ML17264A882: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1REGULATG1 INFORMATION DISTRIBUTION TEM(RIDS)ACCESSL6N fHBR:9709130098 DOC.DATE:
{{#Wiki_filter:CATEGORY 1 REGULATG1 INFORMATION DISTRIBUTION TEM (RIDS)ACCESSL6N fHBR:9709130098 DOC.DATE: 97/04/30 NOTARIZED:
97/04/30NOTARIZED:
NO.DOCKET ft FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.
NO.DOCKETftFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION WALDEN,J.V.
Rochester Gas&Electric Corp.WIDAY,J.A.
Rochester Gas&ElectricCorp.WIDAY,J.A.
Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.
Rochester Gas6ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.
Document Control Branch (Document Contxol Desk)
DocumentControlBranch(Document ContxolDesk)


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptforApr1997forGinnaNuclearPowerPlant.W/970507 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:License Expdateinaccordance with10CFR2;2.109(9/19/72).
Monthly operating rept for Apr 1997 for Ginna Nuclear Power Plant.W/970507 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2;2.109(9/19/72).
05000244QRECIPIENT IDCODE/NAME PD1-1PDINTERNAL:
05000244 Q RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN1 COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1 1 VISSING G.1 1-E CENTER 01 1 1 OC/DB'A;tmD 1 1 COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D U'OTE TO ALL"RIDS" RECIPIENTS:
AEOD/SPD/RRAB NRR/DRPM/PECB RGN1COPIESRECIPIENT LTTRENCLIDCODE/NAME 11VISSINGG.11-ECENTER0111OC/DB'A;tmD 11COPIESLTTRENCL111111EXTERNAL:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10
LITCOBRYCE,JHNRCPDR1111NOAC11DU'OTETOALL"RIDS"RECIPIENTS:
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
LTTR10ENCL10


(pilllIiBIYIE'iIIIIiiiiiz ROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, N.Y.14649-0001 TCLCPHONC
(pilll IiBIYIE'i I IIIiiiiiz ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649-0001 TCLCPHONC*RE*COOE 7ld 546.2700 May 7, 1997 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, DC 20555
*RE*COOE7ld546.2700May7,1997USNuclearRegulatory Commission DocumentControlDeskAttn:GuyS.VissingProjectDirectorate I-1Washington, DC20555


==Subject:==
==Subject:==
MonthlyReportforMarch,1997Operating StatusInformation R.E.GinnaNuclearPowerPlantDocketNo.50-244
Monthly Report for March, 1997 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244  


