ML17341A586

From kanterella
Revision as of 11:02, 18 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Repts for Sept 1981
ML17341A586
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 10/12/1981
From: CHILSON V T
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17341A585 List:
References
NUDOCS 8110200204
Download: ML17341A586 (20)


Text

E AVEIIAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT Unzt No.3 Oct 12 1981 DATE COMPLETED II Y V.T~Chi 1 son TELEPHONE~305)552-3666 Se tember 1981 DAY AVERAGE DAILY POWER LEVEL (hfWe.Nct) 10 I3 l4 l5 l6 DAY AVERAGE DAILY POWER LEVEL (i>>IWe-Net) 17 IS 19 20 2l 22 23 24')5 26 27 2S 29 30 INSTRUCTIONS On this format.list thc average daily unit p>>wcr.le~el in Mme-Net for each day in the,rcp<>rting tn>>nth.C>>mput<<to the nearest whole megawat t.('r/771 8ii0200204 8i iOi2 P'.PDR ADOCK 05000250: R I IPDR

1.1 OPERATING

DATA REPORT OPERATING STATUS Turkey Point Unit No.3 1.Unit Name'eptember 1981 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net M We): DOCKET NO.DATE~Ott.1 1981'COMPLETED BY~T.Chllson TELEPHONE~~552-3666 Notes Unit No.3 remained out of seMice due to Steam" Generator Repair Propram (continued from previous month)'.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.

If Any (Net MWe): 10.Reasons For Restrictions, lf Any: 'l l.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14., Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (Type.Yr.-to-Date This Month 720'.0-0-6'551.0 1'459.3 631.0 1 385.6.--0--0--0--0--0-980 415 916 408-0--1 383 4.2 24.2-0--0-21'20.2 49.0 Date.and Duration of Each): Cumulative 77 336.6 55 760.1 844.4 53 891.34 69 ttt 32 825 89 69.7 69.8 66.0 61.2 5.1 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ('t/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAMF Turke Point.Unit No.3 DATE Oct.12 1981 COMPLETED Bp V.T.Chilson Vo.nate I g CC$Licenscc Event Report=CJ CJ Cause h.Corrective Action to Prevent Recurrence 05 81-06-24 720.0 B 4 HB HTEXCH (F)Unzt No.3 Steam Generator Repaa.r Program in progress (Continued from previous month)F: Forced S: Scheduled ('I/77)Reason: A-Equipment Failure (Explain)B-h(aintenance or Test-C-Refueling D-Regulatory Restriction E-Operator Training'icense Examination F-Administrative G-Operational Error (Explain)II Other (Explairt)

Method:!-hlanual 2-Manual Scram.3-Automatic Scram.4.erin~Exp(ant Continuing 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets I'or Licensee Event Report (LER)File (NUREG-OI 6I)Exhibit I~Sante Source 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.Unit No 4 Oct.12, 1981 COMPLETED BY V.T.Chilson TELEPHONE MONTH Se tember, 1981 DAY AVERAGE DAILY POWER LEVEL (M We-Net)I 661 DAY AVERAGE DA1LY POWER LEVEL (MWe-Net)663 17 10 13 14 15 16 663 661 664 666 661 661 665 663 661 662 662 662 661 661 664 18 19 20 21 22 23 25 26 28 29 30 604 342 662 667 669 669 673 679'82 683680 678 678 NOTE: Average daily power level greater than 646 MWe due to cooler condenser cooling water.INSTRUCTIONS On this for)r)at, list the average daily unit power level, in MWe-Net for each day in the reporting month.Compote to the nearest whole n)egawat t.('1/771 OPERATING DATA REPORT OPERATING STATUS DOCKET NO.DATE~~1981'COMPLETED BY V.T.Chilson TELEPHONE~305 55-3666 Turkey Point Unit No.4 1.Unit Name.2.Reporting Period: September 1981 3.Licensed Thermal Power (MWt): 2200 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe}: 7 a imum De endable Ca acit Net We: Notes Unit No.4 operated at approximately 100X R.P.except for outage of October 18-19, 1981.80.Mx p p y(M)8.If Changes'Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.

If'Any (Net MWe): 10.Reasons For Restrictions, lf Any: This Month Yr.-to-Date Cumulative 71 064.0 52 948.2 720.0 6 551.0 5 935.4 166.6 127.6 4-0-31.2 12 763 999 107 145 354 4 081 344 34 054 517 32 260 502 3 876 482 71.9 i89.3'89.3 72.0 70.5 88.8 65.5'85.4 3.0 3.8-Dec.26, 1981 11.Hours In Reporting Period 12.Number Of Hours'Reactor Was Critical ,711.4 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours-0-16.Gross Thermal Energy Ge'nerated (MWH)1 555 100 17.Gross Electrical Energy Generated (MWH)495 200 18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 98.6 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)98.2'22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage, Rate-0-24.Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each): Scheduled refuelin maintenance, and ins ection Oct.25 25.If Shut Down At End'Of Report Period, Fstimated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):

Forecast Achieved IN IT!A L CRITICALITY IN ITIA L ELECTRICITY'OMMERCIAL OPERATION (')/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.urke Poin t Uni t No.4 DATF Oct.12 19 1 Dale I~Ch Lice nscc Event Rcport=Cause&Corrective Action to Prcvcnt Recurrence 12 81-10-18 10.1.B HB VALVOP (D)Unit was removed from service to repair instrument air leaks on both pressurizer spray control valves.Corrective actions'ncluded re-torquing valve operator flange bolts.(Nuclear system)F: Forced S: Scheduled Reason: A-Equipment Failure (Explain)B-Maintenance oi Test.C-Refueling D.Regulatory Restriction E.Operator Training'icense Examination F-Ad mi nist rat i ve G.Operational Error (Explain)H-Other (Explain)3 4 Method: l hlanual 2.Manual Scram.3-Automatic Scrag).4.~t;~~t~t)

