ML17345A245

From kanterella
Revision as of 10:27, 14 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for May 1988 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2.W/880615 Ltr
ML17345A245
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 05/31/1988
From: CONWAY W F, GRANT N W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-88-260, NUDOCS 8806220050
Download: ML17345A245 (30)


Text

AC CE>~SMTED DE IBUTION DEMDNSTR ATION SYSTEM ACCESSION NBR: FACIL:50-000 50-250 50-251 50-335 50-389 AUTH.NAME GRANT,N.W.

CONWAY,W.F.

RECIP.NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)8806220050 DOC.DATE: 88/05/31 NOTARIZED:

NO Generic Docket Turkey Point Plant, Unit 3, Florida Power and Light C Turkey Point Plant, Unit 4, Florida Power and Light C St.Lucie Plant, Unit 1, Florida Power&Light Co.St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTHOR AFFILIATION Florida Power&Light Co.Florida Power&Light Co.RECIPIENT AFFILIATION DOCKET 05000000 05000250 05000251 05000335 05000389 R I'UBJECT: Monthly operating repts for May 1988 for Turkey Point Units 3&4&St Lucie Units 1&2.W/880615 ltr.DISTRIBUTION

.,CODE IE24D COPIES RECEIVED LT'R Q ENCL g', SIZE j TITLE:',Monthly:~Operating Report'(per Tech Spec4JI NOTES RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G COPIES LTTR ENCL 1 0 1 0 RECIPIENT ID CODE/NAME PD2-2 PD TOURIGNY,E COPIES LTTR ENCL 5 5 1 0 j A D INTERNAL: ACRS AEOD/DSP/TPAB NRR DLPQ/PEB 11 PB 10 REG FILE Ol EXTERNAL: EG&G WILLIAMS, S NRC PDR 10 10 1 1 1'1 1 1 1 1 1 1 1 AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 LPDR NSIC 1 1 2 2 1 1 1 1 1 1 2 2 1 1~4 I j A.TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 30

,4l 1l

~EE DAILY UNIT PURER LEVEL DOCKET NO.50-250 UNIT Turke Point Unit 3 DATE June 13, 1988 CONPLETED'BY N.M.Grant TELEPHONE (407)694-4432 MONTH Ma 1988 DAY AVERAGE DAILY P{NER LEVEL (N Ne-Net)5/1/88 5/2/88 5/3/88 5/4/88 5/5/88 5/6/88 5/7/88 5/8/88 5/9/88 5/10/88 5/11/88 5/12/88 5/13/88 5/14/88 5/15/88 5/16/88 5/17/88 5/18/88 5/19/88 5/20/88 5/21/88 5/22/88 5/23/88 5/24/88 5/25/88 5/26/88 5/27/88 5/28/88 5/29/88 5/30/88 5/31/88 681 694 695 697 688 690 694 692 691 688 hee 687 687 692 687 686 687 686 682 679 677 674 672 672 675 679 684 hei 689 684 646 8806220050 880531 PDR ADOCK 05000250 R=DCD QF'ERA TING DA'I'A REI-"ORT OPERATING STATUS DQCI(ET'NQ 56 ZM0 DA1'E 6/6/C:~COHPLETFD BY H H.GRANT TELEF'I.IOHE 407/694/4432 1 UNIT HAHE: TURVEY PQIHT UNIT 3 REF'OR'I'IHG PERIOD'AY 1988 3.LICFHSED'I'HERHAL POWER (HAT): "'200 HAHEPLATE RATING<GROSS HRE)'60 5 o DESIGN FLECTRICAL RATING (HET HME):........693 6~iHAXIHUH DEF'ENDABLE CAF'ACI'I'Y (GROSS HHE)+699 7~~IAXIHUII DEPENDABLE CAFACITY(NET HHE);665 8 IF CHAHGES OCCUR IN CAF'ACXTY RATIHGS (XTEHS NUHBER 3 THROUGH 7)SINCE LAST REF'ORT r GXVF REASONS+POWER I EVEL TO WHICH RESTRICTEDr IF AHY (HET HWE)10 REASOiNS FOP, PESTRTCTIQNSr IF AHY'QNTHLY-YTD-CUHULATIVE ii.I.IQURS IH REPORT F'ERXOD i:I.Z.HUHBFR OF HOURS RFACTOR HAS CRITICAL..13~REAC1'OR RESERVE SHUTDOWN IHOURS IHOURS GENERATOR OH-LTNE.15.UNIT RFSERVE SHUTDOHN HOURS 16~CROSS THERMAL ENERGY GENERATED (HHH)17.GfiQSS ELECTRICAL ENERGY GENERATED (HAH)18i HET ELECTRICAL ENERGY GENERATED (HWH)19+UNIT SERVICE FACTOR e, UNIT AVAILABXLTTY FACTOR Zi+CAF'AC:I:1'Y FACl'OR (USING HDC NET)22.CAPACITY FACTOR (USING DER NET), 3.UNIT FORCED OUTAGE RATE ISUTDQiANS SCHEDULED OVER NEXT 6 HONTHS 744 744ie 0.0 744.e 0 1638874 533200 es7e 10erO 100rO 102 i7 98>7 0 3647 2458i4 0.0 2372+9 0 4974547 1615975 1521069 65.1 55.1 62.6 60rZ 34 i 9 1357/5.6 90434.1 844s4 89208~:L 121r8 134778810 59213976 559998b5 65'55.8 63.3 11.2 25.IF,.HUT DQIIN AT END OF REF'ORT PERIOD ESTIHAl'ED DATE OF STARTUP' 4l Qi UNIT SHUTDOWNS AND POWER REDUCTIONS RFPORT MONTH MAY 1988 DOCKET NO.UNIT NAME Turkey Point Urrit i53 DATE June 13, 1988 COMPLETED BY N.W.Grant TELEPHONE Date Type'uration (Hours)Reason2 Method of Shutting Down Reactor Ucensee Event Reports System Code4 Component Codes Cause&Corrective Actionto Prevent Recurrence Unit 83 had no shutdowns or significant power reductions.

