ML20149M845

From kanterella
Revision as of 10:33, 11 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Forwards Suppl to 880115 Application for Amend to License NPF-3,deleting Tech Spec & Basis Section on Chlorine Detection Sys & Phrase Control Room Ventilation Air Intake Chlorine Concentration - High Test Signal from Tech Spec
ML20149M845
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/17/1988
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20149M846 List:
References
1472, TAC-66734, NUDOCS 8802290143
Download: ML20149M845 (1)


Text

' TOLEDO

%mm EDISON A Cateru Ererp Cm Docket No. 50-346 DONALD C. SHELTON License No. NPF-3 vc. rw =< - sx=,

um uarno Serial No. 1472 February 17, 1988 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Supplement to License Amendment Application to Delete the Technical Specification and Basis Section on Chlorine Detection Systems (TAC No. 66734).

Gentlemen:

On January 15, 1988 (Serial No. 1457), Toledo Edison submitted a License Amendment Application to Delete Technical Specification and Basis Section 3/4.3.3.7, Chlorine Detection Systems. In addition to those proposed changes, Toledo Edison requests deleting the phrase "Control Room Ventilation Air Intake Chlorine Concentration - High test signal" from Surveillance Requirement 4.7.6.1.e.2, of Technical Specification 3/4.7.6, Control Room Emergency Ventilation System, as shown on the attached Technical Specification pages. This request was inadvertently left out of the License Amendment Application submittal; however, because this is a duplicate requirement, the Safety Evaluation and the Significant Hazards Consideration will not be affected by this additional request. Therefore, Toledo Edison requests this change be included with the Chlorine Detection Systems Technical Specification Amendment and Basis Change.

This letter provides supplemental information to our January 15, 1988 application, therefore no fee per 10CFR170.12(c) is incurred.

Verytruy]yours,

/CAB:bam wh Attachments cc: DB-1 Resident Inspector A. B. Davis, Regional Administrator A. W. DeAgazio, NRC/NRR Davis-Besse Project Manager State of Ohio THE'MfDOYD'5D'? PANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OH2O 43652 1 8002200143 880217 PDR ADOCK 05000346 I e-_ nen /