ML17208A612: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:AVERAGEDAILYUNITPOWERLEVELDOCKETNO.UNITDATECOh1PLETED BYTELEPHONE 250ureyointDec.81979V.T.ChilsonMONTHNOVEMBER1979DAYAVERAGEDAILYPOWERLEVEL(MWcNet)66348DAYAVERAGEDAILYPOWERLEVEL(>>IIWe-i%et
{{#Wiki_filter:AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COh1PLETED BY TELEPHONE 250 ur ey oint Dec.8 1979 V.T.Chilson MONTH NOVEMBER 1979 DAY AVERAGE DAILY POWER LEVEL (MWc Net)663 48 DAY AVERAGE DAILY POWER LEVEL (>>IIWe-i%et
)67017IS6820665679IOl3l4ISl6INSTRUCTIONS 6596666666626616596666706722232455'>6172S'>930NOTE:66762666666566366266165Averagedailypowerlevelgreaterthan666MWeduetocoolercondenser coolingwater.Onthisformat.listtheaveragedailyonitIi>>wcrIcvt.linMWc.Nctforeachdayinthereporting ini>nth.Computetothenearestwholemegawatt..
)670 17 IS 6 8 20 665 6 7 9 IO l3 l4 IS l6 INSTRUCTIONS 659 666 666 662 661 659 666 670 67 22 23 24 55'>6 17 2S'>9 30 NOTE: 667 626 666 665 663 662 661 65 Average daily power level greater than 666 MWe due to cooler condenser cooling water.On this format.list the average daily onit Ii>>wcr Icvt.l in MWc.Nct for each day in the reporting ini>nth.Compute to the nearest whole megawatt..
(')!77)
(')!77)
OPERATING DATAREPORTDOCKETNO.
OPERATING DATA REPORT DOCKETNO.50 250 DBTE Dec.B 1979 COMPLETED BY V.T.Chilean TELEPHONE~3OB 332 3924 OPERATING STATUS l.Unit Name: 2.Reporting period: November 1 7 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): S.Design Electrical Rating (Net hIWe): 6.Maximum Dependable Capacity (Gross hive): 7.Maximum Dependable Capacity (Net MWe): 2200 760 693 700 666 Notes-Unit No.3 operated at approxima'tely 100%R.P.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, lf Any: NONE This Month Yr.-to.Date Cumulative 720.0 8 I I.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 720.0 13.Reactor Reserve Shutdown Hours-0>>14.Hours Generator On.L'ine 720.0~IS.Unit Reserve Shutdown Hours=II='6.Gross Thermal Energy Ge'nerated (hIWH)1 569 305 9 17.Gross Electrical Energy Generated (hlWH)500 205 3 18.Net Electrical Energy Generated (hOVH)476 202 2 19.Unit Service Factor 100.0 20.Unit Availability Factor 100.0 21.Unit Capacity Factor (Using MDC Net)99.3 22.Unit Capacity Factor (Using DER Net)95.4 23.Unit Forced Outage Rate-0-24.Shutdowns Scheduled Over Next 6 h(onths (Type, Date.and Duration of Each Scheduled refuelin maintenance and ins ect'ons-016.0 6 4.6 18.7 510.5 699 457 045 985 876 322 56.3 56.6 53.9 51.8 3.5 e 61 257.6 213.3 45 685.8 91 464 405 29 080 415 2 2 4 74.6 74.8 68.0'64.8 2.6 80.25.If Shut Down At End Of Report Period, Estimated Date of Startup.'6.
50250DBTEDec.B1979COMPLETED BYV.T.ChileanTELEPHONE
Units In Test Status (Prior to Commercial Operation):
~3OB3323924OPERATING STATUSl.UnitName:2.Reporting period:November173.LicensedThermalPower(MWt):4.Nameplate Rating(GrossMWe):S.DesignElectrical Rating(NethIWe):6.MaximumDependable Capacity(Grosshive):7.MaximumDependable Capacity(NetMWe):2200760693700666Notes-UnitNo.3operatedatapproxima'tely 100%R.P.8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, lfAny:NONEThisMonthYr.-to.Date Cumulative 720.08II.HoursInReporting Period12.NumberOfHoursReactorWasCritical720.013.ReactorReserveShutdownHours-0>>14.HoursGenerator On.L'ine720.0~IS.UnitReserveShutdownHours=II='6.GrossThermalEnergyGe'nerated (hIWH)1569305917.GrossElectrical EnergyGenerated (hlWH)500205318.NetElectrical EnergyGenerated (hOVH)476202219.UnitServiceFactor100.020.UnitAvailability Factor100.021.UnitCapacityFactor(UsingMDCNet)99.322.UnitCapacityFactor(UsingDERNet)95.423.UnitForcedOutageRate-0-24.Shutdowns Scheduled OverNext6h(onths(Type,Date.andDurationofEachScheduled refuelinmaintenance andinsect'ons-016.064.618.7510.569945704598587632256.356.653.951.83.5e61257.6213.345685.8914644052908041522474.674.868.0'64.82.680.25.IfShutDownAtEndOfReportPeriod,Estimated DateofStartup.'6.
