|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.Turke Point UNIT COMPLETED gY V.T.Chi ls<n I L (I TELEPHONE Llll5l=MONTH SEPTEMBER 197S DAY AVERAGE DAILY POWER LEVEL (M We-Net)I 7 659 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17 I8 IO l3 IS!6 60 660 58 652 657 660 665 663 659 l9 20 2l 22 25 26 27 28 a9 30 310 6 2 450 260 624 0 660 56 it tt I li;r ts INSTRUCTIONS On this format.list the average daily unit power level tn LiDVe Nct for each day in thc reporting month.Compute to the nearest whole niegaivat t.(or77)8004840 ggyI OPERATING STATUS OPERATING DATA REPORT DOCKET NO.50 250 DATE~~2,78 COhlPLETED BY~~hj3.son TELEPHONE~~3824 728 I.Unit iVame: Turkey Point Unit iVo.3 2.Reporting Period: S tembe 3.Licensed Thermal Power (MWt): 2200 4.Nameplate Rating (Gross MWe): S.Design Electrical Rating (Net hlWe): iVotes-Unit No.3 operated a approximately 100/.R.P.ex-cept for outage of Sept.18-19 1978, and load reductions of Sept.22-23, and 23-24,1978.
8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net hOVe): 10.Reasons For Restrictions, If Any: NONE This Month Yr.to-Date Cumulative 720.0 6 551.0 707.7 4 946.6 ll.Hours In Reporting Period 12.i umber Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 9.6 83.5 14.Hours Generator On-Line IS.Unit Reserve Shutdown Hours 17.Gross Electrical Energy Generated (MWH)469 785 3 313 410 18.iVet Electrical Energy Generated (MWH)446 134 3 135 529 19.Unit Service Factor 98.3 75.5 20.Unit Availability Factor 100.0 75.5 71.9 22.Unit Capacity Factor (Using DER Net)89.4 69.1 23.Unit Forced Outage Rate-0-1.1 24.Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each): 51" 032.6 194.6 39 033.0 24 597 755 23 282 179 76.5 76.7 69.1 65.8 2.6 Harch 4 1979.25.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units ln Test Status{Prior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY INITIA L ELECTRICITY COMMERCIAL OPERATION UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT hION'fll~SZXQJ55 1978 I it No.3 DATF Oct.7 1978 COMPI.ETED DY Ihtc fP A c c ec u<c>>CA Licensee Event Report c CC u u g O cn 6 c 0 c Q c E~O Cause Ec Corrective Acliun lo Prcvcnl Recurrence 21 78-09-18 12.3 B N/A ZZZZZZ Unit No.3 Mas removed from service to perform integrated safeguards surveillance test.(Nuclear system)22 78-09-22-0-N/A HC HTEXCH (D)Load reduction to locate and repair condenser tube leak.(Non-nuclear sys tern)23 78-08-23 N/A HC HTEXCH (D)Load reduction to locate and repair condenser tube leak.(Non-nuclear system)I F: Forccrl S: Schcdolcd (9/77)Reason: A.Erluipmcnt Failure (Explain)8 hlaintcnance oi Test C Refueling D Regulatory Restriction li-Operator Twining k Liccnsc Examination F.Administrative G Opcratiottal lirrur (Fxplain)I I Otlfcr (Explain)3 hlclhod: I hlauual 2 hlanual Scram.3 Automatic Scram.4.Other (Lxplain)Exltibil G-Instructions for Preparatloll ul Data Entry Sltccts I'or Licensee Event Report (LERI Flic INURI'.G-OI6 I)Exlribit I~Saruc Source ,<<',~,<<i~>~',"~~',~'i~~~>><<ia~"-."~i>>'I"'.<<': i 8<<.w
AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO.50-25 1 DATE Ot~.7, 1978 COMPLETED BY SEPTEMBERr 1978 DAY AVERAGE DAILY POWER LEVEL (hI We.Nct)'AY AVERAGE DAILY POWER LEVEL (hIWe-iVct) l7 I8 l9 20 2l 22 IO l3 l4 IS l6 84 25 26 2 f 2$'i9 30 INSTRUCTIONS On this format, list the aireragc daily unit power ieiiel in MWc Nct for each day in the reporting tnunth.Cumput<<to the nearest whole megawatt.I')177 l OPERATING DATA REPORT OPERATING STATUS ev Point Unit No.4 o0 728 I.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (iIWt): 4.iVamepiate Rating (Gross Mme): S.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum'Dependable Capacity (iVet MWe): DOCKET NO.DATE Qcr~78 COMPLETED OY~~hilson TELEPHOiVE 430S3~-3824 Notes-Una.t No.4 scheduled refueling, maintenance, and inspections continued during month.Initial reactor crit cality following completion of refueling was accompli'she on September 28, 1978.~g~'.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons: 9.Power Level To'iVhich Restricted, lf Any (Net MWe): 10.Reasons For Restrictions, lf Any: 5 i Yr..to.Date This Month 720.0 I I.Hours In Reporting Period 12., Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On.Line IS.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (M'IVH)17.Gross Electrical Energy Generated (hlWH)IS.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using I(DC Net)"".Unit Capacity Factor (Using DER Net)~D.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months 4 876.5 54.7-0--0-'-0--0-3 028 155 2 865 454-3 210 73.4 73.4 65.7-0--0-63.1-0-0.1 (Type.Date, and Duration of Each): Cumulative 32 349.4 138.8-0-20 852 080 19 761 939 6.1 66.8 63.7 2.9 25.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):
October 1, 1978 Forecast Achieved IN ITIA L CR ITICA LITY INITIAL ELFCTRICITY COMMERCIAL OPERATION ('>/77)
UNIT SIIUTDOWNS AND POWER REDUCTIONS gEpppTgpNm SEPTppBER 1978 COh(PLETED BY lit No.4 Ns).Dare~A I.~I I'vl rl Cl a, c 5rx!r<c~C/l Llceiiscc Event Report ir C tt 0 Cl'n Vl cn G C 0 c Q E~O Cr Cailsc k, Corrective Acllilil lo Prcvelil Rceurrcrlec 7S-08-13 S 720.0 N/A zz ZZZZZZ Unit No.4 was removed from service for scheduled refueling, maintenance, and inspections.(Continued f rom previous month)(Nuclear and non-nuclear systems)I F: Forced S: Scheduled ('t/17)Reason: A-Er(uipmcnt Failure (Explain)8 htalntcnancc oi Test C-Refueling D Rcyilatory Restriction L.Operator Training tL Liccnsc Exaniinalion F.Adminislmtive G Operational Error (Lxplain)I I Other (Explain)htcthod: I-hlanual 2-h(anual Scram.3-Aulolualic Scram.4.Other (Explain)Exhibit G-Instructions for Preparation tf Data Entry Sheets lor Licensee Event Rcport (LL'R)File (NURL'G.016 l)5 Exliibil I-Saine Source 4'r-4~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.S t.Lucre DATE Oct.7, 1978 COMPLETED BY on MONTH SEP TEI IBE R, 19 78 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)DAY AVERAGE DAlLY POWER LEVEL (LIIWe.Nct) 782 17 10 12 13 15 16 INSTRUCTIONS 351 77 777 778 778 779 767 773 IS 19 20 21 22 23 25 26'l9 30 NOTE: 783 778 741 782 769 764 765~760 Average daily power level greater than 777 Kfe due to cooler condenser cooling water.'is ,r I-0~4'r I~o o tt II tt ll I: I j;it~j On this format, list the average daily unit power tcvcl in Mac.Nct for each day in thc rcportinnmonth.
