ML17309A429

From kanterella
Revision as of 11:09, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for June 1989 for Re Ginna Nuclear Power Plant.W/890724 Ltr
ML17309A429
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/30/1989
From: DODGE R E, MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8908030214
Download: ML17309A429 (7)


Text

A.CCElZRATEDDlBU'EONDEMONSTRTIO.'iSYSTEM4REGULATORY INFORMATION DISTRIBUTION SYSTEM(RXDS)ACCESSION NBR:8908030214 DOC.DATE:

89/06/30NOTARIZED:

NODOCKETFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION DODGE,R.E.

Rochester Gas&ElectricCorp.MECREDY,R.C.

Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthlyoperating reptforJune1989forREGinnaNuclearPowerPlant.W/890724 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIWED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72)

.05000244DRECIPIENT IDCODE/NAME PD1-3LAJOHNSON,A INTERNAL:

AEOD/DOAXRMTECHADVNRR/DOEA/EAB 11NUDOCS-ABSTRACT RGN1EXTERNALEG&GSIMPSONIFNRCPDRCOPIESLTTRENCL331111221111111111RECIPIENT IDCODE/NAME PD1-3PDAEOD/DSP/TPAB NRR/DLPQ/PEB 10NRR/JEEP/RPB 10EG01LPDRNSXCCOPXESLTTRENCL11111111111111DDNOTE'IOALL"RIBS"MKXPZEPIS SPLEASEHELPUS'IOREDUCEHASTE!CONI'ACZ'IHEDOCXJMKI'XWZROL DESKROCNPl-37(EXT.20079)IOEIaIMZNATE KRRNAMEHEMDISI%GH7ZXCN LISTSFORDOCUKRPIS YOUDGN~TNEED!TOTALNUMBEROFCOPXESREQUIRED:

LTTR19ENCL19

,0t~'vzz<uzeEel(Al~*A~uiI"iI@auROCHESTER GASANDELECTRICCORPORATION o69EASTAVENUE,ROCHESTER, N.Y.14649-0001 TELEPHONE

  • ma*coos7ia546.2700GINNASTATIONJuly24,1989USNuclearRegulatory Commission DocumentControlDeskWashington, DC20555

Subject:

MonthlyReportforJune,1989Operating StatusInformation R.E.GinnaNuclearPowerPlantDocketNo.50-244r

DearSir:

PursuanttoourTechnical Specification 6.9.1,attachedherewithisthemonthlyoperating statusreportforGinnaStationforthemonthofJune,1989.Verytrulyyours,RobertC.MereGeneralManagerNuclearProduction RCM/eehAttachments cc:Mr.WilliamT.RussellNRC(1)aqppp3pg]4

+90&3PDRPDQCKp~~.R OPERATING STATUSOPERAT(NG DATAREPORTDOCKETNO.50244'l24,1989COMPLETED BYRobertE.DodgTELFPHONE 315-524-4446 x-396GinnaStationI~UnitName:R.E.6INNANUCLEARPOWER2.Reporting Period:June,19893.LicensedThermalPower(MWt):4.Nameplate Rating(GrossMWe):5.DesignElectrical Rating(NctMWe):6.MaximumDependable Capacity(GrossMWe)t7.MaximumDependable Capacity(NetMWe):PLANT1520490470490470NotesTheunitoperatedatapprox.100%powerforthemajorityofthereportperiod,withafewexceptions detailedonpage4ofthereport.8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastRcport,GiveReasons:9.PowerLeveltoWhichRestricted, IfAny(NctMWc):10.ReasonsForRestrictions, IfAny:ThisMonthYr.-to-Date Cumulative 4,3437202,514.232,455.753,517,368 1,187,058 1,127,294 56.5556.5555.2355.2382.584.3111.HoursInReporting Period12.NumberofHoursReactorWasCritical636.74:~13.ReactorReserveShutdownHours14.HoursGcncrator On-Line630.515.UnitReserveShutdownHours016.GrossThermalEnergyGenerated (MWH)878,17417.GrossElectrical EnergyGenerated (MWH)294,83318.NctFlectrical EnergyGencratcd (MWH)19.UnitServiceFactor87.5720.UnitAvailability Factor87.5721.UnitCapacityFactor(UsingMDCNct)22.UnitCapacityFactor(UsingDER Net)82.5823.UnitForcedOutageRate12.4324.Shutdowns Scheduled OverNext6Months(Type,DateandDurationofEach):172,169.45 134,211.84 1,687.55*