N A Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY COMhIERCIAL OPERATION (4>/77)
UnitsInTestStatus(PriortoCommercial Operation):
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DOCKET NO.50 250*COMPLETED BY nit No.3 No.rl~Vl J~V~J c~V)Liccnscc Fvent Rcport=CP CP~tl G CJ~a Cause&Corrective Action to Prevent Recurrence NONE F: Forced S: Scheduled (9/77)Reason: A-Equipment Failure (Explain)B.hlaintenance oi Test~C-Refueling D Regulatory Restriction E-Operator Training&, Liccnsc Exaniination F-Administrative G.Operational Error (Explain)II.Other (Explain)3 h(ethod: I-hlanual 2-Manual Scram.3-Automatic Scram.4.Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NVREG-OI61)5 Exhibit I-Satnc Source
NAForecastAchievedINITIALCRITICALITY INITIALELECTRICITY COMhIERCIAL OPERATION (4>/77)
'0 AVERAGE DAILY UNIT POWER LEVEL.DOCKET NO.50-251 ll-'ATE Dec.8~1979 COMPLETED BY'ELEPHONE MONTH=NOVEMBER 1 9 7 9 DAY AVERAGE DAlLY POWER LEVEL (MWe.Net)661 DAY AVERAGE DAILY POWER LEVEL (iMWc.Net) 666 17 IS 10 12 13 IS 16 INSTRUCTIONS 663 62 660 657 652 537 646 666 63 19 20 21 22 23 25 26 27 2S 29 30 NOTE: 598'58 582 661 674 Average daily power level greater than 666 Mwe due to cooler condenser cooling water.On this format, list the avtcragc daily unit power Icvpl in ivlhVe.Net for each day in the reporting tnonth.Cinnpulc lo the nearest whole megawat t.('>(77)
UNITSHUTDOWNS ANDPOWERREDUCTIONS REPORTMONTHDOCKETNO.50250*COMPLETED BYnitNo.3No.rl~VlJ~V~Jc~V)LiccnsccFventRcport=CPCP~tlGCJ~aCause&Corrective ActiontoPreventRecurrence NONEF:ForcedS:Scheduled (9/77)Reason:A-Equipment Failure(Explain)
OPERATING DATA REPORT.DOCKET NO.50-251 DATE 1~~79 COMPLETED BY Y'~jiilson TELEPHONE&22~2-3824 OPERATING STATUS Turke Point Unit No.4 2200 760 700 666 I.Unit Nar'ne: 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross h(We): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross hIWe): 7.Maximum Dependable Capacity (Net hIWe): Notes-Unit No.4 operated at approximately 100%R.P., except for outages of Nov.12 and 24-28, 1979, and load reductions of Nov.18-19 and 21-22, 1979.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.
B.hlaintenance oiTest~C-Refueling DRegulatory Restriction E-Operator Training&,LiccnscExaniination F-Administrative G.Operational Error(Explain)
If Any (Net h(We): 10.Reasons For Restrictions.
II.Other(Explain) 3h(ethod:I-hlanual2-ManualScram.3-Automatic Scram.4.Other(Explain)
If Any: NONE This Month Yr..to-Date 720.0 8 016.0 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using hIDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months Sc eduled maintenance and ins 649.5 5 912.7 15.5-0-639.3-0-18.9 1 363 537 11 874 026 430 655 3 683 463 408 275 3 481 770 88.8 72.4 88.8 72.6 85.1 65.2 62.7 81.8 0.3.3 (Type.Date, and Duration of Each): ections-A ril 27-Ha 31, 1980.Cumulative 54 985.0 40 260.3 154.3 18.9 80 013 893 25 519 188 24 166 475 70.2 70.3 66.4 63.4 2.9 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):
ExhibitG-Instructions forPreparation ofDataEntrySheetsforLicenseeEventReport(LER)File(NVREG-OI61)5ExhibitI-SatncSource
N A Forecast Achieved IN ITIA L CRITICA LITY INITIA L ELECTRICITY COMMERCIAL OPERATION ('>/77 l UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH NOVFiIBER 1979 Page 1 of 2*Vo.Dale r>~A rj I Q A Q~V)Llccnscc Event Report~CP ID IA w Cr R~'o Cp C~Cr Caiise 4 Corrective Action to Prevent Recurrence 20 79-11-12 F-1.8 N/A HH INSTRU (s)Unit was tripped by steam generator No.4B level protection system caused by sudden loss of signal to the feedwater control system.Corrective action includes replace-ment of the.feedwater flow channel selector switch with an improved type switch.(Non-nuclear system)21 22 79-11-18 F 79-11-21 F-0--0-A 4 A 4 N/A N/A , HC HC HTEXCH (D)HTEXCH (D)Load reduction to repair condenser tube leak.(Non-nuclear system)Load reduction to repair condenser tube leak..(Non-nuclear system)F: Forced S: Scheduled (i)177)Reason: A-Equipment Failure (Explain)B.Maintenance or Test~C-Refueling D.Regulatory Restriction E.Operator Training&.Liccnsc Examination F-Administrative G.Operational Error (Fxplain)H-Other (Explain)Method:-I Manual 2-Manual Scram.3-Au t orna t ic Scram.4-Other (Explain)Exhibit G-instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-Ol 6l)5 Exhibit I-Satnc Source
