ML17208A612

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1979
ML17208A612
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 12/08/1979
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A611 List:
References
NUDOCS 8005200563
Download: ML17208A612 (14)


Text

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 250 ur ey oint UNIT DATE Dec. 8 1979 COh1PLETED BY V. T. Chilson TELEPHONE MONTH NOVEMBER 1979 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWc Net) (>>IIWe-i%et )

17 670 663 IS 48 6 8 20 665 6 659 22 667 7 23 626 666 24 666 9 666 55 665 IO 662 '>6 663 661 17 659 2S 662 l3 '>9 661 l4 666 30 65 IS 670 l6 67 NOTE: Average daily power level greater than 666 MWe due to cooler condenser cooling water.

INSTRUCTIONS On this format. list the average daily onit Ii>>wcr Icvt.l in MWc.Nct for each day in the reporting ini>nth. Compute to the nearest whole megawatt..

(') !77)

OPERATING DATA REPORT DOCKETNO. 50 250 DBTE Dec. B 1979 COMPLETED BY V. T. Chilean TELEPHONE ~3OB 332 3924 OPERATING STATUS Notes - Unit No. 3 operated

l. Unit Name:

at approxima'tely 100% R.P.

2. Reporting period: November 1 7
3. Licensed Thermal Power (MWt): 2200
4. Nameplate Rating (Gross MWe): 760 S. Design Electrical Rating (Net hIWe): 693
6. Maximum Dependable Capacity (Gross hive): 700
7. Maximum Dependable Capacity (Net MWe): 666
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe): NONE
10. Reasons For Restrictions, lf Any:

This Month Yr.-to.Date Cumulative I I. Hours In Reporting Period 720.0 8 016.0 61 257.6

12. Number Of Hours Reactor Was Critical 720.0 6 4.6
13. Reactor Reserve Shutdown Hours -0>> 18.7 213. 3
14. Hours Generator On.L'ine 720.0 510.5 45 685.8

~

IS. Unit Reserve Shutdown Hours =II='6.

Gross Thermal Energy Ge'nerated (hIWH) 1 569 305 9 699 457 91 464 405

17. Gross Electrical Energy Generated (hlWH) 500 205 3 045 985 29 080 415
18. Net Electrical Energy Generated (hOVH) 476 202 2 876 322 2 2 4
19. Unit Service Factor 100.0 56.3 74.6
20. Unit Availability Factor 100.0 56.6 74.8
21. Unit Capacity Factor (Using MDC Net) 99.3 53.9 68.0
22. Unit Capacity Factor (Using DER Net) 95.4 51. 8 '64.8
23. Unit Forced Outage Rate 3.5 2.6
24. Shutdowns Scheduled Over Next 6 h(onths (Type, Date. and Duration of Each Scheduled refuelin maintenance and ins ect'ons e 80.
25. If Shut Down At End Of Report Period, Estimated Date of Startup.'6.

N A Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMhIERCIAL OPERATION (4>/77)

DOCKET NO. 50 250 UNIT SHUTDOWNS AND POWER REDUCTIONS nit No.3 COMPLETED BY REPORT MONTH

~V ~

rl J CJ

~

Liccnscc CP CP Cause & Corrective No. ~

Vl c Fvent ~ tl Action to J

~ V) Rcport = G a Prevent Recurrence NONE 3

F: Forced Reason: h(ethod: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I -hlanual for Preparation of Data B.hlaintenance oi Test ~ 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NVREG-D Regulatory Restriction 4.Other (Explain) OI61)

E-Operator Training &, Liccnsc Exaniination F-Administrative 5 G.Operational Error (Explain) Exhibit I - Satnc Source (9/77) II.Other (Explain)

'0 AVERAGE DAILYUNIT POWER LEVEL .

DOCKET NO. 50 251 ll Dec.

'ATE 8 ~ 1979 COMPLETED BY

'ELEPHONE MONTH

= NOVEMBER 1979 DAY AVERAGE DAlLYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) (iMWc.Net) 17 666 661 IS 19 598

'58 20 21 663 22 62 23 660 582 657 25 10 652 26 27 12 537 2S 13 646 29 661 30 674 IS 666 16 63 NOTE: Average daily power level greater than 666 Mwe due to cooler condenser cooling water.

INSTRUCTIONS On this format, list the avtcragc daily unit power Icvpl in ivlhVe.Net for each day in the reporting tnonth. Cinnpulc lo the nearest whole megawat t.

