Rev 1 to Solid State Protection Sys Function Test-Train B.
ML18087A736
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/02/1982
From:
Public Service Enterprise Group
To:
Shared Package
ML18087A720 List:
References
1PD-18.1.009, NUDOCS 8303160573
Download: ML18087A736 (52)


Text

NOTE: PRESS HARO YOU ARE MAKING FIVE (S) COPIES .

  • .

ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE CHANGE TYPE:

1\71 lC.J PERMANENT (GREEN)

D *TEMPORARY (ORANGE)

  • EXPIRES:

ALL ON*THE*SPOT CHANGES TO BE CONSIDERED !="OR APPLICABILITY TO BOTH UNITS.

[ZJ UNIT I PROCECURENO. ___ \~\=>--.....\J...._-_\~B........

  • ~'~*~O~L~~q--*_________ REV. NO. _ _\_ _ _ CHANGE No._\..___ _

~ UNITZ PROCECURENO.~~c:9-.---..?n.......~-__.\~B-'_*~\-*___,OQ~-C\_,________ REV. NO._--.._ _ CHANGE NO._.;___ _\

PROPOSED CHANGE:

<a.'d-,.\.L\, res.:1-,.s, e.~,.,1.1_, ca.~\.\\;i 1 A~~ B.~\,\'1 B. ~'- \ J

'8. d.. \. C\ ) CC> . d-L \ u REASON FOR CHANGE:

ACTION TAKEN FOR OTHER UNIT:

°SP.W'Q.. ~

AUTHORIZATION: ~**S ERViORIN

.;~ CHARGE

~ DATE OR SHIFT SUPERVISOR

-SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO ~OTH UNITS HAS BEEN CONSIDERED.

ACCEPTABLE: POST CHANGE-REVIEW/APPROVAL I ~I D ()l!!clratt'-

~ D .19K~THEAD c:~:I'"t:J"'.3 ~ ~ .  :' SORC \:HAIRMAN) l?tl I ~r~

MANAGER.* SALEM GENERATING STATION RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW*UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:

' 8303160573 830314 PDR ADOCK 05000272 S PDR.

PERFORMED BY:

SIGNATURE DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE*REVIEW/APPROVAL CYCLE.

  • \

SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & qAS COMPANY

  • ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET SAF~TY RELATED PROCEDURE:

lPD-18.1.009 - SOLID STATE PROTECTION SYSTEM REMARKS: FUNCTIONAL TEST - TRAIN B REV. 1 - General Revision to incorporate On-The-Spot-Changes .

  • PERF. ENGR. SORC STA. SUPT.

REV APPROVED REVIEWED APPROVED 1

  • '

'x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009

  • PERFORMANCE DEPARTMENT (I & C) REV. NO. _l~------

DATE _5~/~2~4~/~8~2_______

TEST PROCEDURE PAGE 1 50

--- OF TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

1.0 Purpose

l*.1 The purpose of this procedure is to verify the operability of Solid State Protection System Train B.

1.2 To satisfy the train surveillance requirement of the technical specifications *

  • 2.0

References:

2ol Solid State Protection System Manual.

2.2 Wiring Diagrams: 203688, 2~2885, 224305

';

I

\

.'

  • ' x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009
    • PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE REV.NO.

DATE

_1_*------------~

5/24/82


PAGE 2

--- OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

3.0 Precautions

3.1 Test conditions must be applied to only Train B. A reactor trip will occur if both trains have a general warning condition. Therefore, it is extremely important that the doors to only one train at a time are open, to preclude the introduction of test conditions into

    • 3.2 both trainsc Test conditions may be applied to one train using its*

. built-in testers, while the opposite train is used to ma~ntain the plant protection and provide data to the demultiplexers. If in the process of testing, mal-functions are detected, they can be isolated by care-fully following the procedures in Section 6 of the Solid State Protection Manual.

3.3 This procedure must be completed in the sequence given to insure successful completion *

.,

,x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. 1~~~~~~~

__

  • PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82


~--~-------

  • TEST PROCEDURE PAGE 3 OF 50

---

TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 4.0 Limitations and Actions:

4.1 If, at any time during the performance of this test, there is any reason to suspect that the test equipment being used may not be performing properly, a comparison check shall be performed with a similar device or the device shall be checked for calibration against a

  • standardo This shall be done prior ~o taking any other corrective action.

\.._.

4o2 If, during the performance of this test, the "As Found" data does not meet the requirements of the specified accuracy, the Job Supervisor shall be notified immediately

_ and PD-14.1.001 shall be performed.

4o3 If, during the performance of this procedure, the required status indication cannot be obtained, the Job Supervisor shall be notified immediately. Exceptions*

to the required indication, due to plant conditions at the time of the test, may be made by the Job Supervisor.

Any exceptions of this nature must be indicated and explained in the Remarks section of this procedure.

4o4 An entry will be made in the Remarks section of this

  • procedure indicating any deficiency and the corrective action taken.
  • X SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV. NO. ....;;;..l_ _ _ _ _ __
  • PERFORMANCE DEPARTMENT (I & C)

DATE _S~/...:2;..;;4-'-/..;;.8=2_ _ __

TEST PROCEDURE PAGE _4_ _ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 5.0 Test Equipment:

Device Name PD No. Recal. Date Fluke (2)

Stop Watch

  • SALEM GENERATING STATION NUMBER - lPD-18.1.009 REV. NO. 1
  • PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE _s__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 6.* 0 Prerequisites:

6.1 The individual assigned to perform this procedure is qualified to do so in accordance with Solid State Protection System Qualification Card 2.6.