'0AVERAGEDAILYUNITPOWERLEVEL.DOCKETNO.50-251ll-'ATEDec.8~1979COMPLETED BY'ELEPHONE MONTH=NOVEMBER1979DAYAVERAGEDAlLYPOWERLEVEL(MWe.Net) 661DAYAVERAGEDAILYPOWERLEVEL(iMWc.Net) 66617IS101213IS16INSTRUCTIONS 663626606576525376466666319202122232526272S2930NOTE:598'58582661674Averagedailypowerlevelgreaterthan666Mweduetocoolercondenser coolingwater.Onthisformat,listtheavtcragcdailyunitpowerIcvplinivlhVe.Net foreachdayinthereporting tnonth.Cinnpulclothenearestwholemegawatt.('>(77)
~~~%~UNIT SHUTDOWNS AND PO)UER REDUCTIONS JJI" DOCKET NO 50-251 UNIT NAhjF Turke P'n PAGE 2 of 2, 1979 No.Date~h J~C/7 Liccnscc Event Report=Cause A Corrective Actton to Prevent Recurrence 23 79-11-24 S 79.0.A 1 N/A HH VALVEX (c)Unit was removed from service to repair feedwater purap No.4B dis-charge check valve.Corrective actions included repairing check valve seat ring retainer.(Non-nuclear system)F: Forced S: Scheduled\(9177)Reason: A-Equipment Failure (Explain)B-hiaintenance or Test-C-Refueling D Regulatory Restriction E-Operator Training k.Liccnsc Examination F-Administrative G Operational Error (Explain)II-Other (Explairt) 3 Method: I-hlanual 2-Manual Scram.3-Autontatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets I'or Licensee Event Report (LER)File (NUREG-0!6I)Exhibit I-Same Source 0 AVERAGE DAILY UNIT POWER LEVELSt.Lucre DATE Dec.8, 1979 MONTH NOVEMBER'979 DAY AVERAGE DAlLY POWER LEVEL (MWe.Net)I 776 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)I7 IO 12 13 15 16 INSTRUCTIONS 731 788 790 90 791 789 7 0 788 788 785 785 790'8 19 20 21 22 23 24 25 26 27 28'79 30 NOTE: 580 790 790 789 789 88 787 785 785 785 785 87 Average daily power level greater than 777 MWe due to cooler condenser cooling water.On this format.list the average daily unit power le~pl in Mme Net for each day in the reporting Inimth.Compute to the nearest whole megawat t.P)/771 OPERATING STATUS OPERATING DATA REPORT DOCKET NO.59=2Zi DATE Oat~~79 COMPLETED BY~~lLLl.son TELEPHONE~i~3824 Notes-Unit operated at approximately 100%R.P., except for load reduction of Nov.17-18, 1979.I.Unit Name: St.Lucie Unit No.1 2.Reporting Period: 3.Licensed Thermal Power (MWt): 2560 4.Nameplate Rating (Gross MWe): 850 S.Design Electrical Rating (Net M'lVe): 6.Maximljm Dependable Capacity (Gross 11IWe): 822 7.MaximumDe endableCa acit Net MWe: p p y()8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.
OPERATING DATAREPORT.DOCKETNO.50-251DATE1~~79COMPLETED BYY'~jiilson TELEPHONE
If Any (Net MiVe): 10.Reasons For Restrictions, If Any: This Month" Yr..to-Date 11.Hours In Reporting Period 720.0 8 016.0 12.Number Of Hours Reactor Was Critical 720.0 13.Reactor Reserve Shutdown Hours-0-11.0 14.Hours Genemtor On-Line, 5 726.8~IS.Unit Reserve Shutdown Hours-0-11.0 16.Gross Thermal Energy Generated (MWH)1 820 321 14 140 208 ly.GroeeEleelrleelEnergyGenerere4(glWH)
&22~2-3824 OPERATING STATUSTurkePointUnitNo.42200760700666I.UnitNar'ne:2.Reporting Period:3.LicensedThermalPower(MWt):4.Nameplate Rating(Grossh(We):5.DesignElectrical Rating(NetMWe):6.MaximumDependable Capacity(GrosshIWe):7.MaximumDependable Capacity(NethIWe):Notes-UnitNo.4operatedatapproximately 100%R.P.,exceptforoutagesofNov.12and24-28,1979,andloadreductions ofNov.18-19and21-22,1979.8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:9.PowerLevelToWhichRestricted.
~51 450.4 511 950 18.Net Electrical Energy Generated (MWH)559 946 4 301 600 19.Unit Service Factor 100.0 71.4 20.Unit Availability Factor 100.0 71.6 21.Unit Capacity Factor (Using MDC Net)100.1 69.1 22.Unit Capacity Factor (Using DER Net)97.0 66.9 23.Unit Forced Outage Rate-0-3.6 24.Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration of Each): Scheduled refuelin maintenance and ins ections-March 16-Ma Cumulative 25 800.0 20 765e8 129.5 20 086.0 32.0 48 358 356 15 678 200 14 744 438 77.9 78.0 73.6 71.3'.6 10 1980.25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
IfAny(Neth(We):10.ReasonsForRestrictions.
