|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
AVERAGE DAILYU>VIT POWER LEVEL DOCKET NO.
DATE June 3, 1978 COMPLP TED IIY V~ T ~ Chilson MONTH mz, 1978 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL (MWe-Net) {MWe->Vet)
I 671 l7 670 663 IS 668 661 19 611 665 '>0 667 21 6 22 416 657 23
'07 650 14 655 648 15 657 lo 646 26 662 298 27 664 589 2S 673 l3 515 79 671 662 30 662 l5 661 3l 660 l6 663 NOTE: Average daily power level greater than 666 MHe'ue to cooler condenser cooling water.
INSTRUCTIONS J
On this format. list the average daily unit power level in!>IIVe Net for each day in the reporting mi>nth. Ci>mpute to the nearest whole megawat t.
{9/77)
OPERATING DATA REPORT DOCKET NO.
DATE ~June 1978 COMPLETED BY ~~hilson 552-3824 TELEPHONE DQ.'Q OPERATING STATUS Turke Point Unit No. 3 Notes - Unit No. 3 operated I. Unit Name: at approximately 100X 'R.P.
- g. Reporting Period:
2200 except for outages of May 11,
- 3. Licensed Thermal Power (MWt): 13, and 19;22, 1978.
- 4. Namephte Rating (Gross MWe):
- 5. Design Electrical Rating (Net ilIWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
IfAny (Net MWe): NONE
- 9. Power Level To Which Restricted,
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative 744.0 3 623.0 48 104.6
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 701. 9 2 468.0 39.7 73.'9 185 '
- 13. Reactor Reserve Shutdown Hours 678.2 2 327.1 36 413.5
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours 4 929 172 71 703 364
- 16. Gross Thecal Energy Generated (MWH) 458 740 1 583 575 22 867 920 l7. Gross Electrical Ener ~ Generated (MWH)
- 19. Unit Service Factor 91. 2 64. 2
- 20. Unit Availability Factor
'1.6 64.2 75.9
- 21. Unit Capacity Factor (Using MDC Net) 87.8 62.0 84.4 . 59.6 64.9
- 22. Unit Capacity Factor (Using DER Net) 1.9 0.9 2.7
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 elfonths (Type. Date, and Duration of Each):
Steam Generator Tube Insnection Pro ram Au ust 17 - Sentember 1 1 78
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
UNIT SIIUTDOWNS AND FOWER REDUCTIONS DOCKET NO 50 250 UNITNAMF Turke Point Unit No. 3 COMPLETED DY V REPORT MONTH ~MY 1978 rl Liccnsec 8 Vl 9 Cause A Corrective RE N11. Date ~ A Event Action to EE Cl Rcport 0 E~
O Prevent Rccurrcnee Cr 78-05-11 F 10. 2 N/A HJ PIPEXX Unit was removed from service to (D) repair leak in a moisture-separator-reheater alternate. drain line to the condenser. (Non-nuclear system) 78-05-13 F 3.0 N/A HH VALVEX Unit was removed from service to (c) repair a feed water check valve packing leak. (Non-nuclear system) 10 78&5-19 S 52.5 N/A N/A zzzzzz Unit was removed from service to repair miscellaneous steam leaks in the secondary system. (Non-nuclear system)
I 3 4 F: Forced Reason: Method: Exhibit G ~ Instructions S: Scheduled A.Equipment Failure (Explain) I.Manual for Preparation of Data I).hiaintenancc or Test 2 Manual Scram. Entry Sheets for Licensee C.Rcfucling 3.Automatic Scram. Event Rcport (LE R) File (NU RE-'016 D Regulatory Restriction ~ 4 Other (Explahl) )
E.Operator Training k, Liccnsc Examination F-Administrative G.Operational Error (Explain) Exhibit I - Sante Source II Other (Expiahl)
AVERAGE DAILYUNIT POWER LEVEL DATE June 3 1978 COMPLETED BY + T Chilson TELEPHONE (305) 552-3824 MOMH Mug 1978 P
DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-iNet)
I 656 l7 641 646 IS 642 642 I9 648 50 643
'655 21 643 652 22 639 644 23 642 'i4 628 645 'l5 626 10 644 26 629 642 27 l2 647 2S 646 l3 647 99 41 l4 644 30 611 15 31 l6 646 INSTR VCTIONS, On this format, list the average daily unit power level in Mme.Net for each day in the reporting month. Compute to the nearest whole megawat t.
