ML17208A495

From kanterella
Revision as of 00:24, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Repts for May 1978
ML17208A495
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 06/03/1978
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A494 List:
References
NUDOCS 8004240356
Download: ML17208A495 (13)


Text

AVERAGE DAILYU>VIT POWER LEVEL DOCKET NO.

DATE June 3, 1978 COMPLP TED IIY V~ T ~ Chilson MONTH mz, 1978 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL (MWe-Net) {MWe->Vet)

I 671 l7 670 663 IS 668 661 19 611 665 '>0 667 21 6 22 416 657 23

'07 650 14 655 648 15 657 lo 646 26 662 298 27 664 589 2S 673 l3 515 79 671 662 30 662 l5 661 3l 660 l6 663 NOTE: Average daily power level greater than 666 MHe'ue to cooler condenser cooling water.

INSTRUCTIONS J

On this format. list the average daily unit power level in!>IIVe Net for each day in the reporting mi>nth. Ci>mpute to the nearest whole megawat t.

{9/77)

OPERATING DATA REPORT DOCKET NO.

DATE ~June 1978 COMPLETED BY ~~hilson 552-3824 TELEPHONE DQ.'Q OPERATING STATUS Turke Point Unit No. 3 Notes - Unit No. 3 operated I. Unit Name: at approximately 100X 'R.P.

g. Reporting Period:

2200 except for outages of May 11,

3. Licensed Thermal Power (MWt): 13, and 19;22, 1978.
4. Namephte Rating (Gross MWe):
5. Design Electrical Rating (Net ilIWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

IfAny (Net MWe): NONE

9. Power Level To Which Restricted,
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative 744.0 3 623.0 48 104.6

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 701. 9 2 468.0 39.7 73.'9 185 '
13. Reactor Reserve Shutdown Hours 678.2 2 327.1 36 413.5
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours 4 929 172 71 703 364
16. Gross Thecal Energy Generated (MWH) 458 740 1 583 575 22 867 920 l7. Gross Electrical Ener ~ Generated (MWH)
19. Unit Service Factor 91. 2 64. 2
20. Unit Availability Factor

'1.6 64.2 75.9

21. Unit Capacity Factor (Using MDC Net) 87.8 62.0 84.4 . 59.6 64.9
22. Unit Capacity Factor (Using DER Net) 1.9 0.9 2.7
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 elfonths (Type. Date, and Duration of Each):

Steam Generator Tube Insnection Pro ram Au ust 17 - Sentember 1 1 78

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

UNIT SIIUTDOWNS AND FOWER REDUCTIONS DOCKET NO 50 250 UNITNAMF Turke Point Unit No. 3

  • COMPLETED DY V REPORT MONTH ~MY 1978 rl Liccnsec 8 Vl 9 Cause A Corrective RE N11. Date ~ A Event Action to EE Cl Rcport 0 E~

O Prevent Rccurrcnee Cr 78-05-11 F 10. 2 N/A HJ PIPEXX Unit was removed from service to (D) repair leak in a moisture-separator-reheater alternate. drain line to the condenser. (Non-nuclear system) 78-05-13 F 3.0 N/A HH VALVEX Unit was removed from service to (c) repair a feed water check valve packing leak. (Non-nuclear system) 10 78&5-19 S 52.5 N/A N/A zzzzzz Unit was removed from service to repair miscellaneous steam leaks in the secondary system. (Non-nuclear system)

I 3 4 F: Forced Reason: Method: Exhibit G ~ Instructions S: Scheduled A.Equipment Failure (Explain) I.Manual for Preparation of Data I).hiaintenancc or Test 2 Manual Scram. Entry Sheets for Licensee C.Rcfucling 3.Automatic Scram. Event Rcport (LE R) File (NU RE-'016 D Regulatory Restriction ~ 4 Other (Explahl) )

E.Operator Training k, Liccnsc Examination F-Administrative G.Operational Error (Explain) Exhibit I - Sante Source II Other (Expiahl)

AVERAGE DAILYUNIT POWER LEVEL DATE June 3 1978 COMPLETED BY + T Chilson TELEPHONE (305) 552-3824 MOMH Mug 1978 P

DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-iNet)

I 656 l7 641 646 IS 642 642 I9 648 50 643

'655 21 643 652 22 639 644 23 642 'i4 628 645 'l5 626 10 644 26 629 642 27 l2 647 2S 646 l3 647 99 41 l4 644 30 611 15 31 l6 646 INSTR VCTIONS, On this format, list the average daily unit power level in Mme.Net for each day in the reporting month. Compute to the nearest whole megawat t.

