ML17340A184: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.
{{#Wiki_filter:AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.
COMPLETED IIY
COMPLETED IIY T~    Chilson t9aSl=
                                                                                                      '
T~    Chilson t9aSl=
MONTH          AUGUST i 1980 DAY      AVERAGE DAlLYPOWER LEVEL                              DAY        AVERAGE DAlLYPOWER LEVEL (MWe.Net}                                                      (MWe.Ãet )
MONTH          AUGUST i 1980 DAY      AVERAGE DAlLYPOWER LEVEL                              DAY        AVERAGE DAlLYPOWER LEVEL (MWe.Net}                                                      (MWe.Ãet )
I 643                                    17                      653 639                                    18 647 637                                  20                      653 64                                    21                      647 22 503                                                            652 664                                  24 658                                    25                      657 10                        655                                  16                      652 658                                  17 12                        656                                  28                      642 I3                        656                                  o9                      643,.
I 643                                    17                      653 639                                    18 647 637                                  20                      653 64                                    21                      647 22 503                                                            652 664                                  24 658                                    25                      657 10                        655                                  16                      652 658                                  17 12                        656                                  28                      642 I3                        656                                  o9                      643,.
Line 169: Line 167:
Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
Very  truly yours, D. chmidt Vice President Power Resources VTC/ddc cc:  Mr. James P. O'Reilly Robert Lowenstein, Esquire e P'      SER"ING P=QP'
Very  truly yours, D. chmidt Vice President Power Resources VTC/ddc cc:  Mr. James P. O'Reilly Robert Lowenstein, Esquire e P'      SER"ING P=QP'
                    .


==SUMMARY==
==SUMMARY==
Line 179: Line 175:


                                               -  ~
                                               -  ~
                    .


==SUMMARY==
==SUMMARY==
Line 186: Line 181:
Inspections and requirements  of IE Bulletins and NUREG-0578 in progress.
Inspections and requirements  of IE Bulletins and NUREG-0578 in progress.
Florida Power & Light Company commitments for NUREG-'0578 implementation are continuning.      Refer to correspondence between FPL and NRC for ad-ditional information.
Florida Power & Light Company commitments for NUREG-'0578 implementation are continuning.      Refer to correspondence between FPL and NRC for ad-ditional information.
                    .


==SUMMARY==
==SUMMARY==

Latest revision as of 00:10, 4 February 2020

Monthly Operating Repts for Aug 1980
ML17340A184
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 09/06/1980
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A993 List:
References
NUDOCS 8009170281
Download: ML17340A184 (14)


Text

AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.

COMPLETED IIY T~ Chilson t9aSl=

MONTH AUGUST i 1980 DAY AVERAGE DAlLYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL (MWe.Net} (MWe.Ãet )

I 643 17 653 639 18 647 637 20 653 64 21 647 22 503 652 664 24 658 25 657 10 655 16 652 658 17 12 656 28 642 I3 656 o9 643,.

656 30 644 IS 649 31 648 656 16 NOTE: Average daily power level greater than 646 MWe due to cooler condenser cooling INSTRUCTlONS water.

On this format. list the aveta8e daily unit power Ie> eI in MWe.Net for each day in the rep<>rtin8 tn>>nth. C>>n>pute to the nearest whole megawat t.

(ol77)

OPERATING DATA REPORT DOCKET NO.

DA~ ~S~ e. 980 COMPLETED BY 2L3~31Q.son TEI.EPHONE +~~2-3824 OPERATING STATUS Turke Point Unit No. 3 Notes Unit No. 3 operated

1. Unit Name:

at approximately 100X R.P.,

2. Reporting Period: of
3. Licensed Thermal Power (MWt):

except for outage Aug.

760 6-7, 1980

4. Nameplate Rating (Gross MWe):
5. Design EIcctrical Rating (Net MWe): 693
6. Maximum Dependable Capacity (Gross MWe): 680
7. Maximum Dependable Capacity (Net MWc):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7} Since Last Report, Give Reasons:

Maximum De endable Ca acit Gross MVe has been rerated to the most restricted seasonal conditions (summer) experienced. Maximum Dependable Capacity (Net MWe) has been rerated accordingly.

