ML20149E029

From kanterella
Revision as of 01:20, 27 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Application for Amend to License NPF-3,clarifying Boron Concentration Requirements for Refueling Conditions, Specifically Requirements Not Applicable When Reactor Vessel Completely Defueled.Fee Paid
ML20149E029
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/04/1988
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20149E031 List:
References
1459, TAC-66733, NUDOCS 8801130201
Download: ML20149E029 (1)


Text

_ ______- -_ _

o- O TOtEDO

%== EDISON i

Docket No. 50-346 DONALO C. SHELTON

w. w-rwa License No. NPF-3 Id18dSP38' Serial No. 1459 January 4, 1988 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

License Amendment Application to Clarify the Boron Concentration Requirements, in Technical Specification 3.9.1, for Refueling Conditions (TAC No. 66733)

Gentlemen:

Enclosed is an application for an Amendment to the Davis-Besse Nuclear Power Station, Unit No. 1 Operating License No. NPF-3, Appendix A, Technical Specifications.

This application requests that the Technical Specifications be revised to reflect the changes attached. The proposed changes involve clarifying the boron concentration requirements for refueling conditions. Specifically, this revisica clarifies that boration requirements are not applicable when the reactor vessel is completely defueled and therefore, not a criticality concern. Boration requirements will still be required during refueling (Mode 6).

Toledo Edison requests that the Technical Specification Amendment be issued by February 15, 1988, for immediate implementation.

Enclosed is a check for $150 as required by 10CFR170.12(c) for a License Amendment application.

Very tru' yours, 4%

CAB:bam 8801130201 890104 Enclosures PDR ADOCK 05000346 p PDR cc: DB-1 Resident Inspector A. B. Davis, Regional Administrator A. W. DeAgazio, NRC/NRR Davis-Besse Project Manager State of Ohio pol THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 #

pc <h w/wex

_ _ .w=S8suov5___ . _ _ _ _ _ _ _ _