Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
E AVEIIAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT Unzt No.3 Oct 12 1981 DATE COMPLETED II Y V.T~Chi 1 son TELEPHONE~305)552-3666 Se tember 1981 DAY AVERAGE DAILY POWER LEVEL (hfWe.Nct) 10 I3 l4 l5 l6 DAY AVERAGE DAILY POWER LEVEL (i>>IWe-Net) 17 IS 19 20 2l 22 23 24')5 26 27 2S 29 30 INSTRUCTIONS On this format.list thc average daily unit p>>wcr.le~el in Mme-Net for each day in the,rcp<>rting tn>>nth.C>>mput<<to the nearest whole megawat t.('r/771 8ii0200204 8i iOi2 P'.PDR ADOCK 05000250: R I IPDR
1.1 OPERATING
DATA REPORT OPERATING STATUS Turkey Point Unit No.3 1.Unit Name'eptember 1981 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net M We): DOCKET NO.DATE~Ott.1 1981'COMPLETED BY~T.Chllson TELEPHONE~~552-3666 Notes Unit No.3 remained out of seMice due to Steam" Generator Repair Propram (continued from previous month)'.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.
If Any (Net MWe): 10.Reasons For Restrictions, lf Any: 'l l.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14., Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (Type.Yr.-to-Date This Month 720'.0-0-6'551.0 1'459.3 631.0 1 385.6.--0--0--0--0--0-980 415 916 408-0--1 383 4.2 24.2-0--0-21'20.2 49.0 Date.and Duration of Each): Cumulative 77 336.6 55 760.1 844.4 53 891.34 69 ttt 32 825 89 69.7 69.8 66.0 61.2 5.1 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ('t/77)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAMF Turke Point.Unit No.3 DATE Oct.12 1981 COMPLETED Bp V.T.Chilson Vo.nate I g CC$Licenscc Event Report=CJ CJ Cause h.Corrective Action to Prevent Recurrence 05 81-06-24 720.0 B 4 HB HTEXCH (F)Unzt No.3 Steam Generator Repaa.r Program in progress (Continued from previous month)F: Forced S: Scheduled ('I/77)Reason: A-Equipment Failure (Explain)B-h(aintenance or Test-C-Refueling D-Regulatory Restriction E-Operator Training'icense Examination F-Administrative G-Operational Error (Explain)II Other (Explairt)
Method:!-hlanual 2-Manual Scram.3-Automatic Scram.4.erin~Exp(ant Continuing 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets I'or Licensee Event Report (LER)File (NUREG-OI 6I)Exhibit I~Sante Source 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.Unit No 4 Oct.12, 1981 COMPLETED BY V.T.Chilson TELEPHONE MONTH Se tember, 1981 DAY AVERAGE DAILY POWER LEVEL (M We-Net)I 661 DAY AVERAGE DA1LY POWER LEVEL (MWe-Net)663 17 10 13 14 15 16 663 661 664 666 661 661 665 663 661 662 662 662 661 661 664 18 19 20 21 22 23 25 26 28 29 30 604 342 662 667 669 669 673 679'82 683680 678 678 NOTE: Average daily power level greater than 646 MWe due to cooler condenser cooling water.INSTRUCTIONS On this for)r)at, list the average daily unit power level, in MWe-Net for each day in the reporting month.Compote to the nearest whole n)egawat t.('1/771 OPERATING DATA REPORT OPERATING STATUS DOCKET NO.DATE~~1981'COMPLETED BY V.T.Chilson TELEPHONE~305 55-3666 Turkey Point Unit No.4 1.Unit Name.2.Reporting Period: September 1981 3.Licensed Thermal Power (MWt): 2200 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe}: 7 a imum De endable Ca acit Net We: Notes Unit No.4 operated at approximately 100X R.P.except for outage of October 18-19, 1981.80.Mx p p y(M)8.If Changes'Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.
If'Any (Net MWe): 10.Reasons For Restrictions, lf Any: This Month Yr.-to-Date Cumulative 71 064.0 52 948.2 720.0 6 551.0 5 935.4 166.6 127.6 4-0-31.2 12 763 999 107 145 354 4 081 344 34 054 517 32 260 502 3 876 482 71.9 i89.3'89.3 72.0 70.5 88.8 65.5'85.4 3.0 3.8-Dec.26, 1981 11.Hours In Reporting Period 12.Number Of Hours'Reactor Was Critical ,711.4 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours-0-16.Gross Thermal Energy Ge'nerated (MWH)1 555 100 17.Gross Electrical Energy Generated (MWH)495 200 18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 98.6 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)98.2'22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage, Rate-0-24.Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each): Scheduled refuelin maintenance, and ins ection Oct.25 25.If Shut Down At End'Of Report Period, Fstimated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):
Forecast Achieved IN IT!A L CRITICALITY IN ITIA L ELECTRICITY'OMMERCIAL OPERATION (')/77)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.urke Poin t Uni t No.4 DATF Oct.12 19 1 Dale I~Ch Lice nscc Event Rcport=Cause&Corrective Action to Prcvcnt Recurrence 12 81-10-18 10.1.B HB VALVOP (D)Unit was removed from service to repair instrument air leaks on both pressurizer spray control valves.Corrective actions'ncluded re-torquing valve operator flange bolts.(Nuclear system)F: Forced S: Scheduled Reason: A-Equipment Failure (Explain)B-Maintenance oi Test.C-Refueling D.Regulatory Restriction E.Operator Training'icense Examination F-Ad mi nist rat i ve G.Operational Error (Explain)H-Other (Explain)3 4 Method: l hlanual 2.Manual Scram.3-Automatic Scrag).4.~t;~~t~t)
Continuing 5-Load Reduction 9-Other (Explain)5 Exhibit G~Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File lNUREG-OI 6I)Exhibit I~Sante Source 0 h II"'Oct.12, 1981 COMPLETED BY>-T.Chi 1 son TELEPHONE MONTH Se tetttber 1 9 8 1 DAY AVERAGE DAILY POWER LEVEL (M Wc-Net 3 768 76(3 777 776 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)I7 IS I9 20 775 779 22 23 IO 45 26 I4 IS 16 28 99 30 NOTE: Average daily power level greater than 777 NWe due to cooler condenser cooling water.INSTRUCTIONS On this forn>at.'list the average daily unit power Icvt.'I in MNe-Net for each day in thc reporting tnonth.Contputc to the nearest whole mcgawat t.(~)/77) 0 I OPERATING DATA REPORT DOCKET NO.OATj Oc~..DO, 1981 COMPLETED BY~~i TELEPHONE~30~-3666 OPERATING STATUS Notes Unit dpera't:ed at approxi-mately 100%RP until Sept.8, 1981.St.Lucie Unit No.1 l.Unit Name: Septem er, 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 802 7.Maximum De cndable Ca acit Nct hIWe: 822 p p y()8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level Tn Which Restricted.
