AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

Turke Point UNIT I

COMPLETED gY V. T. Chi ls<n L (I

TELEPHONE Llll5l=

MONTH SEPTEMBER 197S DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (M We-Net) (MWe-Net)

I 7 17 659 I8 60 l9 310 20 it 2l 6 2 tt I

22 li 660 450 ;r ts 58 260 25 624 IO 652 26 0 657 27 660 660 28 l3 665 a9 56 663 30 IS 659

!6 INSTRUCTIONS On this format. list the average daily unit power level tn LiDVe Nct for each day in thc reporting month. Compute to the nearest whole niegaivat t.

(or77) 8004840 ggyI

OPERATING DATA REPORT DOCKET NO. 50 250 DATE COhlPLETED BY

~~2,78

~~hj3.son TELEPHONE ~~3824 OPERATING STATUS Turkey Point Unit iVo. 3 iVotes - Unit No. 3 operated a I. Unit iVame: approximately 100/. R.P. ex-

2. Reporting Period: S tembe 2200 cept for outage of Sept.18-19
3. Licensed Thermal Power (MWt): 1978, and load reductions of 728
4. Nameplate Rating (Gross MWe): Sept. 22-23, and 23-24,1978.

S. Design Electrical Rating (Net hlWe):

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net hOVe): NONE
10. Reasons For Restrictions, If Any:

This Month Yr. to-Date Cumulative ll. Hours In Reporting Period 720.0 6 551.0 51" 032.6

12. i umber Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 9.6 83.5 194.6
14. Hours Generator On-Line 707. 7 4 946.6 39 033.0 IS. Unit Reserve Shutdown Hours
17. Gross Electrical Energy Generated (MWH) 469 785 3 313 410 24 597 755
18. iVet Electrical Energy Generated (MWH) 446 134 3 135 529 23 282 179
19. Unit Service Factor 98.3 75.5 76.5
20. Unit Availability Factor 100.0 75.5 76.7 71.9 69. 1
22. Unit Capacity Factor (Using DER Net) 89.4 69.1 65.8
23. Unit Forced Outage Rate 1.1 2.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

Harch 4 1979.

25. IfShut Down At End Of Report Period. Estimated Date of Startup:
26. Units ln Test Status { Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS Oct. 7 1978 I it No.3 DATF COMPI.ETED DY REPORT hION'fll ~SZXQJ55 1978 fP A c c Licensee uCCu c0 Cause Ec Corrective Ihtc Event gO Q c Acliun lo c ec E~

>>u<CA c Report c cn 6 O Prcvcnl Recurrence 21 78-09-18 12.3 B N/A ZZZZZZ Unit No. 3 Mas removed from service to perform integrated safeguards surveillance test. (Nuclear system) 22 78-09-22 N/A HC HTEXCH Load reduction to locate and repair (D) condenser tube leak. (Non-nuclear sys tern) 23 78-08-23 N/A HC HTEXCH Load reduction to locate and repair (D) condenser tube leak. (Non-nuclear system)

I 3 F: Forccrl Reason: hlclhod: Exltibil G - Instructions S: Schcdolcd A.Erluipmcnt Failure (Explain) I hlauual for Preparatloll ul Data 8 hlaintcnance oi Test 2 hlanual Scram. Entry Sltccts I'or Licensee C Refueling 3 Automatic Scram. Event Report (LERI Flic INURI'.G-D Regulatory Restriction 4.Other (Lxplain) OI6 I )

li-Operator Twining k Liccnsc Examination F.Administrative G Opcratiottal lirrur (Fxplain) Exlribit I Saruc Source

~

(9/77) I I Otlfcr (Explain)

,<<', ~,< ~

'," ~ ~

',~ '

i~~ ~ >><< ia ~ "- ."

~ i>> 'I "'. <<': i 8<<. w

AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO. 50 - 25 1 DATE Ot~. 7, 1978 COMPLETED BY SEPTEMBERr 1978 DAY AVERAGE DAILYPOWER LEVEL 'AY AVERAGE DAILYPOWER LEVEL (hI We.Nct) (hIWe-iVct) l7 I8 l9 20 2l 22 84 25 IO 26 2f 2$

l3 'i9 l4 30 IS l6 INSTRUCTIONS On this format, list the aireragc daily unit power ieiiel in MWc Nct for each day in the reporting tnunth. Cumput<< to the nearest whole megawatt.

I') 177 l

OPERATING DATA REPORT DOCKET NO.

