{{#Wiki_filter:NOTE: PRESS HARO YOU ARE MAKING FIVE (S) COPIES                              .
{{#Wiki_filter:NOTE: PRESS HARO YOU ARE MAKING FIVE (S) COPIES                              .
*.
ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE CHANGE TYPE:
ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE CHANGE TYPE:
1\71 lC.J PERMANENT (GREEN)
1\71 lC.J PERMANENT (GREEN)
Line 45: Line 44:


   *\
   *\
SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & qAS COMPANY
SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & qAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET  SAF~TY    RELATED PROCEDURE:
* ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET  SAF~TY    RELATED PROCEDURE:
lPD-18.1.009 - SOLID STATE PROTECTION SYSTEM REMARKS:  FUNCTIONAL TEST - TRAIN B REV. 1 - General Revision to incorporate On-The-Spot-Changes .
lPD-18.1.009 - SOLID STATE PROTECTION SYSTEM REMARKS:  FUNCTIONAL TEST - TRAIN B REV. 1 - General Revision to incorporate On-The-Spot-Changes .
* PERF. ENGR. SORC    STA. SUPT.
PERF. ENGR. SORC    STA. SUPT.
REV                                      APPROVED    REVIEWED  APPROVED 1
REV                                      APPROVED    REVIEWED  APPROVED 1


  *'
'x SALEM GENERATING STATION                    NUMBER -      lPD-18 .1. 009
'x SALEM GENERATING STATION                    NUMBER -      lPD-18 .1. 009
* PERFORMANCE DEPARTMENT (I & C)              REV. NO. _l~------
* PERFORMANCE DEPARTMENT (I & C)              REV. NO. _l~------
Line 70: Line 67:
:I
:I
                                               \
                                               \
*


    .'
*' x SALEM GENERATING STATION                    NUMBER -    lPD-18 .1. 009
*' x SALEM GENERATING STATION                    NUMBER -    lPD-18 .1. 009
  **    PERFORMANCE DEPARTMENT (I & C)
  **    PERFORMANCE DEPARTMENT (I & C)
Line 78: Line 73:
DATE
DATE
_1_*------------~
_1_*------------~
5/24/82
5/24/82 PAGE 2
                                                              -------------------
PAGE 2
                                                                   --- OF 50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
                                                                   --- OF 50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B


Line 88: Line 81:
                   . built-in testers, while the opposite train is used to ma~ntain  the plant protection and provide data to      the demultiplexers. If in the process of testing, mal-functions are detected, they can be isolated by care-fully following the procedures in Section 6 of the Solid State Protection Manual.
                   . built-in testers, while the opposite train is used to ma~ntain  the plant protection and provide data to      the demultiplexers. If in the process of testing, mal-functions are detected, they can be isolated by care-fully following the procedures in Section 6 of the Solid State Protection Manual.
3.3    This procedure must be completed in the sequence given to insure successful completion *
3.3    This procedure must be completed in the sequence given to insure successful completion *
  *


  .,
,x SALEM GENERATING STATION                  NUMBER -    lPD-18 .1. 009 REV.NO. 1~~~~~~~
,x SALEM GENERATING STATION                  NUMBER -    lPD-18 .1. 009 REV.NO. 1~~~~~~~
__
* PERFORMANCE DEPARTMENT (I & C)
* PERFORMANCE DEPARTMENT (I & C)
DATE        5/24/82
DATE        5/24/82
                                                             ----~--~-------
                                                             ----~--~-------
             *TEST PROCEDURE                              PAGE  3      OF  50
             *TEST PROCEDURE                              PAGE  3      OF  50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 4.0    Limitations and Actions:
                                                                ---
4.1  If, at any time during the performance of this test, there is any reason to suspect that the test equipment being used may not be performing properly, a comparison check shall be performed with a similar device or the device shall be checked for calibration against a standardo  This shall be done prior  ~o  taking any other corrective action.
TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 4.0    Limitations and Actions:
4.1  If, at any time during the performance of this test, there is any reason to suspect that the test equipment being used may not be performing properly, a comparison check shall be performed with a similar device or the device shall be checked for calibration against a
* standardo  This shall be done prior  ~o  taking any other corrective action.
                                                                               \.._.
                                                                               \.._.
4o2  If, during the performance of this test, the "As Found" data does not meet the requirements of the specified accuracy, the Job Supervisor shall be notified immediately
4o2  If, during the performance of this test, the "As Found" data does not meet the requirements of the specified accuracy, the Job Supervisor shall be notified immediately
Line 116: Line 103:
Device Name              PD No.                  Recal. Date Fluke (2)
Device Name              PD No.                  Recal. Date Fluke (2)
Stop Watch
Stop Watch
*
 
* SALEM GENERATING STATION                  NUMBER -    lPD-18.1.009 REV. NO. 1
SALEM GENERATING STATION                  NUMBER -    lPD-18.1.009 REV. NO. 1
* PERFORMANCE DEPARTMENT (I & C)
* PERFORMANCE DEPARTMENT (I & C)
DATE        5/24/82 TEST PROCEDURE                                PAGE  _s__  OF 50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 6.* 0 Prerequisites:
DATE        5/24/82 TEST PROCEDURE                                PAGE  _s__  OF 50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 6.* 0 Prerequisites:
6.1  The individual assigned to perform this procedure is qualified to do so in accordance with Solid State Protection System Qualification Card 2.6.
6.1  The individual assigned to perform this procedure is qualified to do so in accordance with Solid State Protection System Qualification Card 2.6.
* Supervisor 6.2  The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure.
Supervisor 6.2  The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure.
Senior Shift Supervisor/Shift Supervisor Date/Time 603  The Control Operator is aware of all of the alarms and indications that will result from the performance of this procedure.
Senior Shift Supervisor/Shift Supervisor Date/Time 603  The Control Operator is aware of all of the alarms and indications that will result from the performance of this procedure.
Control Operator
Control Operator
* SALEM GENERATING STATION                  NUMBER -      lPD-18.1.009
 
SALEM GENERATING STATION                  NUMBER -      lPD-18.1.009
* PERFORMANCE DEPARTMENT (I & C)
* PERFORMANCE DEPARTMENT (I & C)
REV. NO.      1 DATE          5/24/82 TEST PROCEDURE PAGE  6    OF so TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 7.0  System Line~up:
REV. NO.      1 DATE          5/24/82 TEST PROCEDURE PAGE  6    OF so TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 7.0  System Line~up:
Line 134: Line 122:
: 3. Phase B Isolation
: 3. Phase B Isolation
: 4. Feedwater Isolation s:. Containment Ventilation Isolation from Safety Injection signal Control Operator
: 4. Feedwater Isolation s:. Containment Ventilation Isolation from Safety Injection signal Control Operator
*


.x SALEM GENERATING STATION                      NUMBER -      lPD-18 .1. 009
.x SALEM GENERATING STATION                      NUMBER -      lPD-18 .1. 009
Line 143: Line 130:
8.1    Measure and record the following instrument Bus Voltages (Required 117 + 10 VAC).
8.1    Measure and record the following instrument Bus Voltages (Required 117 + 10 VAC).
8elel    Bus #1 TB-110 - 11    &  12              VAC 8olo2    Bus #2 TB-210 - 11 & 12                  VAC
8elel    Bus #1 TB-110 - 11    &  12              VAC 8olo2    Bus #2 TB-210 - 11 & 12                  VAC
* 8.1.3 8.; 1. 4 Bus #3 TB-310 - 11 Bus #4 TB-410 - 11
* 8.1.3 8.; 1. 4 Bus #3 TB-310 - 11 Bus #4 TB-410 - 11 12 12 VAC VAC 8.1.5    Bus #1 TB--654 - 2  &  12              VAC 8.2    Open the front doors of Train B Logic Bay and Train B Output Relay Bay.
                                                &
                                                &
12 12 VAC VAC 8.1.5    Bus #1 TB--654 - 2  &  12              VAC 8.2    Open the front doors of Train B Logic Bay and Train B Output Relay Bay.
: 8. 3--- On the Logic Tester Panel, verify and record the following Power Supply Voltages 8.3.1    +.4 8VDC #1 Required 4 8. 7 + 0. 2 VDC
: 8. 3--- On the Logic Tester Panel, verify and record the following Power Supply Voltages 8.3.1    +.4 8VDC #1 Required 4 8. 7 + 0. 2 VDC
* 8.3.2 As Found                As Left
* 8.3.2 As Found                As Left
Line 166: Line 150:
* PERFORMANCE DEPARTMENT (I & C)
* PERFORMANCE DEPARTMENT (I & C)
DATE      _5~/_2_4~/_8_2_______
DATE      _5~/_2_4~/_8_2_______
TEST PROCEDURE                              PAGE              OF 50
TEST PROCEDURE                              PAGE              OF 50 9
                                                            ---
TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
9 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B


==8.0 Instructions==
==8.0 Instructions==
(Continued)                                        Initial 8.6  On the Logic Test Panel, verify that each of the following indicators will light by depressing it.
(Continued)                                        Initial 8.6  On the Logic Test Panel, verify that each of the following indicators will light by depressing it.
8.6.1      Testing
8.6.1      Testing 8.6.2      Bad 8.6.3    . Good 8.6.4      Continuity 8.6.5      Memory Set 8.6.6      1/1 8.6.7      1/2 8.6.8      1/3 8.6.9      1/4 8.6.10      2/2
* 8.6.2      Bad 8.6.3    . Good 8.6.4      Continuity 8.6.5      Memory Set 8.6.6      1/1 8.6.7      1/2 8.6.8      1/3 8.6.9      1/4 8.6.10      2/2
* 8.6.11 8.6.12 2/3 2/4
* 8.6.11 8.6.12 2/3 2/4
  ..
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
TEST PROCEDURE NUMBER -
Line 201: Line 181:
* 8.11.2                On the Tester PC Card (AlOS), verify that the top four LED's (light emitting diodes) are lighted.
* 8.11.2                On the Tester PC Card (AlOS), verify that the top four LED's (light emitting diodes) are lighted.


x SALEM GENERATING STATION                  NUMBER -      lPD-18.1.009
x SALEM GENERATING STATION                  NUMBER -      lPD-18.1.009 REV. NO.      l PERFORMANCE DEPARTMENT (I & C)
* REV. NO.      l PERFORMANCE DEPARTMENT (I & C)
DATE          5/24/82 TEST PROCEDURE PAGE  11    OF 50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
DATE          5/24/82 TEST PROCEDURE PAGE  11    OF 50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B


Line 210: Line 189:
* on Al08 light.
* on Al08 light.
On the Logic Test Panel, place the Input Error Inhibit switch to the Inhibit position.
On the Logic Test Panel, place the Input Error Inhibit switch to the Inhibit position.
                                                                        ----
Place the MULTIPLEXER TEST switch to the A & B position.
Place the MULTIPLEXER TEST switch to the A & B position.
                                               *~.
                                               *~.
Line 216: Line 194:
Depress and release the TEST pushbutton.
Depress and release the TEST pushbutton.
8.11.8.l  Verify that the amber testing lamp lights.
8.11.8.l  Verify that the amber testing lamp lights.
* 8.11.8.2  In approximately 1.6 seconds, verify that this lamp extinguishes.
8.11.8.2  In approximately 1.6 seconds, verify that this lamp extinguishes.
8.11.8.3  Verify that the GOOD lamp lights.
8.11.8.3  Verify that the GOOD lamp lights.


Line 225: Line 203:
==8.0 Instructions==
==8.0 Instructions==
(Continued)                                        Initial 8.11.8.4  In approximately 1.6 seconds, verify that the good lamp extinguishes and repeatedly blinks on and off for these periods.
(Continued)                                        Initial 8.11.8.4  In approximately 1.6 seconds, verify that the good lamp extinguishes and repeatedly blinks on and off for these periods.
* 8.11.9    Place the BLOCKING FUNCTION TEST switch to the INHIBIT BLOCKS position.
8.11.9    Place the BLOCKING FUNCTION TEST switch to the INHIBIT BLOCKS position.
8.11.10    ~epress  and release th~  Test pushbutton.
8.11.10    ~epress  and release th~  Test pushbutton.
8.11.10.1 Verify that the AMBER TESTING lamp LIGHTS.
8.11.10.1 Verify that the AMBER TESTING lamp LIGHTS.
Line 273: Line 251:
DATE lPD-18 .1. 009 l
DATE lPD-18 .1. 009 l
                                                                             ~~~~------~
                                                                             ~~~~------~
5/24/82
5/24/82 PAGE  15    OF 50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC          BLOCKING FUNCTION.
* PAGE  15    OF 50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC          BLOCKING FUNCTION.
TEST SWITCH PER-                                                                    BLOCKS LOGI C  LOGIC  LOGIC  LOGIC  MIS-        TEST                                              INHIBIT      NOT A        B      C      D    SIVE      FUNCTION                  REQUIRED    ACTUAL      BLOCKS INHIBITED OFF      24      24    24    OFF  OFF                                                      (GOOD OR BAD) 1    24      24    24    OFF  LOSS OF FLOW, LOOP 1              2/3 2    24      24    24    OFF  LOSS OF FLOW, LOOP 2              2/3 3    24      24      24    OFF  LOSS OF FLOW, LOOP 3              2/3 4    24      24      24    OFF  LOSS OF FLOW, LOOP 4              2/3 5    24      24      24    OFF  LOSS OF FLOW, RCP                  2/4 6    24      24      24    OFF  PRESSURIZER, LOW PRESSURE TRIP    2/4
TEST SWITCH PER-                                                                    BLOCKS LOGI C  LOGIC  LOGIC  LOGIC  MIS-        TEST                                              INHIBIT      NOT A        B      C      D    SIVE      FUNCTION                  REQUIRED    ACTUAL      BLOCKS INHIBITED OFF      24      24    24    OFF  OFF                                                      (GOOD OR BAD) 1    24      24    24    OFF  LOSS OF FLOW, LOOP 1              2/3 2    24      24    24    OFF  LOSS OF FLOW, LOOP 2              2/3
        '
3    24      24      24    OFF  LOSS OF FLOW, LOOP 3              2/3 4    24      24      24    OFF  LOSS OF FLOW, LOOP 4              2/3 5    24      24      24    OFF  LOSS OF FLOW, RCP                  2/4 6    24      24      24    OFF  PRESSURIZER, LOW PRESSURE TRIP    2/4