(ol77 I

OPERATING DATA REPORT DOCKET i fO. 50-251 DATE June ~978 COAiPLETED BY ~V.. Ohilsss TELEPHONE. 4~~-3824 OPERATING STATUS Turke Point Unit No. 4 Not~- Unit No. 4 opera'ted at I. Unit Name: approximate1y 100% R.P.

Ma 1978

2. Reporting period:

2200 except for load reduction-

3. Licensed Thermal Power (hIWt): of May 30-31, 1978.
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net hI IVe):
6. Maximum Dependable Capacity (Gross MWe):

Maxim'um Dependable Capacity (Net MWe):

666 7.

8. IfChanges Occur in Capacity Ratings (Items Nmnber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net hIWe): NONE
10. Reasons For Restrictions, If Any:

This Month Yr:to-Date .Cumulative 2 4 2

'

12. Number Of Hours Reactor Was Critical ~ 744.0 062. 1 30 535.0
13. Reactor Reserve Shutdown Hours 138.8
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
17. Gross Electrical Ener~ Generated (MWH)
18. Net Hectrical Energy Generated (MWH) s '98 100.0 100 2 111 755 84.4 19 935 680 18 904 544
19. Unit Service Factor 100.0 84.4 69.8 20.

21.

Unit Availability Factor Unit Capacity Factor (Using MDC Net)

,

95 ' 83s2 68.4

22. Unit Capacity Factor (Using DER Net) 80.0 65 2
23. Unit Forced Outage Rate 3 '
24. Shutdowns Scheduled Over Next 6 Months (Typ'e. Date. and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A ~
26. Units In Test Status (Prior to Commercial Operation}: Forecast Achieved If INITIALCRITICALITY INITIALELECTRICITY COMMERCLALOPERATION

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

Turke Point Unit No.4 COMPLETED BP V- T. Chilson Page 1 of 2 P'

Licensee Cause k, Corrective Ho. Date ~ ~ec Event Action to

~Q C/I Rcport Prcvcnt Recurrence o

78-07-07 0.7 N/A HH INSTRU Unit was tripped by steam generator (c) No. 4A level protection system when the feedwater control valve opened in response to an erroneous control signal that resulted from the failure of an electronic coraponent in the feedwater control system.

(Non-nuclear system) 78-07-20 N/A zz zzzzzz Load was reduced to approximately 50X R.P. to extend operation of Core Cycle IV.

3 F: Fllrccd Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B.Maintenance or Test 2.hlanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREC.

D Regulatory Restriction 4-Other (Explain) OI 6I )

E Operator Training A Uccnse Examination F-Administ rat ive S G-Operational Error (Explain) Exhibit I - Salnc Sollfcc

(')177) I I-Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL DATF June 3, 1978 COMPLETED BY TELEPHONE (305) 552-3824 MONTH MAY 1978 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 17 18 3 19 20 21 22 23 24 25 10 26 27 12 28 13 99 14 30 15 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MEVe.Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9(77)

OPERATING DATA REPORT DOCKET NO.

DATE J~une 1 78 COMPLETED BY ~~hilson TELEPHONE.QRQ~3824 OPERATING STATUS Notes Unit No.' remained

1. Unit Name: St. Lucie Unit No. 1 Ha 1978 out of service for scheduled
2. Reposing period: refueling, maintenance, and 3, I.icensed Thermal Power (MWt): inspections.
4. Nameplate Rating (Gross MWe):

S. Design Electrical Rating (Net MWe):

6. Maximum Dependable Capacity (Gross MWe):
7. hfaximumDe p endableCa p acit y(Ne ' We:)
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

'. Power Level To Which Restricted, IfAny (Net MWc): NONE

10. Reasons For Restrictions, lf Any This Month Yr:to.Date Cumulative
11. Hours In Reporting Period 744. 0 3 623.0 12 647.0

'2.