  • Supervisor 6.2 The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure.

Senior Shift Supervisor/Shift Supervisor Date/Time 603 The Control Operator is aware of all of the alarms and indications that will result from the performance of this procedure.

Control Operator

  • SALEM GENERATING STATION NUMBER - lPD-18.1.009
  • PERFORMANCE DEPARTMENT (I & C)

REV. NO. 1 DATE 5/24/82 TEST PROCEDURE PAGE 6 OF so TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 7.0 System Line~up:

7.1 The following conditions must be established and/or verified by the Control Operator.

7.1.1 Reactor Trip Bypass Breaker A is open and in the Racked Out position .

  • Safeguard actions which are being blocked by virtue of having been *Reset from the Control Bezel will be re-initiated at the completion of this test if the necessary logic signal is present. The Safeguard actions involved are:
1. Containment Spray
2. Phase A Isolation
3. Phase B Isolation
4. Feedwater Isolation s:. Containment Ventilation Isolation from Safety Injection signal Control Operator

.x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009

  • PERFORMANCE DEPARTMENT (I & C) REV. NO. ---=l=--------

DATE 5/24/82 TEST PROCEDURE PAGE _7_ _ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

8.1 Measure and record the following instrument Bus Voltages (Required 117 + 10 VAC).

8elel Bus #1 TB-110 - 11 & 12 VAC 8olo2 Bus #2 TB-210 - 11 & 12 VAC

  • 8.1.3 8.; 1. 4 Bus #3 TB-310 - 11 Bus #4 TB-410 - 11

&

&

12 12 VAC VAC 8.1.5 Bus #1 TB--654 - 2 & 12 VAC 8.2 Open the front doors of Train B Logic Bay and Train B Output Relay Bay.

8. 3--- On the Logic Tester Panel, verify and record the following Power Supply Voltages 8.3.1 +.4 8VDC #1 Required 4 8. 7 + 0. 2 VDC
  • 8.3.2 As Found As Left

+48VDC #2 Required 48.7 + 0.2 VDC As Found . As Left

.x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV. NO. *l

  • PERFORMANCE DEPARTMENT (I & C) ~~~~~~~-

DATE 5/24/82 TEST PROCEDURE PAGE ---..8__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.3.3 +lSVDC #1 Required 15.7 + 0.2 VDC As Found As Left

+15VDC #2 Required l5o7 + 0.2 VDC

  • As Found As Left 8.4 Verify the followi.ng Solid State Protection System General Warnings Lamps are Off o 8 4 .1
0. General Warning Lamp - Train A 8.4.2 General Warning Lamp - Train B 8.5 Depress the following General Warning Lamps and verify the Lamp Lights, and then remains OFF.

General Warning Lamp - Train A

  • 8.5.2 General Warning Lamp - Train B

.x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. ~l~~~~~~-

  • PERFORMANCE DEPARTMENT (I & C)

DATE _5~/_2_4~/_8_2_______

TEST PROCEDURE PAGE OF 50

---

9 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.6 On the Logic Test Panel, verify that each of the following indicators will light by depressing it.

8.6.1 Testing

  • 8.6.2 Bad 8.6.3 . Good 8.6.4 Continuity 8.6.5 Memory Set 8.6.6 1/1 8.6.7 1/2 8.6.8 1/3 8.6.9 1/4 8.6.10 2/2
  • 8.6.11 8.6.12 2/3 2/4

..

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV.NO.

DATE

. lPD-18 .1. 009

~l~~~~~~-

PAGE 5/24/82 10 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.7 Record UV Coil Voltage Meter Reading.

.. Required 43 VDC + 2 VDC

((w~:n, ~~hh~~~~~~( O\~~.°.~:.~1 ~ ~.~~l~*:; <->.~.:~~*~:ni-\~--:.

\ "'-"" *~ ~ '.:, t: ..,_. l:"<ffi c. *1-.. \*;:i :H><.'- 1G t..ic ~ , :** 1.-.. L.. *

,t ~--~ L1<.- i 1~\

/

8.8 On the Outpu~ Relay Test Panel, place the Mode Selector Switch in the Test position.

8.9 Verify the Operate Lamp is not lighted.

8.10 Verify the General Warning Lamp is lighted~

8.11 Verify the operation of the Semi-Automatic Tester.

Self-check as follows:

-NOTE-Steps 8.11.6 through 8.11.11 will result in continuous alarms in the Control Room if there are any tripped inputs to the SSPS.

8.11.1 Verify that the continuity lamp is lighted .

  • 8.11.2 On the Tester PC Card (AlOS), verify that the top four LED's (light emitting diodes) are lighted.

x SALEM GENERATING STATION NUMBER - lPD-18.1.009

  • REV. NO. l PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 11 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.11~3 Depress the test pushbutton. Verify that the continuity lamp and the top four LEDS on Al08 extinguish.

8.11.4 Release the TEST pushbutton. Verify that the continuity lamp and the top four LEDS

  • on Al08 light.

On the Logic Test Panel, place the Input Error Inhibit switch to the Inhibit position.


Place the MULTIPLEXER TEST switch to the A & B position.

  • ~.