                                                            *                                              *
,/\
,/\
SALEM GE.A TING ST A TION NUMBER -    lPD-18 .1. 009 PEAFOAft.1ANCE DEPARTMENT (I & C)                                  REV. NO. 1 TEST PAOCEDUBE                                              DATE        5/24/82 50 PAGE
SALEM GE.A TING ST A TION NUMBER -    lPD-18 .1. 009 PEAFOAft.1ANCE DEPARTMENT (I & C)                                  REV. NO. 1 TEST PAOCEDUBE                                              DATE        5/24/82 50 PAGE
Line 289: Line 263:
REV. NO.
REV. NO.
lPD-18 .1. 009 1
lPD-18 .1. 009 1
5/24/82
5/24/82 DATE PAGE 17    OF  50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                  BLOCKS LOGIC    LOGIC  LOGIC  LOGIC  MIS-        TEST                                            INHIBIT      NOT  . ;
* DATE PAGE 17    OF  50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                  BLOCKS LOGIC    LOGIC  LOGIC  LOGIC  MIS-        TEST                                            INHIBIT      NOT  . ;
A        B      c      D    SIVE      FUNCTION                  REQUIRED    ACTUAL    BLOCKS INHIBITED 13      24      24    24    OFF  LOW FEEDWATER FLOW, LOOP 3        1/2 14      24      24    24    OFF  LOW FEEDWATER FLOW, LOOP 3        1/2 15      24      24      24    OFF  LOW FEEDWATER FLOW, LOOP 4        1/2 16      24      24      24    OFF  LOW FEEDWATER FLOW, LOOP 4        1/2 17      24      24      24    OFF  OIL PRESSURE SWITCHES REACTOR    2/3 TRIP 18      24      24      24  .OFF  STOP VALVES GENERATOR TRIP        2/2
A        B      c      D    SIVE      FUNCTION                  REQUIRED    ACTUAL    BLOCKS INHIBITED 13      24      24    24    OFF  LOW FEEDWATER FLOW, LOOP 3        1/2 14      24      24    24    OFF  LOW FEEDWATER FLOW, LOOP 3        1/2 15      24      24      24    OFF  LOW FEEDWATER FLOW, LOOP 4        1/2 16      24      24      24    OFF  LOW FEEDWATER FLOW, LOOP 4        1/2 17      24      24      24    OFF  OIL PRESSURE SWITCHES REACTOR    2/3 TRIP 18      24      24      24  .OFF  STOP VALVES GENERATOR TRIP        2/2
: 19. 24      24      24    OFF  STOP VALVES GENERATOR TRIP        2/2
: 19. 24      24      24    OFF  STOP VALVES GENERATOR TRIP        2/2
Line 296: Line 269:
SA.LEM GE.TING STATION PERFORMANCE DEPARTMENT (I & C)
SA.LEM GE.TING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDUHE
TEST PROCEDUHE
                                        ..'**
                                         *~'; .
                                         *~'; .
* NUMBER -
* NUMBER -
REV. NO.
REV. NO.
lPP-18 .1. 009 1 .*
lPP-18 .1. 009 1 .*
5/24/82
5/24/82 DATE PAGE      18  OF  50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS.                                              FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                        BLOCKS LOGIC  LOGIC    LOGIC  LOGIC  'MIS-          TEST                                              INHIBIT      NOT A        B      C    .D    SIVE        FUNCTION                  REQUIRED      ACTUAL    BLOCKS INHIBITED 20      24      24    24    OFF    STOP VALVES REACTOR TRIP            2/2 21      24      24    24    OFF    SOURCE RANGE TR+P                  2/2 22      24      24      24    OFF    SOURCE RANGE TRIP                  2/2 23      24      24      24    OFF    FEED THRU TO LOGIC B 23      1    *24      24    OFF    INTERMEDIATE RANGE TRIP            2/2 23      2      24      24    OFF    INTERMEDIATE RANGE TRIP            2/2 23      3      24      24    OFF    POWER RANGE, LOW SETPOINT TRIP    2/4
                                                                                                            **
DATE PAGE      18  OF  50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS.                                              FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                        BLOCKS LOGIC  LOGIC    LOGIC  LOGIC  'MIS-          TEST                                              INHIBIT      NOT A        B      C    .D    SIVE        FUNCTION                  REQUIRED      ACTUAL    BLOCKS INHIBITED 20      24      24    24    OFF    STOP VALVES REACTOR TRIP            2/2 21      24      24    24    OFF    SOURCE RANGE TR+P                  2/2 22      24      24      24    OFF    SOURCE RANGE TRIP                  2/2 23      24      24      24    OFF    FEED THRU TO LOGIC B 23      1    *24      24    OFF    INTERMEDIATE RANGE TRIP            2/2 23      2      24      24    OFF    INTERMEDIATE RANGE TRIP            2/2 23      3      24      24    OFF    POWER RANGE, LOW SETPOINT TRIP    2/4


                                                                        ...
SALEM G.ATING ST A TION PERFORMANCE DEPARTMENT (I & C)
SALEM G.ATING ST A TION PERFORMANCE DEPARTMENT (I & C)
* NUMBER -
* NUMBER -
REV. NO.
REV. NO.
lPD-18.1.009 1
lPD-18.1.009 1
* TEST PAOCEDUHE                                            DATE          5/24/82 PAGE  19    OF  50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH
TEST PAOCEDUHE                                            DATE          5/24/82 PAGE  19    OF  50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH
                                 *PER-                                                                      BLOCKS LOGIC    LOGIC    LOGIC  LOGIC  MIS-        TEST.                                            INHIBIT      NOT A        B      C      D    SIVE      FUNCTION                    REQUIRED      ACTUAL    BLOCKS INHIBITED 23      4      24    24    OFF' POWER RANGE, HIGH SETPOINT TRIP      2/4 23      5      24    24    .OFF  OVERTEMPERATURE DELTA T TRIP        2/4 23      6      24      24    OFF  OVERPOWER DELTA T TRIP              2/4 23      7      24      24  OFF  RCP UNDERVOLTAGE TRIP                2/4 23      8      24      24    OFF  RCP UNDERVOLTAGE TRIP              1/2 23      9      24      24    OFF  RCP UNDERVOLTAGE, TURB. FEED        1/2 PUMP
                                 *PER-                                                                      BLOCKS LOGIC    LOGIC    LOGIC  LOGIC  MIS-        TEST.                                            INHIBIT      NOT A        B      C      D    SIVE      FUNCTION                    REQUIRED      ACTUAL    BLOCKS INHIBITED 23      4      24    24    OFF' POWER RANGE, HIGH SETPOINT TRIP      2/4 23      5      24    24    .OFF  OVERTEMPERATURE DELTA T TRIP        2/4 23      6      24      24    OFF  OVERPOWER DELTA T TRIP              2/4 23      7      24      24  OFF  RCP UNDERVOLTAGE TRIP                2/4 23      8      24      24    OFF  RCP UNDERVOLTAGE TRIP              1/2 23      9      24      24    OFF  RCP UNDERVOLTAGE, TURB. FEED        1/2 PUMP


Line 318: Line 287:
REV. NO.
REV. NO.
lPD-18 .1. 009 1 .
lPD-18 .1. 009 1 .
5/24/82
5/24/82 DATE PAGE  20    OF 50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC    LOGIC    LOGIC  LOGIC  MIS-        TEST.                                            INHIBIT      NOT A        B        c    b    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      10      24    24    OFF  RCP UNDERVOLTAGE, TURB. FEED        2/4 PUMP 23    11        24    24    OFF  LOW STEAMLINE PRESSURE              2/4 23      12      24    24  OFF  HIGH STEAMLINE FLOW, LOOP 1        1/2 23      13      24    24  OFF  HIGH STEAMLINE FLOW, LOOP 2        1/2 23      14      24    24  OFF  HIGH STEAMLINE FLOW, LOOP 3        1/2 23      15      *24    24  OFF  HIGH STEAMLINE FLOW, LOOP 4        1/2
* DATE PAGE  20    OF 50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC    LOGIC    LOGIC  LOGIC  MIS-        TEST.                                            INHIBIT      NOT A        B        c    b    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      10      24    24    OFF  RCP UNDERVOLTAGE, TURB. FEED        2/4 PUMP 23    11        24    24    OFF  LOW STEAMLINE PRESSURE              2/4 23      12      24    24  OFF  HIGH STEAMLINE FLOW, LOOP 1        1/2 23      13      24    24  OFF  HIGH STEAMLINE FLOW, LOOP 2        1/2 23      14      24    24  OFF  HIGH STEAMLINE FLOW, LOOP 3        1/2 23      15      *24    24  OFF  HIGH STEAMLINE FLOW, LOOP 4        1/2


                                                          *
I\
* I\
SALEM G.ATING STATION                                            NUMBER -    lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C)                                              1 REV. NO.
SALEM G.ATING STATION                                            NUMBER -    lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C)                                              1 REV. NO.
TEST PROCEDU'HE                                                        5/24/82 DATE PAGE  21    OF  50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST T.RAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC .      BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC  LOGIC  LOGIC  LOGIC  MIS-        TEST                                            INHIBIT      NOT A      B      c      D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23    16      ~4    24    OFF  STEAMLINE ISOLATION                2/4
TEST PROCEDU'HE                                                        5/24/82 DATE PAGE  21    OF  50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST T.RAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC .      BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC  LOGIC  LOGIC  LOGIC  MIS-        TEST                                            INHIBIT      NOT A      B      c      D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23    16      ~4    24    OFF  STEAMLINE ISOLATION                2/4
Line 333: Line 300:
REV. NO.
REV. NO.
DATE lPD-18 .1. 009 1
DATE lPD-18 .1. 009 1
5/24/82
5/24/82 PAGE  22    OF  50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC  .& PERMISSIVES
                                                                                                        **
PAGE  22    OF  50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC  .& PERMISSIVES
                                                                                                                 ;
                                                                                                                 ;
                                                                                                                !
FUNCTION SELECTORS                                              FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH LOGIC    LOGIC    LOGIC  LOGIC PER-MIS-        TEST                                              INHIBIT BLOCKS NOT
FUNCTION SELECTORS                                              FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH LOGIC    LOGIC    LOGIC  LOGIC PER-MIS-        TEST                                              INHIBIT BLOCKS NOT
                                                                                                                .
                                                                                                                 ;
                                                                                                                 ;
A        B      c      D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED  i 23    21      24    24    OFF  HI-HI CONTAINMENT PRESSURE,          2/4 PHASE B ISOLATION 23    22      24    24    OFF  SAFETY INJECTION, PHASE A            1/1 ISOLATION 23    23      24    24    OFF  SAFETY INJECTION, CONTAINMENT        1/2 VENTILATION ISOLATION 23    24      24    24    OFF  FEED THRO TO LOGIC C 23    24        l    24    OFF  STEAMLINE DIFFERENTIAL              2/3 PRESSURE, LOOP 1
A        B      c      D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED  i 23    21      24    24    OFF  HI-HI CONTAINMENT PRESSURE,          2/4 PHASE B ISOLATION 23    22      24    24    OFF  SAFETY INJECTION, PHASE A            1/1 ISOLATION 23    23      24    24    OFF  SAFETY INJECTION, CONTAINMENT        1/2 VENTILATION ISOLATION 23    24      24    24    OFF  FEED THRO TO LOGIC C 23    24        l    24    OFF  STEAMLINE DIFFERENTIAL              2/3 PRESSURE, LOOP 1


                                                            *
I\
* I\
SALEM G.ATING ST A TION                                            NUMBER -      lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C)                                    REV. NO.      1 TEST PROCEDUHE                                              DATE          5/24/82 PAGE    23    OF  50 TITLE          SOLID STATE PROTECT.ION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                      BLOCKS LOGIC    LOGIC    LOGIC  LOGIC  MIS-:-        TEST                                              INHIBIT      NOT A        B      c      D    SIVE        FUNCTION                    REQUIRED      ACTUAL    BLOCKS .INHIBITED 23      24      2    24    OFF    STEAMLINE DIFFERENTIAL              2/3 PRESSURE, LOOP 2 23      24      3    24    OFF    STEAMLINE DIFFERENTIAL              2/3 PRESSURE, LOOP 3 23      24      4    24    OFF    STEAMLINE DIFFERENTIAL              2/3 PRESSURE, LOOP 4 23      24      5    24    OFF      PRESSURIZER PRESSURE              2/3 23      24.      6    24    OFF      PRESSURIZER PRESSURE              2/3 23      24      7    24    OFF      PRESSURIZER PRESSURE              2/3
SALEM G.ATING ST A TION                                            NUMBER -      lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C)                                    REV. NO.      1 TEST PROCEDUHE                                              DATE          5/24/82 PAGE    23    OF  50
                                                                                      ---
TITLE          SOLID STATE PROTECT.ION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                      BLOCKS LOGIC    LOGIC    LOGIC  LOGIC  MIS-:-        TEST                                              INHIBIT      NOT A        B      c      D    SIVE        FUNCTION                    REQUIRED      ACTUAL    BLOCKS .INHIBITED 23      24      2    24    OFF    STEAMLINE DIFFERENTIAL              2/3 PRESSURE, LOOP 2 23      24      3    24    OFF    STEAMLINE DIFFERENTIAL              2/3 PRESSURE, LOOP 3 23      24      4    24    OFF    STEAMLINE DIFFERENTIAL              2/3 PRESSURE, LOOP 4 23      24      5    24    OFF      PRESSURIZER PRESSURE              2/3 23      24.      6    24    OFF      PRESSURIZER PRESSURE              2/3 23      24      7    24    OFF      PRESSURIZER PRESSURE              2/3