F Forced S Scheduled Reason A-Equipment Failure (Exphin)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&Ucense Examination F-Administrative G-Operational Error (Explain)H-Other(Explain)

Method 1-Manual 2-ManualScram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other(Explain)

Exhibit G-Instructions for Preparation of Data Entry Scheets Licensee Event Report(LER)

File (NUREG4161)

Exhibit 1-Same Source e>1'J dMMARY OF OPERATING EXPER ACE DOCKET NO'NIT DATE.COMPLETED, BY'ELEPHONE 50-250 Turkey Point Unit.¹3 June 13, 1988 N.>l.Grant (407)694-4432 REPORT MONTH HAY 1988 Unit.¹3 operated at essentially full power and had no"Unit Shutdowns or Significant Power Reductions.'"

e>Oi AARE DAILY UNIT PURER LEVEL~DOCKET NQ.50-251 UNIT Turke Point Unit 4 June 13, 1988 CONPLETED BY N.W.Grant TELEPHONE 40 May 1988 DAY AVERAGE DAILY PQfER LEVEL'(N Qe-Net)5/1/88 5/2/88 5/3/88 5/4/88 5/5/88 5/6/88 5/7/88 5/8/88 5/9/88 5/10/88 5/11/88 5/12/88 5/13/88 5/14/88 5/15/88.5/16/88 5/$7/88 5/18/88 5/19/88 5/20/88 5/21/88 5/22/88 5/23/88 5/24/88 5/25/88 5/26/88'5/27/88 5/28/88 5/29/88 5/30/88 5/31/88-8 5-5 5-5 5-6-1,0-ie-10-12'-10-12-12-12-12-12-11-12-17'19-'~2-23-19-21-23 190 598 679 688

))Pc.RA)j.ivil l~TA FLb OPERA'I'XHG uA i'ri REF'ORT DOCKET HQ DATE hr'8'QHPLF'IED BY H.W.GRANT TELEF'HONE 407/694/rV432 I.,'HlT HAME;I URKEY PQIHT UNIT REF'QRTXHG PERIOD;HAY 1988'CEHSE>'I'HERMAL FQWER<MWT>: 00 ilA)IEF'I..ATE R*TXHG<GROSS MWE>'60 DESIGN ELEC'I'RICAL RAIXHG<HET iHWE>:.......693~.>>HAXIHUH DEF'EHDABLE CAF'ACITY<GROSS HWE)1 699 i"IA;<IMUM DEPE.ADDABLE CAF'ACITY<HET t1'HE).'666 8, IF CIIA'ICES OCCUR Ill CAPACITY RATING (ITEMS HUMBI-=R 3 rHROUGH 7)"IHCE.AST REF'ORTH'IVi F REASQHS'OWER I..FVFL TQ!WHICH RESTRICTED