8.11.7 Place the BLOCKING FUNCTION TEST switch to the BLOCKS NOT INHIBITED position.

Depress and release the TEST pushbutton.

8.11.8.l Verify that the amber testing lamp lights.

  • 8.11.8.2 In approximately 1.6 seconds, verify that this lamp extinguishes.

8.11.8.3 Verify that the GOOD lamp lights.

x SALEM GENERATING STATION NUMBER- lPD-18.1.009 REV. NO. 1

  • PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE .;;;1~2__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.11.8.4 In approximately 1.6 seconds, verify that the good lamp extinguishes and repeatedly blinks on and off for these periods.

  • 8.11.9 Place the BLOCKING FUNCTION TEST switch to the INHIBIT BLOCKS position.

8.11.10 ~epress and release th~ Test pushbutton.

8.11.10.1 Verify that the AMBER TESTING lamp LIGHTS.

8.11.10.2 Verify that the red BAD lamp lights.

8.11.11 Place the MULTIPLEXER TEST switch to INHIBIT *.

8.12 Verify Reactor Trip Breaker B is CLOSED (if Reactor Trip Breaker is open have the Cont.rel Operator CLOSE Reactor Trip Breaker (B)

  • 8.13 Verify the following High Radiation ALARM Lights on panel lRPl are OFF.

8.13.1 lR-llA Containment or Vent Particulate

x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV. NO. -=-1_ _ _ _ _ __

  • PERFORMANCE DEPARTMENT (I & C)

DATE ~5~/~2~4~/~8=2~~~-

TEST PROCEDURE 13 50 PAGE

--- OF TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.13.2 1R-12A Containment or Vent Gas Effluent.

8.13.3 1R-12B Containment or Vent Gas Effluent (Iodine)

  • 8.14 If any high RADIATION ALARM is present in
  • Steps 8.13e1 through 8 .13. 3 lift the *field lead on terminal TB-506-2.

8.15 Perform the following for LOGIC and PERMISSIVE testing. Record results on TABLE I.

WARNING: If a malfunction within the logics is detected, the red BAD LAMP will come on at the instant of detection and

-remain on. It is then necessary to refer to Section 6.3 of the Solid State Protection System Manual to troubleshoot and define the cause.

Verify the following switches are in *the positions indicated *

  • 8.15.1.1 Logic A 8.15.1.2 _Logic B OFF 24

.x SALEM GENERATING STATION NUMBER - lPD-18.1.009

  • PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE REV. NO.

DATE 1

5/24/82 PAGE ..;;;;l;..;;..4_ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.15.1.3 Logic C 24 8.15.1.4 Logic D 24

  • 8.15.l.6 8.15.2 Memories OFF Place Logic A switch to position "l" and verify that Function Logic! Lamp 2/3 lights.

8.15.3 Depress and. release the TEST pushbutton.

The amber testing lamp will LIGHT. After all combinations of logics are tested, the Amber TESTING Lamp should extinguish and

. ~

. I the Green GOOD Lamp should 1light. The I

GOOD Lamp will extinguish ;*1he next tl.me the TEST pushbutton is dep;ressed ..

Place the Blocking Functi~n Test Switch to the opposite position and r~peat Steps 8.15.2 and 8.15.3 *

  • 8.15.5 Using Table I, perform Step 8.15.2 through 8.15.4 for the positions of the logic and permissive switches as listed.

SALEM GENE.ING ST ATION PERFORMANCE DEPARTMENT TEST PROCEOUHE 0& C)

  • NUMBER_

REV.NO.

