| title = Monthly Operating Repts for Jul 1980
| title = Monthly Operating Repts for Jul 1980
| author name = CHILSON V T
| author name = Chilson V
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 09:43, 19 June 2019

Monthly Operating Repts for Jul 1980
ML17208A904
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 08/10/1980
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A903 List:
References
NUDOCS 8008180391
Download: ML17208A904 (15)


Text

AVERAGE DAILY UNIT POWER LEVEL DOCKET VO COMPLETED BY TELEPHONE Lllla=h(ONTH JULY 1980 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)I 645 DAY AVERAGE DAlLY POWER LEVEL (MWe->%et) 647 17 IO l3 IS l6 650 647 646 642 570 442 634 637 640 645 l8 20 13 24 95 16 7't 2g 19 30 652 654 654 655 653 651 649 646 638 640 645 INSTRUCTIONS On this format, list the avera((c daily unit p>>wer!eve(in MWe.Net for each day in the rep<>rtintt n>>>nth.C>>>npute to the nearest whole megawat t.('>r77 j 80081 8031/

OPERATING DATA REPOR'T OPERATING STATUS Turke Point Unit No.3 760 693 I.Unit Name 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross a(We): 5.Design Electrical Rating (Net MWe): 6.Lblaximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): DOCKET NO.DATE hug~1980 COMPLETED BY~~son TELEPHONE~i~3824 Notes-Unit No.3 operated at approzimately 100%R.P., ex'cept for outage of July 8-9, 1980.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons: 9.Power'Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, lf Any'his Month Yr.to-Date Cumulative 744.737.0-0-1 612 271 47 164 99.1 I I.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours-0--0-14.Hours Generator On-Line 4 071.6 IS.Unit Reserve Shutdown Hours'6.Gross Thermal Energy Generated (MWH)8 797 278<'JL 19.Unit Service Factor 20.Unit Availability Factor 79.7 22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 0.9 1.4 24.Shutdowns Scheduled Over Next 6 Months IType.Date.and Duration of Each I: Steam Generator Tube Tnsoection Program-Oct.5-Hov.1, 1980.67 112.6 51 505.2 213.3 49 761.7 121.8 100 265 912 31 852 845 30 148 198 74.1 74.3 68.0 64.8'.5 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I'>/77)

UNIT SIIUTDOIVNS AND POPOVER REDUCTIONS REPOR.I h(ONTII JUI.Y 1980 a~COhlPLETED UY 2-2 Nii.Dale~A u L o Q~~<I)Llccf<sec Evc>>l Repi)fl)<t 4l 4J~n o u o Cause Sc Coffel:tive Acliu>>to Pieveol Rccuffcoce 80-07-08 7.0 N/A HOTORX Unit No.3 was removed from service due to low oil level in reactor coolant pump motor-No.38.Cor-rective actions included adding oil.(Nuclear system)I'ofced S;Sclicd<<led (I/77)Reasoo: A-EII>>ipo<e>>t Failure (Explain)U.hlaiote<uioce or Test~(-Rct'ucli>>I, D.RCII>>lalo<y Rcslrlclloo I: 0pcfalo<Tfalolog k.Llccosi: I:xJ>>ll>>JI<o>>

I'.Adioioislralive G.Operalio>>al Lrrur (lixplai<i)

I I.OII<cf (Expl J>><)3 hletl<od: I-hlaoual 2.hlaoual Scram.3-Auloo<at

<c Serio)<.4-Otl<er (Lxplalo)4 Exl)ibil G-Instructions lof I (cpafalloo ol Data Eolry Sl)eels I'oi Liccosee Event Repi)rl (I.ER)File (NURI!G-OI6))Ex l lib it I-Saute Source 0 AVERAGE DAlLY UNIT POWER LEVEL DOCKET iVO.50-251 Turkey.Point IUI!t.TELEPHONE MONTH JULY 1980 DAY AVERAGE DAILY POWER LEVEL!MWe Net)I 640 DAY AVERAGE DAILY POWER LEVEL (i'e-Net)642 lp 649 645 644 644 646 641 641 641 641 636 633 l8 l9 20 2I 22 23 24 25 28 647 647 647 642 645 643 638 631 629 629 l3 4 636 IS 635!6 638 79 30 31 631 591 INSTRUCTIONS On this form>>a.list the average daily unit power!evel in MWe Net for each day i>>the reporting tnonth.Cot>>pote to the nearest whole...egawat!.(o lii)