DATE Qcr COMPLETED OY

~78

~~hilson TELEPHOiVE 430S3 ~-3824 OPERATING STATUS

~g ev Point Unit No. 4 Notes- Una.t No. 4 scheduled I. Unit Name:

2. Reporting Period:

refueling, maintenance, and ~

o0 inspections continued during

3. Licensed Thermal Power (iIWt):
4. iVamepiate Rating (Gross Mme): 728 month. Initial reactor crit cality following completion S. Design Electrical Rating (Net MWe): of refueling was accompli'she '.
6. Maximum Dependable Capacity (Gross MWe): on September 28, 1978.
7. Maximum'Dependable Capacity (iVet MWe):

IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

5 i

9. Power Level To 'iVhich Restricted, lfAny (Net MWe):
10. Reasons For Restrictions, lf Any:

This Month Yr..to.Date Cumulative I I. Hours In Reporting Period 720.0 12., Number Of Hours Reactor Was Critical 54.7 4 876.5 32 349.4

13. Reactor Reserve Shutdown Hours 138.8
14. Hours Generator On. Line IS. Unit Reserve Shutdown Hours

' 16. Gross Thermal Energy Generated (M'IVH) 17. Gross Electrical Energy Generated (hlWH) 3 028 155 20 852 080 IS. Net Electrical Energy Generated (MWH)

- 3 210 2 865 454 19 761 939

19. Unit Service Factor 73.4 6 .1
20. Unit Availability Factor 73.4
21. Unit Capacity Factor (Using I(DC Net) 65.7 66.8

"". Unit Capacity Factor (Using DER Net) 63.1 63.7

~D. Unit Forced Outage Rate 0.1 2.9

24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup: October 1, 1978
26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved IN ITIAL CR ITICALITY INITIALELFCTRICITY COMMERCIAL OPERATION

('>/77)

UNIT SIIUTDOWNS AND POWER REDUCTIONS lit No.4 SEPTppBER 1978 COh(PLETED BY gEpppTgpNm I' a, C Llceiiscc 0 tt'n c0 Cailsc k, Corrective

~ A C I Cl vl Ns). Dare .~

I rl Cl cr<5rx!c Event Vl G

Q E~

Acllilillo Report ir cn O Prcvelil Rceurrcrlec

~ C/l Cr 7S-08-13 S 720.0 N/A zz ZZZZZZ Unit No. 4 was removed from service for scheduled refueling, maintenance, and inspections. (Continued f rom previous month) (Nuclear and non-nuclear systems)

I F: Forced Reason: htcthod: Exhibit G - Instructions S: Scheduled A-Er(uipmcnt Failure (Explain) I -hlanual for Preparation tf Data 8 htalntcnancc oi Test 2-h(anual Scram. Entry Sheets lor Licensee C-Refueling 3-Aulolualic Scram. Event Rcport (LL'R) File (NURL'G.

D Rcyilatory Restriction 4.Other (Explain) 016 l )

L.Operator Training tL Liccnsc Exaniinalion F.Adminislmtive 5 G Operational Error (Lxplain) Exliibil I - Saine Source

('t/17) I I Other (Explain) 4' r- 4 ~

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

S t. Lucre DATE Oct. 7, 1978 COMPLETED BY on MONTH SEP TEI IBE R, 19 78 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL (MWe.Net) (LIIWe.Nct) 17 782 351 IS 783 19 is

,r 20 I-0

~4 21 'r I~

22 778 o o

77 23 tt II tt ll 777 25 741 I:

I 10 778 782 j; 26 778 769 it 779

~

j 12 764 13 'l9 765 30 ~

760 15 767 16 773 NOTE: Average daily power level greater than 777 Kfe due to cooler condenser cooling INSTRUCTIONS water.

On this format, list the average daily unit power tcvcl in Mac.Nct for each day in thc rcportinnmonth. Compute to the nearest whole megawatt.

I<)/77)

OPERATING DATA REPORT DOCKET NO.

Q~f~f[78 DATE COhIPLETED GY TELEPHONE

~~son X2RB ~-3824 OPERATING STATUS Notes - Unit operated at ap-

l. Unit Name:

prox'.mately 100K R.P. afrer

2. Reportfng Period: Se tember 1978 main power transformer Vo.lA Licensed Thermal Power (MWt): 2560
3. was returned to service on
4. Namephte Rating (Gross MWe): 850 September 3, 1978.
5. Design Electrical Rating (Net MIVe): 802
6. Maximum Dependable Capacity (Cross MWe): 822
7. hlaximum Dependable Capacity (Net hIWe): 777
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, lf Any:

