{{#Wiki_filter:flle C'/l'; | {{#Wiki_filter:consumers flle C'/l'; Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 January 7, 1976 US Nuclear Regulatory Commission Mail and Records Section Washington, D. C. 20555 RE: LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen: | ||
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear l975. Howard R. Vernick Associate Engineer CC: JGKeppler, NRC RBDeWitt RBSewell 1.9:1 | Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear | ||
:;::;;71~mber l975. | |||
Howard R. Vernick Associate Engineer CC: JGKeppler, NRC RBDeWitt RBSewell 1.9:1 | |||
~:_....,:- __ ...........__..,,,___~----............_.__ | |||
I | |||
.. ,. .- | |||
APPENDIX 0- | |||
* UNIT Palisades Plant DATE _ _ l_/7_/_7_5~----- | |||
" | |||
. CO'fPLETE DYB _H.__ R._Vernick | |||
__ | _ _ __ | ||
. " DOCKET N0. _ _5_0_/_2_5_5_ __ .* | |||
OPERATIKG STATt:S | |||
( | * 1. REPORTING PERIOD: _ _~7~5_1_2_0_i_.________ THROUGH _ __,_7""-5-=l-=2'-"'3'=1'---------- | ||
HOURS IN REPORTl:\G PERIOD: _ _ _~_4_4_..,.--------------------=..,..-- | |||
: 2. CURRENTLY ACTHORIZED POWER LEVEL ('.\tWth). 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684 | |||
: 3. LO\\!EST POWER LEVEL TO WlllCH SPECIFICALLY RESTRICTED (IF ANY) (l\!We-NE1'): _ _6_3_0______-:-- | |||
.4. REASONS FOR ~ESTRICTION (IF AN.Y): | |||
THIS. CUl\IULA TIVE REPORTING PERIOD YR TO DATE TO DATE S* . HOURS REACTOR WAS CRITICAL. .*.. .' ******. 463.6 5,850.1 16,087 | |||
: 6. REACTOR RESERVE SHUTDOWN HOURS *.***** ; 0 0 0 | |||
: 7. . HOURS GENERATOR ON LINE.*.. ~ .*...****** 463.6 . 5.652.7 14.973.8 8.. \JNJT RESERVE SHUTDOWN HOURS . *.* ~ ******* 0 0 0 | |||
: 9. GROSS THER'.\IAL ENERGY . | |||
GENERATED ('.\tWH) **.*****.************ 537,672 8,906,400 23-,019~960 10; GROSS.ELEqRICAL ENERGY 154,850 2,642,400 1,146~650 11. | |||
.. | -GENERA TEDJ'.\IWII) . . . : . . . . . . . * . * . * * * * * | ||
. | * NET ELECTRICAL ENERGY GENERATED | ||
. | |||
('.\!\\'II) 138,558. 2;427,933 6,681,638 | |||
: 12. REACTOR AVAILABILiTY fACTOR (1) . * * * * * * * * . 62. 3% 66.8% . --.,..-......,4~5: 9% | |||
. 13. UNIT A \"AILABILITY FACTOR (2) ..*.********. 62.3%. . 64. 5%. ---~h..... 2:1% | |||
: 14. l'NIT C AP.-\Cl1Y FACTOR (3) . . * . . * * * * * . * * * | |||
.. | * 21.2%* 40.5% _ _ __._2.7.. . 9% | ||
15 . l 1NIT FORCED Ol!TAGE RATE (4) . . . . . . * * * * . | |||
* 0% 32.6% _ _**-~5_4 .1% | |||
. 16. smrTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH): | |||
Refueling, 12/20/75, 3 months . . . . * | |||
. | : 17. IF Sllt:l" DOWN AT END or.- REPORT PERIOD, ESTl'.\IATED DATE or STARTUP: _3_/_2_9_*_/_7_6_*- - - - - - - - | ||
( | : 18. UNITS IN TEST STATCS C. RIOR TO CO'.\l'.\IERCIAL OPERATION) REPORT THE FOLLOWING: | ||
/ | DATE LAST DATE | ||
.* | |||
FORECAST ACHIEVED INITl!\L CRITICALITY INITIAL ELECrRICAL POWER GENERATION COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL (I) ~EACTOR A \'AILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE (2) l?NIT A\'AILABILITY FACTOR -~-~-~--~~~~-x100 HOURS IN REPORTING PERIOD NF.T ELF.CTR IC Al. PO\\TR GF~F.RATED | |||