SALEM GE.ATING STATION
SALEM GE.ATING STATION
Line 354: Line 314:
REV. NO.
REV. NO.
lPD-18.1.009 1
lPD-18.1.009 1
* DATE        5/24/82 PAGE  24    OF  50 TITLE          SOI.ID STATE  PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                                      FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH    .
DATE        5/24/82 PAGE  24    OF  50 TITLE          SOI.ID STATE  PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                                      FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH    .
PER-                                                                          . BLOCKS LOGI C  LOGIC    LOGIC  LOGIC  MIS~                TEST                                            INHIBIT      NOT A        B        C      D    S.IVE            FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24        8      24    OFF  STEAM GENERATOR LO-LO WATER                2/3
PER-                                                                          . BLOCKS LOGI C  LOGIC    LOGIC  LOGIC  MIS~                TEST                                            INHIBIT      NOT A        B        C      D    S.IVE            FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24        8      24    OFF  STEAM GENERATOR LO-LO WATER                2/3
                                                 .LEVEL LOOP 1 23      24      .9      24    OFF  STEAM GENERATOR LO-LO WATER                2/3 LEVEL LOOP. 2 23      24      10      24    OFF  STEAM GENERATOR LO-LO WATER                2/3 LEVEL LOOP 3
                                                 .LEVEL LOOP 1 23      24      .9      24    OFF  STEAM GENERATOR LO-LO WATER                2/3 LEVEL LOOP. 2 23      24      10      24    OFF  STEAM GENERATOR LO-LO WATER                2/3 LEVEL LOOP 3
                                               ~ ..
                                               ~ ..
                                          *:*_.  ,
23      24      11      24    OFF  STEAM GENERATOR LO-LO WATER                2/3 LEVEL LOOP 4 23      24      i2      24    OFF  STEAM GENERATOR LO-LO WATER                1/4 LEVEL TRIP
23      24      11      24    OFF  STEAM GENERATOR LO-LO WATER                2/3 LEVEL LOOP 4 23      24      i2      24    OFF  STEAM GENERATOR LO-LO WATER                1/4 LEVEL TRIP


Line 366: Line 325:
* NUMBER-REV. NO.
* NUMBER-REV. NO.
lPD-18.1.009 1
lPD-18.1.009 1
5/24/82
5/24/82 DATE PAGE    25        50
* DATE PAGE    25        50
                                                                                 --- OF ---
                                                                                 --- OF ---
TITLE          SOLID.STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC    LOGIC    LOGIC  LOGIC  MIS-        TEST                                            INHIBIT      NOT A        B      c      b    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24      13    24    OFF  STEAM GENERATOR LO-LO WATER          1/4 LEVEL, MOTOR FEED PUMP 23      24      14    24    OFF .STEAM GENERATOR *LO-LO WATER        2/4 LEVEL, TURBINE FEED PUMP 23      24      15    24    OFF  STEAM GENERATOR HI-HI LEVEL,        2/3 GENERATOR 1 23 . 24      16    24    OFF  STEAM GENERATOR HI-HI LEVEL,        2/3 GENERATOR 2 23      24      17    24    OFF  STEAM GENERATOR HI-HI LEVEL,        2/3 GENERATOR 3
TITLE          SOLID.STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC    LOGIC    LOGIC  LOGIC  MIS-        TEST                                            INHIBIT      NOT A        B      c      b    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24      13    24    OFF  STEAM GENERATOR LO-LO WATER          1/4 LEVEL, MOTOR FEED PUMP 23      24      14    24    OFF .STEAM GENERATOR *LO-LO WATER        2/4 LEVEL, TURBINE FEED PUMP 23      24      15    24    OFF  STEAM GENERATOR HI-HI LEVEL,        2/3 GENERATOR 1 23 . 24      16    24    OFF  STEAM GENERATOR HI-HI LEVEL,        2/3 GENERATOR 2 23      24      17    24    OFF  STEAM GENERATOR HI-HI LEVEL,        2/3 GENERATOR 3
Line 376: Line 334:
* NUMBEA-AEV. NO.
* NUMBEA-AEV. NO.
lPD-18.1.009 1
lPD-18.1.009 1
* DATE        5/24/82 PAGE              50
DATE        5/24/82 PAGE              50
                                                                                 -2(?- - OF TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOG IC  LOGIC    LOGIC  LOGIC  MIS-        TEST                                              INHIBIT      NOT A        B        C      D    SIVE      FUNCTION                  REQUIRED      ACTUAL    BLOCKS INHIBITED 23      24      18    24    OFF  STEAM GENERATOR HI-HI LEVEL,      2/3 GENERATOR 4 23      24      19    24    OFF  LOW TAVG                          2/4 23      24      20    24    OFF  TAVG AND REACTOR TRIPPED          2/2 23      24      21    24    OFF  UV DIODES AND OUTPUT              1/4 23      24      22    24    OFF  SAFETY INJECTION DIODES & OUTPUT 1/4 23      24      23    24    OFF  UV DIODES AND OUTPUT              1/4
                                                                                 -2(?- - OF TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                            FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOG IC  LOGIC    LOGIC  LOGIC  MIS-        TEST                                              INHIBIT      NOT A        B        C      D    SIVE      FUNCTION                  REQUIRED      ACTUAL    BLOCKS INHIBITED 23      24      18    24    OFF  STEAM GENERATOR HI-HI LEVEL,      2/3 GENERATOR 4 23      24      19    24    OFF  LOW TAVG                          2/4 23      24      20    24    OFF  TAVG AND REACTOR TRIPPED          2/2 23      24      21    24    OFF  UV DIODES AND OUTPUT              1/4 23      24      22    24    OFF  SAFETY INJECTION DIODES & OUTPUT 1/4 23      24      23    24    OFF  UV DIODES AND OUTPUT              1/4


Line 383: Line 341:
REV. NO.
REV. NO.
lPD-18.1.009 1
lPD-18.1.009 1
* DATE          5/24/82 PAGE  27  OF  50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                                FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                  BLOCKS LOGIC  LOGIC    LOGIC  LOGIC    MIS-        TEST                                            INHIBIT      NOT A        B      c        D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24      24    _* 24    OFF  FEED THRU TO LOGIC D 23      24      24        1    OFF  SAFETY INJECTION DIODES & OUTPUT 1/3 23      24      24        2    OFF  UV DIODES AND OUTPUT                1/4 23      24      24        3    OFF  UV DIODES AND OUTPUT                1/4 23      24      24        4    OFF  UV DIODES AND OUTPUT                1/4 23      24      24        5    OFF  UV DIODES AND OUTPUT                1/4 23    24      24        6    OFF  UV DIODES AND OUTPUT                1/4
DATE          5/24/82 PAGE  27  OF  50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                                FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                  BLOCKS LOGIC  LOGIC    LOGIC  LOGIC    MIS-        TEST                                            INHIBIT      NOT A        B      c        D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24      24    _* 24    OFF  FEED THRU TO LOGIC D 23      24      24        1    OFF  SAFETY INJECTION DIODES & OUTPUT 1/3 23      24      24        2    OFF  UV DIODES AND OUTPUT                1/4 23      24      24        3    OFF  UV DIODES AND OUTPUT                1/4 23      24      24        4    OFF  UV DIODES AND OUTPUT                1/4 23      24      24        5    OFF  UV DIODES AND OUTPUT                1/4 23    24      24        6    OFF  UV DIODES AND OUTPUT                1/4


SALEM  GEa    TING STATION PERFORUANCE DEPARTMENT (I & C)
SALEM  GEa    TING STATION PERFORUANCE DEPARTMENT (I & C)
Line 390: Line 348:
REV. NO.
REV. NO.
lPD-18 .1. 009 1
lPD-18 .1. 009 1
* DATE          5/27/82 PAGE  28  OF    50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC  *& PERMISSIVES FUNCTION SELECTORS                                                  FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                      BLOCKS LOGIC . LOGIC    LOGIC  LOGIC    MIS-        TEST                                              INHIBI'I'    NOT A        B        c      D      SIVE      FUNCTION                      REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24      24      7      OFF  FEEDWATER CONTROL                    1/2 23      24      24      8      OFF  FEEDWATER CONTROL                    1/1 23      24      24      9      OFF  RCP UNDERFREQUENCY                    2/4 23    24        24    10      OFF  RCP UNDERFREQUENCY                    1/2 23    24        24    11      OFF  RCP UNDERFREQUENCY                    1/2 23    24        24    12      OFF  RCP UNDERFREQUENCY                    2/4 23    24        24    13      OFF  POWER RANGE, HI FLUX RATE TRIP        2/4
DATE          5/27/82 PAGE  28  OF    50 TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC  *& PERMISSIVES FUNCTION SELECTORS                                                  FUNCTION LOGIC        BLOCKING FUNCTION TEST SWITCH PER-                                                                      BLOCKS LOGIC . LOGIC    LOGIC  LOGIC    MIS-        TEST                                              INHIBI'I'    NOT A        B        c      D      SIVE      FUNCTION                      REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24      24      7      OFF  FEEDWATER CONTROL                    1/2 23      24      24      8      OFF  FEEDWATER CONTROL                    1/1 23      24      24      9      OFF  RCP UNDERFREQUENCY                    2/4 23    24        24    10      OFF  RCP UNDERFREQUENCY                    1/2 23    24        24    11      OFF  RCP UNDERFREQUENCY                    1/2 23    24        24    12      OFF  RCP UNDERFREQUENCY                    2/4 23    24        24    13      OFF  POWER RANGE, HI FLUX RATE TRIP        2/4
                                  ..


SALE~ GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)
SALE~ GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)
Line 398: Line 355:
REV. NO.
REV. NO.
lPD-18 .1. 009 1
lPD-18 .1. 009 1
* DATE          5/24/82 PAGE  29    OF  50
DATE          5/24/82 PAGE  29    OF  50
"'IT(U:        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC  LOGIC    LOGIC  LOGIC  MIS-        TEST                                              INHIBIT      NOT A        B      c      D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24      24    14    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION 23      24      24    15    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION 23      24      24    16    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION 23      24      24    17    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION
"'IT(U:        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC  LOGIC    LOGIC  LOGIC  MIS-        TEST                                              INHIBIT      NOT A        B      c      D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23      24      24    14    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION 23      24      24    15    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION 23      24      24    16    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION 23      24      24    17    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION 23      24. 24    18    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION 23      24      24    19    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION
* 23      24. 24    18    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION 23      24      24    19    OFF  SAFETY INJECTION, PHASE A          1/1 ISOLATION


SALEM GEN.TING STATION PERFORMANCE DEPARTMENT (I & C)
SALEM GEN.TING STATION PERFORMANCE DEPARTMENT (I & C)
Line 407: Line 363:
REV. NO.
REV. NO.
lPD-18 .1. 009 1
lPD-18 .1. 009 1
* DATE          5/24/82 PAGE  30    OF  50 TITLE        SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
DATE          5/24/82 PAGE  30    OF  50 TITLE        SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
                                                     . TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                      BLOCKS LOGIC  LOGIC    LOGIC  LOGIC  MIS-        TEpT                                              INHIBIT      NOT A      B        c      D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23    24      24    20    OFF  SAFETY INJECTION, PHASE A            1/1 ISOLATION 23    24      24    21
                                                     . TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                      BLOCKS LOGIC  LOGIC    LOGIC  LOGIC  MIS-        TEpT                                              INHIBIT      NOT A      B        c      D    SIVE      FUNCTION                    REQUIRED    ACTUAL    BLOCKS INHIBITED 23    24      24    20    OFF  SAFETY INJECTION, PHASE A            1/1 ISOLATION 23    24      24    21
                                 - OFF  SAFETY INJECTION, PHASE A            1/1 ISOLATION 23    24      24    22    OFF  SAFETY INJECTION, PHASE A*          1/1 ISOLATION 23    24      24    23    OFF  SAFETY INJECTION, PHASE A            1/1 ISOLATION 23    24      24    24    OFF  FEED THRU TO PERMISSIVES 23    24      24    24      1  P6                                  1/2
                                 - OFF  SAFETY INJECTION, PHASE A            1/1 ISOLATION 23    24      24    22    OFF  SAFETY INJECTION, PHASE A*          1/1 ISOLATION 23    24      24    23    OFF  SAFETY INJECTION, PHASE A            1/1 ISOLATION 23    24      24    24    OFF  FEED THRU TO PERMISSIVES 23    24      24    24      1  P6                                  1/2