OPERATING DATA REPORT OPERATING STATUS DOCKET NO.DATE 4~~~80 COMPLETED BY~~hi3.son TELEPHONE~05 552-382E Notes-Unit No.4 operated at approximately 100%R.P., except for load reduction of July 30-31, 1980.7 0 I.Unit Name: Turkev Point Unit No.4 2.Reporting Period: a 3.Licensed Thermai Power (MWt): 4.iVameplate Rating (Gross iPIWe): S.Design Electrical Rating (iVet MWe): 6.iiPIaximum Dependable Capacity (Gross SIWe): 7.maximum Dependable Capacity (Viet MWe): 8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.

If Any (Net MWe): IO.Reasons For Restrictions, lf Any: 'This Month Yr.to-Date Cumulative 744.0 60 840.0 5 111.0 44 615.9 3 788.1 1 6.31.2 o 4 26 896 109 474 472 72.6 70.5 6.8 0.4 3.0 I I.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 744.0 l3.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line IS.Unit Reserve Shutdown Hours-0-12.3 Ig.Net Electrical Energy Generated (MWH)2 366 113 l9.Unit Service Factor 20.Unit Availability Factor 100.0 22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate-0-4.Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Re e in maintenance and inspections

-Nov.9 1980-Jan.10 1981.25.If Shut Down At End Of Report Period.Estimated Date of Startup.'6.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (o j77)

UNIT SIIUTDO)VNS ANI)PO'iVER REI)UCTIONS I)OCKET NO.REPORT hlONTII iVii.l)ate CI~A o I o o.)~C/l Ltccnscc Event Repiwt>o 4l~A i o~o Cause Er.Corrective Action lo I Icvcnt I(ecurlcncc 80-07-30 B N/A HA VAI.VEX Load reduction to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves.(Non-nuclear system)I I': Forced S: Scbcdulcil I'>/77)Reason: A.l!quipu)ent Failure (Explain)B.hlaiiileiiance or Test.(-Reflieliilg I)ltegiilaiory Rcslfti;lion I:.Operali)r Training k.Ltcciisc Exainiiialion I"Ad))III)Ist ralIvc G Operation Jl L'irI>r (Explain)I I Oilier (Lxplaui)3 Method: I.hla>>ual 2.hlanual Scram.3 Ault)IAJtiC SCrani.4.Oilier (llxplain) llxliibit G-Instructions I)r I ri'pJr Jlii)n ol Data I:))try Sliecls I'or l.icensee Evcol Report (LER)File (NUREG.016I)I'xliibll I-Saine Source AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT COMPLETED IIY<-T.Chilson MONTH JULY 1980 DAY AVERAGE DAILY POWER LEVEL (MWe-iVet)

I 767 733 658 791 DAY AVERAGE DAILY POWER LEVEL (il(We.iVe t)790 l7 l8 789 30 796 788 IO l3 15 l6 INSTRUCTIONS 716 789 793 791 733 782 791 13 34'75 16 3S 59 30 3l NOTE: 793 797 797 7 6 792 793 795 Ave age daily power level greater than 777 NWe due to cooler condenser cooling water.On this format.list the averaile daily unit power level in MWe.Net for each day tn the reportintt tnonth.Coittpute to the nearest whole ate(Iawat t.

'0 0 OPERATING DATA REPORT OPERATING STATUS l.Unit Name: St.Lucie Unit No.1 2.Reporting Period: 3.Licensed Thermal Power (MW:): 2560 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 2 6.tglaximum Dependable Capacity (Gross agWe): 7.Maximum Dependable Capacity (Net MWe): 850 822 777 DOCKET NO.DATE~~80 COMPLETED BY~~~son TELEPHONE~~~3824 Notes-Unit operated at approxiataeely 100%R.P.,'ezcept for load reduction of July 2-3, 1980.8.If Changes Occur in Capacity Ratings (Items ltlumber 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.

If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 744.0 13.Reactor Reserve Shutdown Hours-0-14.Hours Generator On.Line IS.Unit Reserve Shutdown Hours it.Grata Electrical Energy Generated (gtWH)18.Net Electrical Energy Generated (MWH)579 531 19.Unit Service Factor 100.0 20.Unit Availability Factor 100.0 21.Unit Capacity Factor (Using MDC Net)100.2 22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 i4Ionths(Type.