==DearMr.Vissing:==
==Dear Mr.Vissing:==
PursuanttoQianaImprovedTechnical Specifications Section5.6.4,attachedisthemonthlyoperating statusreportforGinnaStationforthemonthofApril,1997.Verytrulyyours,a.dshA.WilantManagerxc:U.S.NuclearRegulatory Commission Mr.GuyS.Vissing(MailStop14C7)ProjectDirectorate I-1Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406U.S.NRCGinnaSeniorResidentInspector Attachments
Pursuant to Qiana Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of April, 1997.Very truly yours, a.d s h A.Wi lant Manager xc: U.S.Nuclear Regulatory Commission Mr.Guy S.Vissing (Mail Stop 14C7)Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector Attachments
/]~79705130098 9'70430PDRADOCK05000244RPDR'V!lV!lV!ill!IV
/]~7 9705130098 9'70430 PDR ADOCK 05000244 R PDR'V!lV!lV!ill!IV.FVlflllV S-*I'\L OPERATING DATA REPORT COMPLETED BY Ma 7 1997 50-244 John V.Walden TELEPHONE (716)771Q588 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: 'ril 1997 3.Licensed Thermal Power (MWI): 1520 4.Nameplate Rating (Gross MWe): 517 5.Design Electric Rating (Net MWe): 470 6.Maximum Dependable Capacity (Gross MWe): 490 7.Maximum Dependable Capacity (Net MWe): 480 8.If Changes Occur ln Capacity Rating (Items Number 3 Through 7)Since Last Report, Give Reason: 9.Power Level to Which Restricted, If Any (Net MWe): 10.Reason For Restrictions, If An: This Month Yr.-to-Date Cumulative**
.FVlflllV S-*I'\L OPERATING DATAREPORTCOMPLETED BYMa7199750-244JohnV.WaldenTELEPHONE (716)771Q5881.UnitName:R.E.GINNANUCLEARPOWERPLANT2.Reporting Period:'ril19973.LicensedThermalPower(MWI):15204.Nameplate Rating(GrossMWe):5175.DesignElectricRating(NetMWe):4706.MaximumDependable Capacity(GrossMWe):4907.MaximumDependable Capacity(NetMWe):4808.IfChangesOccurlnCapacityRating(ItemsNumber3Through7)SinceLastReport,GiveReason:9.PowerLeveltoWhichRestricted, IfAny(NetMWe):10.ReasonForRestrictions, IfAn:ThisMonthYr.-to-Date Cumulative**
11, Hours in Reported Period 12.Number of hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor (%)20.Unit Availability Factor (%)21.Unit Capacity Factor (using MDC Net)(%)22.Unit Capacity Factor (using DER Net)(%)23.Unit Forced Outage Rate (%)719.0 719.0 0.0 719.0 0.0 1090818.0 373401.0 355839.0 100.0 100.0 103.1 103.1 0.0 2879.0 2879.0 0.0 2879.0 0.0 4364821.0 1494789.0 1424246.0 100.0 100.0 103.1 103.1 0.0 240431.0 192793.3 1687.6*189805.5 8.5*270241091.0 89605098.0 85070112.8 78.9 78.9 76.3 76.3 5.7 24.Shutdowns Scheduled Over Next6 Months(Type, Date and Duration of Each): 'herefuelin andmaintenanceouta eisscheduledforOctober20 1997.The lanneddurationis22da s.25.If Shutdown At End of Report Period, Estimate Date of Startup: 26.Units in Test Status (Prior to Commercial Operation):
11,HoursinReportedPeriod12.NumberofhoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator On-line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated (MWH)17.GrossElectrical EnergyGenerated (MWH)18.NetElectrical EnergyGenerated (MWH)19.UnitServiceFactor(%)20.UnitAvailability Factor(%)21.UnitCapacityFactor(usingMDCNet)(%)22.UnitCapacityFactor(usingDERNet)(%)23.UnitForcedOutageRate(%)719.0719.00.0719.00.01090818.0 373401.0355839.0100.0100.0103.1103.10.02879.02879.00.02879.00.04364821.0 1494789.0 1424246.0 100.0100.0103.1103.10.0240431.0192793.31687.6*189805.58.5*270241091.0 89605098.0 85070112.8 78.978.976.376.35.724.Shutdowns Scheduled OverNext6Months(Type, DateandDurationofEach):'herefuelin andmaintenanceouta eisscheduledforOctober20 1997.Thelanneddurationis22da s.25.IfShutdownAtEndofReportPeriod,EstimateDateofStartup:26.UnitsinTestStatus(PriortoCommercial Operation):