If Any (Net hIWe): 10.Reasons For Restrictions, If Any: 11.Hours ln Reporting Period'12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Ge'nerated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (hIWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 hlonths This Month 720.0 172 1 75.9 172.1 0.0 Yr.-to.Date 6'551.0 5 883.8 75: 9'882.3 0.0 438 971 14 947 870 140 810 128 871 23.9 23.9 23.0 22.3 30.6 4 881 580 4 614 030 89.8 89.8 90.6 87.8'.7 (Type, Date.and Duration of Each): Cumulative 41 8Z9.0 34 309.1 205.3 33 513.4 39.3 82 196 018 26 691 440 25 141 516 80.0 80.1 77.3 74.9 5.1 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
November 15 1981 Forecast Achieved IN ITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPERATION (1t/771 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Sept.1981 DOCKET NO.UN!T NAME S t.Lucie Unit No.1 DATE Oct.12 1981 Date c I l/I J Liccn sec Event Report=Cause&, Correct ive Action to Prevent Recurrence 05 06 81-10-08 81-10-11 75.9 A S 472 0 C GENERA (D)RC FUELXX Unit trip caused by electric gener-ator protection system due to a fault on"C" phase winding.Corrective actions included minor insulation repair, (Non-nuclear system)Scheduled refueling, maintenance, and inspections.(Nuclear and non-nuclear systems)F: Forced S: Schedu!ed ('>/77)Reason: A.Equipment Failure (Explain)B.h>>a!ntenance or Test-C-Refueling D-Regulatory Restriction E-Operator Training&.Liccnsc Exainination F-Administ rat ivc G.Operational Error (Explain)l>>.Other (Explairr)
Method:!.Manual 2.Manual Scram.3-Autontatic Scram.4-Qt>>m(Explain)-
Continuing 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG.OI 6I)5 Exhibit I-Sante Source
~yAlllg~a FLORIOA POWER II LIGHT COMPANY October 12, 1981 Office of Management Xnformati;on and Program Controls U.S.Nuclear Regulatory.
Commission Washington, D.C.20555 Gentlemen:
Re: Turkey Point Units 3 6 4 St.Lucie'Unit 1 Docket Nos.50-250, 251, and 335 Attached are the September, 1981, Operating Summary Reports for Turkey Point Units Nos.3 and'and St.Lucie Unit No.l.Very truly yours, J.W.Williams, Jr.Director Nuclear Energy VTC/mbd cc: Mr.-James P.O'Reilly Robert Lowenstein, Esquire PEOPLE...SERVING PEOPLE
SUMMARY
OF OPERATXNG EXPERXENCE DOCKET NO.50-250 Turkey Point Unit No.3 DATE October 12, 1981 COMPLETED BY.V.T..Chilson REPORT MONTH Se tember 1981 TELEPHONE (305)552-3666 Unit No.3 remained out of service due to Steam Generator Repair Program.Refer to"Unit Shutdowns and Power Reductions" section of September, 1981 Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power a.Light Company commitments for NRUEG-0578 implementation are continuing.
Refer.to correspondence
'between FPL and NRC for additional information.
Steam Generator Repair Program in progress.Decontamination of Steam.Generator Nos.3A, 3B, and 3C in progress.
i5 II 4 II II
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.50 253 Turkey...Paint UNI T Unit No.4 DATE October 12, 1981 COMPLETED BY TELEPHONE 5 2-6 REPORT MONTH Se tember 1981 Unit No.4 operated at approximately 100%R.P.except for outage of October 18-19, 1981.Refer to"Unit Shutdowns and Power Reductions" section'of September, 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included;.
Inspections and requirements of IE Bulletins and NUREG-0578 in progress.Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing; Refer to correspondence between FPL and NRC for additional information.
0~.e f'I
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.50-335 St.'Lucie Unit No.1 DATE October 12, 1981 COMPLETED BY'.T.Chilson TELEPHONE (305)552-3666 REPORT MONTH September 1981 r Unit operated at approximately 100%R.P.until September 8;1981.Refer to"Unit Shutdowns and Power Reductions" section of September, 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 in progress.Florida Power&Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
f Removed reactor vessel closure head, transferred fuel to spent fuel pool, and inspected reactor vessel internals.
'I Inservice Inspection irogress.
/f P j 0 S