('>(77 )

OPERATING DATA REPORT DOCKET NO. 50-251 DATE COMPLETED BY Y 1~~79

'~jiilson TELEPHONE &22~2-3824 OPERATING STATUS Turke Point Unit No. 4 Notes Unit No. 4 operated I. Unit Nar'ne:

at approximately 100% R.P.,

2. Reporting Period:

2200 except for outages of Nov. 12

3. Licensed Thermal Power (MWt): and 24-28, 1979, and load
4. Nameplate Rating (Gross h(We): 760 reductions of Nov. 18-19 and
5. Design Electrical Rating (Net MWe): 21-22, 1979.
6. Maximum Dependable Capacity (Gross hIWe): 700
7. Maximum Dependable Capacity (Net hIWe): 666
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net h(We): NONE
10. Reasons For Restrictions. If Any:

This Month Yr..to-Date Cumulative

11. Hours In Reporting Period 720.0 8 016.0 54 985.0
12. Number Of Hours Reactor Was Critical 649.5 5 912.7 40 260.3
13. Reactor Reserve Shutdown Hours 15.5 154.3
14. Hours Generator On-Line 639.3
15. Unit Reserve Shutdown Hours 18.9 18.9
16. Gross Thermal Energy Generated (MWH) 1 363 537 11 874 026 80 013 893
17. Gross Electrical Energy Generated (MWH) 430 655 3 683 463 25 519 188
18. Net Electrical Energy Generated (MWH) 408 275 3 481 770 24 166 475
19. Unit Service Factor 88.8 72.4 70.2
20. Unit Availability Factor 88.8 72.6 70.3
21. Unit Capacity Factor (Using hIDC Net) 85. 1 65.2 66.4
22. Unit Capacity Factor (Using DER Net) 81. 8 62. 7 63.4
23. Unit Forced Outage Rate 0. 3.3 2.9
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Sc eduled maintenance and ins ections - A ril 27 Ha 31, 1980.

25. IfShut Down At End Of Report Period, Estimated Date of Startup: N A
26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

('>/77 l

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH NOVFiIBER 1979 Page 1 of 2 I

r> A

'oR~Cp Q

Llccnscc CP ID Caiise 4 Corrective Vo. Dale ~

rjA Event IA Action to

~Q V) Report ~ w Cr C ~ Prevent Recurrence Cr 20 79-11-12 F- 1.8 N/A HH INSTRU Unit was tripped by steam generator (s) No. 4B level protection system caused by sudden loss of signal to the feedwater control system.

Corrective action includes replace-ment of the. feedwater flow channel selector switch with an improved type switch. (Non-nuclear system) 21 79-11-18 F A N/A , HC HTEXCH Load reduction to repair condenser 4

(D) tube leak. (Non-nuclear system) 22 79-11-21 F A 4 N/A HC HTEXCH Load reduction to repair condenser (D) tube leak.. (Non-nuclear system)

F: Forced Reason: Method: Exhibit G - instructions S: Scheduled A-Equipment Failure (Explain) -I Manual for Preparation of Data B.Maintenance or Test ~ 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Au t orna t ic Scram. Event Report (LER) File (NUREG-D.Regulatory Restriction 4-Other (Explain) Ol 6l )

E.Operator Training &. Liccnsc Examination F-Administrative 5 G.Operational Error (Fxplain) Exhibit I - Satnc Source (i)177) H-Other (Explain)

~ ~~% ~

DOCKET NO 50-251 UNITSHUTDOWNS AND PO)UER REDUCTIONS UNIT NAhjF Turke P 'nJJI" 1979 PAGE 2 of 2,

~ h J Liccnscc Cause A Corrective No. Date Event Actton to Report = Prevent Recurrence

~ C/7 23 79-11-24 S 79.0 . A 1 N/A HH VALVEX Unit was removed from service to (c) repair feedwater purap No. 4B dis-charge check valve. Corrective actions included repairing check valve seat ring retainer. (Non-nuclear system) 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I -hlanual for Preparation of Data

\ B-hiaintenance or Test- 2-Manual Scram. Entry Sheets I'or Licensee C-Refueling 3-Autontatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0!6I )

E-Operator Training k. Liccnsc Examination F-Administrative G Operational Error (Explain) Exhibit I - Same Source (9177) II-Other (Explairt)

0 AVERAGE DAILYUNIT POWER LEVEL St. Lucre DATE Dec. 8, 1979 MONTH NOVEMBER '979 DAY AVERAGE DAlLYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) (MWe.Net)

I 776 I7 731 580 788 19 790 790 20 790 90 21 789 22 791 23 789 789 24 88 7 0 25 787 IO 788 26 785 788 785 790'8 27 12 785 28 785 13 785 '79 785 30 87 15 16 NOTE: Average daily power level greater than 777 MWe due to cooler condenser cooling water.

INSTRUCTIONS On this format. list the average daily unit power le~pl in Mme Net for each day in the reporting Inimth. Compute to the nearest whole megawat t.