Force st Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975'*CUMUlATIVE TOTAL COMMENCING NOVEMBER 8.1969 0 w1 E AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plan&DATE: Ma 7 1997 COMPLETED BY: TELEPHONE:
ForcestAchievedINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION CUMULATIVE TOTALCOMMENCING JANUARY1,1975'*CUMUlATIVE TOTALCOMMENCING NOVEMBER8.1969 0w1E AVERAGEDAILYUNITPOWERLEVELDOCKETNO:50-244UNIT:R.E.GinnaNuclearPowerPlan&DATE:Ma71997COMPLETED BY:TELEPHONE:
John Walden 716 771-3588 MONTH A ril 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)494 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)496 494 18.495 496 19.495 4.496 20.495 5.496 496 496 22.496 495 23.496 495 24.495 495 25.495 10.495 26.495 496 27.495 12.496 28.495 13.496 29.495 496 30.495 15.495 31.495 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.Compute to the nearest whole megawatt.
JohnWalden716771-3588MONTHAril1997DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 494DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 49649418.49549619.4954.49620.4955.49649649622.49649523.49649524.49549525.49510.49526.49549627.49512.49628.49513.49629.49549630.49515.49531.495INSTRUCTIONS Onthisformat,listtheaveragedailyunitpowerlevelinMWe-Netforeachdayinreporting month.Computetothenearestwholemegawatt.
DOCKET NO: 50-244 UNIT: R.E.GINNA NUCLEAR POWER PLA T A E: a 7 1997 COMPLETED BY: John Walden, UNIT SHUTDOWN AND POWER REDUCTIONS No.Date Type Duration (hours)Reason'ethod of shuting down reactors'icensee Event Report 0 System Code'omponent Code'ause&Corrective Action to Prevent Recurrence 1 F: Forced S: Scheduled 2 Reason: A-Equipment (Explain)8-Maintenance or Test C-Refueling D-Regulatory E-Operator Training&Lecensee Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method: 1-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161)5 Exhibit 1-Same Source
DOCKETNO:50-244UNIT:R.E.GINNANUCLEARPOWERPLATAE:a71997COMPLETED BY:JohnWalden,UNITSHUTDOWNANDPOWERREDUCTIONS No.DateTypeDuration(hours)Reason'ethod ofshutingdownreactors'icensee EventReport0SystemCode'omponent Code'ause
&Corrective ActiontoPreventRecurrence 1F:ForcedS:Scheduled 2Reason:A-Equipment (Explain) 8-Maintenance orTestC-Refueling D-Regulatory E-Operator Training&LecenseeExamination F-Administrative G-Operational Error(Explain)
H-Other(Explain) 3Method:1-Manual2-ManualScram.3-Automatic Scram.4-Other(Explain) 4ExhibitG-Instructions forPreparation ofDataEntrySheetsforLicenseeEventReport(LER)File(NUREG-0161)5Exhibit1-SameSource
/  
/  
'~~~-4-NARRATIVE SUMMARYOFOPERATING EXPERIENCE DOCKETNO:50-244UNIT:R.E.GinnaNuclearPowerPlantDATE:Ma71997MONTHAril1997COMPLETED BY:TELEPHONE:
'~~~-4-NARRATIVE  
JohnWalden16771-3588TheunitoperatedatfullpowerfortheentiremonthofApril.Theaveragepowerlevelwas99.8%  
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: Ma 7 1997 MONTH A ril 1997 COMPLETED BY: TELEPHONE:
John Walden 16 771-3588 The unit operated at full power for the entire month of April.The average power level was 99.8%  
'0"0'4l~~r.->~s}}
'0"0'4l~~r.->~s}}