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMM ERCIA L 0 PER ATION ('t/77)
IfAny:NONEThisMonthYr..to-Date 720.08016.011.HoursInReporting Period12.NumberOfHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator On-Line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated (MWH)17.GrossElectrical EnergyGenerated (MWH)18.NetElectrical EnergyGenerated (MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(UsinghIDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6MonthsSceduledmaintenance andins649.55912.715.5-0-639.3-0-18.91363537118740264306553683463408275348177088.872.488.872.685.165.262.781.80.3.3(Type.Date,andDurationofEach):ections-Aril27-Ha31,1980.Cumulative 54985.040260.3154.318.980013893255191882416647570.270.366.463.42.925.IfShutDownAtEndOfReportPeriod,Estimated DateofStartup:26.UnitslnTestStatus(PriortoCommercial Operation):
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNITNAME St.Lucie Unit No.l REPORTMONTH NOVEMBER, 1979 V)).Date fV I g)~J S 9 5 c<.'Vf Llccnscc Event Report=gm CJ Cause&Corfcctlvc Action to Prevent Recurrence 22 79-11-17 S 4 N/A PUMPXX (B)Load reduction to replace failed mechanical seal on turbine plant cooling water pump.No.1B.(Non-nuclear system)I F: Forced S: Scheduled ('>/77)Reason: A-Equipment Failure (Explain)B.hlaintenance oi Test.C-Refueling D.Regulatory Restriction E-Operator Training&Liccnsc Examination F.Admi nist ra tive G.Operational Error (Explain)II.Other'(Explain) 3 Method: I-hlanual 2.Manual Scram.3-Autunlatic Scranl.4.Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-016I)Exhibit I-Salnc Source
NAForecastAchievedINITIALCRITICALITYINITIALELECTRICITY COMMERCIAL OPERATION
~~.3QX'9lQQ.Vs(@i'll~FL 33'162 December 8, 1979 Office of Management Information and Program Controls U.S.Regulatory Commission-Washington, D.C.20555 Gentlemen:
('>/77l UNITSHUTDOWNS ANDPOWERREDUCTIONS REPORTMONTHNOVFiIBER 1979Page1of2*Vo.Daler>~ArjIQAQ~V)LlccnsccEventReport~CPIDIAwCrR~'oCpC~CrCaiise4Corrective ActiontoPreventRecurrence 2079-11-12F-1.8N/AHHINSTRU(s)Unitwastrippedbysteamgenerator No.4Blevelprotection systemcausedbysuddenlossofsignaltothefeedwater controlsystem.Corrective actionincludesreplace-mentofthe.feedwater flowchannelselectorswitchwithanimprovedtypeswitch.(Non-nuclear system)212279-11-18F79-11-21F-0--0-A4A4N/AN/A,HCHCHTEXCH(D)HTEXCH(D)Loadreduction torepaircondenser tubeleak.(Non-nuclear system)Loadreduction torepaircondenser tubeleak..(Non-nuclear system)F:ForcedS:Scheduled (i)177)Reason:A-Equipment Failure(Explain)
Attached are the November, 1979, Operating Status Reports for Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.l.Very truly yours, A.D.Schmidt Vice President Power Resources VTC/DDC cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire SUl&JA OF OPERATING EXPER ENCE POCKET NO.UNIT 50-250 Turkey Point Unit No.3 DATE COi41PLETED BY Dec.8, 1979 V.T.Chilson REPORT MONTH NOVEMBER, 1979 TELEPHONE (305)552-3824 Unit No.3 operated at approximately 100%R.P.Refer to"Unit Shut-downs and Power Reductions" section of the November, 1979, Operating Status Report for additional information.
B.Maintenance orTest~C-Refueling D.Regulatory Restriction E.Operator Training&.LiccnscExamination F-Administrative G.Operational Error(Fxplain)
No major Safety-related maintenance activities performed during the month.
H-Other(Explain)
0
Method:-IManual2-ManualScram.3-AutornaticScram.4-Other(Explain)
 
ExhibitG-instructions forPreparation ofDataEntrySheetsforLicenseeEventReport(LER)File(NUREG-Ol6l)5ExhibitI-SatncSource
==SUMMARY==
~~~%~UNITSHUTDOWNS ANDPO)UERREDUCTIONS JJI"DOCKETNO50-251UNITNAhjFTurkeP'nPAGE2of2,1979No.Date~hJ~C/7LiccnsccEventReport=CauseACorrective ActtontoPreventRecurrence 2379-11-24S79.0.A1N/AHHVALVEX(c)Unitwasremovedfromservicetorepairfeedwater purapNo.4Bdis-chargecheckvalve.Corrective actionsincludedrepairing checkvalveseatringretainer.
OF OPERATING EXPERIENCE DOCKET.NO.Turkey Point UNIT 4 DATE COMPLETED BY hilson REPORT MONTH NOVEMBER~1 9 7 9 TELEPHONE 5 552-3824 Unit No.4 operated at approximately 100%R.P., except for outages of Nov.12 and 24-28, 1979, and load reductions of Nov.18-19 and 21-22, 1979.Refer to"Unit Shutdowns and.Power.Reductions" section of the November, 1979, Operating Status Report for additional information.