P)/771

OPERATING DATA REPORT DOCKET NO. 59=2Zi DATE COMPLETED BY Oat~~

~~lLLl.son 79 TELEPHONE ~i~3824 OPERATING STATUS St. Lucie Unit No. 1 Notes Unit operated at I. Unit Name: approximately 100% R.P.,

2. Reporting Period: except for load reduction
3. Licensed Thermal Power (MWt): 2560 of Nov. 17-18, 1979.
4. Nameplate Rating (Gross MWe): 850 S. Design Electrical Rating (Net M'lVe):
6. Maximljm Dependable Capacity (Gross 11IWe): 822
7. MaximumDe p endableCa p acit y(Net MWe: )
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MiVe):
10. Reasons For Restrictions, If Any:

This Month "

Yr..to-Date Cumulative

11. Hours In Reporting Period 720.0 8 016.0 25 800.0
12. Number Of Hours Reactor Was Critical 720.0 20 765e8
13. Reactor Reserve Shutdown Hours 11.0 129.5
14. Hours Genemtor On-Line, 5 726.8 20 086.0

~

IS. Unit Reserve Shutdown Hours 11.0 32.0 1 820 321 14 140 208 48 358 356

16. Gross Thermal Energy Generated (MWH) ly. GroeeEleelrleelEnergyGenerere4(glWH)
18. Net Electrical Energy Generated (MWH)

~51 559 946 450 . 4 511 950 4 301 600 15 678 200 14 744 438

19. Unit Service Factor 100.0 71.4 77.9
20. Unit Availability Factor 100.0 71.6 78.0
21. Unit Capacity Factor (Using MDC Net) 100.1 69.1 73.6
22. Unit Capacity Factor (Using DER Net) 97.0 66.9 71.
23. Unit Forced Outage Rate 3.6 3'.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Scheduled refuelin maintenance and ins ections March 16 - Ma 10 1980.

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMM ERCIA L 0 PER ATION

('t/77)

DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS St. Lucie Unit No.l UNITNAME REPORTMONTH NOVEMBER, 1979 fV I

g) ~J gmCJ S

Llccnscc Cause & Corfcctlvc V)). Date 9 5 c<.' Event Action to Vf Report = Prevent Recurrence 22 79-11-17 S 4 N/A PUMPXX Load reduction to replace failed (B) mechanical seal on turbine plant cooling water pump.No. 1B. (Non-nuclear system)

I 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I -hlanual for Preparation of Data B.hlaintenance oi Test . 2.Manual Scram. Entry Sheets for Licensee C-Refueling 3-Autunlatic Scranl. Event Report (LER) File (NUREG-D.Regulatory Restriction 4.Other (Explain) 016I )

E-Operator Training & Liccnsc Examination F.Admi nist ra tive G.Operational Error (Explain) Exhibit I - Salnc Source

('>/77) II.Other'(Explain)

. 3QX '9lQQ.

~ Vs( @i'll FL 33'162

~

December 8, 1979 Office of Management Information and Program Controls U. S. Regulatory Commission

-Washington, D. C. 20555 Gentlemen:

Attached are the November, 1979, Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.

Very truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire

SUl&JA OF OPERATING EXPER ENCE POCKET NO. 50 250 Turkey Point UNIT Unit No. 3 DATE Dec. 8, 1979 COi41PLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH NOVEMBER, 1979 Unit No. 3 operated at approximately 100% R.P. Refer to "Unit Shut-downs and Power Reductions" section of the November, 1979, Operating Status Report for additional information.

No major Safety-related maintenance activities performed during the month.

0

SUMMARY

OF OPERATING EXPERIENCE DOCKET. NO.

Turkey Point UNIT 4 DATE COMPLETED BY hilson TELEPHONE 5 552-3824 REPORT MONTH NOVEMBER ~ 1 9 7 9 Unit No. 4 operated at approximately 100% R.P., except for outages of Nov. 12 and 24-28, 1979, and load reductions of Nov. 18-19 and 21-22, 1979. Refer to "Unit Shutdowns and .Power. Reductions" section of the November, 1979, Operating Status Report for additional information.

No Major Safety.-related'aintenance activities performed during. the month.

( ~

I SUMI OF OPERATING EXPERIENCE POCKET NO. 50 335 St. Lucie UNIT Unit No. 1 DATE Dec. 8, 1979

'OMPLETED BY '. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH NOVEMBER, 1979 Unit operated at approximately 100% R.P., e'xcept for load reduction of Nov. 17-18, 1979. Refer to "Unit Shutdowns and Power Reductions" section of the November, 1979, Operating Status Report for additional information.=

No Major Safety-related maintenance activities performed during the month.