Revision as of 12:45, 7 July 2018

Monthly Operating Rept for Apr 1997 for Ginna Nuclear Power Plant.W/970507 Ltr
ML17264A882
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1997
From: WALDEN J V, WIDAY J A
ROCHESTER GAS & ELECTRIC CORP.
To: VISSING G S
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9705130098
Download: ML17264A882 (11)


Text

CATEGORY 1 REGULATG1 INFORMATION DISTRIBUTION TEM (RIDS)ACCESSL6N fHBR:9709130098 DOC.DATE: 97/04/30 NOTARIZED:

NO.DOCKET ft FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.

Rochester Gas&Electric Corp.WIDAY,J.A.

Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.

Document Control Branch (Document Contxol Desk)

SUBJECT:

Monthly operating rept for Apr 1997 for Ginna Nuclear Power Plant.W/970507 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2;2.109(9/19/72).

05000244 Q RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN1 COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1 1 VISSING G.1 1-E CENTER 01 1 1 OC/DB'A;tmD 1 1 COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D U'OTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

(pilll IiBIYIE'i I IIIiiiiiz ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649-0001 TCLCPHONC*RE*COOE 7ld 546.2700 May 7, 1997 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for March, 1997 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Vissing:

Pursuant to Qiana Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of April, 1997.Very truly yours, a.d s h A.Wi lant Manager xc: U.S.Nuclear Regulatory Commission Mr.Guy S.Vissing (Mail Stop 14C7)Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector Attachments

/]~7 9705130098 9'70430 PDR ADOCK 05000244 R PDR'V!lV!lV!ill!IV.FVlflllV S-*I'\L OPERATING DATA REPORT COMPLETED BY Ma 7 1997 50-244 John V.Walden TELEPHONE (716)771Q588 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: 'ril 1997 3.Licensed Thermal Power (MWI): 1520 4.Nameplate Rating (Gross MWe): 517 5.Design Electric Rating (Net MWe): 470 6.Maximum Dependable Capacity (Gross MWe): 490 7.Maximum Dependable Capacity (Net MWe): 480 8.If Changes Occur ln Capacity Rating (Items Number 3 Through 7)Since Last Report, Give Reason: 9.Power Level to Which Restricted, If Any (Net MWe): 10.Reason For Restrictions, If An: This Month Yr.-to-Date Cumulative**

11, Hours in Reported Period 12.Number of hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor (%)20.Unit Availability Factor (%)21.Unit Capacity Factor (using MDC Net)(%)22.Unit Capacity Factor (using DER Net)(%)23.Unit Forced Outage Rate (%)719.0 719.0 0.0 719.0 0.0 1090818.0 373401.0 355839.0 100.0 100.0 103.1 103.1 0.0 2879.0 2879.0 0.0 2879.0 0.0 4364821.0 1494789.0 1424246.0 100.0 100.0 103.1 103.1 0.0 240431.0 192793.3 1687.6*189805.5 8.5*270241091.0 89605098.0 85070112.8 78.9 78.9 76.3 76.3 5.7 24.Shutdowns Scheduled Over Next6 Months(Type, Date and Duration of Each): 'herefuelin andmaintenanceouta eisscheduledforOctober20 1997.The lanneddurationis22da s.25.If Shutdown At End of Report Period, Estimate Date of Startup: 26.Units in Test Status (Prior to Commercial Operation):

Force st Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975'*CUMUlATIVE TOTAL COMMENCING NOVEMBER 8.1969 0 w1 E AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plan&DATE: Ma 7 1997 COMPLETED BY: TELEPHONE:

John Walden 716 771-3588 MONTH A ril 1997 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)494 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)496 494 18.495 496 19.495 4.496 20.495 5.496 496 496 22.496 495 23.496 495 24.495 495 25.495 10.495 26.495 496 27.495 12.496 28.495 13.496 29.495 496 30.495 15.495 31.495 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.Compute to the nearest whole megawatt.

DOCKET NO: 50-244 UNIT: R.E.GINNA NUCLEAR POWER PLA T A E: a 7 1997 COMPLETED BY: John Walden, UNIT SHUTDOWN AND POWER REDUCTIONS No.Date Type Duration (hours)Reason'ethod of shuting down reactors'icensee Event Report 0 System Code'omponent Code'ause&Corrective Action to Prevent Recurrence 1 F: Forced S: Scheduled 2 Reason: A-Equipment (Explain)8-Maintenance or Test C-Refueling D-Regulatory E-Operator Training&Lecensee Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method: 1-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161)5 Exhibit 1-Same Source

/

'~~~-4-NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: Ma 7 1997 MONTH A ril 1997 COMPLETED BY: TELEPHONE:

John Walden 16 771-3588 The unit operated at full power for the entire month of April.The average power level was 99.8%

'0"0'4l~~r.->~s