ML20214U126

From kanterella
Revision as of 02:51, 4 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Schedule for Completion of 10 Plant Mods Identified for Literal Compliance w/10CFR50,App R
ML20214U126
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/18/1986
From: Kingsley O
MISSISSIPPI POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
AECM-86-0274, AECM-86-274, NUDOCS 8609300513
Download: ML20214U126 (3)


Text

.

F MISSISSIPPI POWER & LIGHT COMPANY EinMhMMdB

] Helping Build Mississippi P. O. B O X 164 0, J A C K S O N, MIS SIS SIP PI 39215-1640 September 18, 1986 O. D. KINGSLEY, JR. i ViCE PRE SIDENT . NUCLE AR C9'E R ATIONS U. S. Nuclear Pegulatory Commission Office of Nuclear Reactor Regulation Washington, D. C. 20555 Attention: Mr. liarold R. Denton, Director

Dear Mr. Denton:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 MP&L Schedule for Completion of Plant Modifications Identified for Literal Compliance With 10CFR50, Appendix R AECM-86/0274 On August 26, 1986, a telephone conference was held between Mississippi Power & Light (MP&L), NRC Region II Division of Reactor Projects and the NRC-NRR Project Manager regarding MP&L's schedule for implementing those plant modifications identified by MP&L as required to bring Grand Gulf Nuclear Station (GGNS) into literal compliance with 10CFR50 Appendix R. This letter is provided to document MP&L's commitment to that schedule.

By letter dated May 7, 1985 MPSL submitted for NRC review a report (AECM-85/0129) summarizing it's detailed analysis of GGNS compliance with sections III.G, J, and L of 10CFR50 Appendix R. Contained in this report were commitments to modify 'certain fire protection features to bring GGNS into literal compliance with 10CFR50 Appendix R. These commitments were expanded and modified by letters dated May 18, 1985 (AECM-85/0165), July 24, 1986 (AECM-86/0190) and July 31, 1986 (AECM-86/0209). A large percentage of the work associated with these modifications is now essentially complete. At the commencement of the first refueling outage (RF01), there will be ten (10) outstanding plant modifications (DCP's). Seven (7) DCP's are scheduled for completion during RF01 and three (3) DCP's are scheduled for completion by June 30, 1987. All ten (10) modifications will be completed no later than June 30, 1987.

! Attached is MP&L's schedule for completion of the remaining ten (10)

DCP's. MP&L will notify the NRC of any changes to the schedule involving those DCP's scheduled for completion by the end of the first refueling outage.

i 8609300513 860918

! PDR ADOCK 05000416 F PDR 0\,#

h0 l t \

l J13AECM86082701 - 1 Member Middle South Utilities System i

v AECM-86/0274 Page 2 If you require additional information, please advise.

Yo r ruly, ODK:vog Attachment s cc: Mr. T. H. Cloninger (w/a)

Mr. R. B. McGehee (w/a) -

Mr. N. S. Reynolds (w/a)

Mr.' H. L. Thomas (w/o)

Mr. R. C. Butcher (w/a)

Mr. James M. Taylor, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr.J.NelsonGrace,RegionalAdministrator(w/a)

U. S.-Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 (

Atlanta, Georgia 30323 \

J13AECM86082701 o

.o Attachment to AECM-86/0274 Rev. O GGNS APPENDIX R PLANT MODIFICATION SCHEDULE D'P C DESCRIPTION' SCHEDULED COMPLETION' 81/5003 Install' Transfer Switch to Isolate the *RF01 Control Room From the Alternate Shut-down Panel.

84/3222 Prevent a Hot Short in Valve Q1E38F0018-B. *RF01-or Cable 1BB61113C from Closing Valve Q1E12F2908-B (Fire Zone 1A305).

84/5002 Change Tap Setting for Breaker IDAl-05 *RF01 (Common Bus Concern).

85/3064 Isolation of Remote Shutdown Panel Asso-- *RF01 ciated Circuits.

85/3075 Radiant Energy Shields (Fire Area 25). *RF01-85/3098 Alternate Shutdown Local Stations. *RF01 85/3100 Alternate Shutdown Emergency Lighting. *RF01:

83/4526-1 Upgrade Closure for Penetration to meet 6/30/87 3 Hr Rating (Fire Zone OC217).

84/3221 Fire Wraps in Fire Zone OC302. 6/30/87 85/4026 Install Fire Dampers in Penetrations to 6/30/87 Provide 3-Hr. Rating (Fire Zones 0C402A, OC405A, &-00607.

s

  • First Refueling Outage - Scheduled for September 6, 1986 - November 5, 1986.

I l

l

! J13AECM86082701 - 4