Continuing 5-Load Reduction 9-Other (Explain)5 Exhibit G~Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File lNUREG-OI 6I)Exhibit I~Sante Source 0 h II"'Oct.12, 1981 COMPLETED BY>-T.Chi 1 son TELEPHONE MONTH Se tetttber 1 9 8 1 DAY AVERAGE DAILY POWER LEVEL (M Wc-Net 3 768 76(3 777 776 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)I7 IS I9 20 775 779 22 23 IO 45 26 I4 IS 16 28 99 30 NOTE: Average daily power level greater than 777 NWe due to cooler condenser cooling water.INSTRUCTIONS On this forn>at.'list the average daily unit power Icvt.'I in MNe-Net for each day in thc reporting tnonth.Contputc to the nearest whole mcgawat t.(~)/77) 0 I OPERATING DATA REPORT DOCKET NO.OATj Oc~..DO, 1981 COMPLETED BY~~i TELEPHONE~30~-3666 OPERATING STATUS Notes Unit dpera't:ed at approxi-mately 100%RP until Sept.8, 1981.St.Lucie Unit No.1 l.Unit Name: Septem er, 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 802 7.Maximum De cndable Ca acit Nct hIWe: 822 p p y()8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level Tn Which Restricted.

If Any (Net hIWe): 10.Reasons For Restrictions, If Any: 11.Hours ln Reporting Period'12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Ge'nerated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (hIWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 hlonths This Month 720.0 172 1 75.9 172.1 0.0 Yr.-to.Date 6'551.0 5 883.8 75: 9'882.3 0.0 438 971 14 947 870 140 810 128 871 23.9 23.9 23.0 22.3 30.6 4 881 580 4 614 030 89.8 89.8 90.6 87.8'.7 (Type, Date.and Duration of Each): Cumulative 41 8Z9.0 34 309.1 205.3 33 513.4 39.3 82 196 018 26 691 440 25 141 516 80.0 80.1 77.3 74.9 5.1 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):

November 15 1981 Forecast Achieved IN ITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPERATION (1t/771 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Sept.1981 DOCKET NO.UN!T NAME S t.Lucie Unit No.1 DATE Oct.12 1981 Date c I l/I J Liccn sec Event Report=Cause&, Correct ive Action to Prevent Recurrence 05 06 81-10-08 81-10-11 75.9 A S 472 0 C GENERA (D)RC FUELXX Unit trip caused by electric gener-ator protection system due to a fault on"C" phase winding.Corrective actions included minor insulation repair, (Non-nuclear system)Scheduled refueling, maintenance, and inspections.(Nuclear and non-nuclear systems)F: Forced S: Schedu!ed ('>/77)Reason: A.Equipment Failure (Explain)B.h>>a!ntenance or Test-C-Refueling D-Regulatory Restriction E-Operator Training&.Liccnsc Exainination F-Administ rat ivc G.Operational Error (Explain)l>>.Other (Explairr)

Method:!.Manual 2.Manual Scram.3-Autontatic Scram.4-Qt>>m(Explain)-

Continuing 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG.OI 6I)5 Exhibit I-Sante Source

~yAlllg~a FLORIOA POWER II LIGHT COMPANY October 12, 1981 Office of Management Xnformati;on and Program Controls U.S.Nuclear Regulatory.

Commission Washington, D.C.20555 Gentlemen:

Re: Turkey Point Units 3 6 4 St.Lucie'Unit 1 Docket Nos.50-250, 251, and 335 Attached are the September, 1981, Operating Summary Reports for Turkey Point Units Nos.3 and'and St.Lucie Unit No.l.Very truly yours, J.W.Williams, Jr.Director Nuclear Energy VTC/mbd cc: Mr.-James P.O'Reilly Robert Lowenstein, Esquire PEOPLE...SERVING PEOPLE

SUMMARY

OF OPERATXNG EXPERXENCE DOCKET NO.50-250 Turkey Point Unit No.3 DATE October 12, 1981 COMPLETED BY.V.T..Chilson REPORT MONTH Se tember 1981 TELEPHONE (305)552-3666 Unit No.3 remained out of service due to Steam Generator Repair Program.Refer to"Unit Shutdowns and Power Reductions" section of September, 1981 Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power a.Light Company commitments for NRUEG-0578 implementation are continuing.

Refer.to correspondence

'between FPL and NRC for additional information.

Steam Generator Repair Program in progress.Decontamination of Steam.Generator Nos.3A, 3B, and 3C in progress.

i5 II 4 II II

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50 253 Turkey...Paint UNI T Unit No.4 DATE October 12, 1981 COMPLETED BY TELEPHONE 5 2-6 REPORT MONTH Se tember 1981 Unit No.4 operated at approximately 100%R.P.except for outage of October 18-19, 1981.Refer to"Unit Shutdowns and Power Reductions" section'of September, 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included;.

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing; Refer to correspondence between FPL and NRC for additional information.

0~.e f'I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-335 St.'Lucie Unit No.1 DATE October 12, 1981 COMPLETED BY'.T.Chilson TELEPHONE (305)552-3666 REPORT MONTH September 1981 r Unit operated at approximately 100%R.P.until September 8;1981.Refer to"Unit Shutdowns and Power Reductions" section of September, 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 in progress.Florida Power&Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

f Removed reactor vessel closure head, transferred fuel to spent fuel pool, and inspected reactor vessel internals.

'I Inservice Inspection irogress.

/f P j 0 S