{{#Wiki_filter:CATEGORY 1 REGULA'I RY INFORMATIONDISTRIBUTION SYSTEM (RIDS)ACCESSION NBR,:9810190325 DOC.DATE: 98/09/30 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULA'I RY INFORMATIONDISTRIBUTIONSYSTEM (RIDS)
NO DOCKET I FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN;J.p.'ochester Gas&Electric Corp.WIDAY,J.A.
ACCESSION NBR,:9810190325           DOC.DATE: 98/09/30       NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                     G DOCKET 05000244 I
Rochester Gas 6 Electric Corp.RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.
AUTH. NAME           AUTHOR AFFILIATION WALDEN;J.p.'ochester               Gas & Electric Corp.
~
WIDAY,J.A.           Rochester Gas 6 Electric Corp.
RECIP.NAME           RECIPIENT AFFILIATION VISSING,G.S.
Monthly operating rept        for              for      Ginna Nuclear ltr.Sept  1998
~  


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Sept 1998 for RE Ginna Nuclear Power Plant.With 981009 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
RE Power Plant. With 981009 DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR           ENCL       SIZE:
E 05000244 RECIPIENT ID CODE/NAME PD1-1 PD COPIES RECIPIENT LTTR ENCL-.ID CODE/NAME 1 1 VISSING,G.
TITLE: Monthly Operating Report (per Tech Specs)
COPIES LTTR ENCL 1 1 INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 1 1 1 1 RGN1 NOAC 1 1 1 1 1 1 D N NOTE TO ALL"RIDS" RECIPIENTS:
E NOTES:License Exp date       in accordance with 10CFR2,2.109(9/19/72).                   05000244 RECIPIENT           COPIES              RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL   -. ID CODE/NAME         LTTR ENCL PD1-1  PD                1     1       VISSING,G.               1     1 INTERNAL: AEOD/SPD/RRAB               1      1                                1      1 OC/DBA/PAD               1      1      RGN1                      1      1 EXTERNAL: LITCO BRYCE,J H             1     1       NOAC                     1     1 NRC PDR                  1     1 D
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 0~S  
N NOTE TO ALL "RIDS" RECIPIENTS:
~~ROCHESTER GAS AND ELECTRIC CORPORATION 89EASTAVENIJE, ROCHESTER, N.Y.14649-000'REA CODE 716-546-2700 October 9, 1998 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project, Directorate I-1 Washington, DC 20555  
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                 9   ENCL     9
 
0 ~ S
      ~
        ~
ROCHESTER GAS AND ELECTRIC CORPORATION 89EASTAVENIJE, ROCHESTER, N.Y. 14649-000'REA CODE 716-546-2700 October 9, 1998 US Nuclear Regulatory Commission Document Control Desk Attn:       Guy S. Vissing Project, Directorate I-1 Washington, DC 20555


==Subject:==
==Subject:==
Monthly Report for September, 1998 Operating Status Information R.E: Ginna Nuclear Power Plant Docket No.50-244  
Monthly Report for September, 1998 Operating Status Information R.E: Ginna Nuclear Power Plant Docket No. 50-244


==Dear Mr.Vissing:==
==Dear Mr. Vissing:==
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of September, 1998.xc: U.S.Nuclear Regulatory Commission Mr.Guy S.Vissing (Mail Stop 14B2)Project Directorate l-1 Washington, D.C.20555.Very truly yours, Q..d se h A.Widay Plant Manager U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector Attachments 98i0190325 980930 PDR ADOCK 05000244 R PDR  
 
~~T OPERPlNG DATA REPORTCOMPLETED BY: 50-244 October 9, 1998 f.U John V.Walden TELEPHONE (716)771-3588 OPERATING STATUS 480 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: Se tember, 1998 3.Design Electric Rating (Net MWe): 470 4.Maximum Dependable Capacity (Net MWe): Notes: This Month Yr.-to-Date Cumulative**
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of September, 1998.
5.Number of hours Reactor Was Critical 6.Hours Generator On-line 7.Unit Reserve Shutdown Hours 8.Net Electrical Energy Generated (MWH)720.0 720.0 0.0 345907.0 6551.0 6551.0 0.0 3219003.0 204510.2 201489.7 8.5*90760519.4
Very truly yours, Q.. d se h A. Widay Plant Manager xc:         U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)
**CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 7 C F Q Jl DOCKET NO: 50-244 UNIT NAME: R.E.GINNA NUCLEAR POWER PLANT DATE: October 9 1998 COMPLETED BY: John V.Walden UNIT SHUTDOWN REPORTING PERIOD: Se tember 1998 (Month/Year)
Project Directorate l-1 Washington, D.C. 20555.
NO.DATE TYPE F: FORCED S: SCHEDULED DURATION (HOURS)REASON"'ETHOD OF SHUTTING DOWN'" CAUSE/CORRECTIVE ACTIONS COMMENTS  
U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments 98i0190325 980930 PDR     ADOCK     05000244 R                       PDR
 
