Monthly Operating Rept for Apr 1997 for Ginna Nuclear Power Plant.W/970507 Ltr
ML17264A882
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1997
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9705130098
Download: ML17264A882 (11)


Text

CATEGORY 1 REGULATG1 INFORMATION DISTRIBUTION TEM (RIDS)

ACCESSL6N fHBR:9709130098 DOC.DATE: 97/04/30 NOTARIZED: NO . DOCKET ft FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas & Electric Corp.

WIDAY,J.A. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S. Document Control Branch (Document Contxol Desk)

SUBJECT:

Monthly operating rept for Apr 1997 for Ginna Nuclear Power Plant.W/970507 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2;2.109(9/19/72). 05000244 Q

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 VISSING G. 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 - E CENTER 01 1 1 NRR/DRPM/PECB 1 1 OC/DB'A;tmD 1 1 RGN1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

U'OTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

'i I

( pilll IiBIYIE IIIiiiiiz ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TCLCPHONC

  • RE* COOE 7ld 546.2700 May 7, 1997 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for March, 1997 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Qiana Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of April, 1997.

Very truly yours, s

a. d h A. Wi lant Manager xc: U. S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14C7)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road

/]

King of Prussia, PA 19406

~7 U.S. NRC Ginna Senior Resident Inspector Attachments 9705130098 9'70430 PDR ADOCK 05000244 R PDR

'V!lV!lV!ill!IV

.FVlflllV

  • I S-

'\

L

OPERATING DATA REPORT 50-244 Ma 7 1997 COMPLETED BY John V. Walden TELEPHONE (716) 771Q588

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT
2. Reporting Period: ril 1997
3. Licensed Thermal Power (MWI): 1520
4. Nameplate Rating (Gross MWe): 517
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gross MWe): 490
7. Maximum Dependable Capacity (Net MWe): 480
8. If Changes Occur ln Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
9. Power Level to Which Restricted, IfAny (Net MWe):
10. Reason For Restrictions, IfAn:

This Month Yr.-to-Date Cumulative**

11, Hours in Reported Period 719.0 2879.0 240431.0

12. Number of hours Reactor Was Critical 719.0 2879.0 192793.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 1687.6 *
14. Hours Generator On-line 719.0 2879.0 189805.5
15. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
16. Gross Thermal Energy Generated (MWH) 1090818.0 4364821.0 270241091.0
17. Gross Electrical Energy Generated (MWH) 373401.0 1494789.0 89605098.0
18. Net Electrical Energy Generated (MWH) 355839.0 1424246.0 85070112.8
19. Unit Service Factor (%) 100.0 100.0 78.9
20. Unit Availability Factor (%) 100.0 100.0 78.9
21. Unit Capacity Factor (using MDC Net) (%) 103.1 103.1 76.3
22. Unit Capacity Factor (using DER Net) (%) 103.1 103.1 76.3
23. Unit Forced Outage Rate (%) 0.0 0.0 5.7
24. Shutdowns Scheduled Over Next6 Months(Type, Date and Duration of Each):

andmaintenanceouta eisscheduledforOctober20 1997. The lanneddurationis22da

'herefuelin s.

25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Force st Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION CUMULATIVETOTAL COMMENCING JANUARY 1, 1975

'* CUMUlATIVETOTAL COMMENCING NOVEMBER 8. 1969

0 w1 E

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plan&

DATE: Ma 7 1997 COMPLETED BY:

John Walden TELEPHONE: 716 771-3588 MONTH A ril 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 494 496 494 18. 495 496 19. 495

4. 496 20. 495
5. 496 496 496 22. 496 495 23. 496 495 24. 495 495 25. 495
10. 495 26. 495 496 27. 495
12. 496 28. 495
13. 496 29. 495 496 30. 495
15. 495 31.

495 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

DOCKET NO: 50-244 UNIT: R.E. GINNA NUCLEAR POWER PLA T A E: a 7 1997 COMPLETED BY:

John Walden, UNIT SHUTDOWN AND POWER REDUCTIONS No. Date Type Duration Reason'ethod of Code'omponent System Code'ause & Corrective Action to (hours) reactors'icensee shuting down Event Prevent Recurrence Report 0 1 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment (Explain) 1-Manual for Preparation of Data 8-Maintenance or Test 2-Manual Scram. Entry Sheets for C-Refueling 3-Automatic Scram. Licensee Event Report D-Regulatory 4-Other (Explain) (LER) File (NUREG-E-Operator Training & 0161)

Lecensee Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 5 Exhibit 1- Same Source

/

~ ~ ~

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Ma 7 1997 COMPLETED BY:

John Walden TELEPHONE: 16 771-3588 MONTH A ril 1997 The unit operated at full power for the entire month of April. The average power level was 99.8%

'0 "0 '4l

~ ~ r

.- >~ s