| number = ML20148C317
| number = ML20148C317
| issue date = 05/09/1997
| issue date = 05/09/1997
| title = Ack Receipt of 970501 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-454/96-13 & 50-455/96-13 Issued on 970331.Corrective Actions Will Be Examined During Future Inspections
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-454/96-13 & 50-455/96-13 Issued on 970331.Corrective Actions Will Be Examined During Future Inspections
| author name = Grant G
| author name = Grant G
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 50-454-96-13, 50-455-96-13, NUDOCS 9705150327
| document report number = 50-454-96-13, 50-455-96-13, NUDOCS 9705150327
| title reference date = 05-01-1997
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2

Latest revision as of 00:28, 12 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-454/96-13 & 50-455/96-13 Issued on 970331.Corrective Actions Will Be Examined During Future Inspections
ML20148C317
Person / Time
Site: Byron  Constellation icon.png
Issue date: 05/09/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Graesser K
COMMONWEALTH EDISON CO.
References
50-454-96-13, 50-455-96-13, NUDOCS 9705150327
Download: ML20148C317 (2)


Text

- -- . . - . .

,

'

,,

~

.  :

!

!

May 9, 1997 j

<

.

I

!

Mr. Site Vice President -

Byron Nuclear Power Station 1 Commonwealth Edison Company  ;

- 4450 North German Church Road i

Byron, IL 61010 SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT 50-454/96013(DRS);

, 50-455/96013(DRS))

.

Dear Mr. Graesser:

l l

This will acknowledge receipt of your May 1,1997 letter in response to our March 31, )

1997 letter transmitting a Notice of Violation (NOV) associated with the above mentioned 1 inspection report. This report summarized the results of the fire protection corrective

.

action inspection at your Byron Plant. We have reviewed your corrective actions for the NOV and have no further questions at this time. These corrective actions will be examined during future inspections.

,

in regard to your response to the unresolved issue concerning the reactor coolant pump motor oil leakage collection system, we will review your responso and contact you if further information is required.

'

Sincerely,

,

-

\

-

/s/ M. Icach (for) l

"

9705150327 970509 Geoffrey E. Grant, Director PDR ADOCK 05000454 0 PDR Division of Reactor Safety Docket No. 50-454 Docket No. 50-455 Enclosure: Ltr 05/01/97,