"'
SALEM GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)'
SALEM GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)'
* NUMBER -
* NUMBER -
REV. NO.
REV. NO.
lPD-18 .1. 009 1
lPD-18 .1. 009 1
                                                                                                                **
TEST PROCEDUHE                                                DATE          5/24/82-31        50
TEST PROCEDUHE                                                DATE          5/24/82-31        50
                                            .. !:*
                                           .*4'.:
                                           .*4'.:
PAGE
PAGE
Line 429: Line 382:
SALEM GE.ATING STATION PERFORUANCE DEPARTMENT (I & C)
SALEM GE.ATING STATION PERFORUANCE DEPARTMENT (I & C)
* NUMBER -
* NUMBER -
REV. NO. 1 lPD-18.1.009
REV. NO. 1 lPD-18.1.009 TEST PROCEDUHE                                            DATE          5/24/82 PAGE    32    OF  50
* TEST PROCEDUHE                                            DATE          5/24/82
* PAGE    32    OF  50
   'TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC  LOGIC    LOGIC  LOGIC  MIS-        TEST                                              INHIBIT      NOT A        B      c      I)    SIVE      FUNCTION                    REQUIRED      ACTUAL    BLOCKS INHIBITED 23      24      24    24      9  Pll                                2/3  I I
   'TITLE          SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS                                              FUNCTION LOGIC          BLOCKING FUNCTION TEST SWITCH PER-                                                                    BLOCKS LOGIC  LOGIC    LOGIC  LOGIC  MIS-        TEST                                              INHIBIT      NOT A        B      c      I)    SIVE      FUNCTION                    REQUIRED      ACTUAL    BLOCKS INHIBITED 23      24      24    24      9  Pll                                2/3  I I
23      24      24    24      10  P8 RCP BREAKERS                    1/4 23      24      24    24      11  P8 RCP BREAKERS                    1/4 OFF    24      24    24    OFF  OFF                                OFF
23      24      24    24      10  P8 RCP BREAKERS                    1/4 23      24      24    24      11  P8 RCP BREAKERS                    1/4 OFF    24      24    24    OFF  OFF                                OFF


  *X
  *X SALEM GENERATING STATION                    NUMBER -    lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C)              REV.NO. _l~~~~~~
* SALEM GENERATING STATION                    NUMBER -    lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C)              REV.NO. _l~~~~~~
DATE      _5/,__24~/~8_2~~~~
DATE      _5/,__24~/~8_2~~~~
TEST PROCEDURE                                PAGE _3_3__ OF  50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
TEST PROCEDURE                                PAGE _3_3__ OF  50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
Line 449: Line 399:
8.16.3    After MEMORY SET lamp lights, depress and release BLACK pushbutton.
8.16.3    After MEMORY SET lamp lights, depress and release BLACK pushbutton.
8.16.4    Repeat Steps 8.16.2 and 8.16.3 for the positions of the MEMORIES switch as listed oh TABLE II .
8.16.4    Repeat Steps 8.16.2 and 8.16.3 for the positions of the MEMORIES switch as listed oh TABLE II .
* I & C - 001
I & C - 001
* SALEM GENERATING STATION                  NUMBER -    lPD-18 .1. 009 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)
 
SALEM GENERATING STATION                  NUMBER -    lPD-18 .1. 009 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)
DATE        5/24/82 TEST PROCEDURE                              PAGE _3_4__ OF  50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE 2 MEMORIES FUNCTION                                            FUNCTION      MEMORY      FUNCTION SELECTOR                                              LOGIC          TEST    PUSHBUTTON MEMORIES                  TEST FUNCTION                1/4          RED        BLACK OFF        OFF                                                    (ON OR OFF) 1        POWER RANGE BLOCK
DATE        5/24/82 TEST PROCEDURE                              PAGE _3_4__ OF  50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE 2 MEMORIES FUNCTION                                            FUNCTION      MEMORY      FUNCTION SELECTOR                                              LOGIC          TEST    PUSHBUTTON MEMORIES                  TEST FUNCTION                1/4          RED        BLACK OFF        OFF                                                    (ON OR OFF) 1        POWER RANGE BLOCK
* 2 3
* 2 3
Line 458: Line 409:


     .~
     .~
* SALEM GENERATING STATION                                                                                        NUMBER -                      lPD-18 .1. 009 REV.NO.                  _l_ _ _ _ _ __
SALEM GENERATING STATION                                                                                        NUMBER -                      lPD-18 .1. 009 REV.NO.                  _l_ _ _ _ _ __
PERFORMANCE DEPARTMENT° (I & C)
PERFORMANCE DEPARTMENT° (I & C)
DATE                          5/24/82
DATE                          5/24/82
Line 475: Line 426:
                                           ~*
                                           ~*
                                             ~
                                             ~
                                              -
                                               \-z:..:.  .......... -1...*.i '--
                                               \-z:..:.  .......... -1...*.i '--
                                                                                 .      (I
                                                                                 .      (I
                                                                                           ~
                                                                                           ~
H            .
H            .
                                                                                                      ,. . ...
                                                                                                                    "
                                                                                                                       \::""l...
                                                                                                                       \::""l...
                                                                                                                                 'II
                                                                                                                                 'II
                                                                                                                                     ** ....      ~ <"
                                                                                                                                     ** ....      ~ <"
                                                                                                                                                              .
i ..
i ..
                                               \                                                        "'"'"~        ~*J          -  ......"'\_.,.      ,~,.,,,      S:\v:.....* *~
                                               \                                                        "'"'"~        ~*J          -  ......"'\_.,.      ,~,.,,,      S:\v:.....* *~
Line 491: Line 438:
c      ~                V---~*C.      \  ~      &#xa5;..i.vc i_ ., -~\:!C<'3;                        \I... "-.:*<.*l\ ~  \t. 1<:C 'C. \
c      ~                V---~*C.      \  ~      &#xa5;..i.vc i_ ., -~\:!C<'3;                        \I... "-.:*<.*l\ ~  \t. 1<:C 'C. \
                                                     \<... lcC:~                    . \.;.. \..:: '.C      -~~-Q..
                                                     \<... lcC:~                    . \.;.. \..:: '.C      -~~-Q..
                                                                                                                                                                                              .. - - -
                                                                                       \
                                                                                       \
                                                   -.,                                        .. ,,                '.'\
                                                   -.,                                        .. ,,                '.'\
Line 503: Line 449:
REV. NO.
REV. NO.
lPD-18 .1. 009 1
lPD-18 .1. 009 1
* DATE        5/24/82 PAGE  36    OF 50 TITLE        SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY                                                                SLAVE RELAY CONTINUITY LAMPS SELECTOR              SLAVE RELAY FUNCTION          Al    A2    A3    A4      Bl      B2    B3  B4 1      CONTAINMENT ISOLATION, PHASE A            ON    ON    ON    OFF    ON      ON    ON  OFF 2      CONTAINMENT VENTILATION ISOLATION        ON    OFF    OFF    OFF    ON    *oFF  OFF OFF 3      STEAM STOP VALVES                        ON    OFF    OFF    OFF    ON      O;F'F OFF OFF 4      SPRAY ACTUATION                          ON    OFF    OFF    OFF    ON      ON    OFF OFF 5      CONTAINMENT ISOLATION, PHASE B            ON    ON    OFF    OFF    ON      ON    OFF OFF 6      FEEDWATER VALVES (HI-HI STEAM            ON    OFF    OFF    OFF    OFF    pFF  OFF OFF GENERATOR LEVEL) 7      TRIP TURBINE/MAIN FEEDWATER PUMPS        ON    OFF    OFF    OFF    OFF    OFF  OFF OFF
DATE        5/24/82 PAGE  36    OF 50 TITLE        SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY                                                                SLAVE RELAY CONTINUITY LAMPS SELECTOR              SLAVE RELAY FUNCTION          Al    A2    A3    A4      Bl      B2    B3  B4 1      CONTAINMENT ISOLATION, PHASE A            ON    ON    ON    OFF    ON      ON    ON  OFF 2      CONTAINMENT VENTILATION ISOLATION        ON    OFF    OFF    OFF    ON    *oFF  OFF OFF 3      STEAM STOP VALVES                        ON    OFF    OFF    OFF    ON      O;F'F OFF OFF 4      SPRAY ACTUATION                          ON    OFF    OFF    OFF    ON      ON    OFF OFF 5      CONTAINMENT ISOLATION, PHASE B            ON    ON    OFF    OFF    ON      ON    OFF OFF 6      FEEDWATER VALVES (HI-HI STEAM            ON    OFF    OFF    OFF    OFF    pFF  OFF OFF GENERATOR LEVEL) 7      TRIP TURBINE/MAIN FEEDWATER PUMPS        ON    OFF    OFF    OFF    OFF    OFF  OFF OFF


SALEM GE.TING STATION PERF0Rf.1ANCE DEPARTMENT (I & C)
SALEM GE.TING STATION PERF0Rf.1ANCE DEPARTMENT (I & C)
Line 510: Line 456:
REV. NO.
REV. NO.
lPD-18 .1. 009 1
lPD-18 .1. 009 1
5/24/82
5/24/82 DATE PAGE  37    OF  50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY                                                              SLAVE RELAY CONTINUITY LAMPS SELECTOR          SLAVE RELAY FUNCTION              Al    A2    A3    A4      Bl    B2  B3  B4 8      RCP UNDERFREQUENCY                      ON    OFF    OFF    OFF    OFF    OFF  OFF OFF 9      SPARE                                  ON    OFF    OFF    OFF    OFF    OFF  OFF OFF 10        (NOT USED)                              OFF  OFF    OFF    OFF    OFF    OFF  OFF OFF 11        (NOT USED)                              OFF  OFF    OFF    OFF    OFF    OFF  OFF OFF 12        LO-LO TAVG STEAM DUMP INTERLOCK        ON    OFF    OFF    OFF    OFF    OFF  OFF OFF 13        LOSS OF POWER/TURBINE AUXILIARY PUMP    ON    OFF    OFF    OFF    OFF    OFF. OFF OFF 14        LOW WATER LEVEL/MOTOR AUXILIARY PUMP    ON    OFF    OFF    OFF    OFF    OFF  OFF OFF 15        LOW WATER LEVEL/TURBINE AUXILIARY PUMP  ON    OFF    OFF    OFF    OFF    OFF  OFF OFF
* DATE PAGE  37    OF  50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY                                                              SLAVE RELAY CONTINUITY LAMPS SELECTOR          SLAVE RELAY FUNCTION              Al    A2    A3    A4      Bl    B2  B3  B4 8      RCP UNDERFREQUENCY                      ON    OFF    OFF    OFF    OFF    OFF  OFF OFF 9      SPARE                                  ON    OFF    OFF    OFF    OFF    OFF  OFF OFF 10        (NOT USED)                              OFF  OFF    OFF    OFF    OFF    OFF  OFF OFF 11        (NOT USED)                              OFF  OFF    OFF    OFF    OFF    OFF  OFF OFF 12        LO-LO TAVG STEAM DUMP INTERLOCK        ON    OFF    OFF    OFF    OFF    OFF  OFF OFF 13        LOSS OF POWER/TURBINE AUXILIARY PUMP    ON    OFF    OFF    OFF    OFF    OFF. OFF OFF 14        LOW WATER LEVEL/MOTOR AUXILIARY PUMP    ON    OFF    OFF    OFF    OFF    OFF  OFF OFF 15        LOW WATER LEVEL/TURBINE AUXILIARY PUMP  ON    OFF    OFF    OFF    OFF    OFF  OFF OFF


                                                          *                                              *
,/\
,/\
SALEM GE.A TING STATION                                            NUMBER -      lPD-18 .1. 009 PERF0Rf..1ANCE DEPARTMENT (I & C)                                  REV. NO.      1 TEST PAOCEDUUE DATE          5/24/82 PAGE    38    OF  50 TITLE        SOI, ID STATE PROTECTION SYSTEM FUNCTION~L  TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY                                                                  SLAVE RELAY CONTINUITY LAMPS SELECTOR          SLAVE RELAY FUNCTION                Al    A2    A3      A4. Bl    B2  B3  B4 16        GENERATOR TRIP & .STEAM DUMP INTERLOCK    ON    OFF    OFF    OFF    OFF    OFF  OFF  OFF 17        TAVG AND REACTOR TRIPPED                  ON    OFP    OFF    OFF    ON    OFF  OFF  OFF 18        SAFETY INJECTION .                        ON    ON    ON      ON      ON    ON  ON  ON 19        (NOT USED)                                OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF 20        (NOT USED)                                OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF 21        (NOT USED)                                OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF 22        (NOT USED)                                OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF 23        (NOT USED)                                OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF OFF      OFF                                        OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF
SALEM GE.A TING STATION                                            NUMBER -      lPD-18 .1. 009 PERF0Rf..1ANCE DEPARTMENT (I & C)                                  REV. NO.      1 TEST PAOCEDUUE DATE          5/24/82 PAGE    38    OF  50 TITLE        SOI, ID STATE PROTECTION SYSTEM FUNCTION~L  TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY                                                                  SLAVE RELAY CONTINUITY LAMPS SELECTOR          SLAVE RELAY FUNCTION                Al    A2    A3      A4. Bl    B2  B3  B4 16        GENERATOR TRIP & .STEAM DUMP INTERLOCK    ON    OFF    OFF    OFF    OFF    OFF  OFF  OFF 17        TAVG AND REACTOR TRIPPED                  ON    OFP    OFF    OFF    ON    OFF  OFF  OFF 18        SAFETY INJECTION .                        ON    ON    ON      ON      ON    ON  ON  ON 19        (NOT USED)                                OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF 20        (NOT USED)                                OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF 21        (NOT USED)                                OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF 22        (NOT USED)                                OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF 23        (NOT USED)                                OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF OFF      OFF                                        OFF  OFF    OFF    OFF    OFF    OFF  OFF  OFF
Line 526: Line 470:
8.21 Manual Input Function Test
8.21 Manual Input Function Test
                                       -NOTE-  8.~\.\)  8.ai.\.&deg;t Omit steps 8.21.4, 8.21.5, 8.21.14, 8.21.16 6'.,l.\,\0 and &.21.19 if Reactor is Tripped Tripped                      Operational 8.21.1    Have the Control Operator rack in and close Reactor By-pass Breaker B, and verify that the breaker is in Operate position and its light is illuminated .
                                       -NOTE-  8.~\.\)  8.ai.\.&deg;t Omit steps 8.21.4, 8.21.5, 8.21.14, 8.21.16 6'.,l.\,\0 and &.21.19 if Reactor is Tripped Tripped                      Operational 8.21.1    Have the Control Operator rack in and close Reactor By-pass Breaker B, and verify that the breaker is in Operate position and its light is illuminated .
*