. | *.MAX. Dl-.l'ENDABLE CAPACITY (~!We-NET) X HOURS IN RU'ORTING l'E!{IOL> | ||
* | FORCED oL:TA(;E llOL:Rs | ||
-~--~~~--'--~~-~-~~-~--~-~-x100 HOURS GENERATOR ON Llt\E-+ FORCED OUTAGE HOURS I. I 6-D* l | |||
. | . . !-- ""! .. | ||
.e Plant Statistics for Month of: December* 1975 .... | |||
*Month Year to Date Total to Date | |||
.. | |||
,_. . ., | |||
Net*Plant Output, Mwhe 138,558 :2,4~7,933 .6 ,881, _638_ .. | |||
.. | Gross Generation, Mwhe 154,850 2,6~2,4ob- . 7,146 ,650. | ||
Station Power, Mwhe - i | |||
*On Days Generating On Days Not. Generating 16,292 1,014 214,467 | |||
.20 ,492 . | |||
*465,012 113 ,-902 II Reactor Heat Produced, Mwht 537,672 *8;906,4Qo 23,019,960 iI t* | |||
Hours Critical 463.6 5,850;1 16,087 Hours Generating .. 463.6 . . 5,65i:1 14,973.8 Capacity Factor 27.2% 40.5% 2.7.9% | |||
/ | |||
Station Power, % of Gross 10.5% 8.1% 6.5% | |||
(Days Generating) | |||
CoJ!.e Ave. Burnup, Mwd/MTU ll,347.3* | |||
Batch A Ave. Burnup, Mwd/}lmJ<~** 11,102.9 | |||
...... | |||
Batch A Lead Bundles, lV!i~/MTU 11,716.64 (A-25; A-14, A-1};. A-22, A-44, A-55, A-56, A-47) | |||
Batch B_Ave. Burnup, Mwd/MTU .13,093-5 | |||
.Batch B L::!ad Bundles, Mwd/MTU 14,194.6 (B-20, B-17, B-49, B-52) | |||
Batch C Ave. Burnup, Mwd/MI'U Batch C Lead Bundles, Mwd/MTU 12,900.0 | |||
-. ( C-10, C-03, C-02, C-09, C-ll, C-18, C-19, C-12) | |||
Dates on Line: 1 thru 20 inclusive except plant shutdown at 0738 hours on 12/20 for scheduled outage'. . | |||
Availability (%) Month *_Year to Date Plant 62.3 64.5 Reactor 62.3 66.8. | |||
*This number represents the core average burnups calculated by INCA. The corresponding core average burnup calculated from thermal considerations is 11,430.1. | |||
.. -* | |||
APPENDIX C | |||
.. * . ::j,, | |||
. ' | |||
DOCKET NO. 50- 255' *. | |||
* UNIT Palisades Plant DATE l/y_/_76_ _ | |||
.. | |||
COMPLETED BY H. R. Vernick AVERAGE DAILY UNIT POWER LEVEL MONTH December 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY {.M\Vc-net) .. DAY (MWe-net) 1 484 17*. . 480 | |||
,,,.,..*. | |||
2 268* 18 4 1 | |||
/ | |||
3 -24J: . .19' 4 4 241 20. 10 5 235 21 6* 237 *22 7 237 23 s 240 24 .. .... -:- . . | |||
.* . | |||
: ~: | |||
9 237 25 10 235 . 26 11* 250 27. | |||
12 *. 259 *28 13 ,- 261. 29. | |||
14 266 30 1"5 264 31 | |||
~ .. . | |||
16 421 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in M\Vc-net for each day in the reporting month. | |||
Compute to the nearest whole megawatt. | |||
*These figures will be used to plot a gr;,iph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the rcstrktcd power level* line). In such cases, the average daily unit power output sheet should be footnoted to explain the aprJarent anomaly. | |||
I | |||
* I | |||
: 1. J6-C* l | |||
!~::'\ | |||
..=.:*-,, | |||
.....,.2~*-***W~'r~txMilleilGrd~**~r2*rw1-..*******>n..-............_.,,__...,.,~m_..*-*~*u***1~::.....~**-.--.1,, ...-...-..... - - - - . . - - - - - - - - - - - - - - - - - - - - . . _ . . . . . ,____...._-..,._ | |||
.I | |||
-~ | |||
\ | |||
.** \ | |||
. 't I | |||
.. | |||
I APPENDIX E DOCKET NO. 50-255 ~ ! | |||