DATE lPD-18 .1. 009 l

~~~~------~

5/24/82

  • PAGE 15 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION.

TEST SWITCH PER- BLOCKS LOGI C LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B C D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED OFF 24 24 24 OFF OFF (GOOD OR BAD) 1 24 24 24 OFF LOSS OF FLOW, LOOP 1 2/3 2 24 24 24 OFF LOSS OF FLOW, LOOP 2 2/3

'

3 24 24 24 OFF LOSS OF FLOW, LOOP 3 2/3 4 24 24 24 OFF LOSS OF FLOW, LOOP 4 2/3 5 24 24 24 OFF LOSS OF FLOW, RCP 2/4 6 24 24 24 OFF PRESSURIZER, LOW PRESSURE TRIP 2/4

  • *

,/\

SALEM GE.A TING ST A TION NUMBER - lPD-18 .1. 009 PEAFOAft.1ANCE DEPARTMENT (I & C) REV. NO. 1 TEST PAOCEDUBE DATE 5/24/82 50 PAGE

- OF TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED .l 7 24 24 24 OFF PRESSURIZER, HIGH PRESSURE TRIP 2/4 8 24 24 24 OFF PRESSURIZER, HIGH WATER LEVEL 2/3 TRIP 9 24 24 24 OFF LOW FEEDWATER FLOW, LOO:P 1 1/2 10 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 1 1/2 11 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 2 1/2 12 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 2 1/2

SALEM GE.A TING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

5/24/82

  • DATE PAGE 17 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT . ;

A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 13 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 3 1/2 14 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 3 1/2 15 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 4 1/2 16 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 4 1/2 17 24 24 24 OFF OIL PRESSURE SWITCHES REACTOR 2/3 TRIP 18 24 24 24 .OFF STOP VALVES GENERATOR TRIP 2/2

19. 24 24 24 OFF STOP VALVES GENERATOR TRIP 2/2

SA.LEM GE.TING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE

..'**

  • ~'; .
  • NUMBER -

REV. NO.

lPP-18 .1. 009 1 .*

5/24/82

DATE PAGE 18 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS. FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC 'MIS- TEST INHIBIT NOT A B C .D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 20 24 24 24 OFF STOP VALVES REACTOR TRIP 2/2 21 24 24 24 OFF SOURCE RANGE TR+P 2/2 22 24 24 24 OFF SOURCE RANGE TRIP 2/2 23 24 24 24 OFF FEED THRU TO LOGIC B 23 1 *24 24 OFF INTERMEDIATE RANGE TRIP 2/2 23 2 24 24 OFF INTERMEDIATE RANGE TRIP 2/2 23 3 24 24 OFF POWER RANGE, LOW SETPOINT TRIP 2/4

...

SALEM G.ATING ST A TION PERFORMANCE DEPARTMENT (I & C)

  • NUMBER -

REV. NO.

lPD-18.1.009 1

  • TEST PAOCEDUHE DATE 5/24/82 PAGE 19 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH
  • PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST. INHIBIT NOT A B C D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 4 24 24 OFF' POWER RANGE, HIGH SETPOINT TRIP 2/4 23 5 24 24 .OFF OVERTEMPERATURE DELTA T TRIP 2/4 23 6 24 24 OFF OVERPOWER DELTA T TRIP 2/4 23 7 24 24 OFF RCP UNDERVOLTAGE TRIP 2/4 23 8 24 24 OFF RCP UNDERVOLTAGE TRIP 1/2 23 9 24 24 OFF RCP UNDERVOLTAGE, TURB. FEED 1/2 PUMP

SALEM GE.A TING ST A TION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUBE

    • NUMBER_

REV. NO.

lPD-18 .1. 009 1 .

5/24/82

  • DATE PAGE 20 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST. INHIBIT NOT A B c b SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 10 24 24 OFF RCP UNDERVOLTAGE, TURB. FEED 2/4 PUMP 23 11 24 24 OFF LOW STEAMLINE PRESSURE 2/4 23 12 24 24 OFF HIGH STEAMLINE FLOW, LOOP 1 1/2 23 13 24 24 OFF HIGH STEAMLINE FLOW, LOOP 2 1/2 23 14 24 24 OFF HIGH STEAMLINE FLOW, LOOP 3 1/2 23 15 *24 24 OFF HIGH STEAMLINE FLOW, LOOP 4 1/2
  • I\

SALEM G.ATING STATION NUMBER - lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C) 1 REV. NO.

TEST PROCEDU'HE 5/24/82 DATE PAGE 21 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST T.RAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC . BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 16 ~4 24 OFF STEAMLINE ISOLATION 2/4

~3 17 24 24 OFF HIGH .CONTAINMENT PRESSURE, 2/3 SAFETY INJECTION 23 18 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4.

SPRAY ACTUATION 23 19 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4 SPRAY ACTUATION 23 20 24 24 OFF HI-HI CONTAI'NMENT PRESSURE, 2/4 STEAM STOP VALVES

SALEM GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PAOCEDUHE

  • NUMBER -

REV. NO.

DATE lPD-18 .1. 009 1

5/24/82

PAGE 22 OF 50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC .& PERMISSIVES

!

FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH LOGIC LOGIC LOGIC LOGIC PER-MIS- TEST INHIBIT BLOCKS NOT

.

A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED i 23 21 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4 PHASE B ISOLATION 23 22 24 24 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 23 24 24 OFF SAFETY INJECTION, CONTAINMENT 1/2 VENTILATION ISOLATION 23 24 24 24 OFF FEED THRO TO LOGIC C 23 24 l 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 1

  • I\

SALEM G.ATING ST A TION NUMBER - lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C) REV. NO. 1 TEST PROCEDUHE DATE 5/24/82 PAGE 23 OF 50

---