(Non-nuclearsystem)F:ForcedS:Scheduled
No Major Safety.-related'aintenance activities performed during.the month.  
\(9177)Reason:A-Equipment Failure(Explain)
(~I SUMI OF OPERATING EXPERIENCE POCKET NO.50-335 St.Lucie UNIT Unit No.1 DATE Dec.8, 1979 REPORT MONTH NOVEMBER, 1979'OMPLETED BY'.T.Chilson TELEPHONE'(305)552-3824 Unit operated at approximately 100%R.P., e'xcept for load reduction of Nov.17-18, 1979.Refer to"Unit Shutdowns and Power Reductions" section of the November, 1979, Operating Status Report for additional information.=
B-hiaintenance orTest-C-Refueling DRegulatory Restriction E-Operator Trainingk.LiccnscExamination F-Administrative GOperational Error(Explain)
No Major Safety-related maintenance activities performed during the month.}}
II-Other(Explairt) 3Method:I-hlanual2-ManualScram.3-Autontatic Scram.4-Other(Explain) 4ExhibitG-Instructions forPreparation ofDataEntrySheetsI'orLicenseeEventReport(LER)File(NUREG-0!6I)ExhibitI-SameSource 0AVERAGEDAILYUNITPOWERLEVELSt.LucreDATEDec.8,1979MONTHNOVEMBER'979DAYAVERAGEDAlLYPOWERLEVEL(MWe.Net)
I776DAYAVERAGEDAILYPOWERLEVEL(MWe.Net)
I7IO12131516INSTRUCTIONS 7317887909079178970788788785785790'819202122232425262728'7930NOTE:5807907907897898878778578578578587Averagedailypowerlevelgreaterthan777MWeduetocoolercondenser coolingwater.Onthisformat.listtheaveragedailyunitpowerle~plinMmeNetforeachdayinthereporting Inimth.Computetothenearestwholemegawatt.P)/771 OPERATING STATUSOPERATING DATAREPORTDOCKETNO.59=2ZiDATEOat~~79COMPLETED BY~~lLLl.son TELEPHONE
~i~3824Notes-Unitoperatedatapproximately 100%R.P.,exceptforloadreduction ofNov.17-18,1979.I.UnitName:St.LucieUnitNo.12.Reporting Period:3.LicensedThermalPower(MWt):25604.Nameplate Rating(GrossMWe):850S.DesignElectrical Rating(NetM'lVe):6.MaximljmDependable Capacity(Gross11IWe):8227.MaximumDe endableCa acitNetMWe:ppy()8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:9.PowerLevelToWhichRestricted.
IfAny(NetMiVe):10.ReasonsForRestrictions, IfAny:ThisMonth"Yr..to-Date 11.HoursInReporting Period720.08016.012.NumberOfHoursReactorWasCritical720.013.ReactorReserveShutdownHours-0-11.014.HoursGenemtorOn-Line,5726.8~IS.UnitReserveShutdownHours-0-11.016.GrossThermalEnergyGenerated (MWH)182032114140208ly.GroeeEleelrleelEnergyGenerere4(glWH)
~51450.451195018.NetElectrical EnergyGenerated (MWH)559946430160019.UnitServiceFactor100.071.420.UnitAvailability Factor100.071.621.UnitCapacityFactor(UsingMDCNet)100.169.122.UnitCapacityFactor(UsingDERNet)97.066.923.UnitForcedOutageRate-0-3.624.Shutdowns Scheduled OverNext6Months(Type.Date,andDurationofEach):Scheduled refuelinmaintenance andinsections-March16-MaCumulative 25800.020765e8129.520086.032.048358356156782001474443877.978.073.671.3'.6101980.25.IfShutDownAtEndOfReportPeriod,Estimated DateofStartup:26.UnitsInTestStatus(PriortoCommercial Operation):
ForecastAchievedINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL0PERATION('t/77)
UNITSHUTDOWNS ANDPOWERREDUCTIONS DOCKETNO.UNITNAMESt.LucieUnitNo.lREPORTMONTH
: NOVEMBER, 1979V)).DatefVIg)~JS95c<.'VfLlccnsccEventReport=gmCJCause&Corfcctlvc ActiontoPreventRecurrence 2279-11-17S4N/APUMPXX(B)Loadreduction toreplacefailedmechanical sealonturbineplantcoolingwaterpump.No.1B.(Non-nuclearsystem)IF:ForcedS:Scheduled
('>/77)Reason:A-Equipment Failure(Explain)
B.hlaintenance oiTest.C-Refueling D.Regulatory Restriction E-Operator Training&LiccnscExamination F.AdministrativeG.Operational Error(Explain)
II.Other'(Explain) 3Method:I-hlanual2.ManualScram.3-Autunlatic Scranl.4.Other(Explain) 4ExhibitG-Instructions forPreparation ofDataEntrySheetsforLicenseeEventReport(LER)File(NUREG-016I)ExhibitI-SalncSource
~~.3QX'9lQQ.Vs(@i'll~FL33'162December8,1979OfficeofManagement Information andProgramControlsU.S.Regulatory Commission
-Washington, D.C.20555Gentlemen:
AttachedaretheNovember, 1979,Operating StatusReportsforTurkeyPointUnitNos.3and4andSt.LucieUnitNo.l.Verytrulyyours,A.D.SchmidtVicePresident PowerResources VTC/DDCcc:Mr.JamesP.O'ReillyRobertLowenstein, Esquire SUl&JAOFOPERATING EXPERENCEPOCKETNO.UNIT50-250TurkeyPointUnitNo.3DATECOi41PLETED BYDec.8,1979V.T.ChilsonREPORTMONTHNOVEMBER, 1979TELEPHONE (305)552-3824UnitNo.3operatedatapproximately 100%R.P.Referto"UnitShut-downsandPowerReductions" sectionoftheNovember, 1979,Operating StatusReportforadditional information.