r. | |||
. | |||
UNIT SHUTDOWNS UNIT NAME Palisades- Plant 1/7176 DATE Vernick. | |||
\ | |||
COMPLETED l3Y H. *R. | |||
REPORT MONTH December 1975 TYPE | |||
' | |||
METHOD OF | |||
. | |||
F*FORCED DURATIPN SHUTTING DOWN NO. DATE S*SCHEDULED (HOU.RS) REASON (1) THE REACTOR (2) CORR.ECTIVE ACTIONS/COMMENTS 10 751220 s 280.4 c 3 While coming down 'in power for the | |||
' sch~duled outage, there was a Reactor | |||
.. Protective System flow trip. | |||
:.... ., | |||
.. | |||
. - ; | |||
. '\ | |||
: | |||
* . : | |||
\ | |||
(l) REASON (2) METHOD . | |||
*' | |||
.. A**EQUIPMENT FAlLURE'(EXPLAlN) I-MANUAL B* MAINT. OR TEST 2-MANUAL | |||
. C- REFUELING SCRAM | |||
. | |||
,. | |||
. \ | |||
.. | |||
., - | |||
D-REGULATORY RESTRICTION E-*OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATI VE 3-AUTOMATIC SCRAM e. | |||
G-Ol'ERATIONAL ERROR | |||
,. (EXPLAIN) | |||
.. H-OTliER (EXPLAIN) | |||
.. | |||
.. | |||
. . . | |||
.. .. | |||
,. .. | |||
==SUMMARY== | ==SUMMARY== | ||
: | : | ||
* The unit operated at . 45% tl;Lis month until. December 16, .:1975 when power was increased to 80%. Load :i;-emained at 80%.until the unit came-off the line.for a scheduled refueling on December 20, 1975- | * The unit operated at . 45% tl;Lis month until. December 16, .:1975 when power was increased to 80%. | ||
Load :i;-emained at 80%.until the unit came- off the line.for a scheduled refueling on December 20, 1975-l j . ,. | |||
**.. | |||
t *}} |
Revision as of 09:06, 20 October 2019
ML18347A830 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 01/07/1976 |
From: | Vernick H Consumers Power Co |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML18347A830 (5) | |
Text
consumers flle C'/l'; Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 January 7, 1976 US Nuclear Regulatory Commission Mail and Records Section Washington, D. C. 20555 RE: LICENSE REPORTS OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:
Enclosed is a copy of the Monthly Operating Data for the Palisades Nuclear
- 71~mber l975.
Howard R. Vernick Associate Engineer CC: JGKeppler, NRC RBDeWitt RBSewell 1.9:1
~:_....,:- __ ...........__..,,,___~----............_.__
I
.. ,. .-
APPENDIX 0-
- UNIT Palisades Plant DATE _ _ l_/7_/_7_5~-----
"
. CO'fPLETE DYB _H.__ R._Vernick
_ _ __
. " DOCKET N0. _ _5_0_/_2_5_5_ __ .*
OPERATIKG STATt:S
- 1. REPORTING PERIOD: _ _~7~5_1_2_0_i_.________ THROUGH _ __,_7""-5-=l-=2'-"'3'=1'----------
HOURS IN REPORTl:\G PERIOD: _ _ _~_4_4_..,.--------------------=..,..--
- 2. CURRENTLY ACTHORIZED POWER LEVEL ('.\tWth). 2200 MAX. DEPENDABLE CAPACITY (MWe-NET) 684
- 3. LO\\!EST POWER LEVEL TO WlllCH SPECIFICALLY RESTRICTED (IF ANY) (l\!We-NE1'): _ _6_3_0______-:--
.4. REASONS FOR ~ESTRICTION (IF AN.Y):
THIS. CUl\IULA TIVE REPORTING PERIOD YR TO DATE TO DATE S* . HOURS REACTOR WAS CRITICAL. .*.. .' ******. 463.6 5,850.1 16,087
- 6. REACTOR RESERVE SHUTDOWN HOURS *.***** ; 0 0 0
- 7. . HOURS GENERATOR ON LINE.*.. ~ .*...****** 463.6 . 5.652.7 14.973.8 8.. \JNJT RESERVE SHUTDOWN HOURS . *.* ~ ******* 0 0 0
- 9. GROSS THER'.\IAL ENERGY .