TITLE SOLID STATE PROTECT.ION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS-:- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS .INHIBITED 23 24 2 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 2 23 24 3 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 3 23 24 4 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 4 23 24 5 24 OFF PRESSURIZER PRESSURE 2/3 23 24. 6 24 OFF PRESSURIZER PRESSURE 2/3 23 24 7 24 OFF PRESSURIZER PRESSURE 2/3

SALEM GE.ATING STATION

  • PERFORMANCE DEPARTMENT (I & Cl TEST PAOCEDUHE
    • NUMBER:-

REV. NO.

lPD-18.1.009 1

  • DATE 5/24/82 PAGE 24 OF 50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH .

PER- . BLOCKS LOGI C LOGIC LOGIC LOGIC MIS~ TEST INHIBIT NOT A B C D S.IVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 8 24 OFF STEAM GENERATOR LO-LO WATER 2/3

.LEVEL LOOP 1 23 24 .9 24 OFF STEAM GENERATOR LO-LO WATER 2/3 LEVEL LOOP. 2 23 24 10 24 OFF STEAM GENERATOR LO-LO WATER 2/3 LEVEL LOOP 3

~ ..

    • _. ,

23 24 11 24 OFF STEAM GENERATOR LO-LO WATER 2/3 LEVEL LOOP 4 23 24 i2 24 OFF STEAM GENERATOR LO-LO WATER 1/4 LEVEL TRIP

\, -

S~LEM G a ATING ST ATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE

  • NUMBER-REV. NO.

lPD-18.1.009 1

5/24/82

  • DATE PAGE 25 50

--- OF ---

TITLE SOLID.STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c b SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 13 24 OFF STEAM GENERATOR LO-LO WATER 1/4 LEVEL, MOTOR FEED PUMP 23 24 14 24 OFF .STEAM GENERATOR *LO-LO WATER 2/4 LEVEL, TURBINE FEED PUMP 23 24 15 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 1 23 . 24 16 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 2 23 24 17 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 3

SALEM GU*

  • TING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PAOCEDUHE

  • NUMBEA-AEV. NO.

lPD-18.1.009 1

  • DATE 5/24/82 PAGE 50

-2(?- - OF TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOG IC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B C D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 18 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 4 23 24 19 24 OFF LOW TAVG 2/4 23 24 20 24 OFF TAVG AND REACTOR TRIPPED 2/2 23 24 21 24 OFF UV DIODES AND OUTPUT 1/4 23 24 22 24 OFF SAFETY INJECTION DIODES & OUTPUT 1/4 23 24 23 24 OFF UV DIODES AND OUTPUT 1/4

SALEM GE.ATINGSTATION PERFORMANCE DEPARTMENT TEST PAOCEDUHE 11 & C)

  • NUMBER -

REV. NO.

lPD-18.1.009 1

  • DATE 5/24/82 PAGE 27 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 _* 24 OFF FEED THRU TO LOGIC D 23 24 24 1 OFF SAFETY INJECTION DIODES & OUTPUT 1/3 23 24 24 2 OFF UV DIODES AND OUTPUT 1/4 23 24 24 3 OFF UV DIODES AND OUTPUT 1/4 23 24 24 4 OFF UV DIODES AND OUTPUT 1/4 23 24 24 5 OFF UV DIODES AND OUTPUT 1/4 23 24 24 6 OFF UV DIODES AND OUTPUT 1/4

SALEM GEa TING STATION PERFORUANCE DEPARTMENT (I & C)

TEST PAOCEDUHE

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

  • DATE 5/27/82 PAGE 28 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC *& PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC . LOGIC LOGIC LOGIC MIS- TEST INHIBI'I' NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 7 OFF FEEDWATER CONTROL 1/2 23 24 24 8 OFF FEEDWATER CONTROL 1/1 23 24 24 9 OFF RCP UNDERFREQUENCY 2/4 23 24 24 10 OFF RCP UNDERFREQUENCY 1/2 23 24 24 11 OFF RCP UNDERFREQUENCY 1/2 23 24 24 12 OFF RCP UNDERFREQUENCY 2/4 23 24 24 13 OFF POWER RANGE, HI FLUX RATE TRIP 2/4

..

SALE~ GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE.

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

  • DATE 5/24/82 PAGE 29 OF 50

"'IT(U: SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 14 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 15 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 16 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 17 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION

  • 23 24. 24 18 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 19 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION

SALEM GEN.TING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PAOCEDUHE

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

  • DATE 5/24/82 PAGE 30 OF 50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

. TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEpT INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 20 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 21

- OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 22 OFF SAFETY INJECTION, PHASE A* 1/1 ISOLATION 23 24 24 23 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 24 OFF FEED THRU TO PERMISSIVES 23 24 24 24 1 P6 1/2

"'

SALEM GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)'

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

TEST PROCEDUHE DATE 5/24/82-31 50

.. !:*

.*4'.:

PAGE

--- OF ---

TITLE SOLID STATE PROTECTION.SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS

  • FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED_ ACTUAL BLOCKS INHIBITED 2_3 24 24 24 2 P8 2/4 23 24 24 24 3 PlO 2/4 23 24 24 24 4 P7 1/3 23 24 24 24 5 pg 2/4 !