Number Of Hours Reactor Was Critical '17.9 2 120.9 10 021-0

13. Reactor Reserve Shutdown Hours 3.4 3 4 '05.0
14. Hours Generator 1 985.9 9 667.6 On-Line'5.

Unit Reserve Shutdown Hotus . L

16. Gross Thecal Energy Generated (MWH) 4 891 229 22 740, 443
17. Gross Electrical Energy Generated (MWH) 1 599 030 7 393 790
18. Net Electrical Energy Generated (MWH) -6528 1 499 755 6 942 332
19. Unit Service Factor

'. 54.8 76.4,

20. Unit Availability Factor . 54.8 76.4
21. Unit Capacity Factor (Using MDC Net) 53.3 70.7 M. Unit Capacity Factor (Using DER Net) '1;6 68.4
23. Unit Forced Outage Rate 1.6 8.4
24. Shutdowns Scheduled Over Next 6 Month s (Type, Date. and Duration of Each): ~

1 1

25. IfShut Down At End Of Report Period, Estimated Date of Startup: June 1 1978
26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION fo/77I

UNIT SHUTDOWNS AND POSER REDUCTIONS DOCKET NO.

DATE June 3 1978 REPORT MONTH MAY 1978 Date PI EA Cl

<<

A<<tgo

'Ch

$

Licensee Fvcnt Rcport rr

'W ii) El cn G Cause k. Corrective Action to Prevent Rccurrcncc 78-03<<28 S 744.0 .Zz zzzzzz Unit No. 1 remained out of service for scheduled refueling, maintenance, and inspections. (Continued from previous month) (N'uclear and non-nuclear systems) 3 F: Forced Reason: Method: Exhibit G ~ Instructions S: Scheduled A-Equipmcnt Failure (Explain) I.Manual for Preparation of Data D.hIaintenance or Test 2.Manual Scram. Entry Shccts for Liccnsec C-Re I'ueling .3.Automatic Scram.. Event Report (LER) File(NUREG-D.Regulatory Restriction. '

4 Other (Explain) 016I )

E-Operator Training &: Liccnsc Examination F-Administrative G.Operational Error (Explain) Exhibit I - Satnc Source

(')177) I I Other (Explain)

.,g FLOIIlOA POWEII 5 LIGHT COI'IPAi'IY June 13, 1978 Office of Management Xnformation and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the Yay, 1978, Operating Scary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.

Very truly yours,

z. u>r D. Schmi Vice President Power Resources VTC/DDC cc': Hr. James P. O'Reilly Robert Lowenstein, Esctuire P OPLE...SERVING PEOPLE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 250 Turkey Point UNIT Unit No. 3 DATE June 3, 1978 COMPLETED BY V. T. Chilson TELEPHONE (305)'52-3824

~PORT MONTH MAYi 1978 Turkey Point Unit No. 3 operated at approximately 100% R.P. during the month, except for outages of May ll, 13, and 19-22, 1978. Refer to Unit Shutdowns and Power Reductions Section of the Operating Status the Report. for details.

No Maj'or Safety-related maintenance was performed during the month.

QUKIARX OF OPERATING EXPERIENCE DOCKET NO.

Turkey Point UNIT Unit No. 4 DATE June 3, 1978 COMPLETED BY 'V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH MAX, 1978 Turkey Point Unit No. 4 operated at approximately 100% R.P. during the month, except for load reduction of May 30-31, 1978, to repair con-denser leak.

'No Major Safety-related Maintenance was performed during the month.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. .50 335 St. Lucie UNIT Unit No. 1 DATE June 3 1978 COMPLETED BY V. T. Chilson TELEPHONE '305) 552-3824 QEPORT MONTH MAY, 1978 St. Lucie Unit No. 1 remained out of service during the month for scheduled refueling', maint'enance, and inspections.

Major safety-related maintenance activities performed during the month included:

Replaced 60 Batch A fuel assemblies with 60 Batch D new fuel assemblies for Cycle 2 operation.

Removed all part length control element assemblies, including drive shaft extensions, from the reactor assembly.

Installed stainless steel sleeves in the guide tubes of the fuel assemblies under full length control element assemblies.