This hlonth Yr. to Date Cumulative I I. Hours In Reporting Period

12. Number Of Hours Reactor 'IVas Critical 2 32.0
13. Reactor Reserve Shutdown Hours 16.9 '118.5
14. Hours Generator On. Line 4 844.0 12 525.8
15. Unit Reserve Shutdown Hours 11.7 21.0 21.0 11 780 990 29 630 204
17. Gross Electrical Energy Ccnerated (MWH) 558 870 3 826 300 9 621 060
18. Net Electrical Energy Generated (MWH) 5 27 .35 7 3 599 148 9 041 725
19. Unit Service Factor 98.4 73.9 80.4
20. Unit Avaiiability Factor 100 ' 74 ~ 3 80.6
70. 7 74. 7
22. Unit Capacity Factor (Using DER Net) 91.3 68.5 72.4
23. Unit Forced Outage Rate 1.4 6.9
24. Shutdowns Scheduled Over Next 6 hlonths (Type, Date.and Duration of Each):

am Generator Tube Insnection Pro ram - October 30 - Decemb er 3, 1978

25. IfShut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CR ITICALITY INITIALELECTRICITY COhIMERCIAL OPERATION

DOCKET NO. 50 335 UNIT SIIUTDOWNS AND POWER REDUCTIONS UNITNAhIE No. 1 REPORThIONfI>> SEPTEHBER, 1978 C

~e Nii. Date I I Ul

~-M n V Liccnscc Event C

a~>

Cause h. Corrective Action lo fl ~ cc u<Vl a 0E(3 Cl Report rr Pfcvcrll Recllrrerrcc

~ CJ Q

18 78-08-30 S N/A EG TRANS F Load was limited to the capacity of main power transformer No. 1B.

(Continued from previous month) (Non-nuclear system) 78-08-31 S 5.3 N/A EG TRANSF Unit was removed from service to pro-tect personnel using a crane to remove a faulty bushing from main power transformer No. 1A. (Continued from previous month) (Non-nuclear system) 20 78-09-02 S 6.4 B N/A EG TRANSF Unit was removed from service to return main power transformer No.lA to service after installation of a new bushing and seal. (Non-nuclear system)

F: Forced Reason: hicthod: Exhibit G - Instructions S: Scheduled A Equipmcnt Failure (Expiaio) I.hianual for Prcparalio>> of Data 8 hlainlcnance oi Test 2.hianual Scram. Entry Sheets lor Lieensec C Rcfucling 3-Aufonmlic Scram. Event lteporl (LL'R) Fiie I YUltEG.

D Regrdatory ltestrtclton 4-Other (Explaut) 0!6I )

E.Operator Training h. Iiccnsc Examination F.Administ wlivc 5 G.Opcraliooal Error (Explain) Exllibit I - Sarrre Source (9/77) II.Other (Explain)

i+ I cLORIOA ?0"VER 5 uGHI'Qi"I?A."A October 7, 1978

~ ~

C Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the September, 1978, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.

I'

~4 Very truly yours, I;

~~

tl-D. Schmia C Vice President Power Resources VTC/DDC cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire 4

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 250 Turkey Point UNIT Unit No. 3 DATE Oct. 7, 1978 COMPLETED BY V. T. Chilson TELEPHONE ( 305) 552-3824

)

QEPORT MONTH SEPTEMBER, 19 78 Unit operated at approximately 100$ R.P. except for the outage of September 18-19, 1978, and the load reductions of September 22-23 and 23-24, 1978. Refer to "Unit Shutdowns and Power Reductions" section of the September, 1978, Operating Status Report for additonal information.

No Major Safety-related maintenance was performed during the month.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. . 50 - 251 Turkey Point Unit No. 4 DATE Oct. 7 1978 COMPLETED BY V. T. Chilson ~

4~

~

TELEPHONE 305 552-3824 QEPORT MONTH SEPTEMBER 1978 Scheduled refueling, maintenance, and inspections outage continued during month. Initial reactor criticality following completion of zefueling was accomplished on September 28, 1978.

Major Safety-related maintenance activities performed during the g month included: 1 Completed the Steam Generator Tube Inspection Program.

Refer to Steam Generator Inspection Report of September I C

6, 1978, for additional information.

Installed 12 new fuel assemblies and shuffled partially spent fuel assemblies for Core Cycle V operation.

Completed modifications to charging system piping.

~ 4

~ ~

$ UMMARY OF OPERATING EXPERIENCE ~~

~

KT cC it

.il

'C DOCKET NO.. 50 335 S t. Lucie UNIT nit N. 1 DATE Oct. 7 1978 COMPLETED BY V. T. i s t~

I I!

'i TELEPHONE Ig i

QEPORT MONTH SEPTEMBER, 1978 ~

Unit operated at approximately 100% R.P. after main power trans-former No. 1A was. returned to service on September 3, 1978.

Major Safety-related maintenance performed during the month in-Pi If cluded inspection and repairs on charging pump No. 1A. Refer to ~

j Licensee Event Report No. 335-78-34 for additional details.

l if

~

i t!