23 24 24 24 6 P12 23 24 24 24 7 P12 2/4 23 24 24 24 8 P12 2/4

J\

SALEM GE.ATING STATION PERFORUANCE DEPARTMENT (I & C)

  • NUMBER -

REV. NO. 1 lPD-18.1.009

  • TEST PROCEDUHE DATE 5/24/82
  • PAGE 32 OF 50

'TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c I) SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 24 9 Pll 2/3 I I

23 24 24 24 10 P8 RCP BREAKERS 1/4 23 24 24 24 11 P8 RCP BREAKERS 1/4 OFF 24 24 24 OFF OFF OFF

  • X
  • SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C) REV.NO. _l~~~~~~

DATE _5/,__24~/~8_2~~~~

TEST PROCEDURE PAGE _3_3__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.16 Perform the following Memories Testing._

Record results on TABLE II.

8.16.l Place MEMORIES switch to position "l".

(The 1/4 function logic lamp will light

  • 8.16.2 whenever the MEMORIES switch is not in the OFF position) ..

In the MEMORY FUNCTION TEST portion of the LOGIC TEST PANEL, depress and. release the RED pushbutton and verify that the MEMORY SET lamp lights. (If already on, depress and release BLACK pushbutton).

8.16.3 After MEMORY SET lamp lights, depress and release BLACK pushbutton.

8.16.4 Repeat Steps 8.16.2 and 8.16.3 for the positions of the MEMORIES switch as listed oh TABLE II .

  • I & C - 001
  • SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE _3_4__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE 2 MEMORIES FUNCTION FUNCTION MEMORY FUNCTION SELECTOR LOGIC TEST PUSHBUTTON MEMORIES TEST FUNCTION 1/4 RED BLACK OFF OFF (ON OR OFF) 1 POWER RANGE BLOCK

  • 2 3

INTERMEDIATE RANGE BLOCK SOURCE RANGE BLOCK 4 SOURCE RANGE BLOCK 5 SAFETY INJECTION BLOCK, PRESSURIZER 6 SAFETY INJECTION BLOCK, PRESSURIZER 7 SAFETY INJECTION BLOCK, STEAM LINE PRESSURE AND LEVEL ,

8 SAFETY INJECTION BLOCK, STEAM LINE PRESSURE AND LOGIC 9 AUTOMATIC SAFETY INJECTION BLOCK 10 FEEDWATER VALVE CONTROL

    • 11 FEEDWATER VALVE CONTROL OFF OFF I & C - 001

.~

  • SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ __

PERFORMANCE DEPARTMENT° (I & C)

DATE 5/24/82


'----~---

TEST PROCEDURE 35 50 PAGE

--- OF TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.17 Perform the following for Output Relay Testing and Record'results on TABLE III.

8.17.1 Place the MASTER RELAY SELECTOR in Position "l".

8.17.2 Depress SLAVE TEST A pushbutton and verify that the required "A" lamps lights while pushbutton is depressed. Verify the required lamps light by placing an "X" under each on*requirement.

8.17.3 Repeat Step 8.17.2 for SLAVE TEST B.

8.17.4 Repeat Steps 8.17.2 and 8.17.3 for each MASTER RELAY SELECTOR position listed on TABLE III.

c..* -

( ' . \ \.

~*

~

-

\-z:..:. .......... -1...*.i '--

. (I

~

H .

,. . ...

"

\::""l...

'II

    • .... ~ <"

.

i ..

\ "'"'"~ ~*J - ......"'\_.,. ,~,.,,, S:\v:.....* *~

'~~ \.... \.:>f'; ,..; ;...\... * \j"~,...~ \,:\ \°")*~t:. <!.. C'\~

c ~ V---~*C. \ ~ ¥..i.vc i_ ., -~\:!C<'3; \I... "-.:*<.*l\ ~ \t. 1<:C 'C. \

\<... lcC:~ . \.;.. \..:: '.C -~~-Q..

.. - - -

\

-., .. ,, '.'\

".i. ~\'\""c.c.... "A ~(...

~~ .;* \- (-'1- *" . :. \. ._

  • 1 a. r _ nn1

SALEM G.ATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

  • DATE 5/24/82 PAGE 36 OF 50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY SLAVE RELAY CONTINUITY LAMPS SELECTOR SLAVE RELAY FUNCTION Al A2 A3 A4 Bl B2 B3 B4 1 CONTAINMENT ISOLATION, PHASE A ON ON ON OFF ON ON ON OFF 2 CONTAINMENT VENTILATION ISOLATION ON OFF OFF OFF ON *oFF OFF OFF 3 STEAM STOP VALVES ON OFF OFF OFF ON O;F'F OFF OFF 4 SPRAY ACTUATION ON OFF OFF OFF ON ON OFF OFF 5 CONTAINMENT ISOLATION, PHASE B ON ON OFF OFF ON ON OFF OFF 6 FEEDWATER VALVES (HI-HI STEAM ON OFF OFF OFF OFF pFF OFF OFF GENERATOR LEVEL) 7 TRIP TURBINE/MAIN FEEDWATER PUMPS ON OFF OFF OFF OFF OFF OFF OFF

SALEM GE.TING STATION PERF0Rf.1ANCE DEPARTMENT (I & C)

TEST PROCEDUHE

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

5/24/82

  • DATE PAGE 37 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY SLAVE RELAY CONTINUITY LAMPS SELECTOR SLAVE RELAY FUNCTION Al A2 A3 A4 Bl B2 B3 B4 8 RCP UNDERFREQUENCY ON OFF OFF OFF OFF OFF OFF OFF 9 SPARE ON OFF OFF OFF OFF OFF OFF OFF 10 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 11 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 12 LO-LO TAVG STEAM DUMP INTERLOCK ON OFF OFF OFF OFF OFF OFF OFF 13 LOSS OF POWER/TURBINE AUXILIARY PUMP ON OFF OFF OFF OFF OFF. OFF OFF 14 LOW WATER LEVEL/MOTOR AUXILIARY PUMP ON OFF OFF OFF OFF OFF OFF OFF 15 LOW WATER LEVEL/TURBINE AUXILIARY PUMP ON OFF OFF OFF OFF OFF OFF OFF
  • *

,/\

SALEM GE.A TING STATION NUMBER - lPD-18 .1. 009 PERF0Rf..1ANCE DEPARTMENT (I & C) REV. NO. 1 TEST PAOCEDUUE DATE 5/24/82 PAGE 38 OF 50 TITLE SOI, ID STATE PROTECTION SYSTEM FUNCTION~L TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY SLAVE RELAY CONTINUITY LAMPS SELECTOR SLAVE RELAY FUNCTION Al A2 A3 A4. Bl B2 B3 B4 16 GENERATOR TRIP & .STEAM DUMP INTERLOCK ON OFF OFF OFF OFF OFF OFF OFF 17 TAVG AND REACTOR TRIPPED ON OFP OFF OFF ON OFF OFF OFF 18 SAFETY INJECTION . ON ON ON ON ON ON ON ON 19 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 20 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 21 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 22 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 23 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF

SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 39 OF SO SOLID STATE PROTECTION SYSTEM FUNCTIONAL T.EST TRAIN B TITLE

8.0 Instructions

(Continued) Initial 8.18 Place the MULTIPLEXER TEST switch to Normal.

8.19 Replace (if required) the field lead to TB-506-2 lifted ~n Step 8.14.

8.20 Inform the Control Operator that a containment ventilation isolation will be initiated if a high radiation alarm is present when this procedure is completed. Inform him that -he may reset the containment ventilation isolation at this time.

8.21 Manual Input Function Test

-NOTE- 8.~\.\) 8.ai.\.°t Omit steps 8.21.4, 8.21.5, 8.21.14, 8.21.16 6'.,l.\,\0 and &.21.19 if Reactor is Tripped Tripped Operational 8.21.1 Have the Control Operator rack in and close Reactor By-pass Breaker B, and verify that the breaker is in Operate position and its light is illuminated .

    • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE PAGE lP D-18 . 1. 0 0 9 5/24/82 40 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial

  • -WARNING-Reactor By-pass Breaker B must remain energized for the duration of the manual testing, otherwise a Reactor Trip will occur *
  • 8.21.2 At the LOGIC TEST Panel place the LOGIC A Test Switch in Position 7.

High Pressure Trip).

(Pressurizer 8.21.3 In the MANUAL INPUT FUNCTION TEST portion of the LOGIC TEST PANEL, depress and hold any TWO pushbuttons.

8. 21. 4 At the Control Board, verify that Reactor Trip Break~r B is OPEN.
8. 21. 5 Verify the UV COIL VOLTAGE meter indicates approximately 0 VDC.

8.21.6 Release the pushbuttons depressed in Step 8.21.3 .

  • I & C - 001

'x

  • SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C) REV. NO. -*--=l=--------

DATE 5/24/82 TEST PROCEDURE PAGE 41 OF 50 TITLE . SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial

8. 21. 7 Place the LOGIC A Test Switch in the OFF position.
8. 21. 8 Have the Control Opeator close the Reactor Trip Breaker B .
    • 8.21.9 Have the Control Operator OPEN Reactor By-Pass Breaker B.

8.21.10 Have the Control Operator rack Out Reactor By-Pass Breaker B.

8.21.11 Verify that the general warning test LED for SSPS Train B is extinguished in both Train A and Train B .

  • I I & C
  • 001

. )<

  • SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ _~

PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE

- OF 50 SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.22 Perform the following for SAFETY INJECTION RESET TIMING TEST.

8.22.1 Select position 9 on the MEMORIES switch and if the MEMORY SET lamp is illuminated,

  • depress the BLACK button to extinguish it .

8.22.2 In the OUTPUT TEST cabinet, place test switch 602 in the BLOCK OUT~UT position.

8.22.3 Connect the Digital Voltmeter as follows:

8.22.3Al

  • TD-1, Terminal 6 (+)

8.22.3.2 Logic Ground (GND) 8.-22.4 The DVM should read approximately +48 VDC.

8.22.5 Move the positive lead of the DVM from TD-1, Terminal 6 to TD-1, Terminal 2.

8.22.6 The DVM should indicate 0 VDC.

  • I & C - 001

.x

  • SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ __

PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 43 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.22.7 Latch-up Relay K602 by depressing the latch plunger and time the interval from this point until the voltmeter reads approximately *+48 VDC. (The time should be 60 to 65 sec.)

- - - - -sec.

  • 8.22.8 At the Control Board depress the S.I.

Block/Reset pushbutton and verify the following:

8.22.8.1 DVM indicates 0 VDC 8.22.8.2 MEMORY SET lamp lights 8.22.8.3 Relay K602 Resets 8.22.9 Return the MEMORIES switch to the OFF position.

8.22.10 Connect the Digital Voltmeter as follows:

8.22.10.l TD-1, Terminal 6 (+)

    • - 8.22.10.2 IDgic Ground (GND) 8.22.11 The DVM .should read approximately +48 VDC.

I & C - 001

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER_

REV.NO.

DATE PAGE lPD-18 .1. 009

~l~~~~~~~

5/24/82

- OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.22.12 Move the positive lead of the DVM to TD-1 Terminal 2 and measure the resistance to gr_ound (GND) . The DVM should indicate an Open.

  • 8.22.13 Connect the Digital Voltmeter (AC Scale) as follows:

8.22.13.l TD-1, Terminal 1 8.22.13.2 TD-1, Terminal 5 8.22.14 The.DVM* should read 0 VAC.

NOTE: A DVM indication of 25 VAC or less is considered noise.

8.22.15 Measure the resi.stance between* TD-1, Terminal 1 and TD-1, Terminal 5. The DVM should indicate an OPEN.

8.22.16 In the output test cabinet, return the test

    • switch 602 to the UNBLOCK outp~t position and verify the TL/TXC Alarm light extinguishes.

..

. }(

  • SALEM GENERATING STATION . NUMBER - lPD-18 .1. 009 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 45 OF 50 TITLE *~~-S~O.:..=L~I~D-*~s~TA_..:.TE:::._P~R-O_T_E~C~T.:.:..;_IO~N:..:..._S~Y.:.:..;_S_TE_M~F-U_N_C_T~IO_N_A_L~T~E~S-T~T-RA~I-N_B~

