The unit operated at full power for the entire month of August. Average power for the month was 99.7%.
The unit operated at full power for the entire month of August. Average power for the month was 99.7%.
(1) Reason                                                    (2) Method A - Equipment Failure (Explain)                              1 - Manual B - Maintenance or Test                                      2 - Manual Trip/Scram C - Refueling                                                3 - Automatic Trip/Scram D - Regulatory Restriction                                  4 - Continuation E - Operator Training/License Examination                    5 - Other (Explain)
(1) Reason                                                    (2) Method A - Equipment Failure (Explain)                              1 - Manual B - Maintenance or Test                                      2 - Manual Trip/Scram C - Refueling                                                3 - Automatic Trip/Scram D - Regulatory Restriction                                  4 - Continuation E - Operator Training/License Examination                    5 - Other (Explain)

Latest revision as of 09:09, 4 February 2020

Monthly Operating Rept for Aug 1999 for Re Ginna Npp.With 990909 Ltr
ML17265A747
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/31/1999
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9909150052
Download: ML17265A747 (8)


Text

REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9909150052 DOC.DATE: 99/08/31 NOTARIZED: NO DOCKET FACIL:50-244=Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NJ&TE,, AUTHOR AFFILIATION Rochester Gas & Electric Corp.

~

WALDEN,3';-V.

WIDAY,J.A. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.

SUBJECT:

Monthly operating rept for Aug 1999 for RE Ginna NPP.With 990909 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEXVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per. Tech Specs)

E NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 G

RECIPIENT COPIES RECIPIENT COPIES 0 ID CODE/NAME LTTR ENCD ID CODE/NAME LTTR ENCL VISSING,.G. 1 1 INTERNAL: F E CE'NTER O~ly OC/DBA/PAD 1 1 Y' RE fOERKB RGhI1 1 .1 EXTERNAL: LMITCO MARSHALL NOAC NRC PDR

'I U

~ Sw NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8

'IA % 1 We l

4~

AeO SZ1%

ROCHESTER GAS AND ELECTRIC CORPORATION 89EASTAVENUE, ROCHESTER, N.V. 14649-0001 AREA CODE 716-546-2700 it i September 9, 1999 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for August, 1999 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of August, 1999.

Very truly yours, cj. U se A. Widay Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate l-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission I 'egion 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

.-qq gV pq0q150052 '2~083<

l PDR R

ADOCK 05000244 PDR ~

4 Il t

~ ~

g

OPERATING DATA REPORT 50-244 September 9, 1999 COMPLETED BY:

John V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: August, 1999
3. Design Electric Rating (Net MWe): 470
4. Maximum Dependable Capacity (Net MWe): 480 This Month Yr.-to-Date Cumulative**
5. Number of hours Reactor Was Critical 744.0 4565.8 211285.0
6. Hours Generator On-line 744.0 4516.2 208214.9
7. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
8. Net Electrical Energy Generated (MWH) 358167.0 2102265.0 93953345.4
    • CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: Se tember9 1999 COMPLETED BY: John V. Walden TELEPHONE~TE 31 3588 UNIT SHUTDOWN REPORTING PERIOD: Au ust 1999 (Month/Year)

NO. DATE TYPE DURATION REASON<'> METHOD OF CAUSE/CORRECTIVE ACTIONS F:FORCED (HOURS) SHUTTING S: SCHEDULED DOWN(') COMMENTS

SUMMARY

The unit operated at full power for the entire month of August. Average power for the month was 99.7%.

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

~ ~ ~