(ol77 I
OPERATING DATA REPORT DOCKET i fO. 50-251 DATE June ~978 COAiPLETED BY ~V.. Ohilsss TELEPHONE. 4~~-3824 OPERATING STATUS Turke Point Unit No. 4 Not~- Unit No. 4 opera'ted at I. Unit Name: approximate1y 100% R.P.
Ma 1978
- 2. Reporting period:
2200 except for load reduction-
- 3. Licensed Thermal Power (hIWt): of May 30-31, 1978.
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net hI IVe):
- 6. Maximum Dependable Capacity (Gross MWe):
Maxim'um Dependable Capacity (Net MWe):
666 7.
- 8. IfChanges Occur in Capacity Ratings (Items Nmnber 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net hIWe): NONE
- 10. Reasons For Restrictions, If Any:
This Month Yr:to-Date .Cumulative 2 4 2
- 12. Number Of Hours Reactor Was Critical ~ 744.0 062. 1 30 535.0
- 13. Reactor Reserve Shutdown Hours 138.8
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 17. Gross Electrical Ener~ Generated (MWH)
- 18. Net Hectrical Energy Generated (MWH) s '98 100.0 100 2 111 755 84.4 19 935 680 18 904 544
- 19. Unit Service Factor 100.0 84.4 69.8 20.
21.
Unit Availability Factor Unit Capacity Factor (Using MDC Net) 95 ' 83s2 68.4
- 22. Unit Capacity Factor (Using DER Net) 80.0 65 2
- 23. Unit Forced Outage Rate 3 '
- 24. Shutdowns Scheduled Over Next 6 Months (Typ'e. Date. and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A ~
- 26. Units In Test Status (Prior to Commercial Operation}: Forecast Achieved If INITIALCRITICALITY INITIALELECTRICITY COMMERCLALOPERATION
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
Turke Point Unit No.4 COMPLETED BP V- T. Chilson Page 1 of 2 P'
Licensee Cause k, Corrective Ho. Date ~ ~ec Event Action to
~Q C/I Rcport Prcvcnt Recurrence o
78-07-07 0.7 N/A HH INSTRU Unit was tripped by steam generator (c) No. 4A level protection system when the feedwater control valve opened in response to an erroneous control signal that resulted from the failure of an electronic coraponent in the feedwater control system.
(Non-nuclear system) 78-07-20 N/A zz zzzzzz Load was reduced to approximately 50X R.P. to extend operation of Core Cycle IV.
3 F: Fllrccd Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B.Maintenance or Test 2.hlanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREC.
D Regulatory Restriction 4-Other (Explain) OI 6I )
E Operator Training A Uccnse Examination F-Administ rat ive S G-Operational Error (Explain) Exhibit I - Salnc Sollfcc
(')177) I I-Other (Explain)
AVERAGE DAILYUNIT POWER LEVEL DATF June 3, 1978 COMPLETED BY TELEPHONE (305) 552-3824 MONTH MAY 1978 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 17 18 3 19 20 21 22 23 24 25 10 26 27 12 28 13 99 14 30 15 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MEVe.Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9(77)
OPERATING DATA REPORT DOCKET NO.
DATE J~une 1 78 COMPLETED BY ~~hilson TELEPHONE.QRQ~3824 OPERATING STATUS Notes Unit No.' remained
- 1. Unit Name: St. Lucie Unit No. 1 Ha 1978 out of service for scheduled
- 2. Reposing period: refueling, maintenance, and 3, I.icensed Thermal Power (MWt): inspections.
- 4. Nameplate Rating (Gross MWe):
S. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. hfaximumDe p endableCa p acit y(Ne ' We:)
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
'. Power Level To Which Restricted, IfAny (Net MWc): NONE
- 10. Reasons For Restrictions, lf Any This Month Yr:to.Date Cumulative
- 11. Hours In Reporting Period 744. 0 3 623.0 12 647.0
'2.