8.0 Instructions

(Continued) Initial 8.22.17 Have the Control Operator reinstate the FLUX TRIP MANUAL Blocks from the Control

. Board.

NOTE: The pushbutton must be pushed even when BEZEL block light is lit. (ND block~ can

  • be applied if their permissives are not present, therefore, only those permitted will be set.)

8.22.17.1 Block Source Range-Train B pu~hed 8.22.17.2 Block Intermediate Range-Train B pushed.


8.22.17.3 Block Power Range - Train B pushed.

WARNING: The Flux Trip Manual Blocks. must*be reinstated prior to placing the input error inhibit switch in the normal position.

8.22.18 Place the Input Error Inhibit Switch in the NORMAL position *

  • I & C -001

. 'X

  • SALEM GENERATING STATION NUMBER - lPD-18.1.009 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 46 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.23 Perform the following for Spray Actuation Test.

8.23.1 Depreas Spray Test pushbutton for each of the individual channels and verify proper indication at the Control Board .

  • 8.23;1.l Channel I Containment Pressure Hi-Hi I
8. 23 .1. 2 Channel II Containment Pressure Hi-Hi II 8.23.1.3 Channel III Containment Pressure Hi-Hi III 8.23.1.4 Channel IV Containment Pressure "Hi-Hi. IV 8.23.2 Place input ERROR INHIBIT Switch in the
  • 8.23.3 INHIBIT position.

Place the MODE Selector switch in the OPERATE position.

I Iii c j 001

  • ****- **) *,o**~**-*'<**"*O.-.~: *.-*o*.-, ... ._.,.~-.-.-..*-*,-*.*.-*o*r-Y-~*-- *-~*** --~*--**-*-'*"*'*- * --**** .**

~

. x'

  • SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C) REV. NO. 1 DATE 5/24/82 TEST PROCEDURE PAGE 47 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.23.4 Actuate"the following MANUAL BLOCKS using the pushbuttons on the Control Board. No blocks can be applied if their permissives are not present; therefore, only those per-rni tted will be set.

8.23.4.1 Pressurizer Safety Injection .

  • 8.23.4.2 Steamline Pressure Safety Injection.

Safeguard actions which are being blocked by

-NOTE-virtue

',

of having been Reset from the Control Bezels will be re-initiated *at this time if necessary logic signal is present. The safe-guard actions involved are:

1. Containment Spray
2. Phase A Isolation
3. Phase B Isolation
4. Feedwater Isolation
5. Containment Ventilation Isolation from Safety Injection Signal.

Inform the Control Operator of this condition .

  • Control Operator I & C -001
    • ...* --* ,.. *" ...... - **. - .... :::**._"!'. r-.-.- *-***""!--* ...... _._,._. *****---:-**--*-- -*~ - .........., .. - ,. -..... - -* . *- . . .. . ****- .*...

..

.

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT {I & C)

TEST PROCEDURE NUMBER -

REV.NO.

DATE PAGE lPD-18 .1. 009

__;;l;;__~~~~~~

5/24/82 48 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial

  • 8.23.s Place the Input ERROR Inhibit switch in the NORMAL position.

8.23.6 Have the Control Operator reset all unwanted safeguards actions which were re-initiated as a iesult of this test *

  • 8.24 Perform the following for the Multiplexer checks.
  • WARNING: It is necessary that SSPS Train A Mul tip],exer .

Switch be in the normal position and that its general warning lamp be off. If the lamp is already on, it is necessary that it be cleared before the A & B position is selected in the

  • other train.

8.24.1 Place Train B Multiplexer Test Switch to the A & B position.

8.24.2 Verify no intermittent condition exists.

NOTE: An intermittent (on/off) condition is when the indication appears at the control

  • board and the computer at approximately one repetition per second. This indicates one of the two trains has a malfunction in its data multiplexing.

I & C - 001

-~-------

.. '. ...

X*

"

  • SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ __

PERFORMANCE DEPARTMENT (I & C)

DATE. 5/24/82 TEST PROCEDURE* PAGE 49 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

~.*o Instructions: (Continued) Initial 8.24.3 Place Train B Multiplexer Test Switch to the Normal position.

8.24.4 If the Shift Supervisor wants the Safety Injection block re-initiated for the train, short terminals 2 and 6 on TDl and have the

  • Controls Operator depress S.I. Reset for Train B.

Remove jumper:


Initial Senior Shift Supervisor/Shift Supervisor 9.0 System Return to Normal:

9.1 The Senior Shift Supervisor/Shift Supervisor has been notified that this channel has been returned to normal.

Senior Shift Supervisor/Shift Supervisor

  • Date/Time 1 s. c - 001

..~

,.. ,,,.

. x ,*

NUMBER - lPD-18 .1. 009

  • SALEM GENERATING STATION REV.NO. --"l~------

PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 50 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

10. 0 Remarks: w.o. I.O .
  • 11.0 Completion:

11.l Completed by:


Technician Date Time

  • 11.2 Approved by:

Supervisor Date Time I & C -001

..................... .,..- ... -*.***-.-:.***- ... -- ..................... --.-**~*** ... *- ,, ... - ...... .