AVERAGE DAILYU>VITPOWER LEVEL DOCKET NO.
DATE June 3,
1978 COMPLPTED IIY V ~
T ~ Chilson MONTH mz, 1978 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)
I 671 DAY AVERAGE DAlLYPOWER LEVEL
{MWe->Vet) l7 670 6
lo l3 l5 l6 663 661 665 667 657 650 648 646 298 589 515 662 661 663 IS 19
'>0 21 22 23 14 15 26 27 2S 79 30 3l NOTE:
668 611 416
'07 655 657 662 664 673 671 662 660 Average daily power level greater than 666 MHe'ue to cooler condenser cooling water.
INSTRUCTIONS J
On this format. list the average daily unit power level in!>IIVe Net for each day in the reporting mi>nth. Ci>mpute to the nearest whole megawat t.
{9/77)
OPERATING STATUS OPERATING DATAREPORT DOCKET NO.
DATE
~June 1978 COMPLETED BY ~~hilson TELEPHONE DQ.'Q 552-3824 I. Unit Name:
Turke Point Unit No.
3
- g. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2200
- 4. Namephte Rating (Gross MWe):
- 5. Design Electrical Rating (Net ilIWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
Notes - Unit No.
3 operated at approximately 100X 'R.P.
except for outages of May 11, 13, and 19;22, 1978.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr.-to-Date Cumulative 744.0 3 623.0 2 468.0 678.2 4 929 172 458 740 64.2
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 701. 9
- 13. Reactor Reserve Shutdown Hours 39.7 73.'9
- 14. Hours Generator On-Line 2 327.1
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thecal Energy Generated (MWH) l7. Gross Electrical Ener ~ Generated (MWH) 1 583 575
- 19. Unit Service Factor
- 91. 2
- 64. 2
- 20. Unit AvailabilityFactor
'1.6
- 21. Unit Capacity Factor (Using MDC Net) 87.8 62.0
- 22. Unit Capacity Factor (Using DER Net) 84.4 59.6
- 23. Unit Forced Outage Rate 1.9 0.9
- 24. Shutdowns Scheduled Over Next 6 elfonths (Type. Date, and Duration of Each):
Steam Generator Tube Insnection Pro ram Au ust 17 - Sentember 1
48 104.6 185 '
36 413.5 71 703 364 22 867 920 75.9 64.9 2.7 1 78
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units ln Test Status (Prior to Commercial Operation):
N/A Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
UNITSIIUTDOWNS AND FOWER REDUCTIONS REPORT MONTH~MY 1978 DOCKET NO 50 250 UNITNAMFTurke Point Unit No.
3 COMPLETED DY V N11.
Date rl
~A EE Cl Liccnsec Event Rcport 0 8
9 Vl RE E~
O Cr Cause A Corrective Action to Prevent Rccurrcnee 78-05-11 F
- 10. 2 N/A HJ PIPEXX (D)
Unit was removed from service to repair leak in a moisture-separator-reheater alternate. drain line to the condenser.
(Non-nuclear system) 78-05-13 F
3.0 N/A HH VALVEX (c)
Unit was removed from service to repair a feed water check valve packing leak.
(Non-nuclear system) 10 78&5-19 S
52.5 N/A N/A zzzzzz Unit was removed from service to repair miscellaneous steam leaks in the secondary system.
(Non-nuclear system)
I F: Forced S: Scheduled Reason:
A.Equipment Failure (Explain)
I).hiaintenancc or Test C.Rcfucling D Regulatory Restriction E.Operator Training k, Liccnsc Examination F-Administrative G.Operational Error (Explain)
II Other (Expiahl) 3 Method:
I.Manual 2 Manual Scram.
3.Automatic Scram.