~
  ~ T
 
OPERPlNG DATA REPORT 50-244 October 9, 1998 COMPLETED BY:        f.U John V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS
: 1. Unit Name:           R.E. GINNA NUCLEAR POWER PLANT       Notes:
: 2. Reporting Period:           Se tember, 1998
: 3. Design Electric Rating (Net MWe):             470
: 4. Maximum Dependable Capacity (Net MWe):         480 This Month     Yr.-to-Date       Cumulative**
: 5. Number of hours Reactor Was Critical             720.0          6551.0          204510.2
: 6. Hours Generator On-line                         720.0          6551.0          201489.7
: 7. Unit Reserve Shutdown Hours                         0.0            0.0                  8.5 *
: 8. Net Electrical Energy Generated (MWH)       345907.0       3219003.0         90760519.4
** CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969
 
7 C
Jl F Q
 
DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: October 9 1998 COMPLETED BY: John V. Walden UNIT SHUTDOWN REPORTING PERIOD:             Se tember     1998 (Month/Year)
NO.       DATE               TYPE         DURATION        REASON"'ETHOD OF                CAUSE/CORRECTIVE ACTIONS F: FORCED             (HOURS)                         SHUTTING S: SCHEDULED                                            DOWN'"                   COMMENTS


==SUMMARY==
==SUMMARY==
: A power reduction occurred on September 5, 1998 at 2120.Power was reduced to 45%for off-site circuit repairs and turbine control maintenance.
:
Full power operation resumed on September 6, 1998 at 1410.The unit operated at full power for the remainder of the month of September.
A power reduction occurred on September 5, 1998 at 2120. Power was reduced to 45% for off-site circuit repairs and turbine control maintenance. Full power operation resumed on September 6, 1998 at 1410. The unit operated at full power for the remainder of the month of September.
(1)Reason (2)Method A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain) 0}}
(1) Reason (2) Method A - Equipment Failure (Explain)                       1 - Manual B - Maintenance or Test                               2 - Manual Trip/Scram C - Refueling                                         3 - Automatic Trip/Scram D - Regulatory Restriction                           4 - Continuation E - Operator Training/License Examination             5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
 
0}}

Revision as of 17:49, 29 October 2019

Monthly Operating Rept for Sept 1998 for Re Ginna Nuclear Power Plant.With 981009 Ltr
ML17265A429
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/30/1998
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9810190325
Download: ML17265A429 (8)


Text

CATEGORY 1 REGULA'I RY INFORMATIONDISTRIBUTIONSYSTEM (RIDS)

ACCESSION NBR,:9810190325 DOC.DATE: 98/09/30 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G DOCKET 05000244 I

AUTH. NAME AUTHOR AFFILIATION WALDEN;J.p.'ochester Gas & Electric Corp.

WIDAY,J.A. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.

Monthly operating rept for for Ginna Nuclear ltr.Sept 1998

~

SUBJECT:

RE Power Plant. With 981009 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL -. ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 VISSING,G. 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 1 1 OC/DBA/PAD 1 1 RGN1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

0 ~ S

~

~

ROCHESTER GAS AND ELECTRIC CORPORATION 89EASTAVENIJE, ROCHESTER, N.Y. 14649-000'REA CODE 716-546-2700 October 9, 1998 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project, Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for September, 1998 Operating Status Information R.E: Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of September, 1998.

Very truly yours, Q.. d se h A. Widay Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate l-1 Washington, D.C. 20555.

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments 98i0190325 980930 PDR ADOCK 05000244 R PDR

~

~ T

OPERPlNG DATA REPORT 50-244 October 9, 1998 COMPLETED BY: f.U John V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period: Se tember, 1998
3. Design Electric Rating (Net MWe): 470
4. Maximum Dependable Capacity (Net MWe): 480 This Month Yr.-to-Date Cumulative**
5. Number of hours Reactor Was Critical 720.0 6551.0 204510.2
6. Hours Generator On-line 720.0 6551.0 201489.7
7. Unit Reserve Shutdown Hours 0.0 0.0 8.5 *
8. Net Electrical Energy Generated (MWH) 345907.0 3219003.0 90760519.4
    • CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

7 C

Jl F Q

DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: October 9 1998 COMPLETED BY: John V. Walden UNIT SHUTDOWN REPORTING PERIOD: Se tember 1998 (Month/Year)

NO. DATE TYPE DURATION REASON"'ETHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN'" COMMENTS

SUMMARY

A power reduction occurred on September 5, 1998 at 2120. Power was reduced to 45% for off-site circuit repairs and turbine control maintenance. Full power operation resumed on September 6, 1998 at 1410. The unit operated at full power for the remainder of the month of September.

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

0