NomajorSafety-related maintenance activities performed duringthemonth.
0SUMMARYOFOPERATING EXPERIENCE DOCKET.NO.TurkeyPointUNIT4DATECOMPLETED BYhilsonREPORTMONTHNOVEMBER~1979TELEPHONE 5552-3824UnitNo.4operatedatapproximately 100%R.P.,exceptforoutagesofNov.12and24-28,1979,andloadreductions ofNov.18-19and21-22,1979.Referto"UnitShutdowns and.Power.Reductions" sectionoftheNovember, 1979,Operating StatusReportforadditional information.
NoMajorSafety.-related'aintenance activities performed during.themonth.  
(~ISUMIOFOPERATING EXPERIENCE POCKETNO.50-335St.LucieUNITUnitNo.1DATEDec.8,1979REPORTMONTHNOVEMBER, 1979'OMPLETED BY'.T.ChilsonTELEPHONE
'(305)552-3824Unitoperatedatapproximately 100%R.P.,e'xceptforloadreduction ofNov.17-18,1979.Referto"UnitShutdowns andPowerReductions" sectionoftheNovember, 1979,Operating StatusReportforadditional information.=
NoMajorSafety-related maintenance activities performed duringthemonth.}}

Revision as of 18:24, 7 July 2018

Monthly Operating Rept for Nov 1979
ML17208A612
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 12/08/1979
From: CHILSON V T
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A611 List:
References
NUDOCS 8005200563
Download: ML17208A612 (14)


Text

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COh1PLETED BY TELEPHONE 250 ur ey oint Dec.8 1979 V.T.Chilson MONTH NOVEMBER 1979 DAY AVERAGE DAILY POWER LEVEL (MWc Net)663 48 DAY AVERAGE DAILY POWER LEVEL (>>IIWe-i%et

)670 17 IS 6 8 20 665 6 7 9 IO l3 l4 IS l6 INSTRUCTIONS 659 666 666 662 661 659 666 670 67 22 23 24 55'>6 17 2S'>9 30 NOTE: 667 626 666 665 663 662 661 65 Average daily power level greater than 666 MWe due to cooler condenser cooling water.On this format.list the average daily onit Ii>>wcr Icvt.l in MWc.Nct for each day in the reporting ini>nth.Compute to the nearest whole megawatt..

(')!77)

OPERATING DATA REPORT DOCKETNO.50 250 DBTE Dec.B 1979 COMPLETED BY V.T.Chilean TELEPHONE~3OB 332 3924 OPERATING STATUS l.Unit Name: 2.Reporting period: November 1 7 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): S.Design Electrical Rating (Net hIWe): 6.Maximum Dependable Capacity (Gross hive): 7.Maximum Dependable Capacity (Net MWe): 2200 760 693 700 666 Notes-Unit No.3 operated at approxima'tely 100%R.P.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, lf Any: NONE This Month Yr.-to.Date Cumulative 720.0 8 I I.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 720.0 13.Reactor Reserve Shutdown Hours-0>>14.Hours Generator On.L'ine 720.0~IS.Unit Reserve Shutdown Hours=II='6.Gross Thermal Energy Ge'nerated (hIWH)1 569 305 9 17.Gross Electrical Energy Generated (hlWH)500 205 3 18.Net Electrical Energy Generated (hOVH)476 202 2 19.Unit Service Factor 100.0 20.Unit Availability Factor 100.0 21.Unit Capacity Factor (Using MDC Net)99.3 22.Unit Capacity Factor (Using DER Net)95.4 23.Unit Forced Outage Rate-0-24.Shutdowns Scheduled Over Next 6 h(onths (Type, Date.and Duration of Each Scheduled refuelin maintenance and ins ect'ons-016.0 6 4.6 18.7 510.5 699 457 045 985 876 322 56.3 56.6 53.9 51.8 3.5 e 61 257.6 213.3 45 685.8 91 464 405 29 080 415 2 2 4 74.6 74.8 68.0'64.8 2.6 80.25.If Shut Down At End Of Report Period, Estimated Date of Startup.'6.