~ 4 Other (Explahl) 4 Exhibit G ~ Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NU RE-'016
)
Exhibit I - Sante Source
AVERAGE DAILYUNITPOWER LEVEL DATE June 3
1978 COMPLETED BY +
T Chilson TELEPHONE (305) 552-3824 MOMH Mug 1978 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)
I 656 P
DAY AVERAGE DAILYPOWER LEVEL (MWe-iNet) 641 l7 10 l2 l3 l4 15 l6 646 642 648
'655 652 644 642 645 644 642 647 647 644 646 IS I9 50 21 22 23
'i4
'l5 26 27 2S 99 30 31 642 643 643 639 628 626 629 646 41 611 INSTRVCTIONS, On this format, list the average daily unit power level in Mme.Net for each day in the reporting month. Compute to the nearest whole megawat t.
(ol77 I
OPERATING STATUS OPERATING DATAREPORT DOCKET ifO.
50-251 DATE June ~978 COAiPLETED BY ~V.. Ohilsss TELEPHONE. 4~~-3824 I. Unit Name:
Turke Point Unit No.
4
- 2. Reporting period:
Ma 1978
- 3. Licensed Thermal Power (hIWt):
2200
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net hIIVe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maxim'um Dependable Capacity (Net MWe):
666 Not~- Unit No.
4 opera'ted at approximate1y 100% R.P.
except for load reduction-of May 30-31, 1978.
- 8. IfChanges Occur in Capacity Ratings (Items Nmnber 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, IfAny (Net hIWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr:to-Date
.Cumulative 2 84.4 80.0
- 12. Number Of Hours Reactor Was Critical
~
744.0 062. 1
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours s
- 17. Gross Electrical Ener~ Generated (MWH)'98 100 2 111 755
- 18. Net Hectrical Energy Generated (MWH)
- 19. Unit Service Factor 100.0
- 20. Unit AvailabilityFactor
, 100.0 84.4
- 21. Unit Capacity Factor (Using MDC Net) 95 '
83s2
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 Months (Typ'e. Date. and Duration of Each):
4 2
30 535.0 138.8 19 935 680 18 904 544 69.8 68.4 65 2
3 '
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation}:
INITIALCRITICALITY INITIALELECTRICITY COMMERCLALOPERATION N/A
~
Forecast Achieved If
UNITSIIUTDOWNS ANDPOWER REDUCTIONS Page 1 of 2 DOCKET NO.
Turke Point Unit No.4 COMPLETED BP V-T. Chilson Ho.
Date P'
~ ~ec Q~ C/I o
Licensee Event Rcport Cause k, Corrective Action to Prcvcnt Recurrence 78-07-07 0.7 N/A HH INSTRU (c)
Unit was tripped by steam generator No. 4A level protection system when the feedwater control valve opened in response to an erroneous control signal that resulted from the failure of an electronic coraponent in the feedwater control system.
(Non-nuclear system) 78-07-20 N/A zz zzzzzz Load was reduced to approximately 50X R.P.
to extend operation of Core Cycle IV.
F: Fllrccd S: Scheduled
(')177)
Reason:
A-Equipment Failure (Explain)
B.Maintenance or Test C-Refueling D Regulatory Restriction E Operator Training A Uccnse Examination F-Administ rat ive G-Operational Error (Explain)
II-Other (Explain) 3 Method:
I-Manual 2.hlanual Scram.
3-Automatic Scram.
4-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREC.
OI 6I )
S Exhibit I - Salnc Sollfcc
AVERAGE DAILYUNITPOWER LEVEL DATF June 3,
1978 COMPLETED BY TELEPHONE (305) 552-3824 MONTH MAY 1978 DAY AVERAGEDAILYPOWER LEVEL (MWe-Net) 3 10 12 13 14 15 16 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 17 18 19 20 21 22 23 24 25 26 27 28 99 30 31 INSTRUCTIONS On this format, list the average daily unit power level in MEVe.Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9(77)
OPERATING DATAREPORT OPERATING STATUS DOCKET NO.
DATE J~une 1 78 COMPLETED BY ~~hilson TELEPHONE.QRQ~3824 Notes Unit No.'
remained out of service for scheduled refueling, maintenance, and inspections.
- 1. Unit Name:
St. Lucie Unit No.