GENERATED ('.\tWH) **.*****.************ 537,672 8,906,400 23-,019~960 10; GROSS.ELEqRICAL ENERGY 154,850 2,642,400 1,146~650 11.
-GENERA TEDJ'.\IWII) . . . : . . . . . . . * . * . * * * * *
- NET ELECTRICAL ENERGY GENERATED
.
('.\!\\'II) 138,558. 2;427,933 6,681,638
- 12. REACTOR AVAILABILiTY fACTOR (1) . * * * * * * * * . 62. 3% 66.8% . --.,..-......,4~5: 9%
. 13. UNIT A \"AILABILITY FACTOR (2) ..*.********. 62.3%. . 64. 5%. ---~h..... 2:1%
- 21.2%* 40.5% _ _ __._2.7.. . 9%
15 . l 1NIT FORCED Ol!TAGE RATE (4) . . . . . . * * * * .
- 0% 32.6% _ _**-~5_4 .1%
. 16. smrTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH):
Refueling, 12/20/75, 3 months . . . . *
- 17. IF Sllt:l" DOWN AT END or.- REPORT PERIOD, ESTl'.\IATED DATE or STARTUP: _3_/_2_9_*_/_7_6_*- - - - - - - -
- 18. UNITS IN TEST STATCS C. RIOR TO CO'.\l'.\IERCIAL OPERATION) REPORT THE FOLLOWING:
DATE LAST DATE
.*
FORECAST ACHIEVED INITl!\L CRITICALITY INITIAL ELECrRICAL POWER GENERATION COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL (I) ~EACTOR A \'AILABILITY FACTOR x 100 HOURS IN REPORTING PERIOD HOURS GENERATOR ON LINE (2) l?NIT A\'AILABILITY FACTOR -~-~-~--~~~~-x100 HOURS IN REPORTING PERIOD NF.T ELF.CTR IC Al. PO\\TR GF~F.RATED
- .MAX. Dl-.l'ENDABLE CAPACITY (~!We-NET) X HOURS IN RU'ORTING l'E!{IOL>
FORCED oL:TA(;E llOL:Rs
-~--~~~--'--~~-~-~~-~--~-~-x100 HOURS GENERATOR ON Llt\E-+ FORCED OUTAGE HOURS I. I 6-D* l
. . !-- ""! ..
.e Plant Statistics for Month of: December* 1975 ....
- Month Year to Date Total to Date
..
,_. . .,
Net*Plant Output, Mwhe 138,558 :2,4~7,933 .6 ,881, _638_ ..
Gross Generation, Mwhe 154,850 2,6~2,4ob- . 7,146 ,650.
Station Power, Mwhe - i
- On Days Generating On Days Not. Generating 16,292 1,014 214,467
.20 ,492 .
- 465,012 113 ,-902 II Reactor Heat Produced, Mwht 537,672 *8;906,4Qo 23,019,960 iI t*
Hours Critical 463.6 5,850;1 16,087 Hours Generating .. 463.6 . . 5,65i:1 14,973.8 Capacity Factor 27.2% 40.5% 2.7.9%
/
Station Power, % of Gross 10.5% 8.1% 6.5%
(Days Generating)
CoJ!.e Ave. Burnup, Mwd/MTU ll,347.3*
Batch A Ave. Burnup, Mwd/}lmJ<~** 11,102.9
......