131,727.63 8.5*185,487,782 60,986,387 57,871,752 76.6976.6973.0573.056.3425.IfShutDownA'tEndOfReport.Period,Estimated DaceofStartup:26.UnitsInTestStatus(PriortoCommercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMFRCIAL OPERATION ForecastAchieved*Cumnulative totalcomnencing January1,1975Atv.44$4988

>vAVERAGEDAILYUNITPOWERLEVELDOCKETNO.50-244UNITR.E.GinnaNuclearPowerPlantDATEJul4989COMPLETED BYrRobertE.DgeTELEPHONE 1315524-4446Ext.396atGinnaMONTHJune1989DAYAVERAGEDAILYPOWERLEVEL(MWe-Net)

DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 2~3~4~5.6.7~8.9~10.12.13~14.15'6.10136343045948248648248148248648648648648548417.18'9~20.21.22'3'4.25.26.27'8.29'0.31.485485474485445-14160475477477475475INSTRUCTIONS Onthisformat,listtheaveragedailyunitpowerlevelinMWe-Netforeachdayinthereporting month.Computetothenearestwholemegawatt.

DOCKI:.TNO.SO244liNITNAME.

RE-GINNANUCLEARPOWERPLANTUNITSHUTDOWNANDPOWERREDUCTIONS DATE(:OhIPLETED BYRobertE.REPORTMONTHJULY1989TELEPIIONE 315-524-4446 x-396sanaaionCHo.Dotec~0Poo&Q~C00ocdPlcn>>0oau4o>>4>n.'lEoc0CLLicenseeEventReport0Ew500EA(JcOIAocQEo'UCauseLCorrective ActiontoPreventRecurrence 89-36-1-8917H89-"004IEReactortripwasduetoaturbinetripwithreactorpowergreaterthan509,duetoanAMSACactuation.

Corrective Action:affectedprocedures werechangedtoensureANSACisreset.89-4*6-22-89476H89-007SFSFSIpumpdesignflawdeliverycon-cerns.Incorrect originalcalibration data.Corrective Action:correctcalibra-tiondatawasconfirmed foreachorifice/flow transmitter combination 1F:ForcedS:Scheduled REV.4/854949Reason:A-Equipmcnt Failure(Explain)

B-Maintenance orTestC-Refueling D-Regulatory Restriction'-Operator TraininggcLicenseExamination F-Administrative G-Operational Error(Explain)

H-Ocher(Explain) 3hlethod:1-hlanual 2-hlanual Scram.3-Automatic Scram.4-Other(Explain)

FxhibitG-Instructions forPreparation ofDataEntrySheetsforLicenseeEventReport(LER)File(NUREG-0161)Exhibit1-SameSource"YearlyOutageNumber

'ottVt(

NARRATIVE SUMMARYOFOPERATING EXPERIENCE DOCKETNO.50-244UNITR.E.GinnaNuclearPowerPlantDATEJul2199COMPLETED BYobertE.DodeTELEPHONE 1315524-4446EXT.396atGinnaMONTHJune1989Theunitoperatedat100%reactorpowerlevelforthemajorityofthereportperiod,withsomeexceptions, detailedbelow.OnJune1,1989at1332EDST,withthereactoratapproximately 534power,aturbinetripwithsubsequent reactortripoccurredduetoaATNSMitigation SystemActuation Circuitry (AMSAC).OnJune19,1989at1440EDSTwiththereactoratapproximately 994fullpowerthe"B"and"C"SafetyInjection (SI)pumpsweredeclaredinoperable duetoassesseddesignflowdeliveryconcerns.

OnJune21,1989at1401asimilarproblemoccurredwiththe"B"and"C"SIpumpsandplantmanagement decidedtoshuttheplantdownuntiltheSIpumpflowconcernswereresolved.

Theplantwasshutdownandsubsecpxently cooleddowntolessthan350oF