Units In Test Status (Prior to Commercial Operation):

N A Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY COMhIERCIAL OPERATION (4>/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DOCKET NO.50 250*COMPLETED BY nit No.3 No.rl~Vl J~V~J c~V)Liccnscc Fvent Rcport=CP CP~tl G CJ~a Cause&Corrective Action to Prevent Recurrence NONE F: Forced S: Scheduled (9/77)Reason: A-Equipment Failure (Explain)B.hlaintenance oi Test~C-Refueling D Regulatory Restriction E-Operator Training&, Liccnsc Exaniination F-Administrative G.Operational Error (Explain)II.Other (Explain)3 h(ethod: I-hlanual 2-Manual Scram.3-Automatic Scram.4.Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NVREG-OI61)5 Exhibit I-Satnc Source

'0 AVERAGE DAILY UNIT POWER LEVEL.DOCKET NO.50-251 ll-'ATE Dec.8~1979 COMPLETED BY'ELEPHONE MONTH=NOVEMBER 1 9 7 9 DAY AVERAGE DAlLY POWER LEVEL (MWe.Net)661 DAY AVERAGE DAILY POWER LEVEL (iMWc.Net) 666 17 IS 10 12 13 IS 16 INSTRUCTIONS 663 62 660 657 652 537 646 666 63 19 20 21 22 23 25 26 27 2S 29 30 NOTE: 598'58 582 661 674 Average daily power level greater than 666 Mwe due to cooler condenser cooling water.On this format, list the avtcragc daily unit power Icvpl in ivlhVe.Net for each day in the reporting tnonth.Cinnpulc lo the nearest whole megawat t.('>(77)

OPERATING DATA REPORT.DOCKET NO.50-251 DATE 1~~79 COMPLETED BY Y'~jiilson TELEPHONE&22~2-3824 OPERATING STATUS Turke Point Unit No.4 2200 760 700 666 I.Unit Nar'ne: 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross h(We): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross hIWe): 7.Maximum Dependable Capacity (Net hIWe): Notes-Unit No.4 operated at approximately 100%R.P., except for outages of Nov.12 and 24-28, 1979, and load reductions of Nov.18-19 and 21-22, 1979.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.

If Any (Net h(We): 10.Reasons For Restrictions.

If Any: NONE This Month Yr..to-Date 720.0 8 016.0 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using hIDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months Sc eduled maintenance and ins 649.5 5 912.7 15.5-0-639.3-0-18.9 1 363 537 11 874 026 430 655 3 683 463 408 275 3 481 770 88.8 72.4 88.8 72.6 85.1 65.2 62.7 81.8 0.3.3 (Type.Date, and Duration of Each): ections-A ril 27-Ha 31, 1980.Cumulative 54 985.0 40 260.3 154.3 18.9 80 013 893 25 519 188 24 166 475 70.2 70.3 66.4 63.4 2.9 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):

N A Forecast Achieved IN ITIA L CRITICA LITY INITIA L ELECTRICITY COMMERCIAL OPERATION ('>/77 l UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH NOVFiIBER 1979 Page 1 of 2*Vo.Dale r>~A rj I Q A Q~V)Llccnscc Event Report~CP ID IA w Cr R~'o Cp C~Cr Caiise 4 Corrective Action to Prevent Recurrence 20 79-11-12 F-1.8 N/A HH INSTRU (s)Unit was tripped by steam generator No.4B level protection system caused by sudden loss of signal to the feedwater control system.Corrective action includes replace-ment of the.feedwater flow channel selector switch with an improved type switch.(Non-nuclear system)21 22 79-11-18 F 79-11-21 F-0--0-A 4 A 4 N/A N/A , HC HC HTEXCH (D)HTEXCH (D)Load reduction to repair condenser tube leak.(Non-nuclear system)Load reduction to repair condenser tube leak..(Non-nuclear system)F: Forced S: Scheduled (i)177)Reason: A-Equipment Failure (Explain)B.Maintenance or Test~C-Refueling D.Regulatory Restriction E.Operator Training&.Liccnsc Examination F-Administrative G.Operational Error (Fxplain)H-Other (Explain)Method:-I Manual 2-Manual Scram.3-Au t orna t ic Scram.4-Other (Explain)Exhibit G-instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-Ol 6l)5 Exhibit I-Satnc Source

~~~%~UNIT SHUTDOWNS AND PO)UER REDUCTIONS JJI" DOCKET NO 50-251 UNIT NAhjF Turke P'n PAGE 2 of 2, 1979 No.Date~h J~C/7 Liccnscc Event Report=Cause A Corrective Actton to Prevent Recurrence 23 79-11-24 S 79.0.A 1 N/A HH VALVEX (c)Unit was removed from service to repair feedwater purap No.4B dis-charge check valve.Corrective actions included repairing check valve seat ring retainer.(Non-nuclear system)F: Forced S: Scheduled\(9177)Reason: A-Equipment Failure (Explain)B-hiaintenance or Test-C-Refueling D Regulatory Restriction E-Operator Training k.Liccnsc Examination F-Administrative G Operational Error (Explain)II-Other (Explairt) 3 Method: I-hlanual 2-Manual Scram.3-Autontatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets I'or Licensee Event Report (LER)File (NUREG-0!6I)Exhibit I-Same Source 0 AVERAGE DAILY UNIT POWER LEVELSt.Lucre DATE Dec.8, 1979 MONTH NOVEMBER'979 DAY AVERAGE DAlLY POWER LEVEL (MWe.Net)I 776 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)I7 IO 12 13 15 16 INSTRUCTIONS 731 788 790 90 791 789 7 0 788 788 785 785 790'8 19 20 21 22 23 24 25 26 27 28'79 30 NOTE: 580 790 790 789 789 88 787 785 785 785 785 87 Average daily power level greater than 777 MWe due to cooler condenser cooling water.On this format.list the average daily unit power le~pl in Mme Net for each day in the reporting Inimth.Compute to the nearest whole megawat t.P)/771 OPERATING STATUS OPERATING DATA REPORT DOCKET NO.59=2Zi DATE Oat~~79 COMPLETED BY~~lLLl.son TELEPHONE~i~3824 Notes-Unit operated at approximately 100%R.P., except for load reduction of Nov.17-18, 1979.I.Unit Name: St.Lucie Unit No.1 2.Reporting Period: 3.Licensed Thermal Power (MWt): 2560 4.Nameplate Rating (Gross MWe): 850 S.Design Electrical Rating (Net M'lVe): 6.Maximljm Dependable Capacity (Gross 11IWe): 822 7.MaximumDe endableCa acit Net MWe: p p y()8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.