~IF ANY (HET HWE)ice REASONS FQR RESTRlCTIQHS)

XF ANY+HOHTI ILY-YTD-CUHUI ATTVE 11+r~h'll 13+1 rI+15'h~17'8'e n 20'1 4?lf t HOURS 1N F EF ORT F ERIQD: NUMBER OF HOUF;S REACTOR WAS CRITICAL REACTOR RESERVE SHUTDOWH HOURS I'OURS GENERATOR QH-LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)GRQ S ELECTRICAL ENERGY GENERATED (HWH)HET ELECTRICAL ENERGY GENERATED (HWH)UH1T SERVICE FACTOR UHXT A VAILAF~ILITY FACTOR CAF'ACITY FACTOR (USIHG HDC NET>C" F'AC1TY FACTOR (USING DER NET.)UNIT FORCED OUTAGE RATE SHUTDOWNS SCHEDULED QVFR NEXT 6 MONTHS 744 98'O.e 87.7 0 171287 54475 43158 11'11.8 8 i 7 8 i 4 88i2 3647 242lJt9 0.0 2471>3 0 5259712 173097m 1636845 67i8 67.8 67~4 64.8 32o2 129508.0 87712i4 ihh~6 84677.4 1 787 1 533b 57030739 53955627 65+4 65'63.'9 60'11+6 1F SHUT DOWN AT EHD QF REF'ORT PERIOD ESTIMATED DATE OF STARTUF'l 0!1 (

UNlT SHUTDOWNS AND POWER REDUCTlONS REPORT MONTH HAY 1988 DOCKET NO.50-251 Turkey Point Unif¹4 DATE June 13, 1988 COMPLETED BY N.W.Grant TELEPHONE 407 694-4432 Date Type Duration (Hours)Reason~Method of Shutting Down Reactor Ucensee Event Report¹System Code4 Component Codes Cause&Corrective Action to PreventRecurrence 08 880427 656.2 A PC VALVEX Unit¹4 remained shutdown to complete repairs of the pressurizer spray valves.Additional repairs to the containment purge isolation valves were performed to return the stroke time to within specification and the residual heat removal suction isolation valve to correct binding problems.Additional miscellaneous repairs were performed and the unit was returned to full power operation following minor power ascension holds for secondary chemistry, reactor flux mapping, and repairs to the B main feedwater pump.F Forced S Scheduled Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&Ucense Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other(Explain)

Exhibit G-instructions for Preparation of Data EntryScheetsLicensee Event Report(LER)

File (NUREG4161)

Exhibit 1-Same Source 091587 MMARY OF OPERATING EXPER CE DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-'251 Turkey Point Unit 84 June 13, 1988 N.W.Grant'(407)694-4432 REPORT MONTH HAY 1988 See the"Unit Shutdowns and Power Reductions" report.

+RAGE UAILY UNIT PURER LEVEL~DOCKET NO.UNIT 50-335 St.LUC1 June 13, 1988 CONPLETED, BY TELEPHONE N.u.era May 1988 DAY AVERA6E, DAILY PSKR LEVEL (II Qe-Net)5/1/88 5/2/88 5/3/88 5/4/88 5/5/88 5/6/88 S/7/88 5/8/88 5/9/88 5/1'0/88 5/ii/88 5/12/88 5/13/88 5/10/88 5/15/88 5/16/88 5/17/88 5/18/88 5/19/88 5/20/88 5/21/88 5/22/88 5/23/88 5/20/88 5/25/88 5/26/88 5/27/88 5/28/88 5/29/88 5/30/88 5/31/88 859 857 857 858 825 821 860 859 829 825 863 862 869 858 SSS 855.859 ,S57 ss6 855 855 855 859 868 859'61 857 855'849 858 847 0 4~