**          SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
**          SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
Line 542: Line 485:
: 8. 21. 5    Verify the UV COIL VOLTAGE meter indicates approximately 0 VDC.
: 8. 21. 5    Verify the UV COIL VOLTAGE meter indicates approximately 0 VDC.
8.21.6      Release the pushbuttons depressed in Step 8.21.3 .
8.21.6      Release the pushbuttons depressed in Step 8.21.3 .
* I & C - 001
I & C - 001


  'x
  'x
Line 566: Line 509:
==8.0 Instructions==
==8.0 Instructions==
(Continued)                                    Initial 8.22 Perform the following for SAFETY INJECTION RESET TIMING TEST.
(Continued)                                    Initial 8.22 Perform the following for SAFETY INJECTION RESET TIMING TEST.
8.22.1    Select position 9 on the MEMORIES switch and if the MEMORY SET lamp is illuminated,
8.22.1    Select position 9 on the MEMORIES switch and if the MEMORY SET lamp is illuminated, depress the BLACK button to extinguish it .
* depress the BLACK button to extinguish it .
8.22.2    In the OUTPUT TEST cabinet, place test switch 602 in the BLOCK  OUT~UT  position.
8.22.2    In the OUTPUT TEST cabinet, place test switch 602 in the BLOCK  OUT~UT  position.
8.22.3    Connect the Digital Voltmeter as follows:
8.22.3    Connect the Digital Voltmeter as follows:
Line 575: Line 517:
8.22.5    Move the positive lead of the DVM from TD-1, Terminal 6 to TD-1, Terminal 2.
8.22.5    Move the positive lead of the DVM from TD-1, Terminal 6 to TD-1, Terminal 2.
8.22.6    The DVM should indicate 0 VDC.
8.22.6    The DVM should indicate 0 VDC.
* I & C - 001
I & C - 001


.x
.x SALEM GENERATING STATION                    NUMBER -    lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ __
* SALEM GENERATING STATION                    NUMBER -    lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ __
PERFORMANCE DEPARTMENT (I & C)
PERFORMANCE DEPARTMENT (I & C)
DATE        5/24/82 TEST PROCEDURE PAGE  43    OF  50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
DATE        5/24/82 TEST PROCEDURE PAGE  43    OF  50 TITLE        SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
Line 609: Line 550:
**                        switch 602 to the UNBLOCK    outp~t  position and verify the TL/TXC Alarm light extinguishes.
**                        switch 602 to the UNBLOCK    outp~t  position and verify the TL/TXC Alarm light extinguishes.


      ..
. }(
. }(
* SALEM GENERATING STATION .                                                    NUMBER -              lPD-18 .1. 009 REV. NO.              1 PERFORMANCE DEPARTMENT (I & C)
SALEM GENERATING STATION .                                                    NUMBER -              lPD-18 .1. 009 REV. NO.              1 PERFORMANCE DEPARTMENT (I & C)
DATE                  5/24/82 TEST PROCEDURE PAGE        45        OF      50 TITLE *~~-S~O.:..=L~I~D-*~s~TA_..:.TE:::._P~R-O_T_E~C~T.:.:..;_IO~N:..:..._S~Y.:.:..;_S_TE_M~F-U_N_C_T~IO_N_A_L~T~E~S-T~T-RA~I-N_B~
DATE                  5/24/82 TEST PROCEDURE PAGE        45        OF      50 TITLE *~~-S~O.:..=L~I~D-*~s~TA_..:.TE:::._P~R-O_T_E~C~T.:.:..;_IO~N:..:..._S~Y.:.:..;_S_TE_M~F-U_N_C_T~IO_N_A_L~T~E~S-T~T-RA~I-N_B~


Line 620: Line 560:
* be applied if their permissives are not present, therefore, only those permitted will be set.)
* be applied if their permissives are not present, therefore, only those permitted will be set.)
8.22.17.1 Block Source Range-Train B                                        pu~hed 8.22.17.2 Block Intermediate Range-Train B pushed.
8.22.17.1 Block Source Range-Train B                                        pu~hed 8.22.17.2 Block Intermediate Range-Train B pushed.
                                                                                                                                                ----
8.22.17.3 Block Power Range - Train B pushed.
8.22.17.3 Block Power Range - Train B pushed.
WARNING:            The Flux Trip Manual Blocks. must*be reinstated prior to placing the input error inhibit switch in the normal position.
WARNING:            The Flux Trip Manual Blocks. must*be reinstated prior to placing the input error inhibit switch in the normal position.
8.22.18              Place the Input Error Inhibit Switch in the NORMAL position *
8.22.18              Place the Input Error Inhibit Switch in the NORMAL position
* I & C -001
* I & C -001


              *
. 'X SALEM GENERATING STATION                                                                                  NUMBER -      lPD-18.1.009 REV. NO.      1 PERFORMANCE DEPARTMENT (I & C)
. 'X
* SALEM GENERATING STATION                                                                                  NUMBER -      lPD-18.1.009 REV. NO.      1 PERFORMANCE DEPARTMENT (I & C)
DATE          5/24/82 TEST PROCEDURE PAGE  46    OF 50 TITLE                                      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
DATE          5/24/82 TEST PROCEDURE PAGE  46    OF 50 TITLE                                      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B


Line 641: Line 578:
   * ****- **)  *,o**~**-*'<**"*O.-.~: *.-*o*.-, ... ._.,.~-.-.-..*-*,-*.*.-*o*r-Y-~*-- *-~*** --~*--**-*-'*"*'*- * --**** .**
   * ****- **)  *,o**~**-*'<**"*O.-.~: *.-*o*.-, ... ._.,.~-.-.-..*-*,-*.*.-*o*r-Y-~*-- *-~*** --~*--**-*-'*"*'*- * --**** .**


                *
   ~
   ~
. x'
. x' SALEM GENERATING STATION                                                                                                                      NUMBER -      lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C)                                                                                                                  REV. NO.      1 DATE          5/24/82 TEST PROCEDURE PAGE  47    OF  50 TITLE                                                SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
* SALEM GENERATING STATION                                                                                                                      NUMBER -      lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C)                                                                                                                  REV. NO.      1 DATE          5/24/82 TEST PROCEDURE PAGE  47    OF  50 TITLE                                                SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B


==8.0 Instructions==
==8.0 Instructions==
Line 651: Line 586:
* 8.23.4.2                  Steamline Pressure Safety Injection.
* 8.23.4.2                  Steamline Pressure Safety Injection.
Safeguard actions which are being blocked by
Safeguard actions which are being blocked by
                                                                                                                                               -NOTE-virtue
                                                                                                                                               -NOTE-virtue of having been Reset from the Control Bezels will be re-initiated *at this time if necessary logic signal is present.                                                      The safe-guard actions involved are:
                                                                                                    ',
of having been Reset from the Control Bezels will be re-initiated *at this time if necessary logic signal is present.                                                      The safe-guard actions involved are:
: 1.            Containment Spray
: 1.            Containment Spray
: 2.            Phase A Isolation
: 2.            Phase A Isolation
Line 662: Line 595:
* Control Operator I & C -001
* Control Operator I & C -001
   **...* --* ,.. *" ...... - **. - .... :::**._"!'. r-.-.- *-***""!--* ...... _._,._. *****---:-**--*-- -*~ - .........., .. - ,. -..... - -* . *- . . .. . ****- .*...
   **...* --* ,.. *" ...... - **. - .... :::**._"!'. r-.-.- *-***""!--* ...... _._,._. *****---:-**--*-- -*~ - .........., .. - ,. -..... - -* . *- . . .. . ****- .*...
    ..
  .
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT {I & C)
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT {I & C)
TEST PROCEDURE NUMBER -
TEST PROCEDURE NUMBER -
Line 682: Line 612:
8.24.1    Place Train B Multiplexer Test Switch to the A & B position.
8.24.1    Place Train B Multiplexer Test Switch to the A & B position.
8.24.2    Verify no intermittent condition exists.
8.24.2    Verify no intermittent condition exists.
NOTE:      An intermittent  (on/off) condition is when the indication appears at the control
NOTE:      An intermittent  (on/off) condition is when the indication appears at the control board and the computer at approximately one repetition per second. This indicates one of the two trains has a malfunction in its data multiplexing.
* board and the computer at approximately one repetition per second. This indicates one of the two trains has a malfunction in its data multiplexing.
I & C - 001
I & C - 001


                               -~-------
                               -~-------
.. '.      ...
X*
X*
    "
SALEM GENERATING STATION                  NUMBER -    lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ __
* SALEM GENERATING STATION                  NUMBER -    lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ __
PERFORMANCE DEPARTMENT (I & C)
PERFORMANCE DEPARTMENT (I & C)
DATE.      5/24/82 TEST PROCEDURE*                              PAGE  49    OF  50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
DATE.      5/24/82 TEST PROCEDURE*                              PAGE  49    OF  50 TITLE      SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
                 ~.*o  Instructions:  (Continued)                                      Initial 8.24.3    Place Train B Multiplexer Test Switch to the Normal position.
                 ~.*o  Instructions:  (Continued)                                      Initial 8.24.3    Place Train B Multiplexer Test Switch to the Normal position.
8.24.4    If the Shift Supervisor wants the Safety Injection block re-initiated for the train, short terminals 2 and 6 on TDl and have the
8.24.4    If the Shift Supervisor wants the Safety Injection block re-initiated for the train, short terminals 2 and 6 on TDl and have the Controls Operator depress S.I. Reset for Train B.
* Controls Operator depress S.I. Reset for Train B.
Remove jumper:
Remove jumper:
                                                    ----
Initial Senior Shift Supervisor/Shift Supervisor 9.0  System Return to Normal:
Initial Senior Shift Supervisor/Shift Supervisor 9.0  System Return to Normal:
9.1  The Senior Shift Supervisor/Shift Supervisor has been notified that this channel has been returned to normal.
9.1  The Senior Shift Supervisor/Shift Supervisor has been notified that this channel has been returned to normal.
Line 704: Line 629:


           ..~
           ..~
  ,..        ,,,.
  . x ,*
  . x ,*
NUMBER -    lPD-18 .1. 009
NUMBER -    lPD-18 .1. 009 SALEM GENERATING STATION REV.NO.  --"l~------
* SALEM GENERATING STATION REV.NO.  --"l~------
PERFORMANCE DEPARTMENT (I & C)
PERFORMANCE DEPARTMENT (I & C)
DATE        5/24/82 TEST PROCEDURE                                                                                              PAGE  50    OF  50 TITLE                                  SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
DATE        5/24/82 TEST PROCEDURE                                                                                              PAGE  50    OF  50 TITLE                                  SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B
: 10. 0 Remarks:                                                                w.o.                                I.O .
: 10. 0 Remarks:                                                                w.o.                                I.O .
* 11.0 Completion:
11.0 Completion:
11.l Completed by:
11.l Completed by:
                                                                                                            --------
Technician          Date            Time
Technician          Date            Time
* 11.2 Approved by:
* 11.2 Approved by:
                                                                                                        --------
Supervisor          Date            Time I & C -001
Supervisor          Date            Time I & C -001
                     ..................... .,..- ... -*.***-.-:.***- ... -- ..................... --.-**~*** ... *- ,, ... - ...... .}}
                     ..................... .,..- ... -*.***-.-:.***- ... -- ..................... --.-**~*** ... *- ,, ... - ...... .}}

Revision as of 08:47, 3 February 2020

Rev 1 to Solid State Protection Sys Function Test-Train B.
ML18087A736
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/02/1982
From:
Public Service Enterprise Group
To:
Shared Package
ML18087A720 List:
References
1PD-18.1.009, NUDOCS 8303160573
Download: ML18087A736 (52)


Text

NOTE: PRESS HARO YOU ARE MAKING FIVE (S) COPIES .

ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE CHANGE TYPE:

1\71 lC.J PERMANENT (GREEN)

D *TEMPORARY (ORANGE)

  • EXPIRES:

ALL ON*THE*SPOT CHANGES TO BE CONSIDERED !="OR APPLICABILITY TO BOTH UNITS.

[ZJ UNIT I PROCECURENO. ___ \~\=>--.....\J...._-_\~B........

  • ~'~*~O~L~~q--*_________ REV. NO. _ _\_ _ _ CHANGE No._\..___ _

~ UNITZ PROCECURENO.~~c:9-.---..?n.......~-__.\~B-'_*~\-*___,OQ~-C\_,________ REV. NO._--.._ _ CHANGE NO._.;___ _\

PROPOSED CHANGE:

<a.'d-,.\.L\, res.:1-,.s, e.~,.,1.1_, ca.~\.\\;i 1 A~~ B.~\,\'1 B. ~'- \ J

'8. d.. \. C\ ) CC> . d-L \ u REASON FOR CHANGE:

ACTION TAKEN FOR OTHER UNIT:

°SP.W'Q.. ~

AUTHORIZATION: ~**S ERViORIN

.;~ CHARGE

~ DATE OR SHIFT SUPERVISOR

-SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO ~OTH UNITS HAS BEEN CONSIDERED.

ACCEPTABLE: POST CHANGE-REVIEW/APPROVAL I ~I D ()l!!clratt'-

~ D .19K~THEAD c:~:I'"t:J"'.3 ~ ~ .  :' SORC \:HAIRMAN) l?tl I ~r~

MANAGER.* SALEM GENERATING STATION RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW*UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:

' 8303160573 830314 PDR ADOCK 05000272 S PDR.