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 744.0 4 979.7 52 249.2
13. Reactor Reserve Shutdown Hours 213.4
14. Hours Generator On. Line 737. 9 4 &09.4 50 499.6
15. Unit Reserve Shutdown Hours 121.8
16. Gross Thermal Energy Generated (MWH) 1 613 090 10 410 368 101 879 002
17. Gross Electrical Energy Generated (MWH) 503 570 3 275 415 32 356 415
18. Net Electrical Energy Generated (MWH) 478 174 3 104 278 30 626 372
19. Unit Service Factor 99.2 82.1 74.4
20. Unit Availability Factor 99.2 82.1 74.6
21. Unit Capacity Factor (Using MDC Net) 9.5 82.1 70. 2
22. Unit Capacity Factor (Using DER Nct) 6. '5.1 D. Unit Forced Outage Rate 0.8 1.3 2.5
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

- Oct. 5 - Nov. 1 19&0.

25. If Shut Down At End Of Report Period, Estimated Date of Startup
26. Units ln Test Status (Prior to Commercial Operation>: Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (i>(77)

UNIT SHUTDOWNS AND POIVER REDUIONS DOCKET NO.

80 El Liccnscc 0ce<<

s~ Cause & Corrective Q

N<<. I)at>> CL t- c 5L'~

Event Vl C ~

Action lo C Report ~ rn Cr Q Prevent Rccurrcncc

~ C/l Cr 16 80-08-06 6.1 B N/A CB MOTOR X Unit No. 3 was removed from service due to low oil level in reactor coolant pump motor No. 3C. Cor-rective actions included adding oil. (Nuclear System)

I 3 4 I': F<<reed Reason: Method: Exhibit G - Instructions S: Sch>>du!cd A.Equipment Failure (Explain) I.Manual for Preparation ol Data B.Maintenance or Test- 2.Manual Scram. Entry Shccts for Licensee C-Refueling 3-Automatic Scrant. Event Report (LER) Fil>> (NUREC.

D.R>>gulatory Restriction 4.Other (Explain) OI6()

L'.Operator Training & Liccnsc Examination F-Administrative G-Operational Error (Explain) Exhibit I - Same Sour>>>>

II Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50 251 COMPI.ETED IIY V- T ~ ChilSOn MONTH AUGUST 1980 DAY AVERAGE DAlLYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (h)We.Net) (MWe.Net)

I 633 17 639 634 635 19 635 630 20 634 633 21 635 640 22 636 644 638 645 640 644 25 642 10 26 634 630 28 6 2 13 640 '79 641 30 636 15 31 16 640 INSTRUC11ONS Qn this format. list the average daily unit piiwer le~pl in MWe.Net for each day tn the reportin8 inonth. Crnnpute to the nearest whole rnegawat t.

(ril77)

OPERATING DATA REPORT NO..'iQ=~

DOCKET DATE COMPLETED BY

~~980 2LX.~~son TELEPHONE ~F52-3824 OPERATING STATUS I UdtN . Turke Point Unit No. 4 Notes - Unit No. 4 operated

2. Reporting Period:

at approximately 100K R.P.

3. Licensed Thermal Power (MWt): 2200
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

e 646

7. Maximum Dependable Capacity (Net MWe):

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

Maximum De endable Ca acit (Gross MRe) has been rerated to the most restricted seasonal conditions summer ex erieaced. Maximum De endable Ca acit Net MMe has been rerated accordingly.

