOLOGY i

NUCLEAR FIREWATCH OPERATING PROCEDURE i

j FOR SALEN te HOPE CREEK NUCLEAR GENERATING STATION 8 l

TITLE:

NUMBER:

NFW-OP=001 j

Rove Time Keeping Procedure j

REVISION: 0 l

DATE: 09/15/92 1

i i

PREPARED BY:

Michael Wm. Doss I

APPLICABILITY:

SUPERSEDES:

All Nuclear Firewatch supervision Personnel

)

F Reviewed nyt

[, -

7 8 -'f 2

[.I. Firewatch Program Manager Data m.vi..e4.y 4192 l

P.f. f. Quali Assurance Group Dat'e i

\\

r Approved nyt O'M'D P.T.I. Vice'PresidInt - Commercial ops.

Date

}

a 4

g Form PTI-NFW-001-1 lg,'

,(

Rev. 0 1

~-

MAR 06 '93 16819 HRC OFFICE HOPE CREEK P03 PROTECIlON TECHNOIDGY NUCLEAR MREWATCII OPERATING PROCEDURE 1.0 PURPOSE This proc 9 dure establishes the proper format for accurate time keeping when performing firewatch roves at the Salem and Hope Creek Nuclear Generating Stations in Hancocks, NJ.

2.0 SCOPEt This procedure sets forth the requirements necessary to maintain accurate times of reving and constant patrols of the Firewatch and will provide an accurate record of required patrol as required. This procedure applies to all Firewatch 1

personnel.

I

3.0 REFERENCES

None

4.0 RESIDM8IBILITIES

4.1 Management staff The Firewatch Management staff will enforce the compliance of this procedure with the supervisory personnel of PTI Firewatch. Their duties will include:

4.1.1 The Program Manager will perform a random audit of time sheets (Form NFW-OP-001-1 ) and also will conduct certain aspects of the required training in the use of the time sheets if deemed necessary. After he/she has randomly reviewed the time sheets, he/she will then sign & date the form (s).

4.1.2 The Project Manager will assume the same duties as outlined in 4.1.1 in the event of the Program Managers absence or if additional training assistance is required.

4.2.1 The Firewatch Supervisory staff will enforce the proper use of the tirawatch time sheets and ensure that the rove recorded is within the required time frame allotted for that post / rove as outlined in this procedure.

n a, Q p [('A7. ;,.- m

.. sv 1,.. *;

Rw. 0 NFW-OP-001 Page 1 of 3

ttAR* 06 '93 168 20 NRC OFFICE HOPE CREEK PO4 l

i ij' PROTEC110N TECHNOIDGY j

NUCLEAR l'1REWATCH OPERATING PROCEDURE 1

4 4.0 RESPONSIBILITIEBI (Cont'd) 4.2 supervisory staff i'

4.2.2 The Firewatch Supervisory staff will establish l

a maintenance of time standard at the j

beginning of their assigned shift. This will be accomplished by having all firewatch j

personnel set their time pieces to the office clock prior to departing for their assigned j

tour (s).

4.3 Firewatch Personnel 4.3.1 The firewatch personnel will ensure that they-properly record the exact time that they entered and lef t a required area of patrol and are in the required time frame allotted for that post / rove as outlined in this procedure.

5.0 PROCEDUREI 5.1 All firewatch personnel will set their time pieces to the common clock in the firewatch office. This will be done prior to departing for assigned tour (s),

b.2 The firewatch management, supervisory and firewatch staff, utilizing Form NFW-OP-001-1 (Attachment 1), will conduct the required rove / patrol as stated in the post orders and document the 33mg1 times that an area was entered and left by the firewatch officer on the form as j

required. This procedure is inclusive to both, stations.

5.3 If the firewatch person is unable to enter in an area in the required time frame due to a problem (i.e. Inoperable i

fire door, radiography, etc...)

he/she is to notify his/her Shift Supervisor immediately so arrangements and/or corrective actions can be implemented. An incident report (Attachment 2 Form NFW4P-001-2) is also to be filled out in detail explaining the actions causing problem and actions taken to correct problem.

6.O ATTACEMENTSI Attachment #1 Form NFW-OP-001-1 Firewatch Rove Time Sheet Attachment #2 Form NFW-OP-001-2 Firewatd) Incids1C Report NFW-OP-001 Page 2 of 3

- yea p,

IW. 0

)

ena11m

)

Ik

-l i

U.S. NUCLEAR REGULATORY COMMISSION No. 93-41 4

d REGION I NOTICE OF SIGNIFICANT LICENSEE MEEITNG f

i h

/,'

4 b

{

Licensee:

Public Service Electric and Gas Company t

U j

Facility:

Salem and Hope Creek Generating Stations lgu l

Docket No.:

50-272,50-311 and 50-354 a

Time and Date:

10:00 a.m., Tuesday, April 6,1993 I

Imation:

U.S. NRC Region I, King of Prussia, PA Il 4

Division of Reactor Projects Conference Room l

Purpose:

ENFORCEMENT CONFERENCE TO DISCUSS FIRE WATCH ISSUES NRC Attendees:

J. Wiggins, Director, Division of Reactor Projects (DRP) j E. Wenzinger, Chief, Projects Branch 2, DRP l

J. White, Chief, Reactor Projects Section 2A, DRP

{"

)

S. Barr, Resident Inspector, Salem and Hope Creek K. Smith, Regional Attorney, Office of the Regional Administrator (ORA) j i

D. Holody, Enforcement Officer, ORA i

l Licensee Attendees: S. Miltenberger, Vice President and Chief Nuclear Officer j

C. Munzenmaier, General Manager, Nuclear Services l

L. Reiter, Director, Process Improvement l

J. Hagan, Vice President, Nuclear Operations

[.

l F. 'Ihompson, Manager, Lheiao and Regulation R. Brown, Principle Enginaar, Nuclear LM<ing l

H. Onorato, IJcensing Engineer, Nuclear IJcensing J. Kerin, Senior Fire Protection Supervisor Note: This meeting is closed to the public. Attendance by NRC personnel should be made known by 4:00 p.m. April 5,1993, via talanhaaa call to John White, Region I, at (215) 337-5114.

d-Handicapped persons requiring nuienoce to attend or participate in the me**ing shall make their i

requests known prior to the mae*ing.

1

y 0.oq Mcagu e John R. White, Chief
9 PMu L4c.)tm el %. C M d Reactor Projects Section 2A

$ thi

(

M

/T @ %

l n k I

fBOLITZDcot p

.-----.......-.~.......-...---..-_..-.-..-_..s..

~

4-7-33 ; 2:40PM ;

P5E&G LIC & &

ziooo,cau voa

.SENT SY:

l 4.

I I

l

. i I lll LICENSING & REGULATION

[

N

\\

wucuwe ospumnaNT LAM TELECOPY # (809) 33D1448 VEntf4CA110N # -(808) 33D12sa 336 1341 3304484 3361212 JO Number of Pages Qnoimung oover sheeQ oese APKe L ?, ffj3 To Toao (J uirr l

LOCATION N/2c.

(2gc, fog /

PHONE #AX # (4:5) 7 s7.5'3Y9 pnoen Nocaoeo Ocomo won, son Pre n C,ecmImor Cnetc toov)sa9-ev#2 pMONs TnmesserropsnAvon

. PHONE a

.J

?\\

-