1
- 2. Reposing period:
Ha 1978 3, I.icensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
S. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. hfaximumDe endableCa acit Ne We:
p p
y( ')
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
'. Power Level To Which Restricted, IfAny (Net MWc):
- 10. Reasons For Restrictions, lfAny NONE Yr:to.Date This Month 744. 0
'17.9 3 623.0 2 120.9 3 4 3.4 1 985.9 4 891 229 1 599 030 1 499 755
-6528 54.8 '.
. 54.8 53.3
'1;6 1.6 s (Type, Date. and Duration of Each):
~
- 11. Hours In Reporting Period
'2.
Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line'5.
Unit Reserve Shutdown Hotus L
- 16. Gross Thecal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
M. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Month Cumulative 12 647.0 10 021-0
'05.0 9 667.6
. 22 740, 443 7 393 790 6 942 332 76.4, 76.4 70.7 68.4 8.4 1
1
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units ln Test Status (Prior to Commercial Operation):
June 1
1978 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION fo/77I
UNITSHUTDOWNS ANDPOSER REDUCTIONS REPORT MONTH MAY 1978 DOCKETNO.
DATE June 3
A<<
tg
<< 'Ch $
Licensee Fvcnt Rcport rr'W ii) El cn G Cause k. Corrective Action to Prevent Rccurrcncc 78-03<<28 S
744.0
.Zz zzzzzz Unit No.
1 remained out of service for scheduled refueling, maintenance, and inspections.
(Continued from previous month)
(N'uclear and non-nuclear systems)
F: Forced S: Scheduled
(')177)
Reason:
A-Equipmcnt Failure (Explain)
D.hIaintenance or Test C-Re I'ueling D.Regulatory Restriction.
E-Operator Training &: Liccnsc Examination F-Administrative G.Operational Error (Explain)
I I Other (Explain) 3 Method:
I.Manual 2.Manual Scram.
.3.Automatic Scram..
4 Other (Explain) '
Exhibit G ~ Instructions for Preparation of Data Entry Shccts for Liccnsec Event Report (LER) File(NUREG-016I )
Exhibit I - Satnc Source
FLOIIlOA POWEII
.,g 5 LIGHT COI'IPAi'IY June 13, 1978 Office of Management Xnformation and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Attached are the Yay, 1978, Operating Scary Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. 1.
Very truly yours,
- z. u>r D. Schmi Vice President Power Resources VTC/DDC cc':
Hr. James P. O'Reilly Robert Lowenstein, Esctuire P OPLE...SERVING PEOPLE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
UNIT 50 250 Turkey Point Unit No.
3 DATE June 3,
1978 COMPLETED BY V. T. Chilson TELEPHONE (305)'52-3824
~PORT MONTH MAYi 1978 Turkey Point Unit No.
3 operated at approximately 100% R.P. during the
- month, except for outages of May ll, 13, and 19-22, 1978.
Refer to the Unit Shutdowns and Power Reductions Section of the Operating Status Report. for details.
No Maj'or Safety-related maintenance was performed during the month.
QUKIARX OF OPERATING EXPERIENCE DOCKET NO.
Turkey Point UNIT Unit No.
4 DATE June 3,
1978 COMPLETED BY
'V. T. Chilson REPORT MONTH MAX, 1978 TELEPHONE (305) 552-3824 Turkey Point Unit No.
4 operated at approximately 100% R.P. during the month, except for load reduction of May 30-31, 1978, to repair con-denser leak.
'No Major Safety-related Maintenance was performed during the month.
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
.50 335 St. Lucie UNIT Unit No.
1 DATE June 3
1978 COMPLETED BY V. T. Chilson TELEPHONE
'305) 552-3824 QEPORT MONTH MAY, 1978 St. Lucie Unit No.
1 remained out of service during the month for scheduled refueling', maint'enance, and inspections.
Major safety-related maintenance activities performed during the month included:
Replaced 60 Batch A fuel assemblies with 60 Batch D new fuel assemblies for Cycle 2 operation.
Removed all part length control element assemblies, including drive shaft extensions, from the reactor assembly.
Installed stainless steel sleeves in the guide tubes of the fuel assemblies under full length control element assemblies.