9. Power Level To Which Restricted. IfAny (Net MWe): NONE
10. Reasons For Restrictions, lfAny:

TMa Month Yr..to.Date Cumulative "I I. Hours In Reporting Period 744.0

12. Number Of Hours Reactor Was Critical 4 532nl
13. Reactor Reserve Shutdown Hours 12.3 -166.6 4 627.3
15. Unit Reserve Shutdown Hours 12.3 31.2 1 633 024 9 629 136 90 848 116
16. Gross Thermal Energy Generated (MWH)

~4282 la. Grass Eleerrirnl Energy Generereg (grlyHl

19. Unit Service Factor n e slssss 2 997 355 75.9 28 900 833 70.8
20. Unit Availability Factor 100.0 76.1 70.9
21. Unit Capacity Factor (Using MDC Net) 98. 6 75.1 69.0

~~. Unit Capacity Factor (Using DER Net) 92.0 70.0 64.1

23. Unit Forced Outage Rate 0.3 3.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):

maintenance and ins ections >> Nov. 9 1980 - Jan. 10, 1981.

25. IfShut Down At End Of Report Period, Estimated Date of Startup:

2&. Units ln Test Status l Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION Ig>/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORTMONTII AUGUST, 1980 S52-~

TELEPH0>K +30%t t

gr, I

C rl CO c o 2<

C ILI Liccoscc 0 V Cause h Corrective l)alc Vl 'a Q t$ r3 Z gee Event IA Action to 0~z Q

Report > cn'Cr 0 Prcvcnt Recurrcocc

~ CA N 0 N I

3 F: Forced Reason: hlethod:

S: Scl>edulcd Exhibit G - Instructions A.Equipment Failure (Explain) I.Manual for Preparation of Data II hlaintenance or Test 2.Manual Scram. Entry Sheets for Licensee C.Refueling. 3.Autotoatic Scraol. Evcot Report (LER) File (NUREG.

D.Regulatory Restriction 4ther (Explain) 016I )

L.Operator Training Ec Liccosc Examination F Administrative G Operational Error (Fxplain)

Exhibit I - Salllc Sollrcc

('J/77) II Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL COMPLETED IIY V. T. Chilson DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) (MWe.Net) 7 17 794 18 673 796 19 787 777 20 786 77 725'83 792 791 790 791 95 782 10 26 757 798 37 << 759 797 2$ 781 718 >9 779 126 30 780 15 255 31 749 16 394 NOTE: Average daily power level greater than 777 MNe due to cooler condenser cooling water.

INSTRUCTIONS On this format. list the avcral(c daily unit p>>wcr le~el in MIVe Nct for each day in the rep>>rtin>t n>>>nth. C>>rnpute to thc nearest whole megawatt.

(o(77)

OPERATING DATA REPORT DOCKET NO. 'HL3Zi DATE R@~~980-COMPLETED BY T. Chilson TELEPHONE 552-3824 OPERATING STATUS I. Unit Name St. Lucie Unit No. 1 Notes - Unit operated at

2. Reporting Period:

approximately 100X R.P.,

3., Licensed Thermal Power (MWt):

2560 except for outages of Aug.

850 14, 14-15, and 16-18, 1980,

4. Nameplate Rating (Gross MWe}:

802 and reduced load operation S. Design Electrical Rating (Net MWe):

of Aug.14-18, 1980.

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. IfChanges Occur in Ca pacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. IfAny (Net MWe):

IO. Reasons For Restrictions, lf Any:

This Month Yr..to-Date Cumulative I I. Hours In Reporting Period 744.0 5 855.0 32 399.0.

72 .0 4 2 2 l3. Reactor Reserve Shutdown Hours 129. 5

14. Hours Generator On-Line 701.4 3 889.7 24 719.7 IS. Unit Reserve Shutdown Hours 7.3 7.3 39.3 I 7. Gross Electrical Energy Generated (MWH) 551 240 3 101 490 1 395 990 IS. Net Electrical Energy Generated (MWH) 519 201 2 915 036 18 242 932 l9. Unit Service Factor 94.3 66.4 76.3
20. Unit Availability Factor 76.4 8 .8 64.1 72. 5
22. Unit Capacity Factor (Using DER Net) 87.0 62.1 70.2
23. Unit Forced Outage Rate '.4 Z4. Shutdowns Scheduled Over Next 6 Months {Type, Date. and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A

'6. Units In Test Status I Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COhtMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