Batch A Lead Bundles, lV!i~/MTU 11,716.64 (A-25; A-14, A-1};. A-22, A-44, A-55, A-56, A-47)
Batch B_Ave. Burnup, Mwd/MTU .13,093-5
.Batch B L::!ad Bundles, Mwd/MTU 14,194.6 (B-20, B-17, B-49, B-52)
Batch C Ave. Burnup, Mwd/MI'U Batch C Lead Bundles, Mwd/MTU 12,900.0
-. ( C-10, C-03, C-02, C-09, C-ll, C-18, C-19, C-12)
Dates on Line: 1 thru 20 inclusive except plant shutdown at 0738 hours0.00854 days <br />0.205 hours <br />0.00122 weeks <br />2.80809e-4 months <br /> on 12/20 for scheduled outage'. .
Availability (%) Month *_Year to Date Plant 62.3 64.5 Reactor 62.3 66.8.
- This number represents the core average burnups calculated by INCA. The corresponding core average burnup calculated from thermal considerations is 11,430.1.
.. -*
APPENDIX C
.. * . ::j,,
. '
DOCKET NO. 50- 255' *.
- UNIT Palisades Plant DATE l/y_/_76_ _
..
COMPLETED BY H. R. Vernick AVERAGE DAILY UNIT POWER LEVEL MONTH December 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY {.M\Vc-net) .. DAY (MWe-net) 1 484 17*. . 480
,,,.,..*.
2 268* 18 4 1
/
3 -24J: . .19' 4 4 241 20. 10 5 235 21 6* 237 *22 7 237 23 s 240 24 .. .... -:- . .
.* .
- ~:
9 237 25 10 235 . 26 11* 250 27.
12 *. 259 *28 13 ,- 261. 29.
14 266 30 1"5 264 31
~ .. .
16 421 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in M\Vc-net for each day in the reporting month.
Compute to the nearest whole megawatt.
- These figures will be used to plot a gr;,iph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the rcstrktcd power level* line). In such cases, the average daily unit power output sheet should be footnoted to explain the aprJarent anomaly.
I
- I
- 1. J6-C* l
!~::'\
..=.:*-,,
.....,.2~*-***W~'r~txMilleilGrd~**~r2*rw1-..*******>n..-............_.,,__...,.,~m_..*-*~*u***1~::.....~**-.--.1,, ...-...-..... - - - - . . - - - - - - - - - - - - - - - - - - - - . . _ . . . . . ,____...._-..,._
.I
-~
\
.** \
. 't I
..
I APPENDIX E DOCKET NO. 50-255 ~ !
r.
.
UNIT SHUTDOWNS UNIT NAME Palisades- Plant 1/7176 DATE Vernick.
\
COMPLETED l3Y H. *R.
REPORT MONTH December 1975 TYPE
'
METHOD OF
.
F*FORCED DURATIPN SHUTTING DOWN NO. DATE S*SCHEDULED (HOU.RS) REASON (1) THE REACTOR (2) CORR.ECTIVE ACTIONS/COMMENTS 10 751220 s 280.4 c 3 While coming down 'in power for the
' sch~duled outage, there was a Reactor
.. Protective System flow trip.
- .... .,
..
. - ;
. '\
- . :
\
(l) REASON (2) METHOD .
- '
.. A**EQUIPMENT FAlLURE'(EXPLAlN) I-MANUAL B* MAINT. OR TEST 2-MANUAL
. C- REFUELING SCRAM
.
,.
. \
..
., -
D-REGULATORY RESTRICTION E-*OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATI VE 3-AUTOMATIC SCRAM e.
G-Ol'ERATIONAL ERROR
,. (EXPLAIN)
.. H-OTliER (EXPLAIN)
..
..
. . .
.. ..
,. ..
SUMMARY
- The unit operated at . 45% tl;Lis month until. December 16, .:1975 when power was increased to 80%.
Load :i;-emained at 80%.until the unit came- off the line.for a scheduled refueling on December 20, 1975-l j . ,.
- ..
t *