PERFORMED BY:

SIGNATURE DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE*REVIEW/APPROVAL CYCLE.

  • \

SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & qAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET SAF~TY RELATED PROCEDURE:

lPD-18.1.009 - SOLID STATE PROTECTION SYSTEM REMARKS: FUNCTIONAL TEST - TRAIN B REV. 1 - General Revision to incorporate On-The-Spot-Changes .

PERF. ENGR. SORC STA. SUPT.

REV APPROVED REVIEWED APPROVED 1

'x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009

  • PERFORMANCE DEPARTMENT (I & C) REV. NO. _l~------

DATE _5~/~2~4~/~8~2_______

TEST PROCEDURE PAGE 1 50

--- OF TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

1.0 Purpose

l*.1 The purpose of this procedure is to verify the operability of Solid State Protection System Train B.

1.2 To satisfy the train surveillance requirement of the technical specifications *

  • 2.0

References:

2ol Solid State Protection System Manual.

2.2 Wiring Diagrams: 203688, 2~2885, 224305

';

I

\

  • ' x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009
    • PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE REV.NO.

DATE

_1_*------------~

5/24/82 PAGE 2

--- OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

3.0 Precautions

3.1 Test conditions must be applied to only Train B. A reactor trip will occur if both trains have a general warning condition. Therefore, it is extremely important that the doors to only one train at a time are open, to preclude the introduction of test conditions into

    • 3.2 both trainsc Test conditions may be applied to one train using its*

. built-in testers, while the opposite train is used to ma~ntain the plant protection and provide data to the demultiplexers. If in the process of testing, mal-functions are detected, they can be isolated by care-fully following the procedures in Section 6 of the Solid State Protection Manual.

3.3 This procedure must be completed in the sequence given to insure successful completion *

,x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. 1~~~~~~~

  • PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82


~--~-------

  • TEST PROCEDURE PAGE 3 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 4.0 Limitations and Actions:

4.1 If, at any time during the performance of this test, there is any reason to suspect that the test equipment being used may not be performing properly, a comparison check shall be performed with a similar device or the device shall be checked for calibration against a standardo This shall be done prior ~o taking any other corrective action.

\.._.

4o2 If, during the performance of this test, the "As Found" data does not meet the requirements of the specified accuracy, the Job Supervisor shall be notified immediately

_ and PD-14.1.001 shall be performed.

4o3 If, during the performance of this procedure, the required status indication cannot be obtained, the Job Supervisor shall be notified immediately. Exceptions*

to the required indication, due to plant conditions at the time of the test, may be made by the Job Supervisor.

Any exceptions of this nature must be indicated and explained in the Remarks section of this procedure.

4o4 An entry will be made in the Remarks section of this

  • procedure indicating any deficiency and the corrective action taken.
  • X SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV. NO. ....;;;..l_ _ _ _ _ __
  • PERFORMANCE DEPARTMENT (I & C)

DATE _S~/...:2;..;;4-'-/..;;.8=2_ _ __

TEST PROCEDURE PAGE _4_ _ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 5.0 Test Equipment:

Device Name PD No. Recal. Date Fluke (2)

Stop Watch

SALEM GENERATING STATION NUMBER - lPD-18.1.009 REV. NO. 1

  • PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE _s__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 6.* 0 Prerequisites:

6.1 The individual assigned to perform this procedure is qualified to do so in accordance with Solid State Protection System Qualification Card 2.6.

Supervisor 6.2 The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure.

Senior Shift Supervisor/Shift Supervisor Date/Time 603 The Control Operator is aware of all of the alarms and indications that will result from the performance of this procedure.

Control Operator

SALEM GENERATING STATION NUMBER - lPD-18.1.009

  • PERFORMANCE DEPARTMENT (I & C)

REV. NO. 1 DATE 5/24/82 TEST PROCEDURE PAGE 6 OF so TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B 7.0 System Line~up:

7.1 The following conditions must be established and/or verified by the Control Operator.

7.1.1 Reactor Trip Bypass Breaker A is open and in the Racked Out position .

  • Safeguard actions which are being blocked by virtue of having been *Reset from the Control Bezel will be re-initiated at the completion of this test if the necessary logic signal is present. The Safeguard actions involved are:
1. Containment Spray
2. Phase A Isolation
3. Phase B Isolation
4. Feedwater Isolation s:. Containment Ventilation Isolation from Safety Injection signal Control Operator

.x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009

  • PERFORMANCE DEPARTMENT (I & C) REV. NO. ---=l=--------

DATE 5/24/82 TEST PROCEDURE PAGE _7_ _ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

8.1 Measure and record the following instrument Bus Voltages (Required 117 + 10 VAC).

8elel Bus #1 TB-110 - 11 & 12 VAC 8olo2 Bus #2 TB-210 - 11 & 12 VAC

  • 8.1.3 8.; 1. 4 Bus #3 TB-310 - 11 Bus #4 TB-410 - 11 12 12 VAC VAC 8.1.5 Bus #1 TB--654 - 2 & 12 VAC 8.2 Open the front doors of Train B Logic Bay and Train B Output Relay Bay.
8. 3--- On the Logic Tester Panel, verify and record the following Power Supply Voltages 8.3.1 +.4 8VDC #1 Required 4 8. 7 + 0. 2 VDC
  • 8.3.2 As Found As Left

+48VDC #2 Required 48.7 + 0.2 VDC As Found . As Left

.x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV. NO. *l

  • PERFORMANCE DEPARTMENT (I & C) ~~~~~~~-

DATE 5/24/82 TEST PROCEDURE PAGE ---..8__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.3.3 +lSVDC #1 Required 15.7 + 0.2 VDC As Found As Left

+15VDC #2 Required l5o7 + 0.2 VDC

  • As Found As Left 8.4 Verify the followi.ng Solid State Protection System General Warnings Lamps are Off o 8 4 .1
0. General Warning Lamp - Train A 8.4.2 General Warning Lamp - Train B 8.5 Depress the following General Warning Lamps and verify the Lamp Lights, and then remains OFF.

General Warning Lamp - Train A

  • 8.5.2 General Warning Lamp - Train B

.x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. ~l~~~~~~-

  • PERFORMANCE DEPARTMENT (I & C)

DATE _5~/_2_4~/_8_2_______

TEST PROCEDURE PAGE OF 50 9

TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.6 On the Logic Test Panel, verify that each of the following indicators will light by depressing it.

8.6.1 Testing 8.6.2 Bad 8.6.3 . Good 8.6.4 Continuity 8.6.5 Memory Set 8.6.6 1/1 8.6.7 1/2 8.6.8 1/3 8.6.9 1/4 8.6.10 2/2

  • 8.6.11 8.6.12 2/3 2/4
  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV.NO.

DATE

. lPD-18 .1. 009

~l~~~~~~-

PAGE 5/24/82 10 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.7 Record UV Coil Voltage Meter Reading.

.. Required 43 VDC + 2 VDC

((w~:n, ~~hh~~~~~~( O\~~.°.~:.~1 ~ ~.~~l~*:; <->.~.:~~*~:ni-\~--:.

\ "'-"" *~ ~ '.:, t: ..,_. l:"<ffi c. *1-.. \*;:i :H><.'- 1G t..ic ~ , :** 1.-.. L.. *

,t ~--~ L1<.- i 1~\

/

8.8 On the Outpu~ Relay Test Panel, place the Mode Selector Switch in the Test position.

8.9 Verify the Operate Lamp is not lighted.

8.10 Verify the General Warning Lamp is lighted~

8.11 Verify the operation of the Semi-Automatic Tester.

Self-check as follows:

-NOTE-Steps 8.11.6 through 8.11.11 will result in continuous alarms in the Control Room if there are any tripped inputs to the SSPS.

8.11.1 Verify that the continuity lamp is lighted .

  • 8.11.2 On the Tester PC Card (AlOS), verify that the top four LED's (light emitting diodes) are lighted.

x SALEM GENERATING STATION NUMBER - lPD-18.1.009 REV. NO. l PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 11 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.11~3 Depress the test pushbutton. Verify that the continuity lamp and the top four LEDS on Al08 extinguish.

8.11.4 Release the TEST pushbutton. Verify that the continuity lamp and the top four LEDS

  • on Al08 light.

On the Logic Test Panel, place the Input Error Inhibit switch to the Inhibit position.

Place the MULTIPLEXER TEST switch to the A & B position.

  • ~.

8.11.7 Place the BLOCKING FUNCTION TEST switch to the BLOCKS NOT INHIBITED position.

Depress and release the TEST pushbutton.

8.11.8.l Verify that the amber testing lamp lights.

8.11.8.2 In approximately 1.6 seconds, verify that this lamp extinguishes.

8.11.8.3 Verify that the GOOD lamp lights.

x SALEM GENERATING STATION NUMBER- lPD-18.1.009 REV. NO. 1

  • PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE .;;;1~2__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.11.8.4 In approximately 1.6 seconds, verify that the good lamp extinguishes and repeatedly blinks on and off for these periods.

8.11.9 Place the BLOCKING FUNCTION TEST switch to the INHIBIT BLOCKS position.

8.11.10 ~epress and release th~ Test pushbutton.

8.11.10.1 Verify that the AMBER TESTING lamp LIGHTS.

8.11.10.2 Verify that the red BAD lamp lights.

8.11.11 Place the MULTIPLEXER TEST switch to INHIBIT *.

8.12 Verify Reactor Trip Breaker B is CLOSED (if Reactor Trip Breaker is open have the Cont.rel Operator CLOSE Reactor Trip Breaker (B)

  • 8.13 Verify the following High Radiation ALARM Lights on panel lRPl are OFF.

8.13.1 lR-llA Containment or Vent Particulate

x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV. NO. -=-1_ _ _ _ _ __

  • PERFORMANCE DEPARTMENT (I & C)

DATE ~5~/~2~4~/~8=2~~~-

TEST PROCEDURE 13 50 PAGE

--- OF TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.13.2 1R-12A Containment or Vent Gas Effluent.

8.13.3 1R-12B Containment or Vent Gas Effluent (Iodine)

  • 8.14 If any high RADIATION ALARM is present in
  • Steps 8.13e1 through 8 .13. 3 lift the *field lead on terminal TB-506-2.

8.15 Perform the following for LOGIC and PERMISSIVE testing. Record results on TABLE I.

WARNING: If a malfunction within the logics is detected, the red BAD LAMP will come on at the instant of detection and

-remain on. It is then necessary to refer to Section 6.3 of the Solid State Protection System Manual to troubleshoot and define the cause.

Verify the following switches are in *the positions indicated *

  • 8.15.1.1 Logic A 8.15.1.2 _Logic B OFF 24

.x SALEM GENERATING STATION NUMBER - lPD-18.1.009

  • PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE REV. NO.

DATE 1

5/24/82 PAGE ..;;;;l;..;;..4_ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.15.1.3 Logic C 24 8.15.1.4 Logic D 24

  • 8.15.l.6 8.15.2 Memories OFF Place Logic A switch to position "l" and verify that Function Logic! Lamp 2/3 lights.

8.15.3 Depress and. release the TEST pushbutton.

The amber testing lamp will LIGHT. After all combinations of logics are tested, the Amber TESTING Lamp should extinguish and

. ~

. I the Green GOOD Lamp should 1light. The I

GOOD Lamp will extinguish ;*1he next tl.me the TEST pushbutton is dep;ressed ..

Place the Blocking Functi~n Test Switch to the opposite position and r~peat Steps 8.15.2 and 8.15.3 *

  • 8.15.5 Using Table I, perform Step 8.15.2 through 8.15.4 for the positions of the logic and permissive switches as listed.

SALEM GENE.ING ST ATION PERFORMANCE DEPARTMENT TEST PROCEOUHE 0& C)

  • NUMBER_

REV.NO.