No.l Page 1 of 2 80 iW!l 552-3824 cEI I I cA ~ Liccn sec C+Q C lh Cause Ec Corrective P Q Cl Vo. Date Vl rj Event Actiun lo CS Q E t" A ~co g Report > cn Cr O Prcvcnt Recurrcncc Cr 80-08-14 S 10.7 N/A TRANSP Unit was removed from service to isolate main power transformer No. 1B to repair oil leak. Cor-rective actions included installing new bushing. (Non-nuclear system) 12 80-08-14 B N/A TRANSP Load was limited to the capacity of main transformer No. 1A. (Non-nuclear system) 13 80-08-14 7.3 N/A TRANSP Unit was removed from service to pro-tect personnel using a crane to re-move a faulty bushing from main power transformer No. 1B. (Non-nuclear system)

I 3 F: I'orccd Reason: hiethod: Exhibit G - Instructions S: Scheduled A.Equipment Failure (Explain) I-Manual I'or Preparation of Data B.hIaintenance oi Test- 2 hlanual Scratn. Entry Sheets I'or Licensee C.Refueling 3-Autotnalic Scram. Event Report (LER) File (NUREG.

D-Regulatory Restriction 4-Other (Explain) OI6 I )

L-Operator Training Ec Liccnsc Examination F.Adminis t ra tive 5 G-Operational Error (Fxplain) Exhibit I ~ Satne Source II.Other (Explain)

UNIT SIIUTDOWNS AND POWER REDUCTIONS . RL=335-UNIT NAME No.l COMPLETED BY 80 TELEPIIONE 305 552-382 Page 2 of 2 I

C r> ~J El ~ L 0 Liccoscc C<

II'J Cause k Corrective Nii. Date 0- a ~ A Event Action lo W~ Q t

O~AK J Rcport -" cn G 2Q Q Prevent Recurrcncc

~ C/l 14 80-08-17 24.6 B N/A EG TRANSP Unit was removed from service to install new bushing and return main power transformer No. 1B to service.

(Non-nuclear system)

I': Forced Rcasolt: hlethod: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) I -hianual for Preparation oi'Data 8 Maintenance or Test ~

2 hlanual Scram. Entry Sheets I'or Licensee C.Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4 Other (Explain) OI6I )

E Operator Training 8c Liccnsc Examination F.Administrative

., G Operational Error (Fxplain) Exhibit I - Sante SourlY.

('>/77) II.Other (Explaitt)

P.O. 3OX 529100, MIAMI, FL 33152 FLORIOA POWER 4 LIGHT COMPANY September 6, 1980 Office of Management Information and Program Controls U. S. Regulatory Commission washington, D. C. 20555 Gentlemen:

Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.

Very truly yours, D. chmidt Vice President Power Resources VTC/ddc cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire e P' SER"ING P=QP'

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 250 Turkey Point UNIT Unit No. 3 DATE Se t. 6 1980 COMPLETED BY V.. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH AUGUST, 1980 Unit No. 3 operated at approximately 100% R.P., except for outage of Aug. 6-7, 1980. Refer to "Unit Shutdowns and Power Reductions" section of August, 1980, Operating Status Report for additional infor-mation.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

- ~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 - '251 Turkey .Point UNIT Unit No. 4 DATE Se t. 6, 1980 COMPLETED BY V. T. Chilson TELEPHONE. (305) 552-3824 REPORT MONTH AUGUST 1980 Unit No. 4 operated at approximately 100%, R.P. Refer to "Unit Shut-downs and Power Reductions" section of the August, 1980 Operating Status Report for additional information.

Major Safety-related maintenance activities performed duning the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Florida Power & Light Company commitments for NUREG-'0578 implementation are continuning. Refer to correspondence between FPL and NRC for ad-ditional information.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 335 St. Lucie UNIT Unit No. 1 DATE Se t. 6 1980 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH Unit operated at approximately 100% R.P., except for outages of August 14, 14-15, and 16-18, 1980, and reduced load operation of August 14-18, 1980. Refer to "Unit Shutdowns and Power Reductions" section of the August, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power G Light Company Commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for.ad-ditional information.

A modification to provide redundant 15 volt power supply to each Control Element Assembly drive mechanism core power programmer is in progress.