Number Of Hours Reactor Was Critical '17.9 2 120.9 10 021-0
- 13. Reactor Reserve Shutdown Hours 3.4 3 4 '05.0
- 14. Hours Generator 1 985.9 9 667.6 On-Line'5.
Unit Reserve Shutdown Hotus . L
- 16. Gross Thecal Energy Generated (MWH) 4 891 229 22 740, 443
- 17. Gross Electrical Energy Generated (MWH) 1 599 030 7 393 790
- 18. Net Electrical Energy Generated (MWH) -6528 1 499 755 6 942 332
- 19. Unit Service Factor
'. 54.8 76.4,
- 20. Unit Availability Factor . 54.8 76.4
- 21. Unit Capacity Factor (Using MDC Net) 53.3 70.7 M. Unit Capacity Factor (Using DER Net) '1;6 68.4
- 23. Unit Forced Outage Rate 1.6 8.4
- 24. Shutdowns Scheduled Over Next 6 Month s (Type, Date. and Duration of Each): ~
1 1
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup: June 1 1978
- 26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION fo/77I
UNIT SHUTDOWNS AND POSER REDUCTIONS DOCKET NO.
DATE June 3 1978 REPORT MONTH MAY 1978 Date PI EA Cl A<<tgo
'Ch Licensee Fvcnt Rcport rr
'W ii) El cn G Cause k. Corrective Action to Prevent Rccurrcncc 78-03<<28 S 744.0 .Zz zzzzzz Unit No. 1 remained out of service for scheduled refueling, maintenance, and inspections. (Continued from previous month) (N'uclear and non-nuclear systems) 3 F: Forced Reason: Method: Exhibit G ~ Instructions S: Scheduled A-Equipmcnt Failure (Explain) I.Manual for Preparation of Data D.hIaintenance or Test 2.Manual Scram. Entry Shccts for Liccnsec C-Re I'ueling .3.Automatic Scram.. Event Report (LER) File(NUREG-D.Regulatory Restriction. '
4 Other (Explain) 016I )
E-Operator Training &: Liccnsc Examination F-Administrative G.Operational Error (Explain) Exhibit I - Satnc Source
(')177) I I Other (Explain)
.,g FLOIIlOA POWEII 5 LIGHT COI'IPAi'IY June 13, 1978 Office of Management Xnformation and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the Yay, 1978, Operating Scary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.
Very truly yours,
- z. u>r D. Schmi Vice President Power Resources VTC/DDC cc': Hr. James P. O'Reilly Robert Lowenstein, Esctuire P OPLE...SERVING PEOPLE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50 250 Turkey Point UNIT Unit No. 3 DATE June 3, 1978 COMPLETED BY V. T. Chilson TELEPHONE (305)'52-3824
~PORT MONTH MAYi 1978 Turkey Point Unit No. 3 operated at approximately 100% R.P. during the month, except for outages of May ll, 13, and 19-22, 1978. Refer to Unit Shutdowns and Power Reductions Section of the Operating Status the Report. for details.
No Maj'or Safety-related maintenance was performed during the month.
QUKIARX OF OPERATING EXPERIENCE DOCKET NO.
Turkey Point UNIT Unit No. 4 DATE June 3, 1978 COMPLETED BY 'V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH MAX, 1978 Turkey Point Unit No. 4 operated at approximately 100% R.P. during the month, except for load reduction of May 30-31, 1978, to repair con-denser leak.
'No Major Safety-related Maintenance was performed during the month.
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. .50 335 St. Lucie UNIT Unit No. 1 DATE June 3 1978 COMPLETED BY V. T. Chilson TELEPHONE '305) 552-3824 QEPORT MONTH MAY, 1978 St. Lucie Unit No. 1 remained out of service during the month for scheduled refueling', maint'enance, and inspections.
Major safety-related maintenance activities performed during the month included:
Replaced 60 Batch A fuel assemblies with 60 Batch D new fuel assemblies for Cycle 2 operation.
Removed all part length control element assemblies, including drive shaft extensions, from the reactor assembly.
Installed stainless steel sleeves in the guide tubes of the fuel assemblies under full length control element assemblies.