If Any (Net MiVe): 10.Reasons For Restrictions, If Any: This Month" Yr..to-Date 11.Hours In Reporting Period 720.0 8 016.0 12.Number Of Hours Reactor Was Critical 720.0 13.Reactor Reserve Shutdown Hours-0-11.0 14.Hours Genemtor On-Line, 5 726.8~IS.Unit Reserve Shutdown Hours-0-11.0 16.Gross Thermal Energy Generated (MWH)1 820 321 14 140 208 ly.GroeeEleelrleelEnergyGenerere4(glWH)

~51 450.4 511 950 18.Net Electrical Energy Generated (MWH)559 946 4 301 600 19.Unit Service Factor 100.0 71.4 20.Unit Availability Factor 100.0 71.6 21.Unit Capacity Factor (Using MDC Net)100.1 69.1 22.Unit Capacity Factor (Using DER Net)97.0 66.9 23.Unit Forced Outage Rate-0-3.6 24.Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration of Each): Scheduled refuelin maintenance and ins ections-March 16-Ma Cumulative 25 800.0 20 765e8 129.5 20 086.0 32.0 48 358 356 15 678 200 14 744 438 77.9 78.0 73.6 71.3'.6 10 1980.25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMM ERCIA L 0 PER ATION ('t/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNITNAME St.Lucie Unit No.l REPORTMONTH NOVEMBER, 1979 V)).Date fV I g)~J S 9 5 c<.'Vf Llccnscc Event Report=gm CJ Cause&Corfcctlvc Action to Prevent Recurrence 22 79-11-17 S 4 N/A PUMPXX (B)Load reduction to replace failed mechanical seal on turbine plant cooling water pump.No.1B.(Non-nuclear system)I F: Forced S: Scheduled ('>/77)Reason: A-Equipment Failure (Explain)B.hlaintenance oi Test.C-Refueling D.Regulatory Restriction E-Operator Training&Liccnsc Examination F.Admi nist ra tive G.Operational Error (Explain)II.Other'(Explain) 3 Method: I-hlanual 2.Manual Scram.3-Autunlatic Scranl.4.Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-016I)Exhibit I-Salnc Source

~~.3QX'9lQQ.Vs(@i'll~FL 33'162 December 8, 1979 Office of Management Information and Program Controls U.S.Regulatory Commission-Washington, D.C.20555 Gentlemen:

Attached are the November, 1979, Operating Status Reports for Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.l.Very truly yours, A.D.Schmidt Vice President Power Resources VTC/DDC cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire SUl&JA OF OPERATING EXPER ENCE POCKET NO.UNIT 50-250 Turkey Point Unit No.3 DATE COi41PLETED BY Dec.8, 1979 V.T.Chilson REPORT MONTH NOVEMBER, 1979 TELEPHONE (305)552-3824 Unit No.3 operated at approximately 100%R.P.Refer to"Unit Shut-downs and Power Reductions" section of the November, 1979, Operating Status Report for additional information.

No major Safety-related maintenance activities performed during the month.

0

SUMMARY

OF OPERATING EXPERIENCE DOCKET.NO.Turkey Point UNIT 4 DATE COMPLETED BY hilson REPORT MONTH NOVEMBER~1 9 7 9 TELEPHONE 5 552-3824 Unit No.4 operated at approximately 100%R.P., except for outages of Nov.12 and 24-28, 1979, and load reductions of Nov.18-19 and 21-22, 1979.Refer to"Unit Shutdowns and.Power.Reductions" section of the November, 1979, Operating Status Report for additional information.

No Major Safety.-related'aintenance activities performed during.the month.

(~I SUMI OF OPERATING EXPERIENCE POCKET NO.50-335 St.Lucie UNIT Unit No.1 DATE Dec.8, 1979 REPORT MONTH NOVEMBER, 1979'OMPLETED BY'.T.Chilson TELEPHONE'(305)552-3824 Unit operated at approximately 100%R.P., e'xcept for load reduction of Nov.17-18, 1979.Refer to"Unit Shutdowns and Power Reductions" section of the November, 1979, Operating Status Report for additional information.=

No Major Safety-related maintenance activities performed during the month.