ML17265A701: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 06/30/1999
| issue date = 06/30/1999
| title = Monthly Operating Rept for June 1999 for Re Ginna Npp.With 990712 Ltr
| title = Monthly Operating Rept for June 1999 for Re Ginna Npp.With 990712 Ltr
| author name = WALDEN J V, WIDAY J A
| author name = Walden J, Widay J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = VISSING G S
| addressee name = Vissing G
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000244
| docket = 05000244

Revision as of 01:59, 19 June 2019

Monthly Operating Rept for June 1999 for Re Ginna Npp.With 990712 Ltr
ML17265A701
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/30/1999
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9907190127
Download: ML17265A701 (7)


Text

CATEGORY 1 REGULA'INFORMATION DISTRIBUTI SYSTEM (RIDS)ACCESSION NBR:9907190127 DOC.DATE: 99/06/30 NOTARIZED:

NO SCIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G~~WUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.

Rochester Gas 5 Electric Corp.WIDAY,J.A.

Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 VISSING,G.S.

SUBJECT:

Monthly operating rept for June 1999 for RE Ginna NPP.With 990712 ltr.DI'STRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 E RECIPIENT ID CODE/NAME VISSING,G.

INTERNA.FILE CE TER 01 Sj'Date-/OE EXTERNAL: LMITCO MARSHALL NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME OC/DBA/PAD RGN1 NOAC COPIES LTTR ENCL 0 1 1 1 1 1 1 D~lI ii'E NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8

~y ROCHESTER GAS AND ELECTRIC CORPORATION 89EASTAVENUE, ROCHESTER, N.Y.14649-0001 AREA CODE 716-546-2700 July 12, 1999 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for June, 1999 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of June, 1999.Very truly yours, a.d.os ph A.Widay Plant Manager xc: U.S.Nuclear Regulatory Commission Mr.Guy S.Vissing (Mail Stop 14B2)Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector Attachments 9907,i90127

.990b30 PDR'AGGCK'5000244 (R PDR AJ v k ri of et OPERATING DATA REPORT COMPLETED BY: 50-244 JUI 12, 1999 ohn V.Walden TELEPHONE (716)771-3588 OPERATING STATUS 480 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: June, 1999 3.Design Electric Rating (Net MWe): 470 4.Maximum Dependable Capacity (Net MWe): Notes: This Month Yr.-to-Date Cumulative**

5.Number of hours Reactor Was Critical 6.Hours Generator On-line 7.Unit Reserve Shutdown Hours 8.Net Electrical Energy Generated (MWH)720.0 720.0 0.0 352978.0 3077.8 3028.2 0.0 1387218.0 209797.0 206726.9 8.5*93238298.4

    • CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 DOCKET NO: 50-244 UNIT NAME: R.E.GINNA NUCLEAR POWER PLANT DATE: Jul 12 1999 COMPLETED BY: John V.Walden UNIT SHUTDOWN REPORTING PERIOD: June 1999 (Month/Year)

NO.DATE TYPE F:FORCED S:SCHEDULED DURATION (HOURS)REASONu>METHOD OF SHUTTING DOWN('>CAUSE/CORRECTIVE ACTIONS COMMENTS

SUMMARY

The unit operated at full power for the entire month of June.Average power for the month was 99.7%.(1)Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling 0-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)(2)Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain) 0~lv S