ML20198G229: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IA-85-816, Confirms 851202-06 Equipment Qualification Insp of Plant, Per 851113 Telcon.Areas to Be Inspected Listed]]
{{Adams
| number = ML20198G229
| issue date = 11/18/1985
| title = Confirms 851202-06 Equipment Qualification Insp of Plant, Per 851113 Telcon.Areas to Be Inspected Listed
| author name = Zech G
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
| addressee name = Parris H
| addressee affiliation = TENNESSEE VALLEY AUTHORITY
| docket = 05000327, 05000328
| license number =
| contact person =
| case reference number = FOIA-85-813, FOIA-85-816
| document report number = NUDOCS 8511220106
| package number = ML20198G233
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
 
=Text=
{{#Wiki_filter:' . , f *=- 9        o,,                          UNITED STATES
            !          -o              NUCLEAR RE2ULATORY COMMISSION fo I
t CASmNGTON, C. C. 20686
* s.,*****/
November 18, 1985 Docket Nos. 50-327 and 50-328 Mr. H. G. Parris Manager of Power Tennessee Valley Authority 500A Chestnut Street, Tower II Chattanooga, Tennessee 37401 Gentlemen:
 
==SUBJECT:==
EQUIPMENT QUALIFICATION INSPECTION - SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 This letter confirms the dates of December 2-6, 1985, for the NRC equipment qualification (EQ) inspection of Sequoyah Nuclear Plant, Units 1 and 2.
These dates were established during a telephone conversation on November 13, 1985 between Mr. J. Wills of your staff and Mr. G. Hubbard, IE. However, should it be necessary, the inspection team.will return at a later date to complete the inspection activities. This will be decided during the course of the inspection. The inspection will include activities at your corporate offices in Knoxville, Tennessee, and at the plant site in Daisy, Tennessee.
A management entrance meeting is scheduled for 1:00 pm on December 2, 1985 at your corporate offices. If the inspection is completed during this first week, the management exit meeting is tentatively scheduled for 11:00 am on December 6,1985, also at your corporate offices. You will be contacted at a later date concerning arrangements for the members of the inspection team which will be visiting the plant site.      The plant site visit is tentatively scheduled for December 4, 1985.
The inspection will include the following:
: 1. Review of your implementation of a 10 CFR 50.49 EQ program, including preservation of the qualified status of qualified equipment.
: 2. Review of your implementation of Technical Evaluation Report / Safety Evaluation Report EQ corrective action commitments.
                      ~3. Review of EQ documentation files.
I
: 4. Physical inspection of selected equipM nt.
[85itudit(A                2yP
        \_                                                                                      1
 
      .31.  -
Tennessee Valley Authority.              -
2-                    November 18, 1985 Your cooperation with us during this inspection will be appreciated.. Shotid you have any questions regarding this inspection, you can contact Mr. G. Hubbard at (301) 492-9759 or Mr. A. Ruff, RII, at (404) 331-4849.
Sincerely,
                                                                            ~
Gary    . ech, Chief Vendor Procran Branch Division of Quality Assurance, Vendor and Technical Training Center Programs cc:  J. Wills, TVA C. Stahle, NRR R. LaGrange, NRR A. Herdt, RII' T. Conlon, RII R. Wilson, IE
          /
              "      -        ~--    ,}}

Latest revision as of 16:17, 8 December 2021

Confirms 851202-06 Equipment Qualification Insp of Plant, Per 851113 Telcon.Areas to Be Inspected Listed
ML20198G229
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/18/1985
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20198G233 List:
References
FOIA-85-813, FOIA-85-816 NUDOCS 8511220106
Download: ML20198G229 (2)


Text

' . , f *=- 9 o,, UNITED STATES

! -o NUCLEAR RE2ULATORY COMMISSION fo I

t CASmNGTON, C. C. 20686

  • s.,*****/

November 18, 1985 Docket Nos. 50-327 and 50-328 Mr. H. G. Parris Manager of Power Tennessee Valley Authority 500A Chestnut Street, Tower II Chattanooga, Tennessee 37401 Gentlemen:

SUBJECT:

EQUIPMENT QUALIFICATION INSPECTION - SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 This letter confirms the dates of December 2-6, 1985, for the NRC equipment qualification (EQ) inspection of Sequoyah Nuclear Plant, Units 1 and 2.

These dates were established during a telephone conversation on November 13, 1985 between Mr. J. Wills of your staff and Mr. G. Hubbard, IE. However, should it be necessary, the inspection team.will return at a later date to complete the inspection activities. This will be decided during the course of the inspection. The inspection will include activities at your corporate offices in Knoxville, Tennessee, and at the plant site in Daisy, Tennessee.

A management entrance meeting is scheduled for 1:00 pm on December 2, 1985 at your corporate offices. If the inspection is completed during this first week, the management exit meeting is tentatively scheduled for 11:00 am on December 6,1985, also at your corporate offices. You will be contacted at a later date concerning arrangements for the members of the inspection team which will be visiting the plant site. The plant site visit is tentatively scheduled for December 4, 1985.

The inspection will include the following:

1. Review of your implementation of a 10 CFR 50.49 EQ program, including preservation of the qualified status of qualified equipment.
2. Review of your implementation of Technical Evaluation Report / Safety Evaluation Report EQ corrective action commitments.

~3. Review of EQ documentation files.

I

4. Physical inspection of selected equipM nt.

[85itudit(A 2yP

\_ 1

.31. -

Tennessee Valley Authority. -

2- November 18, 1985 Your cooperation with us during this inspection will be appreciated.. Shotid you have any questions regarding this inspection, you can contact Mr. G. Hubbard at (301) 492-9759 or Mr. A. Ruff, RII, at (404) 331-4849.

Sincerely,

~

Gary . ech, Chief Vendor Procran Branch Division of Quality Assurance, Vendor and Technical Training Center Programs cc: J. Wills, TVA C. Stahle, NRR R. LaGrange, NRR A. Herdt, RII' T. Conlon, RII R. Wilson, IE

/

" - ~-- ,