Compute to the nearest whole megawatt.I<)/77)
OPERATING DATA REPORT DOCKET NO.DATE Q~f~f[78 COhIPLETED GY~~son TELEPHONE X2RB~-3824 OPERATING STATUS l.Unit Name: 2.Reportfng Period: Se tember 1978 3.Licensed Thermal Power (MWt): 4.Namephte Rating (Gross MWe): 5.Design Electrical Rating (Net MIVe): 6.Maximum Dependable Capacity (Cross MWe): 7.hlaximum Dependable Capacity (Net hIWe): 2560 850 802 822 777 Notes-Unit operated at ap-prox'.mately 100K R.P.afrer main power transformer Vo.lA was returned to service on September 3, 1978.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, lf Any: This hlonth Yr.to Date Cumulative 2 32.0'118.5 12 525.8 21.0 29 630 204 9 621 060 9 041 725 80.4 80.6 74.7 72.4 6.9 er 3, 1978 I I.Hours In Reporting Period 12.Number Of Hours Reactor'IVas Critical 13.Reactor Reserve Shutdown Hours 16.9 14.Hours Generator On.Line 4 844.0 15.Unit Reserve Shutdown Hours 11.7 21.0 11 780 990 17.Gross Electrical Energy Ccnerated (MWH)558 870 3 826 300 18.Net Electrical Energy Generated (MWH)5 27.35 7 3 599 148 19.Unit Service Factor 98.4 73.9 20.Unit Avaiiability Factor 100'74~3 70.7 22.Unit Capacity Factor (Using DER Net)91.3 68.5 23.Unit Forced Outage Rate-0-1.4 24.Shutdowns Scheduled Over Next 6 hlonths (Type, Date.and Duration of Each): am Generator Tube Insnection Pro ram-October 30-Decemb 25.If Shut Down At End Of Report Period.Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIA L CR ITICA LITY INITIAL ELECTRICITY COhIMERCIAL OPERATION UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.50 335 UNITNAhIE No.1 REPORThIONfI>>
SEPTEHBER, 1978 Nii.Date I I Ul fl Cl M~-n V~cc u<a~Vl Q Liccnscc Event Report rr C C~e a~>E(3 0 CJ Cause h.Corrective Action lo Pfcvcrll Recllrrerrcc 18 78-08-30 S N/A EG TRANS F Load was limited to the capacity of main power transformer No.1B.(Continued from previous month)(Non-nuclear system)78-08-31 S 5.3 N/A EG TRANSF Unit was removed from service to pro-tect personnel using a crane to remove a faulty bushing from main power transformer No.1A.(Continued from previous month)(Non-nuclear system)20 78-09-02 S 6.4 B N/A EG TRANSF Unit was removed from service to return main power transformer No.lA to service after installation of a new bushing and seal.(Non-nuclear system)F: Forced S: Scheduled (9/77)Reason: A Equipmcnt Failure (Expiaio)8 hlainlcnance oi Test C Rcfucling D Regrdatory ltestrtclton E.Operator Training h.Iiccnsc Examination F.Administ wlivc G.Opcraliooal Error (Explain)II.Other (Explain)hicthod: I.hianual 2.hianual Scram.3-Aufonmlic Scram.4-Other (Explaut)Exhibit G-Instructions for Prcparalio>>
of Data Entry Sheets lor Lieensec Event lteporl (LL'R)Fiie I YUltEG.0!6I)5 Exllibit I-Sarrre Source i+I cLORIOA?0"VER 5 uGHI'Qi"I?A."A October 7, 1978 Office of Management Information and Program Controls U.S.Nuclear Regulatory Commission Washington, D.C.20555~~C Gentlemen:
Attached are the September, 1978, Operating Summary Reports for Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.1.Very truly yours, D.Schmia Vice President Power Resources~4 I'I;~~tl-C VTC/DDC cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire 4
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.50-250 Turkey Point UNIT Unit No.3 DATE Oct.7, 1978 COMPLETED BY V.T.Chilson QEPORT MONTH SEPTEMBER, 19 78 TELEPHONE (305)552-3824)Unit operated at approximately 100$R.P.except for the outage of September 18-19, 1978, and the load reductions of September 22-23 and 23-24, 1978.Refer to"Unit Shutdowns and Power Reductions" section of the September, 1978, Operating Status Report for additonal information.
No Major Safety-related maintenance was performed during the month.
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO..50-251 Turkey Point Unit No.4 DATE Oct.7 1978 COMPLETED BY V.T.Chilson~~4~TELEPHONE 305 552-3824 QEPORT MONTH SEPTEMBER 1978 Scheduled refueling, maintenance, and inspections outage continued during month.Initial reactor criticality following completion of zefueling was accomplished on September 28, 1978.Major Safety-related maintenance activities performed during the month included: Completed the Steam Generator Tube Inspection Program.Refer to Steam Generator Inspection Report of September 6, 1978, for additional information.
Installed 12 new fuel assemblies and shuffled partially spent fuel assemblies for Core Cycle V operation.
Completed modifications to charging system piping.g 1 C I
$UMMARY OF OPERATING EXPERIENCE
~4~~~~~KT DOCKET NO..50-335 cC it.il'C UNIT S t.Lucie nit N.1 QEPORT MONTH SEPTEMBER, 1978 DATE Oct.7 1978 COMPLETED BY V.T.i s TELEPHONE t~I'i I!Ig~i Unit operated at approximately 100%R.P.after main power trans-former No.1A was.returned to service on September 3, 1978.Major Safety-related maintenance performed during the month in-cluded inspection and repairs on charging pump No.1A.Refer to Licensee Event Report No.335-78-34 for additional details.Pi If~j l if~i t!