Date, and Duration of Yr.-to-Date

'11.0 3 280.2-0-25 2 395 835 62.4 62.4 60.3 58.4 13.2 ch)e Cumulative 3I 655.0 24 789.9 129.5 24 8.32.0 18 844 750 17 723 731 75.9 76.0 72.1 69.8 6.5 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY IN ITIA L ELECTRICITY COMMERCIAL OPERATION UNIT SIIUTI)0'IVNS AND POIVER RE!)(ICTIONS l)OCKET NO.UNIT NAhIE St.Lucie 0 I.No.l*Ni).l)alc r)IA Q Llcc))sec Event Rcport>Cause Ec Curreclive Action lo Prevent Recurrc>>ce 10 80-07-02-G-N/A FILTER Load reduction Lo approximately 50%R.F.to clean condensate pun)p suction st:rainers..(Non-nuclear system)I': I o)ced S: Scl)cduled Reason: A-L'Iluipment Failure (Explain)It hlaintenance nr Test~C-Ref)li)t', l).)let,ulatory Restriction I.Opelalol' ran))l)g 8c License I:xan)u)i)lion

'F.Administrative G.Ot>erational E)rur (Expl>>in)Il Oll)er t Explain)hlelhod: I 4lanual 2 h4nual Sera)n.3 Au)on>atic Sera>>).4 Oll)cf (Lxplau))4 I.xl)ibit G-Instructions II)r I rcpafall)nl ol Data Lnlry Sl)cuts for Licensee Event Report (I.ER)File (NUR-EG f>I)Exl)ibil I-Sa)nc Source P.O.BOX 5291GO,'IAiiII, FL 33152 FLOAIOA POWER 5 LIGHT COMPANY August 10, 1980 Office oz Management Information and Program Controls U.S.Nuclear Regulatory Commission Washington, D.C.20555 Gentlemen:

Attached are the July, 1980, Ope ating Summary Reports zor Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.1.Very truly yours, A.D.Schmidt.Vice President Power Resources VTC/DDC cc: Nr.James P.0"Reilly Robert Lowenstein, Esquire PBOPLB...SBRVI'VG P"=C~LB

SUMMARY

OF OPERATiNG EXPERiENCE DOCKET NO'0-250 UNIT Turkey Point Unit No.3 DATE August 10, 1980 COMPLETED BY V.T..Chilson REPORT MONTH JULY, 1980 TELEPHONE (305)552-3824 Unit No.3 operated at approximately 100%R.P., except for outage of.July 8-9, 1980.Refer to"Unit Shutdowns and Power Reductions" section of July, 1980, Operating Status Report=or additional infor-mation.Major Sa ety-related maintenance activities performed during the month included: inspections'nd reauirements of'E Bulletins and NUREG-0578 are'ontinuing.

Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for ad-ditional information.

SUMMARY

OF OPERATlViG EXPERIENCE DOCKET NO.50-251 UNIT Turkey Point Unit No.4 DATE Au ust 10, 1980 COMPLETED BY V.T.Chilson REPORT i~!ONTH JULY, 1980 TELEPHONE (305)552-3824 Unit, No.4 operated at approximately 100%R.P., except for load reduction of July 30-31, 1980.Refer to"Unit.Shutdowns and Power Reductions" section of the July, 1980, Operating Status Report for additional infor-mation.Major Safety-related maintenance activities performed during the month included: inspections and requirements fo ZE Bulletins and NUREG-0578 in progress.Florida, Power&Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for ad-ditional information.

SUMMARY

OF OPERATiNG EXPERiENCE DOCKET NO.50-335 UNiT St.Lucie Unit No.1 DATE A'u ust 10,.1980 COMPLETED BY V.T.Chilsc~n TELEPHONE (305)552-3824 REPORT MONTH JULY 1980 Unit operated at approximately 100%R.P., except for load rec;uction of July 2-3, 1980.Refer to"Unit Shutdowns and Power Reductioris" section of the July, 1980, Operating Status Report for additional inf'ormation.

Major Safety-related maintenance activities pe formed du ing the month included: inspections and reauirements of iE Bulletins and NUREG-0578 are continuing.

Florida Power&Light Com.-.,any commitments for NUREG-0578 implementation are continuing:

Refer to correspondence between FPL and NRC for ad-ditional information.

!