QPFfxATXI!G STA'I'I28 OF'ERATXNG DA'I'A REF'QRT OQCVET NO 58-3'-;DATE: 6/6/88 COHPL'ETED EY N.'Wi GRANT TEI EF HONE 407/694/4432 UNXT NAHE7 ST+I..UCXE UNIT 1 2~REPOR'I'XNG PL'RXODo HAY'J.988 3~L'.".EN:-;ED THERHAL POWER (HINT)'700 NAHEF'LATE RATING<GROSS HWE)'.850 5t DESIGN ELFCTRXCAL RATTNG (NET HWE)a...,.830 I1AX HUH OEF'EHDAE:LE CAF'ACXTY (GROSS HWE)l.872 HAXXHUH OEF'DABLE C"PACTTY (NET HWE):....839 8, XF CHANGI.:8 OCCIJR IN CAF'.ACXTY RATX!IGS (XTLHS NUHE'ER 3 THROUGH)SINCE LAST REPQRTr GXUE REASONS: 9e POWER LEVEL TO WHICH RESTRICTEDr XF ANY (NET HWE)18~F'EASQNS f OR RESTRXCTXONSr XF ANY+HONTI-ILY-YTD" CUHULA'I ZUE ii a 4'J.'3.14.il 16~'J./+26.wi ry a J.t 2i 23'-'I+!-Iaur'S XN T'EFORS FERXOD;>.UHBER OF HOURS REACTOR WAS CRXTICAL REACTOf" RESERVE Sl-IUTDOMN HOURS HOURS GENERATOR ON-I XNE UNIT RESERVE SIIUTOOWN HOURS GROSS THERHAL'NEf(GY GFNERATFO (HWH)GROSS EL.ECTR:I:CAL ENERGY GENERATED (HWI.I)T ELECTRTCAL ENERGY GENERATFO (HWH)UNXT SERVTCE FACTOR UNIT AVAILABILITY FACTOR CAF'ACXTY F*CI'OR (USING HDC NET)CAF'ACXTY FACTOR ('USING DER NET)UNTT FORCED OUTAGE RATE SISUTOO!ANS SCI-IEDULED

'OVER NEXT 6 HONTHS...2L.3/Sj.'..I'!3.MXS~BKUKj.'IHG.'44 744+6 0.0 744'0 2000193 668030 634548 166i8 100ro 101.7 182e8 0 3647 3h26.,1 0~0.3620 0 0 972'9318 3269360 3105933 99+3 99+3 101~5 162>6 1603].9'752.76.4 265i3 74589.9 39~3 l91076'988 62792945 59387'100 74.4 74 i 4 i st~V 72~4 3+&'~XF SHUT DOWN AT END QFEF'QRT F'ERXQD r EST'XHATED DATE QF STARTUP:

41 41 UNIT SHUTDOWNS AND POWER REDUCTIONS RFPORT MONTH MAY 1988 DOCKET NO.UNlTNAME St.Lucie Unit iI'1 DATE June 13, 1988 COMPLETED BY 407 694-4432 TELEPHONE Date Type Duration (Hours)Reason2 Method of Shutting Down Reactor Ucensee Event Report¹System Code4 Component Codes Cause 8 Corrective Action to Prevent Recurrence Unit 81 had no shutdowns or significant power reductions.

F Forced S Scheduled Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other(Explain)

Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other(Explain) 4 Exhibit G-Instructions for Preparation of Data EntryScheetsLicensee Event Report(LER)

File (NURES4161) 5 Exhibit1-Same Source 091587 I MMARY OF OPERATING EXPERIENCE.

DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-335 ,'St.Lucie Unit¹1 June 13, 1988 N.W.Grant'(407)694-4432 REPORT'MONTH HAY 1988 Unit¹1 operated at essentially full power and had no"Unit Shutdowns or Significant Power Reductions." In accordance with requirements of Technical.

Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report month.