DATE lPD-18 .1. 009 l

~~~~------~

5/24/82 PAGE 15 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION.

TEST SWITCH PER- BLOCKS LOGI C LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B C D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED OFF 24 24 24 OFF OFF (GOOD OR BAD) 1 24 24 24 OFF LOSS OF FLOW, LOOP 1 2/3 2 24 24 24 OFF LOSS OF FLOW, LOOP 2 2/3 3 24 24 24 OFF LOSS OF FLOW, LOOP 3 2/3 4 24 24 24 OFF LOSS OF FLOW, LOOP 4 2/3 5 24 24 24 OFF LOSS OF FLOW, RCP 2/4 6 24 24 24 OFF PRESSURIZER, LOW PRESSURE TRIP 2/4

,/\

SALEM GE.A TING ST A TION NUMBER - lPD-18 .1. 009 PEAFOAft.1ANCE DEPARTMENT (I & C) REV. NO. 1 TEST PAOCEDUBE DATE 5/24/82 50 PAGE

- OF TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED .l 7 24 24 24 OFF PRESSURIZER, HIGH PRESSURE TRIP 2/4 8 24 24 24 OFF PRESSURIZER, HIGH WATER LEVEL 2/3 TRIP 9 24 24 24 OFF LOW FEEDWATER FLOW, LOO:P 1 1/2 10 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 1 1/2 11 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 2 1/2 12 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 2 1/2

SALEM GE.A TING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

5/24/82 DATE PAGE 17 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT . ;

A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 13 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 3 1/2 14 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 3 1/2 15 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 4 1/2 16 24 24 24 OFF LOW FEEDWATER FLOW, LOOP 4 1/2 17 24 24 24 OFF OIL PRESSURE SWITCHES REACTOR 2/3 TRIP 18 24 24 24 .OFF STOP VALVES GENERATOR TRIP 2/2

19. 24 24 24 OFF STOP VALVES GENERATOR TRIP 2/2

SA.LEM GE.TING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE

  • ~'; .
  • NUMBER -

REV. NO.

lPP-18 .1. 009 1 .*

5/24/82 DATE PAGE 18 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS. FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC 'MIS- TEST INHIBIT NOT A B C .D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 20 24 24 24 OFF STOP VALVES REACTOR TRIP 2/2 21 24 24 24 OFF SOURCE RANGE TR+P 2/2 22 24 24 24 OFF SOURCE RANGE TRIP 2/2 23 24 24 24 OFF FEED THRU TO LOGIC B 23 1 *24 24 OFF INTERMEDIATE RANGE TRIP 2/2 23 2 24 24 OFF INTERMEDIATE RANGE TRIP 2/2 23 3 24 24 OFF POWER RANGE, LOW SETPOINT TRIP 2/4

SALEM G.ATING ST A TION PERFORMANCE DEPARTMENT (I & C)

  • NUMBER -

REV. NO.

lPD-18.1.009 1

TEST PAOCEDUHE DATE 5/24/82 PAGE 19 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH

  • PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST. INHIBIT NOT A B C D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 4 24 24 OFF' POWER RANGE, HIGH SETPOINT TRIP 2/4 23 5 24 24 .OFF OVERTEMPERATURE DELTA T TRIP 2/4 23 6 24 24 OFF OVERPOWER DELTA T TRIP 2/4 23 7 24 24 OFF RCP UNDERVOLTAGE TRIP 2/4 23 8 24 24 OFF RCP UNDERVOLTAGE TRIP 1/2 23 9 24 24 OFF RCP UNDERVOLTAGE, TURB. FEED 1/2 PUMP

SALEM GE.A TING ST A TION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUBE

    • NUMBER_

REV. NO.

lPD-18 .1. 009 1 .

5/24/82 DATE PAGE 20 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST. INHIBIT NOT A B c b SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 10 24 24 OFF RCP UNDERVOLTAGE, TURB. FEED 2/4 PUMP 23 11 24 24 OFF LOW STEAMLINE PRESSURE 2/4 23 12 24 24 OFF HIGH STEAMLINE FLOW, LOOP 1 1/2 23 13 24 24 OFF HIGH STEAMLINE FLOW, LOOP 2 1/2 23 14 24 24 OFF HIGH STEAMLINE FLOW, LOOP 3 1/2 23 15 *24 24 OFF HIGH STEAMLINE FLOW, LOOP 4 1/2

I\

SALEM G.ATING STATION NUMBER - lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C) 1 REV. NO.

TEST PROCEDU'HE 5/24/82 DATE PAGE 21 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST T.RAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC . BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 16 ~4 24 OFF STEAMLINE ISOLATION 2/4

~3 17 24 24 OFF HIGH .CONTAINMENT PRESSURE, 2/3 SAFETY INJECTION 23 18 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4.

SPRAY ACTUATION 23 19 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4 SPRAY ACTUATION 23 20 24 24 OFF HI-HI CONTAI'NMENT PRESSURE, 2/4 STEAM STOP VALVES

SALEM GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PAOCEDUHE

  • NUMBER -

REV. NO.

DATE lPD-18 .1. 009 1

5/24/82 PAGE 22 OF 50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC .& PERMISSIVES

FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH LOGIC LOGIC LOGIC LOGIC PER-MIS- TEST INHIBIT BLOCKS NOT

A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED i 23 21 24 24 OFF HI-HI CONTAINMENT PRESSURE, 2/4 PHASE B ISOLATION 23 22 24 24 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 23 24 24 OFF SAFETY INJECTION, CONTAINMENT 1/2 VENTILATION ISOLATION 23 24 24 24 OFF FEED THRO TO LOGIC C 23 24 l 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 1

I\

SALEM G.ATING ST A TION NUMBER - lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C) REV. NO. 1 TEST PROCEDUHE DATE 5/24/82 PAGE 23 OF 50 TITLE SOLID STATE PROTECT.ION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS-:- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS .INHIBITED 23 24 2 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 2 23 24 3 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 3 23 24 4 24 OFF STEAMLINE DIFFERENTIAL 2/3 PRESSURE, LOOP 4 23 24 5 24 OFF PRESSURIZER PRESSURE 2/3 23 24. 6 24 OFF PRESSURIZER PRESSURE 2/3 23 24 7 24 OFF PRESSURIZER PRESSURE 2/3

SALEM GE.ATING STATION

  • PERFORMANCE DEPARTMENT (I & Cl TEST PAOCEDUHE
    • NUMBER:-

REV. NO.

lPD-18.1.009 1

DATE 5/24/82 PAGE 24 OF 50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH .

PER- . BLOCKS LOGI C LOGIC LOGIC LOGIC MIS~ TEST INHIBIT NOT A B C D S.IVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 8 24 OFF STEAM GENERATOR LO-LO WATER 2/3

.LEVEL LOOP 1 23 24 .9 24 OFF STEAM GENERATOR LO-LO WATER 2/3 LEVEL LOOP. 2 23 24 10 24 OFF STEAM GENERATOR LO-LO WATER 2/3 LEVEL LOOP 3

~ ..

23 24 11 24 OFF STEAM GENERATOR LO-LO WATER 2/3 LEVEL LOOP 4 23 24 i2 24 OFF STEAM GENERATOR LO-LO WATER 1/4 LEVEL TRIP

\, -

S~LEM G a ATING ST ATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE

  • NUMBER-REV. NO.

lPD-18.1.009 1

5/24/82 DATE PAGE 25 50

--- OF ---

TITLE SOLID.STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c b SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 13 24 OFF STEAM GENERATOR LO-LO WATER 1/4 LEVEL, MOTOR FEED PUMP 23 24 14 24 OFF .STEAM GENERATOR *LO-LO WATER 2/4 LEVEL, TURBINE FEED PUMP 23 24 15 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 1 23 . 24 16 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 2 23 24 17 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 3

SALEM GU*

  • TING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PAOCEDUHE

  • NUMBEA-AEV. NO.

lPD-18.1.009 1

DATE 5/24/82 PAGE 50

-2(?- - OF TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOG IC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B C D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 18 24 OFF STEAM GENERATOR HI-HI LEVEL, 2/3 GENERATOR 4 23 24 19 24 OFF LOW TAVG 2/4 23 24 20 24 OFF TAVG AND REACTOR TRIPPED 2/2 23 24 21 24 OFF UV DIODES AND OUTPUT 1/4 23 24 22 24 OFF SAFETY INJECTION DIODES & OUTPUT 1/4 23 24 23 24 OFF UV DIODES AND OUTPUT 1/4

SALEM GE.ATINGSTATION PERFORMANCE DEPARTMENT TEST PAOCEDUHE 11 & C)

  • NUMBER -

REV. NO.

lPD-18.1.009 1

DATE 5/24/82 PAGE 27 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 _* 24 OFF FEED THRU TO LOGIC D 23 24 24 1 OFF SAFETY INJECTION DIODES & OUTPUT 1/3 23 24 24 2 OFF UV DIODES AND OUTPUT 1/4 23 24 24 3 OFF UV DIODES AND OUTPUT 1/4 23 24 24 4 OFF UV DIODES AND OUTPUT 1/4 23 24 24 5 OFF UV DIODES AND OUTPUT 1/4 23 24 24 6 OFF UV DIODES AND OUTPUT 1/4

SALEM GEa TING STATION PERFORUANCE DEPARTMENT (I & C)

TEST PAOCEDUHE

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

DATE 5/27/82 PAGE 28 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC *& PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC . LOGIC LOGIC LOGIC MIS- TEST INHIBI'I' NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 7 OFF FEEDWATER CONTROL 1/2 23 24 24 8 OFF FEEDWATER CONTROL 1/1 23 24 24 9 OFF RCP UNDERFREQUENCY 2/4 23 24 24 10 OFF RCP UNDERFREQUENCY 1/2 23 24 24 11 OFF RCP UNDERFREQUENCY 1/2 23 24 24 12 OFF RCP UNDERFREQUENCY 2/4 23 24 24 13 OFF POWER RANGE, HI FLUX RATE TRIP 2/4

SALE~ GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE.

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

DATE 5/24/82 PAGE 29 OF 50

"'IT(U: SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 14 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 15 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 16 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 17 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24. 24 18 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 19 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION

SALEM GEN.TING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PAOCEDUHE

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

DATE 5/24/82 PAGE 30 OF 50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

. TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEpT INHIBIT NOT A B c D SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 20 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 21

- OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 22 OFF SAFETY INJECTION, PHASE A* 1/1 ISOLATION 23 24 24 23 OFF SAFETY INJECTION, PHASE A 1/1 ISOLATION 23 24 24 24 OFF FEED THRU TO PERMISSIVES 23 24 24 24 1 P6 1/2

SALEM GE.ATING STATION PERFORMANCE DEPARTMENT (I & C)'

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

TEST PROCEDUHE DATE 5/24/82-31 50

.*4'.:

PAGE

--- OF ---

TITLE SOLID STATE PROTECTION.SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS

  • FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c D SIVE FUNCTION REQUIRED_ ACTUAL BLOCKS INHIBITED 2_3 24 24 24 2 P8 2/4 23 24 24 24 3 PlO 2/4 23 24 24 24 4 P7 1/3 23 24 24 24 5 pg 2/4 !

23 24 24 24 6 P12 23 24 24 24 7 P12 2/4 23 24 24 24 8 P12 2/4

J\

SALEM GE.ATING STATION PERFORUANCE DEPARTMENT (I & C)

  • NUMBER -

REV. NO. 1 lPD-18.1.009 TEST PROCEDUHE DATE 5/24/82 PAGE 32 OF 50

'TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE I LOGIC & PERMISSIVES FUNCTION SELECTORS FUNCTION LOGIC BLOCKING FUNCTION TEST SWITCH PER- BLOCKS LOGIC LOGIC LOGIC LOGIC MIS- TEST INHIBIT NOT A B c I) SIVE FUNCTION REQUIRED ACTUAL BLOCKS INHIBITED 23 24 24 24 9 Pll 2/3 I I

23 24 24 24 10 P8 RCP BREAKERS 1/4 23 24 24 24 11 P8 RCP BREAKERS 1/4 OFF 24 24 24 OFF OFF OFF

  • X SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C) REV.NO. _l~~~~~~

DATE _5/,__24~/~8_2~~~~

TEST PROCEDURE PAGE _3_3__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.16 Perform the following Memories Testing._

Record results on TABLE II.

8.16.l Place MEMORIES switch to position "l".

(The 1/4 function logic lamp will light

  • 8.16.2 whenever the MEMORIES switch is not in the OFF position) ..

In the MEMORY FUNCTION TEST portion of the LOGIC TEST PANEL, depress and. release the RED pushbutton and verify that the MEMORY SET lamp lights. (If already on, depress and release BLACK pushbutton).

8.16.3 After MEMORY SET lamp lights, depress and release BLACK pushbutton.

8.16.4 Repeat Steps 8.16.2 and 8.16.3 for the positions of the MEMORIES switch as listed oh TABLE II .

I & C - 001

SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE _3_4__ OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE 2 MEMORIES FUNCTION FUNCTION MEMORY FUNCTION SELECTOR LOGIC TEST PUSHBUTTON MEMORIES TEST FUNCTION 1/4 RED BLACK OFF OFF (ON OR OFF) 1 POWER RANGE BLOCK

  • 2 3

INTERMEDIATE RANGE BLOCK SOURCE RANGE BLOCK 4 SOURCE RANGE BLOCK 5 SAFETY INJECTION BLOCK, PRESSURIZER 6 SAFETY INJECTION BLOCK, PRESSURIZER 7 SAFETY INJECTION BLOCK, STEAM LINE PRESSURE AND LEVEL ,

8 SAFETY INJECTION BLOCK, STEAM LINE PRESSURE AND LOGIC 9 AUTOMATIC SAFETY INJECTION BLOCK 10 FEEDWATER VALVE CONTROL

    • 11 FEEDWATER VALVE CONTROL OFF OFF I & C - 001

.~

SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ __

PERFORMANCE DEPARTMENT° (I & C)

DATE 5/24/82


'----~---

TEST PROCEDURE 35 50 PAGE

--- OF TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.17 Perform the following for Output Relay Testing and Record'results on TABLE III.

8.17.1 Place the MASTER RELAY SELECTOR in Position "l".

8.17.2 Depress SLAVE TEST A pushbutton and verify that the required "A" lamps lights while pushbutton is depressed. Verify the required lamps light by placing an "X" under each on*requirement.

8.17.3 Repeat Step 8.17.2 for SLAVE TEST B.

8.17.4 Repeat Steps 8.17.2 and 8.17.3 for each MASTER RELAY SELECTOR position listed on TABLE III.

c..* -

( ' . \ \.

~*

~

\-z:..:. .......... -1...*.i '--

. (I

~

H .

\::""l...

'II

    • .... ~ <"

i ..

\ "'"'"~ ~*J - ......"'\_.,. ,~,.,,, S:\v:.....* *~

'~~ \.... \.:>f'; ,..; ;...\... * \j"~,...~ \,:\ \°")*~t:. <!.. C'\~

c ~ V---~*C. \ ~ ¥..i.vc i_ ., -~\:!C<'3; \I... "-.:*<.*l\ ~ \t. 1<:C 'C. \

\<... lcC:~ . \.;.. \..:: '.C -~~-Q..

\

-., .. ,, '.'\

".i. ~\'\""c.c.... "A ~(...

~~ .;* \- (-'1- *" . :. \. ._

  • 1 a. r _ nn1

SALEM G.ATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDUHE

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

DATE 5/24/82 PAGE 36 OF 50 TITLE SOI.ID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY SLAVE RELAY CONTINUITY LAMPS SELECTOR SLAVE RELAY FUNCTION Al A2 A3 A4 Bl B2 B3 B4 1 CONTAINMENT ISOLATION, PHASE A ON ON ON OFF ON ON ON OFF 2 CONTAINMENT VENTILATION ISOLATION ON OFF OFF OFF ON *oFF OFF OFF 3 STEAM STOP VALVES ON OFF OFF OFF ON O;F'F OFF OFF 4 SPRAY ACTUATION ON OFF OFF OFF ON ON OFF OFF 5 CONTAINMENT ISOLATION, PHASE B ON ON OFF OFF ON ON OFF OFF 6 FEEDWATER VALVES (HI-HI STEAM ON OFF OFF OFF OFF pFF OFF OFF GENERATOR LEVEL) 7 TRIP TURBINE/MAIN FEEDWATER PUMPS ON OFF OFF OFF OFF OFF OFF OFF

SALEM GE.TING STATION PERF0Rf.1ANCE DEPARTMENT (I & C)

TEST PROCEDUHE

  • NUMBER -

REV. NO.

lPD-18 .1. 009 1

5/24/82 DATE PAGE 37 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY SLAVE RELAY CONTINUITY LAMPS SELECTOR SLAVE RELAY FUNCTION Al A2 A3 A4 Bl B2 B3 B4 8 RCP UNDERFREQUENCY ON OFF OFF OFF OFF OFF OFF OFF 9 SPARE ON OFF OFF OFF OFF OFF OFF OFF 10 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 11 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 12 LO-LO TAVG STEAM DUMP INTERLOCK ON OFF OFF OFF OFF OFF OFF OFF 13 LOSS OF POWER/TURBINE AUXILIARY PUMP ON OFF OFF OFF OFF OFF. OFF OFF 14 LOW WATER LEVEL/MOTOR AUXILIARY PUMP ON OFF OFF OFF OFF OFF OFF OFF 15 LOW WATER LEVEL/TURBINE AUXILIARY PUMP ON OFF OFF OFF OFF OFF OFF OFF

,/\

SALEM GE.A TING STATION NUMBER - lPD-18 .1. 009 PERF0Rf..1ANCE DEPARTMENT (I & C) REV. NO. 1 TEST PAOCEDUUE DATE 5/24/82 PAGE 38 OF 50 TITLE SOI, ID STATE PROTECTION SYSTEM FUNCTION~L TEST TRAIN B TABLE III LOGIC & PERMISSIVES MASTER RELAY SLAVE RELAY CONTINUITY LAMPS SELECTOR SLAVE RELAY FUNCTION Al A2 A3 A4. Bl B2 B3 B4 16 GENERATOR TRIP & .STEAM DUMP INTERLOCK ON OFF OFF OFF OFF OFF OFF OFF 17 TAVG AND REACTOR TRIPPED ON OFP OFF OFF ON OFF OFF OFF 18 SAFETY INJECTION . ON ON ON ON ON ON ON ON 19 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 20 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 21 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 22 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF 23 (NOT USED) OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF

SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 39 OF SO SOLID STATE PROTECTION SYSTEM FUNCTIONAL T.EST TRAIN B TITLE

8.0 Instructions

(Continued) Initial 8.18 Place the MULTIPLEXER TEST switch to Normal.

8.19 Replace (if required) the field lead to TB-506-2 lifted ~n Step 8.14.

8.20 Inform the Control Operator that a containment ventilation isolation will be initiated if a high radiation alarm is present when this procedure is completed. Inform him that -he may reset the containment ventilation isolation at this time.

8.21 Manual Input Function Test

-NOTE- 8.~\.\) 8.ai.\.°t Omit steps 8.21.4, 8.21.5, 8.21.14, 8.21.16 6'.,l.\,\0 and &.21.19 if Reactor is Tripped Tripped Operational 8.21.1 Have the Control Operator rack in and close Reactor By-pass Breaker B, and verify that the breaker is in Operate position and its light is illuminated .

    • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE PAGE lP D-18 . 1. 0 0 9 5/24/82 40 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial

  • -WARNING-Reactor By-pass Breaker B must remain energized for the duration of the manual testing, otherwise a Reactor Trip will occur *
  • 8.21.2 At the LOGIC TEST Panel place the LOGIC A Test Switch in Position 7.

High Pressure Trip).

(Pressurizer 8.21.3 In the MANUAL INPUT FUNCTION TEST portion of the LOGIC TEST PANEL, depress and hold any TWO pushbuttons.

8. 21. 4 At the Control Board, verify that Reactor Trip Break~r B is OPEN.
8. 21. 5 Verify the UV COIL VOLTAGE meter indicates approximately 0 VDC.

8.21.6 Release the pushbuttons depressed in Step 8.21.3 .

I & C - 001

'x

  • SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C) REV. NO. -*--=l=--------

DATE 5/24/82 TEST PROCEDURE PAGE 41 OF 50 TITLE . SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial

8. 21. 7 Place the LOGIC A Test Switch in the OFF position.
8. 21. 8 Have the Control Opeator close the Reactor Trip Breaker B .
    • 8.21.9 Have the Control Operator OPEN Reactor By-Pass Breaker B.

8.21.10 Have the Control Operator rack Out Reactor By-Pass Breaker B.

8.21.11 Verify that the general warning test LED for SSPS Train B is extinguished in both Train A and Train B .

  • I I & C
  • 001

. )<

  • SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ _~

PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE

- OF 50 SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.22 Perform the following for SAFETY INJECTION RESET TIMING TEST.

8.22.1 Select position 9 on the MEMORIES switch and if the MEMORY SET lamp is illuminated, depress the BLACK button to extinguish it .

8.22.2 In the OUTPUT TEST cabinet, place test switch 602 in the BLOCK OUT~UT position.

8.22.3 Connect the Digital Voltmeter as follows:

8.22.3Al

  • TD-1, Terminal 6 (+)

8.22.3.2 Logic Ground (GND) 8.-22.4 The DVM should read approximately +48 VDC.

8.22.5 Move the positive lead of the DVM from TD-1, Terminal 6 to TD-1, Terminal 2.

8.22.6 The DVM should indicate 0 VDC.

I & C - 001

.x SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ __

PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 43 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.22.7 Latch-up Relay K602 by depressing the latch plunger and time the interval from this point until the voltmeter reads approximately *+48 VDC. (The time should be 60 to 65 sec.)

- - - - -sec.

  • 8.22.8 At the Control Board depress the S.I.

Block/Reset pushbutton and verify the following:

8.22.8.1 DVM indicates 0 VDC 8.22.8.2 MEMORY SET lamp lights 8.22.8.3 Relay K602 Resets 8.22.9 Return the MEMORIES switch to the OFF position.

8.22.10 Connect the Digital Voltmeter as follows:

8.22.10.l TD-1, Terminal 6 (+)

    • - 8.22.10.2 IDgic Ground (GND) 8.22.11 The DVM .should read approximately +48 VDC.

I & C - 001

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER_

REV.NO.

DATE PAGE lPD-18 .1. 009

~l~~~~~~~

5/24/82

- OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.22.12 Move the positive lead of the DVM to TD-1 Terminal 2 and measure the resistance to gr_ound (GND) . The DVM should indicate an Open.

  • 8.22.13 Connect the Digital Voltmeter (AC Scale) as follows:

8.22.13.l TD-1, Terminal 1 8.22.13.2 TD-1, Terminal 5 8.22.14 The.DVM* should read 0 VAC.

NOTE: A DVM indication of 25 VAC or less is considered noise.

8.22.15 Measure the resi.stance between* TD-1, Terminal 1 and TD-1, Terminal 5. The DVM should indicate an OPEN.

8.22.16 In the output test cabinet, return the test

    • switch 602 to the UNBLOCK outp~t position and verify the TL/TXC Alarm light extinguishes.

. }(

SALEM GENERATING STATION . NUMBER - lPD-18 .1. 009 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 45 OF 50 TITLE *~~-S~O.:..=L~I~D-*~s~TA_..:.TE:::._P~R-O_T_E~C~T.:.:..;_IO~N:..:..._S~Y.:.:..;_S_TE_M~F-U_N_C_T~IO_N_A_L~T~E~S-T~T-RA~I-N_B~

8.0 Instructions

(Continued) Initial 8.22.17 Have the Control Operator reinstate the FLUX TRIP MANUAL Blocks from the Control

. Board.

NOTE: The pushbutton must be pushed even when BEZEL block light is lit. (ND block~ can

  • be applied if their permissives are not present, therefore, only those permitted will be set.)

8.22.17.1 Block Source Range-Train B pu~hed 8.22.17.2 Block Intermediate Range-Train B pushed.

8.22.17.3 Block Power Range - Train B pushed.

WARNING: The Flux Trip Manual Blocks. must*be reinstated prior to placing the input error inhibit switch in the normal position.

8.22.18 Place the Input Error Inhibit Switch in the NORMAL position

  • I & C -001

. 'X SALEM GENERATING STATION NUMBER - lPD-18.1.009 REV. NO. 1 PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 46 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.23 Perform the following for Spray Actuation Test.

8.23.1 Depreas Spray Test pushbutton for each of the individual channels and verify proper indication at the Control Board .

  • 8.23;1.l Channel I Containment Pressure Hi-Hi I
8. 23 .1. 2 Channel II Containment Pressure Hi-Hi II 8.23.1.3 Channel III Containment Pressure Hi-Hi III 8.23.1.4 Channel IV Containment Pressure "Hi-Hi. IV 8.23.2 Place input ERROR INHIBIT Switch in the
  • 8.23.3 INHIBIT position.

Place the MODE Selector switch in the OPERATE position.

I Iii c j 001

  • ****- **) *,o**~**-*'<**"*O.-.~: *.-*o*.-, ... ._.,.~-.-.-..*-*,-*.*.-*o*r-Y-~*-- *-~*** --~*--**-*-'*"*'*- * --**** .**

~

. x' SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 PERFORMANCE DEPARTMENT (I & C) REV. NO. 1 DATE 5/24/82 TEST PROCEDURE PAGE 47 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial 8.23.4 Actuate"the following MANUAL BLOCKS using the pushbuttons on the Control Board. No blocks can be applied if their permissives are not present; therefore, only those per-rni tted will be set.

8.23.4.1 Pressurizer Safety Injection .

  • 8.23.4.2 Steamline Pressure Safety Injection.

Safeguard actions which are being blocked by

-NOTE-virtue of having been Reset from the Control Bezels will be re-initiated *at this time if necessary logic signal is present. The safe-guard actions involved are:

1. Containment Spray
2. Phase A Isolation
3. Phase B Isolation
4. Feedwater Isolation
5. Containment Ventilation Isolation from Safety Injection Signal.

Inform the Control Operator of this condition .

  • Control Operator I & C -001
    • ...* --* ,.. *" ...... - **. - .... :::**._"!'. r-.-.- *-***""!--* ...... _._,._. *****---:-**--*-- -*~ - .........., .. - ,. -..... - -* . *- . . .. . ****- .*...
  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT {I & C)

TEST PROCEDURE NUMBER -

REV.NO.

DATE PAGE lPD-18 .1. 009

__;;l;;__~~~~~~

5/24/82 48 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

8.0 Instructions

(Continued) Initial

  • 8.23.s Place the Input ERROR Inhibit switch in the NORMAL position.

8.23.6 Have the Control Operator reset all unwanted safeguards actions which were re-initiated as a iesult of this test *

  • 8.24 Perform the following for the Multiplexer checks.
  • WARNING: It is necessary that SSPS Train A Mul tip],exer .

Switch be in the normal position and that its general warning lamp be off. If the lamp is already on, it is necessary that it be cleared before the A & B position is selected in the

  • other train.

8.24.1 Place Train B Multiplexer Test Switch to the A & B position.

8.24.2 Verify no intermittent condition exists.

NOTE: An intermittent (on/off) condition is when the indication appears at the control board and the computer at approximately one repetition per second. This indicates one of the two trains has a malfunction in its data multiplexing.

I & C - 001

-~-------

X*

SALEM GENERATING STATION NUMBER - lPD-18 .1. 009 REV.NO. _l_ _ _ _ _ __

PERFORMANCE DEPARTMENT (I & C)

DATE. 5/24/82 TEST PROCEDURE* PAGE 49 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

~.*o Instructions: (Continued) Initial 8.24.3 Place Train B Multiplexer Test Switch to the Normal position.

8.24.4 If the Shift Supervisor wants the Safety Injection block re-initiated for the train, short terminals 2 and 6 on TDl and have the Controls Operator depress S.I. Reset for Train B.

Remove jumper:

Initial Senior Shift Supervisor/Shift Supervisor 9.0 System Return to Normal:

9.1 The Senior Shift Supervisor/Shift Supervisor has been notified that this channel has been returned to normal.

Senior Shift Supervisor/Shift Supervisor

  • Date/Time 1 s. c - 001

..~

. x ,*

NUMBER - lPD-18 .1. 009 SALEM GENERATING STATION REV.NO. --"l~------

PERFORMANCE DEPARTMENT (I & C)

DATE 5/24/82 TEST PROCEDURE PAGE 50 OF 50 TITLE SOLID STATE PROTECTION SYSTEM FUNCTIONAL TEST TRAIN B

10. 0 Remarks: w.o. I.O .

11.0 Completion:

11.l Completed by:

Technician Date Time

  • 11.2 Approved by:

Supervisor Date Time I & C -001

..................... .,..- ... -*.***-.-:.***- ... -- ..................... --.-**~*** ... *- ,, ... - ...... .