~RAEE OAILV UNIT PENER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPNNE 50-389 St.Lucie Unit 2 June 13, 1988 N.ll.Grant 694-4432 May 1988 DAY AVERAGE DAILY PSKR LEVEL (N Me-Net)5/1/SS 5/2/SS 5/3/88 5/4/88 5/5/88 5/6/88 5/7/88 5/8/88 5/9/88 5/18/88 5/11/88 5/12/88 5/13/88 5/14/88'/15/88 5/16/88 5/17/88 5/18/88 5/19/88 5/20/88 5/21/88 5/22/88 5/23/88 5/24/88 5/25/88 5/26/88 5/27/88 5/28/88 5/29/88 5/30/88 5/31/88 860 858 858 858 858 859 857 857.860 853 855 858 857 856 856 854 857 856 856 854 85'4 855.848 859 859 859 856 855 852 853 853 OPERATING STATUS OI-ERATZNg DATA REFORT DQCI(ET HO 50-389 DATE 6/6/88 CQMPLEI'FD BV H, W, GRANT TELEF'HONE 407/694/4432'NIT NAME: ST.LUCXF UHXT 2 REF'QRTZHG PLRXOD+MAY 1988 LICENSED THERMAL F'OWER (MWT)-:~700 N AMEF'LATE RATING (GROSS MWE): 850 DESIGN ELFCTRXCAL RATING<NET MWE>+830 MAXIMUM DEF'ENDABLE CAF'AC1TY<GROSS MWE): 882 MAXIMUM DEF'EHDABLE CAPACITY<NET MWE)+839 IF CHAHGES OCCUR 1N CAI" ACITY'RATINGS (ITEMS HUMBER 3 THROUGH 7)SINCE LAST REPORT v GIVE REASONS: F'OWER I EV EL TQ WHICH RESTRICTED r IF ANY (NET'MWE)ie+REASOHS FOR RESTRICTIONS'F ANY+MONTHLY-YTD-CUMULATIVE li i I-IQURS XN REF'ORT PERIOD o 12 o HUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR OH-LINE 15.UNIT RESERVE SHUTDOWN HOURS ihi ROSS THERM*I.ENERGY QENERATED (MWH>17'ROSS ELECTRICAL ENERGY GENERATED (MWH)3 o HET ELECTRICAL EHERGY GEHERATED (MWH)UHZT SERVICE FACTOR 20, UNIT A VAILABII XTY FACTOR 21+'CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23i UNIT FORCED OUTAGE'ATE 24m SHUTDOWNS SCIIEDULED OVER HEXT 6 MOHTHS o 744 744.0 0.0 744iO 0 2007863 670860 636870 100iO 100+0 102oO 103+1 0 3647 3647iO OiO 3647+0 0 9799100 3293540 3127454 100>0 ieeoO 102.2 103o3 0 42216.0 36'405+0 OiO 35684.6 0 92795740 Sere 2OO~9~95~42 84..5 84.5 85+1 84.8 6.6 2".ZF SHUT DOWN AT END'F REF'ORT F'ERIOD ESTIMATED DATE OF STARTUP:

0 Ol I UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH MY 1988 50-389 DOCKET NO.NIT NAME St.Lucie Unit p2 DATF June 13, 1988 COMPLETED BY N.W.Grant TELEPHONE (407)694 4432 Date Type'uration (Hours)Reason2 Method of Shutting Down Reactor Licensee Event Report¹System Code4 Component Codes Cause 8 Corrective Actionto Prevent Recurrence Unit¹2 had no shutdowns or significant power reductions.

F Forced S Scheduled Reason A-Equipment Failure(Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 Ucense Examination F-.Administrative G-Operational Error (Explain)H-Other(Explain)

Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Scheets Ucensee Event Report(LER)

File (NUREG4161)

Exhibit 1-Same Source 091 SS7 I!Ol UMMARY OF OPERATING EXPER NCE DOCKET NO.UNIT DATE COMPLETED BY TEL'EP HONE 50-389 St.Lucie Unit¹2 June 13, 1988 tl.W.Grant (407)694-4432 REPORT MONTH 51AY 1988 Unit,¹2 operated at essentially full power and had no"Unit Shutdowns or significant power reductions".

In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves dUring the report month.

0' P OX 14000, JUNO BEACH, FL 33408-0420

~gillie~+i~,y~=JUNE g 5 1988 L-88-260 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the May 1988 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point.Units 3 and 4 and St.Lucie Units 1 and 2.V r trul yours, W.F.<Senio way Vice President-Nuclear WFC/NWG/cm Attachments cc: Dr..J.Region Senior Senior Nelson Grace, Regional Administrator,, II(USNRC Resident Inspector, USNRC, Turkey Point Plant Resident Inspector, USNRC, St.Lucie Plant NWG/001.MOR an FPL Group company 0 Cl II